Attachment Price Breakdown.pdf

PDF 112 KB Posted

Attached to
Z1DA--VISN 21 Project 662-23-120, Replace Xeriscaping Northeast Portion of Campus
Solicitation number
36C26123R0038
Issued by

About this file

This document contains a price breakdown attachment and related federal contract opportunity notice. The price breakdown attachment provides cost estimates for replacing xeriscaping at the Veterans Affairs Medical Center in San Francisco, including material and labor costs for turf removal and installation, playground surface removal and installation, and site preparation. Costs are also listed for overhead, profit, escalation, construction contingency, and bonds/insurance.

The related federal contract opportunity is a solicitation to replace the xeriscaping of the northwest portion of the campus at the VAMC San Francisco. The project scope involves replacing aged synthetic turf in specified areas with LXR Po 80s synthetic turf or approved equal, and replacing an existing playground surface with Sterling Playground Tile 3.25 or approved equal. The replacement work must be completed within 120 calendar days of the notice to proceed. The solicitation is a total SDVOSB set-aside between $250,000 and $500,000 in value. Questions regarding the solicitation must be directed to the specified point of contact.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP No. 36C26123R0038

PRICE BREAKDOWN

Replace Xeriscape VAMC San Francisco

DESCRIPTION MATERIAL LABOR TOTAL

01. General Requirements (Division 01)

A. Site Manager $ $ $

B. Mobilization $ $ $

C. Demolition

1.Turf Removal/Disposal $ $ $

2.Playground Surface Removal/Disposal $ $ $

3. Infill Removal $ $ $

D. Site Preparation

1.Infill Preparation $ $ $

2.Playground Preparation $ $ $

E. Construction

1.Turf Installation $ $ $

2.Playground Installation (Labor Premium) $ $ $

01. General Requirements (Division 01) Subtotal $ $ $

02. Other Costs

Overhead $ $ $

Profit $ $ $

Escalation $ $ $

Construction Contingency $ $ $

Bonds and Insurance $ $ $

Sub Total Other Costs $ $ $

TOTAL OFFER (All Costs) $ $ $ Note: All other costs maybe included as a separate item and shall be specified in this breakdown.

File details come from the government source that posted it. Updated .