Attachment P. Prime Contractor List of ALL Subcontractors.v2.csv

CSV file 35 KB Posted

Attached to
Inventory Reconciliation
Solicitation number
BPM057815
Issued by
Maryland

About this file

This document is an Attachment P form from the State of Maryland, designed to track subcontractors used by prime contractors on state contracts. The form applies to the Maryland Transit Administration (MTA) Inventory Reconciliation solicitation, which requires the reconciliation of approximately 29,000 inventory items across more than 400 locations with a total asset value exceeding $4 billion. The attachment consists of two spreadsheets: the "Anticipated Subcontractors" tab, which prime contractors must complete and submit with their initial bid or proposal, and the "Actual Subcontractors" tab, which contractors must submit during contract performance and at contract closeout. Prime contractors must provide their company name, the agency and program name, solicitation name and number, overall Minority Business Enterprise (MBE) and Veteran Small Business Enterprise (VSBE) participation goals, contract duration, and an authorized signature attesting to the accuracy of subcontractor information and good faith efforts to utilize certified Maryland small businesses.

For each subcontractor listed, prime contractors must identify the subcontractor name, their Maryland certification number (if applicable as an MBE, VSBE, or Certified Small Business), a brief description of work to be performed, and the individual MBE/VSBE percentage goal allocation. During the contract life, the "Actual Subcontractors" tab requires prime contractors to additionally report the total dollar amount paid to each subcontractor, with final reporting required at contract closeout. Any MBE or VSBE identified on this form must also be listed on the corresponding MBE Forms (Attachment D) or VSBE Forms (Attachment E) to be counted toward participation goals. The state acknowledges that subcontractor substitutions may occur during contract performance and requires documentation of all actual subcontractors utilized, regardless of socioeconomic program status or certifications. The form is not protected and may be modified to add additional rows for subcontractors as needed.

Text of this file

Attachment P. 3 Prime Contractor List of ALL Subcontractors Anticipated/Used During Contract,,,,,,,,,,,,,,February 2026,,,,,,,,,,,, "Effective beginning for Fiscal Year (FY) 2023, the State of Maryland is required to collect the names and total payments of all subcontractors used during the life of the contract with no regard to socioeconomic program status or certifications. Provide a State of Maryland certification number for firms that do hold MBE, VSBE, and/or SBR certifications, regardless of whether they are fulfilling subcontracting program goals. It should be noted in the appropriate column if the firm is fulfilling a specific subcontracting goal.",,,,,,,,,,,,,,,,,,,,,,,,,, Attachment P is required to be submitted with the bidder/offeror's bid/proposal whenever there is a MBE and/or VSBE participation goal(s) included in the solicitation.,,,,,,,,,,,,,,,,,,,,,,,,,, Attachment P will be used during the life of the contract to track Subcontractors working for the Prime with a final report of all subcontractors and payments made to the subs regardless of their socioeconomic program status.,,,,,,,,,,,,,,,,,,,,,,,,,, Instructions on How to Complete Attachment P,,,,,,,,,,,,,,,,,,,,,,,,,, 1.,"There are two spreadsheets/tabs in Attachment P - ""Anticipated Subcontractors"" and ""Actual Subcontractors"".",,,,,,,,,,,,,,,,,,,,,,,,, 2.,"The first tab - ""Anticipated Subcontractors"" is to be completed and submitted with the bid/proposal.",,,,,,,,,,,,,,,,,,,,,,,,, 3.,The following information must be filled out at the top of the first spreadsheet prior to submitting the attachment with the bid/proposal:,,,,,,,,,,,,,,,,,,,,,,,,, ,A.,Bidder/Offeror Name: (Bidder/Offeror's Company Name responding to the solicitation),,,,,,,,,,,,,,,,,,,,,,,, ,B.,Agency and Program Name: (State Agency/Program that published the solicitation named on both the cover page and the Key Information Summary Sheet),,,,,,,,,,,,,,,,,,,,,,,, ,C.,Solicitation Name / Number: (Solicitation Name and Number found on the cover page of the solicitation and the Key Information Summary Sheet),,,,,,,,,,,,,,,,,,,,,,,, ,D.,Overall MBE % Goal for Contract: (The total MBE participation goal for the contract identified on the Key Information Summary Sheet),,,,,,,,,,,,,,,,,,,,,,,, ,E.,Overall VSBE % Goal for the Contract: (The total VSBE participation goal for the contract identified on the Key Information Summary Sheet),,,,,,,,,,,,,,,,,,,,,,,, ,F.,Contract Duration: (Contract duration identified in the Key Information Summary Sheet),,,,,,,,,,,,,,,,,,,,,,,, ,G.,Bidder/Offeror Signature: (The Bidder/Offeror's representative with the power to sign a State of Maryland contract and affirm the statement below:),,,,,,,,,,,,,,,,,,,,,,,, ,,"""By my signature above, I attest and affirm that the list below contains all currently known anticipated subcontractors that will be used to fulfill the contact requirements, and good faith efforts will be made to utilize the Maryland Certified Small Business(es) (CSBs) engaged in preparing the bid or proposal to acquire articles, equipment, supplies, services, or materials, or obtain the performance of work from in the same or greater scope, amount, and quality used in preparing and submitting this bid or proposal.""",,,,,,,,,,,,,,,,,,,,,,,, 4.,The following information must be filled out in the body of the first spreadsheet for all known subcontractors prior to submitting the attachment with the bid/proposal:,,,,,,,,,,,,,,,,,,,,,,,,, ,A.,Subcontractor Name (The Subcontractor Company's Name that has an agreement with the Prime to work on the contract),,,,,,,,,,,,,,,,,,,,,,,, ,B.,"MBE/VSBE/CSB - State of Maryland Certification # or NA (If the Subcontractor is a MBE, VSBE, or CSB list their Maryland certification number found on their eMMA profile or DoSEM MBE Directory. If the Subcontractor has no Maryland certifications, enter ""NA"") *",,,,,,,,,,,,,,,,,,,,,,,, ,C.,"Brief Description of Work to be Performed (For MBEs and VSBEs, ensure the work being identified is work they are certified to perform) *",,,,,,,,,,,,,,,,,,,,,,,, ,D.,"Individual MBE/VSBE % Goal or NA (If you are utilizing more than one MBE or VSBE to meet the overall goals identified at the top of the spreadsheet, enter the percentage that this particular MBE or VSBE will fulfill of the overall goal, for example the overall MBE goal is 30% and you have two MBEs each doing half, the percentage would be listed as 15% for each. If the Subcontractor is not a MBE or VSBE, enter ""NA"") *",,,,,,,,,,,,,,,,,,,,,,,,

* NOTE: Any MBE or VSBE named and listed on this spreadsheet must also be listed on the MBE Forms - Attachment D or VSBE Forms - Attachment E required to be submitted with the Bid/Proposal in order to be counted towards meeting the participation goal(s).,,,,,,,,,,,,,,,,,,,,,,,,,, "The State is aware that circumstances change during the course of a contract that requires subsitutions among subcontractors. Thus, this second tab of the form is to capture all subcontractors actually utilized during the life of the contract. For example, if you modified the contract to add or change a MBE or VSBE from the original named MBE(s) or VSBE(s), or added any subcontractors, including MBE, VSBE, and Certified Small Businesses (CSBs) that were not fulfilling a subcontracting goal.",,,,,,,,,,,,,,,,,,,,,,,,,, 5.,"The second tab - ""Actual Subcontractors"" is to be completed and submitted as required by the procurement officer and/or contract monitor/project manager during the contract performance period with the final completed list of all subcontractors and payments to be submitted as part of the contract close out.",,,,,,,,,,,,,,,,,,,,,,,,, 6.,The following information must be filled out at the top of the second spreadsheet prior to submitting the attachment when requested and at contract close out:,,,,,,,,,,,,,,,,,,,,,,,,, ,A.,Prime Contractor Name: (Bidder/Offeror Awarded the Contract that performed as the Prime Contractor),,,,,,,,,,,,,,,,,,,,,,,, ,B.,Agency and Program Name: (Copied from the first spreadsheet),,,,,,,,,,,,,,,,,,,,,,,, ,C.,Contract Name / Number: (Copied from the first spreadsheet),,,,,,,,,,,,,,,,,,,,,,,, ,D.,Overall MBE % Goal for Contract: (Copied from the first spreadsheet),,,,,,,,,,,,,,,,,,,,,,,, ,E.,Overall VSBE % Goal for the Contract: (Copied from the first spreadsheet),,,,,,,,,,,,,,,,,,,,,,,, ,F.,Contract Term (Start Date - End Date): (The actual start and end dates of the Contract),,,,,,,,,,,,,,,,,,,,,,,, ,G.,Total Amount Invoiced to/Paid by the State to the Prime Contractor: (Total amount paid to the Prime Contractor by the State),,,,,,,,,,,,,,,,,,,,,,,, ,H.,Prime Contractor Signature: (The Contractor's representative with the power to sign a State of Maryland contract and affirm the statement below:),,,,,,,,,,,,,,,,,,,,,,,, ,,"""By my signature above, I affirm that the list below contains all subcontractors that were used to fulfill the contact requirements and the total amount paid to each subcontractor to close out the contract.""",,,,,,,,,,,,,,,,,,,,,,,, 7.,The following information must be filled out in the body of the second spreadsheet for all subcontractors that worked on the contract during the time period requested and at contract close out:,,,,,,,,,,,,,,,,,,,,,,,,, ,A.,Subcontractor Name (The Subcontractor Company's Name that has an agreement with the Prime to work on the contract),,,,,,,,,,,,,,,,,,,,,,,, ,B.,"MBE/VSBE/SBR - State of Maryland Certification # or NA (If the Subcontractor is a MBE, VSBE, or SBR list their Maryland certification number found on their eMMA profile or MDOT MBE Directory. If the Subcontractor has no Maryland certifications, enter ""NA"") *",,,,,,,,,,,,,,,,,,,,,,,, ,C.,"Brief Description of Work to be Performed (For MBEs and VSBEs, ensure the work being identified is work they are certified to perform) *",,,,,,,,,,,,,,,,,,,,,,,, ,D.,"Individual MBE/VSBE % Goal or NA (If you are utilizing more than one MBE or VSBE to meet the overall goals identified at the top of the spreadsheet, enter the percentage that this particular MBE or VSBE will fulfill of the overall goal, for example the overall MBE goal is 30% and you have two MBEs each doing half, the percentage would be listed as 15% for each. If the Subcontractor is not a MBE or VSBE, enter ""NA"") *",,,,,,,,,,,,,,,,,,,,,,,, ,E.,Total $$ Paid to Subcontractor (Total amount invoiced by the Subcontractor and paid by the Prime to the Subcontractor during the life of the contract with the State of Maryland) **,,,,,,,,,,,,,,,,,,,,,,,, "** NOTE: Any MBE or VSBE named and listed on this spreadsheet must also be listed on the MBE Forms - Attachment D or VSBE Forms - Attachment E submitted with the bid/proposal or by modification during the contract in order to be counted towards meeting the participation goal(s). The ""Paid/Unpaid Invoice Reports"" (Attachments D-4A or D-4B and D-5 for MBEs and E-4 and E-5 for VSBEs) must be submitted monthly to the procurement officer and/or contract monitor/project manager/compliance monitor as required by the agency.",,,,,,,,,,,,,,,,,,,,,,,,,, 8.,"These spreadsheets are not protected, so you many modify the forms to enter the information required and add rows as needed for additional subcontractors.",,,,,,,,,,,,,,,,,,,,,,,,,

Other files

File Type Posted
IFB - Inventory Reconciliation.pdf PDF
2. Bid Form - Physical Inventory and Reconciliation.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .