Attachment No. 4 - Sample Deliverable Summary Table.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
Fundamental Aerodynamics for Large Wind Turbine Performance and Reliability Federal contract opportunity
Solicitation number
RFX-2025-10021
Issued by
Department of Energy Office of Science

About this file

This is a deliverable summary table template spreadsheet for a Department of Energy Wind Energy Technologies Office (WETO) project focused on aerodynamics research for large wind turbines. The file contains two separate deliverable tables - one for Topic Area 1 (High-Reynolds Number Airfoil Aerodynamics Validation Datasets) and Topic Area 2 (Aerodynamic Characterization of Nonoperational Loads Phenomena).

Both tables outline required deliverables including quarterly progress reports, test plans, fabricated test articles, readiness reviews, test matrix completion, validation data documentation, and final technical reports. The tables include columns for pricing breakdowns between NREL portions and subcontractor portions, though no actual pricing is filled in. Offerors are permitted to modify the deliverable lists by adding or removing items, as long as minimum deliverables specified in the Statement of Work are maintained. Key technical deliverables include airfoil design/selection plans, test article construction and instrumentation details, test facility coordination documentation, and data submission to the WETO data hub.

View the file

Other files for this federal contract opportunity

Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Topic Area 1

Attachment 4
Deliverable Summary Table
Topic Area 1. High-Reynolds Number Airfoil Aerodynamics Validation Datasets
OccurrenceTaskOccurrences/Deliverables - DescriptionNREL PortionSubcontractor PortionTotal
6.1aAllQuarterly Progress Report 1$0.00$0.00$0.00
6.1bAllQuarterly Progress Report 2$0.00$0.00$0.00
6.1cAllQuarterly Progress Report 3$0.00$0.00$0.00
6.1dAllQuarterly Progress Report 4$0.00$0.00$0.00
6.1eAllQuarterly Progress Report 5$0.00$0.00$0.00
6.1fAllQuarterly Progress Report 6$0.00$0.00$0.00
6.1gAllQuarterly Progress Report 7$0.00$0.00$0.00
6.1hAllQuarterly Progress Report 8$0.00$0.00$0.00
6.1iAllQuarterly Progress Report 9$0.00$0.00$0.00
6.1jAllQuarterly Progress Report 10$0.00$0.00$0.00
6.1kAllQuarterly Progress Report 11$0.00$0.00$0.00
6.1lAllQuarterly Progress Report 12$0.00$0.00$0.00
6.24.2Updated Statement of Project Objectives (SOPO) and Project Management Plan after collaborative work with NFAC and NREL regarding installation concepts, testing plan, etc.$0.00$0.00$0.00
6.34.2Signed “Statement of Capabilities” agreement between subcontractor and NFAC (includes testing roles, responsibilities, interfaces, terms and conditions)$0.00$0.00$0.00
6.44.1Airfoil Design/Selection and Science Plan (for review and approval)$0.00$0.00$0.00
6.4.54.1Airfoil conventional WT validation$0.00$0.00$0.00
6.54.1, 4.2,4.3, 4.5Primary Testing CDR: Test Articles Construction, Instrumentation and Test Plan; aligned with NFAC Technical Review Board (for review and approval)$0.00$0.00$0.00
6.5.54.2Delivery of fabricated and instrumented test-articles to NFAC$0.00$0.00$0.00
6.64.1, 4.2,4.3, 4.5Pre-Test Readiness Review Material for Go/No-Go milestone (for joint review and approval with NFAC)$0.00$0.00$0.00
6.74.1, 4.2,4.3, 4.4Baseline high Reynolds Number Testing - Calibration and Initial Result Quality Assessments (Report)$0.00$0.00$0.00
6.84.2,4.3,4.5High Reynolds Number (minimum) Test Matrix Completion$0.00$0.00$0.00
6.94.1,4.2,4.4Secondary Test Design and Science Plan (for review and approval)$0.00$0.00$0.00
6.9.54.4Inflow turbulence sensitivity data for primary airfoil set$0.00$0.00$0.00
6.9.64.4Example: Secondary testing data and modeling to improve Re - scaling prediction$0.00$0.00$0.00
6.9.74.1, 4.2, 4.5Data-sets for expanded hi-Re testing at NFAC - impacts of X$0.00$0.00$0.00
6.10AllResults/Analysis and Lessons Learned Workshop$0.00$0.00$0.00
6.11AllValidation data documentation and delivery to WETO data hub (see more details below)$0.00$0.00$0.00
6.12AllFinal technical reports – primary and secondary testing$0.00$0.00$0.00
Total Price$0.00$0.00$0.00

Above table is list of key deliverables and milestones that offerors may incorporate in their project proposal. Offerors may edit as needed by adding deliverables or removing non-applicable deliverables (do not remove the minimum deliverable identited in Appendix A - SOW).

Topic Area 2

Attachment 4
Deliverable Summary Table
Topic Area 2. Aerodynamic Characterization of Nonoperational Loads Phenomena
OccurrenceOccurrences/Deliverables - DescriptionNREL PortionSubcontractor PortionTotal
6.1aQuarterly Progress Report 1$0.00$0.00$0.00
6.1bQuarterly Progress Report 2$0.00$0.00$0.00
6.1cQuarterly Progress Report 3$0.00$0.00$0.00
6.1dQuarterly Progress Report 4$0.00$0.00$0.00
6.1eQuarterly Progress Report 5$0.00$0.00$0.00
6.1fQuarterly Progress Report 6$0.00$0.00$0.00
6.1gQuarterly Progress Report 7$0.00$0.00$0.00
6.1hQuarterly Progress Report 8$0.00$0.00$0.00
6.1iQuarterly Progress Report 9$0.00$0.00$0.00
6.1jQuarterly Progress Report 10$0.00$0.00$0.00
6.1kQuarterly Progress Report 11$0.00$0.00$0.00
6.1lQuarterly Progress Report 12$0.00$0.00$0.00
6.2Test article design/selection and science plan (for review and approval)$0.00$0.00$0.00
6.3Delivery of fabricated and instrumented test articles to test facility$0.00$0.00$0.00
6.4Pre-Test Readiness Review material for Go/No-Go milestone (for joint review and approval)$0.00$0.00$0.00
6.5Minimum Test Matrix$0.00$0.00$0.00
6.6Calibration and Initial Result Quality Assessments (report)$0.00$0.00$0.00
6.7Results/analysis and lessons learned workshop$0.00$0.00$0.00
6.8Validation data documentation and delivery to WETO data hub (see more details below)$0.00$0.00$0.00
6.9Final technical reports$0.00$0.00$0.00
Total Price$0.00$0.00$0.00
Above table is list of key deliverables and milestones that offerors may incorporate in their project proposal. Offerors may edit as needed by adding deliverables or removing non-applicable deliverables.

File details come from the government source that posted it. Updated .