This exhibit outlines inspection requirements for a photovoltaic system on Alcatraz Island. The inspection list requires reporting on the cleanliness, condition and operational status of photovoltaic panels, batteries, battery inverters and associated battery room equipment. Key equipment to be monitored includes intertier connections, cell voltages, ohms readings, disconnects, combiner boxes, racks, conduits and monitoring systems. Inspections must document specified metrics for arrays A through D, battery strings A and B, as well as cleanliness of designated areas and operation of the dehumidifier, temperature sensors, fire system, bus cables and spill kit.
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT D – PV INSPECTION LIST
Provide reports per Section 9 of the contract.
1. Inspect all photovoltaic panels (Arrays a, B, C, and D). Report on cleanliness, condition of glass, operational status, and voltage and current per string. Items to be monitored and documented shall include at a minimum:
a. Intertier Connections
b. Lowest Cell Voltage
c. Highest Cell Voltage
d. Average Cell Voltage
e. Low Ohms
f. High Ohms
g. Average Ohms
h. Kinfe Switches
i. Current Sensors
j. Racks
k. Solar Sensor
l. PVA Conduit
m. PVB Conduit
n. PVC Conduit
o. PVD Conduit
p. All Disconnects
q. All Combiner Boxes
r. All Array Mounts
s. All Array Racks
2. Inspect all batteries. Report on cleanliness, condition of batteries, charging capacity, operational status, and voltage and current per bank.
3. Inspect Battery Inverters. Report on cleanliness, and operational status.
4. Inspect all equipment associated with Battery Room, items to be monitored and documented shall include at a minimum:
a. Dehumidifier
b. Temperature Sensors
c. Fire System
d. Bus Cables
e. Spill Kit
f. Eye Wash
g. Alber Battery Monitoring System for String A
h. Alber Battery Monitoring System for String B
i. Spare Cells
j. Overhead Fan