Attachment_No_11_-_EXHIBIT_G_AZ_Quartermaster_Warehouse_Plumbing_As-Builts.pdf

PDF 8 MB Posted

Attached to
Preventative Maintenance and Custodial Services fo Federal contract opportunity
Solicitation number
140P8623Q0034
Issued by
Department of the Interior National Park Service

About this file

This document contains as-built plumbing drawings for the Alcatraz Quartermaster Warehouse installation project at Golden Gate National Recreation Area. Key details include specifications for 6-inch tapping saddles, valves, couplers, sleeves, cleanouts, unions, and ball valves of various sizes, primarily stainless steel but some waste. The related federal contract opportunity is a solicitation for preventative maintenance and custodial services at Alcatraz Island, issued under contract number 140P8623Q0034 by the National Park Service within the Department of the Interior. The description specifies maintenance and custodial work for Alcatraz Island.

View the file

Other files for this federal contract opportunity

Other files attached to Preventative Maintenance and Custodial Services fo, newest first.
File Type Posted
Sol_140P8623Q0034_Amd_0001.pdf PDF
Combined_Synopsis_and_Solicitation_140P8623Q0034_-_Full_and_Open_Competition_0001.pdf PDF
Attachment_No_02-_Statement_of_Work.pdf PDF
Attachment_No_18_-_EXHIBIT_N_-_Equipment_Maintenance_Manuals__.pdf PDF
Attachment_No_12_-_EXHIBIT_H_DIRECTORS_ORDER_83_Reference_Manual_83A1_Drinking_Water.pdf PDF
Attachment_No_01-_Quote_Sheet.pdf PDF
Attachment_No_09_-_Exhibit_E_Alcatraz_Guano_CleanUp_Zones_edit.pdf PDF
Attachment_No_08_-_Exhibit_D_Draft_Memo_Cleaning_of_Historic_Concrete.pdf PDF
Sol_140P8623Q0034.pdf PDF
Attachment_No_10_-_Exhibit_F_E-One_DH-152-38_Indoor_Unit.pdf PDF
Attachment_No_14_-_EXHIBIT_J_-_General_Information_and_Requirements_for_Contractors_on_Alcatraz_Island_.pdf PDF
Attachment_No_05_-_Exhibit_A_Alcatraz_PV_System_Warranty_Management_Plan.pdf PDF
Attachment_No_07_-_Exhibit_C_Alcatraz_Trash_Locations.pdf PDF
Attachment_No_17_-_EXHIBIT_M_-_Alcatraz_Equipment_Lists.pdf PDF
Attachment_No_16_-_EXHIBIT_L___Alcatraz_General_Map__.pdf PDF
Attachment_No_15_-_EXHIBIT_K___PV_Inspection_List__.pdf PDF
Attachment_No_13_-_Exhibit_I_AZ_AIR_PERMIT.pdf PDF
Attachment_No_06_-_Exhibit_B_AZ_PV_System_Training_Manual.pdf PDF
Attachment_No_04_-_SCA_Wage_Determination_(PM_Services).pdf PDF
Attachment_No_03_-_SCA_Wage_Determination_(Janitorial_Services).pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Jared King Callout

6" TAPPING SADDLE FLANGE

Jared King Callout 6" MUELLER VALVE FLANGE x FLANGE

Jared King Callout 6" BARRELL COUPLER MJ x MJ

Jared King Callout 1" x 6" SADDLE w/ 1" CORDSTOP

Jared King Callout 6" 45 deg MJ x MJ

Jared King Callout 6" 22.5 deg MJ x MJ

Jared King Callout 6" 22.5 deg MJ x MJ

Jared King Callout 6" 11 1/4 deg MJ x MJ

Jared King Callout 6" 90 deg MJ x MJ (FW)

Jared King Line

Jared King Typewritten Text

(3) 10" SLEEVES IN NEW FOOTING

Jared King Callout CLEANOUT w/ GATE VALVE (SS)

Jared King Polygonal Line

Jared King Polygonal Line

Jared King Polygonal Line

Jared King Line

Jared King Line

Jared King Callout 6" 45 deg MS x FLANGE

Jared King Callout 6" 90 deg MJ x FLANGE

Jared King Callout 6" SPOOL FLANGE x FLANGE

Jared King Callout

CLEANOUT (SS)

Jared King Callout

UNION (SS)

Jared King Callout

UNION (W)

Jared King Callout

1 1/2" GATE VALVE (W)

Jared King Line

Jared King Callout

100' CLEANOUT (SS)

Jared King Line

Jared King Callout

CLEANOUT (SS)

Jared King Callout

UNION (SS)

Jared King Callout 1 1/2" BALL VALVE w/ UNION (SS)

Jared King Callout

CHECK VALVE 1 1/2" (SS)

Jared King Callout 1 1/2" BALL VALVE w/ UNION (W)

Jared King Text Box

PLUMBING AS-BUILDS

ALCATRAZ QUARTER MASTER WAREHOUSE INSTALL PLUMBING AND FIRE SUPPRESSION SYSTEM

CONTRACT NO: P16PC00208

GOGA PMIS NO: 173969

File details come from the government source that posted it. Updated .