Attachment N - VOL6_1363603dwg10of10.pdf

PDF 2 MB Posted

Attached to
P475 Aircraft Maintenance Hangar
Solicitation number
N4008526R0148
Issued by

About this file

These electrical engineering documents are for the P-475 Aircraft Maintenance Hangar project at MCAS Beaufort in South Carolina, prepared by Naval Facilities Engineering Systems Command (NAVFAC). The electrical site plans detail comprehensive electrical infrastructure including medium voltage systems, site lighting, and electrical distribution for a new F-35 maintenance facility. Key components include a 1500kVA pad-mounted transformer (T-1) with 12470Y/7200V primary and 480Y/277V secondary voltage, a 750kVA pad-mounted transformer (T-5), and multiple duct bank configurations for electrical conduit routing. The site plans cover electrical site layouts, lighting arrangements, and lightning protection systems for the hangar, surface parking, and associated structures, with detailed specifications for conduit types, conductor sizes, and mounting requirements.

The documents indicate a project timeline with modifications in May 2023 and October 2025, and include technical specifications for site lighting fixtures with LED technology, ranging from 25'-0" to 45'-0" pole heights and various distribution types. The electrical design incorporates a comprehensive lightning protection system following NFPA 780 and UL96A standards, with down conductors, grounding methods, and bonding requirements for structural elements. The project involves multiple electrical relay panels, underground conduit installations, and precise routing specifications to accommodate the naval aviation maintenance facility's complex electrical infrastructure needs.

View the file

Other files

File Type Posted
1363603Amend0006dwg_VOL 3 ARCHITECTURAL.pdf PDF
1363603Amend0006dwg_VOL 3 STRUCTURAL_1of2.pdf PDF
1363603Amendment0006_Specs.pdf PDF
N4008526R0148_0006.pdf PDF
1363603Amend0005dwg_VOL 1_COMBINED.pdf PDF
Solicitation Amendment N4008526R0148_0005.pdf PDF
1363603Amendment0001_Specs.pdf PDF
1363603Amend0005dwg_VOL 6_COMBINED.pdf PDF
price_schedule_P475_Amendment 0005.pdf PDF
Solicitation Amendment N4008526R01480004 SF 30.pdf PDF
JandA ML-23-33 P475 Interior Finishes Brand Name or Equal_Redacted.pdf PDF
Attachment P - SECNAV 5512.pdf PDF
Attachment N - VOL6_1363603dwg2of10.pdf PDF
Attachment N - VOL6_1363603dwg4of10.pdf PDF
Attachment N - VOL6_1363603dwg9of10.pdf PDF
Attachment N - VOL6_1363603dwg8of10.pdf PDF
Attachment M - VOL5_1363603dwg2of2.pdf PDF
Attachment L - VOL4_1363603dwg1of9.pdf PDF
Attachment K - VOL3_1363603dwg4of11.pdf PDF
Attachment K - VOL3_1363603dwg9of11.pdf PDF
Attachment J - VOL1_1363603dwg4of14.pdf PDF
Attachment J - VOL1_1363603dwg11of14.pdf PDF
Attachment J - VOL1_1363603dwg5of14.pdf PDF
Attachment F - Individual Small Business Subcontracting Plan.pdf PDF
Attachment O - P475 RTA Specs VOL 1 OF 2.pdf PDF
Attachment N - VOL6_1363603dwg3of10.pdf PDF
Attachment M - VOL5_1363603dwg1of2.pdf PDF
Attachment L - VOL4_1363603dwg9of9.pdf PDF
Attachment L - VOL4_1363603dwg3of9.pdf PDF
Attachment L - VOL4_1363603dwg8of9.pdf PDF
Attachment K - VOL3_1363603dwg10of11.pdf PDF
Attachment K - VOL3_1363603dwg7of11.pdf PDF
Attachment K - VOL3_1363603dwg6of11.pdf PDF
Attachment J - VOL1_1363603dwg8of14.pdf PDF
Attachment J - VOL1_1363603dwg14of14.pdf PDF
Attachment J - VOL1_1363603dwg6of14.pdf PDF
Attachment J - VOL1_1363603dwg13of14.pdf PDF
Attachment J - VOL1_1363603dwg9of14.pdf PDF
Attachment J - VOL1_1363603dwg12of14.pdf PDF
Attachment E - Small Business Participation Commitment Document (SBPCD).pdf PDF
Attachment N - VOL6_1363603dwg5of10.pdf PDF
Attachment N - VOL6_1363603dwg6of10.pdf PDF
Attachment N - VOL6_1363603dwg7of10.pdf PDF
Attachment L - VOL4_1363603dwg7of9.pdf PDF
Attachment K - VOL3_1363603dwg3of11.pdf PDF
Attachment K - VOL3_1363603dwg11of11.pdf PDF
Attachment K - VOL3_1363603dwg1of11.pdf PDF
Attachment J - VOL1_1363603dwg7of14.pdf PDF
Attachment J - VOL1_1363603dwg3of14.pdf PDF
Attachment J - VOL1_1363603dwg1of14.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FM1

FM2

24" DI24" DI

24" D I

24" D I

24" DI

EUE

EUE

EUP

EUE

EUE

EUP

10" RW

6'-

0" IE

6" FI RE

2 1/2" GA S

4" CW

6" SAN

3'-

2" IE

6" SAN

3'-

6" IE

12" IW

4'-

0" IE

12" IW

4'-

0" IE

12" IW

4'-

0" IE

12" IW

4'-

0" IE

12" IW

4'-

0" IE

12" IW

4'-

0" IE

12" IW

4'-

0" IE

12" IW

4'-

0" IE

12" IW

4'-

0" IE

12" IW

4'-

0" IE

C

DR

(L

IN

E

"C

0"

D I

P-475

HANGAR

P-475 SURFACE PARKING

SHEET ES100XA

SHEET ES100B

IN VOLUME 1

DUCT BANK FEEDER CONDUCTOR SCHEDULE

CABLE

DESIGNATION CABLE DESCRIPTION

1 (3)1/C, 15KV, MV-105, 133% EPR, #4/0 CABLE + (1)1/C #2 600V GROUND (ALUMINUM)

2 NOT USED.

DUCT BANK CONFIGURATION SCHEDULE

DUCT BANK

DESIGNATION

DUCT BANK

CONFIGURATION

P-1

P-2

P-3

P-4

P-5

P-6

5" 2-WAY

DUCT BANK

DETAIL

P-7

5" 2-WAY

5" 4-WAY

5" 2-WAY

5" 4-WAY

5" 2-WAY

C2/ES503

C4/ES504

A4/ES504

A2/ES504

A2/ES503

A2/ES503

3 NOT USED.

4 (4) #600 KCMIL (ALUMINUM)

5 NOT USED.

P-8

P-9

5" 2-WAY C2/ES503

P-10

5" 2-WAY C2/ES503

5" 2-WAY C2/ES503

S-1

S-2

S-3

S-4

S-5

S-6

4" 8-WAY

A2/ES505

A3ES507

S-7

F-1

F-2

F-3

F-4

F-5

F-6

F-7

F-8

4" 4-WAY C4/ES504

4" 12-WAY

4" 4-WAY

4" 4-WAY

4" 6-WAY

4" 4-WAY

4" 4-WAY

A1/ES501

C4/ES504

C4/ES504

C4/ES504

C4/ES504

NOT USED.

(4) #500 KCMIL + (1) #3/0 GND. (ALUMINUM). CONDUCTORS HAVE BEEN UPSIZED DUE TO VOLTAGE DROP.

C2/ES504

4" 8-WAY

8 NOT USED.

4" 12-WAY A1/ES501

4" 4-WAY C4/ES504

F-9 4" 4-WAY C4/ES504

9 (3)1/C, 15KV, MV-105, 133% EPR, #1 CABLE + (1)1/C #2 600V GROUND (COPPER)

STEEL REINFORCED

DUCTBANK

YES

YES

NO

NO

YES

YES

YES

YES

YES

YES

NO

NO

NO

YES

YES

YES

YES

YES

YES

YES

YES

No 64299

STATE OF

S G

CY

ZRLA BUZ

OH

CI

N

P R

O F

N

SS

OI

E

LA ENG

IN

E E

R

LICENSE

F LO RIDA

I K

ENGINEERS + SURVEYORS

0 100' 150' 200'50' 250'

1/64" = 1'-0" GRAPHIC SCALE

N

PLAN

NORTH

1 2 3 4 5

3 4 5

D

C

B

A

SHEET OF

NAVFAC DRAWING NO.

CONSTR. CONTR. NO.

EPROJECT NO.:

SCALE:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

P -4

A

IR

C

R A

FT

M

A

IN

TE

N

A N

C E

H A

N G

A R

V

O

LU

M E

S

IT

E B

A S

E B

ID

W

IT

H

A D

D

IT

IO

N

A L

O P

TI

O

N S

D C

C O

R E

B E

A U

F O

R T

, S C

N O

R F

O

LK

, V A

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

M C

A S

B E

A U

F O

R T

FP ENGINEER

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

DES DRW CHK

SATISFACTORY TO DATE

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

A/E INFO

SEAL

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

1363603

DRAWFORM REVISION: 25 AUGUST 2020

NOTE:

IF THIS DRAWING IS LESS THAN 34" X 22"

IT IS A REDUCED SIZE DRAWING

D

C

B

A

1 2

KTB / RLH

Approved by J. Scott Roberts, Asset Management Branch Head &

Supervisory Facility Planner, PWD

Beaufort, SC via email.

EJA

DSN

JAS

CUI

CUI

C U

I

12/15/2022

A ut od es k D oc s:

//2

V

M F

A T

F

M ai nt en an ce

H an ga r/

F m ai nt

H an ga r_

S ite

E L-

R V

T

.rv t

/5

/2

1:

:0

P

M

As indicated

E

LE

C T

R

IC

A L

S

IT

E P

LA

N

O

V E

R A

LL

ES100X

RLW RLW KLM

12871501

1/64" = 1'-0"

A1

OVERALL SITE PLAN - ELECTRICAL

M

O D

P

/2

M

O D

P

A N

D M

O D

P

/2

FM2

10" R W

6'- 0"

IE

C

DR

(L

IN

E

"C

D I

T-1

EXISTING

PAD

MOUNTED

SWITCH

PS819

PS819A

MH-P-1

MH-P-2

MH-S-1

P-1

P -3

P-4

P -5

S-1

S -2

P-475 HANGAR

1AHSBN1

T-5

MH-P-4

MH-P-3

P-8

P -9

P-10

S-7

7 7

7 7

4 4

P-475 SURFACE PARKING

MH-F-1

F-1

F -2

P1-1A

P-1A

P-1A

GL

1HFHN1

FRONT

EUL

No 64299

STATE OF

S G

CY

ZRLA BUZ

OH

CI

N

P R

O F

N

SS

OI

E

LA ENG

IN

E E

R

LICENSE

F LO RIDA

I K

ENGINEERS + SURVEYORS

KEY NOTES 00

SHEET NOTES:

NOTES:

1" = 30' GRAPHIC SCALE

0 90'60'30' 120'5'

N

PLAN

NORTH

1 2 3 4 5

3 4 5

D

C

B

A

SHEET OF

NAVFAC DRAWING NO.

CONSTR. CONTR. NO.

EPROJECT NO.:

SCALE:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

P -4

A

IR

C

R A

FT

M

A

IN

TE

N

A N

C E

H A

N G

A R

V

O

LU

M

E B

A S

E B

ID

W

IT

H

A D

D

IT

IO

N

A L

O P

TI

O

N S

D C

C O

R E

B E

A U

F O

R T

, S C

N O

R F

O

LK

, V A

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

M C

A S

B E

A U

F O

R T

FP ENGINEER

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

DES DRW CHK

SATISFACTORY TO DATE

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

A/E INFO

SEAL

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

1363603

DRAWFORM REVISION: 25 AUGUST 2020

NOTE:

IF THIS DRAWING IS LESS THAN 34" X 22"

IT IS A REDUCED SIZE DRAWING

D

C

B

A

1 2

KTB / RLH

Approved by J. Scott Roberts, Asset Management Branch Head &

Supervisory Facility Planner, PWD

Beaufort, SC via email.

EJA

DSN

JAS

CUI

CUI

C U

I

12/15/2022

A ut od es k D oc s:

//2

V

M F

A T

F

M ai nt en an ce

H an ga r/

F m ai nt

H an ga r_

S ite

E L-

R V

T

.rv t

/5

/2

1:

:2

P

M

1" = 30'-0"

E

LE

C T

R

IC

A L

S

IT

E P

LA

N

H

A N

G A

R

ES100XA

RLW RLW KLM

12871502

14071" = 30'-0" A1

ELECTRICAL SITE PLAN - HANGAR/OSF/SHOP ANNEX

1 EXTEND TO BOTTOM OF 1HBHNSB1. SEE A1/EP401 IN VOLUME 2B FOR

LOCATION.

2 EXTEND AND BOND TO HANGAR GROUND LOOP CONDUCTOR.

3 EXISTING CIRCUIT CONTINUES TO ADDITIONAL APRON EDGE FIXTURES

AND TO BUILDING 728 WHERE CIRCUIT ORIGINATES. COORDINATE

LOCATION OF PANEL SERVING APRON EDGE LIGHTS WITH CONTRACTING

OFFICER.

4 UTILITY STRUCTURE SHALL BE RATED FOR 100,000LB WHEEL LOAD

MINIMUM.

5 GROUND BUS SERVING THE OXYGEN STORAGE BUILDING. MOUNT AT 6'-0"

AFF TO TOP. SEE A2/EP502 IN VOLUME 2B FOR DETAIL. ROUTE

GROUNDING CONDUCTOR TO BELOW GRADE IN 1" SCHEDULE 40 PVC.

6 SEE SHEET ES100B IN VOLUME 1 FOR CONTINUATION.

7 3/4"C - (2)#12 + (1)#12 GND. BURY AT 36" BELOW FINISHED GRADE TO TOP.

8 CONCRETE PAD. SEE A4/ES503 FOR DETAIL.

9 EXISTING APRON EDGE LIGHT TO REMAIN.

10 RELOCATED APRON EDGE LIGHT AND ISOLATION TRANSFORMER. SEE

C3/ES506 FOR MOUNTING DETAIL.

11 SEE SHEET EP603 IN VOLUME 2B FOR CONDUIT AND WIRE SIZE.

12 CONNECTION TO DUPLEX SUBMERSIBLE NON-CLOG PUMP STATION. FED

FROM THE HANGAR BUILDING.

13 SEE SHEET ES100C IN VOLUME 1 FOR ADDITIONAL INFORMATION.

1. SEE CIVIL ENGINEERING DEMOLITION SHEETS FOR PROPOSED ROUTING OF

ELECTRICAL UTILITIES TO INDIVIDUAL SHADE STRUCTURES.

2. THE FIRST FLOOR SLAB IS A STRUCTURAL SLAB. ALL UTILITIES MUST BE

SUPPORTED FROM THE SLAB AND UTILITIES MUST HAVE FLEXIBLE CONNECTORS

AS THE UTILITY ENTERS THE BUILDING.

3. UNDERGROUND CONDUITS ROUTED BENEATH THE CONCRETE SLAB SHALL BE

SECURELY SUPPORTED BY EMBEDDED CONDUIT SADDLES/BRACKETS RATED

FOR IN-SLAB USE. SADDLES SHALL BE ATTACHED TO FOOTING REBAR OR

WELDED BRACKETS WITHOUT COMPROMISING REBAR INTEGRITY. CONDUIT

TYPE (EMT, RMC/IMC, OR PVC) AND SIZE SHALL DETERMINE SPACING, WITH

SADDLE SPACING NOT EXCEEDING 6 FT AND NOT LESS THAN 3 FT FOR TYPICAL

RUNS. PROVIDE PROPER ALIGNMENT, REQUIRED CONCRETE COVER, AND

RESTRAINT TO PREVENT MOVEMENT DURING POUR AND OVER THE LIFE OF THE

SLAB. ALL HARDWARE SHALL BE CORROSION-RESISTANT OR EPOXY-COATED AS

REQUIRED FOR ALKALI ENVIRONMENTS AND COMPATIBLE WITH THE CONDUIT

MATERIAL. COORDINATE WITH FORMWORK TO AVOID INTERFERENCE WITH

REBAR CHAIRS, STIRRUPS, AND EMBEDS.

4. ANY UNDERGROUND ELECTRICAL CONDUIT ENTERING THE BUILDING PERIMETER

SHALL PASS THROUGH A FLEXIBLE JOINT OR EXPANSION/CONTRACTION DEVICE

RATED FOR EMBEDDED USE TO ACCOMMODATE SETTLEMENT, THERMAL

MOVEMENT, AND SOIL SHIFTS. THE FLEXIBLE JOINT SHALL BE LOCATED AT THE

BUILDING ENVELOPE ON THE INTERIOR SIDE OF THE EXTERIOR WALL AND SHALL

BE PROTECTED FROM MECHANICAL DAMAGE AND MOISTURE INGRESS.

C1

ES406

VOL 1

M

O D

P

/2

M

O D

P

A N

D M

O D

P

/2

FM2

EUE

EUP

EUE

EUP

" R

W

" IE

6" FIRE

2 1/2" GAS

4" CW

SAN

" IE

SAN

" IE

" IW

" IE

" IW

" IE

" IW

" IE

" IW

" IE

" IW

" IE

" IW

" IE

" IW

" IE

" IW

" IE

" IW

" IE

" IW

" IE

C

DR

(L

IN

E

"C

D I

P-475 HANGAR

P-475 SURFACE PARKING

SL3

SL4

SL4

SL4

SL3

SL3

SL5 SL5 SL5

SL5

SL3

SL3

SL3

SL3

SL3

SL3

SL

UL1

UL1

UL1

SL

UL1

UL1

UL1

UL1

UL1

1HEHN1-15

(VIA LRP1-7)

1HEHN1-16

(VIA LRP1-8)

UL1

UL2

UL2

UL1

U L1

SL5

SL5

EX

EX

1HEHN1-14

(VIA LRP1-6)

UL2

3 3333

SL

SL

SL

SL SL

SL

SL

UL1

UL1

SL6

SL6 SL6

SL6

SL6

SL6

SL7

SL7

SL7

UL1

UL1UL1

UL1

UL1

UL1

No 64299

STATE OF

S G

CY

ZRLA BUZ

OH

CI

N

P R

O F

N

SS

OI

E

LA ENG

IN

E E

R

LICENSE

F LO RIDA

I K

ENGINEERS + SURVEYORS

KEY NOTES 00

SHEET NOTES:

NOTES:

1" = 40' GRAPHIC SCALE

40'0 120'80' 160'20'

N

PLAN

NORTH

1 2 3 4 5

3 4 5

D

C

B

A

SHEET OF

NAVFAC DRAWING NO.

CONSTR. CONTR. NO.

EPROJECT NO.:

SCALE:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

P -4

A

IR

C

R A

FT

M

A

IN

TE

N

A N

C E

H A

N G

A R

V

O

LU

M

E B

A S

E B

ID

W

IT

H

A D

D

IT

IO

N

A L

O P

TI

O

N S

D C

C O

R E

B E

A U

F O

R T

, S C

N O

R F

O

LK

, V A

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

M C

A S

B E

A U

F O

R T

FP ENGINEER

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

DES DRW CHK

SATISFACTORY TO DATE

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

A/E INFO

SEAL

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

1363603

DRAWFORM REVISION: 25 AUGUST 2020

NOTE:

IF THIS DRAWING IS LESS THAN 34" X 22"

IT IS A REDUCED SIZE DRAWING

D

C

B

A

1 2

KTB / RLH

Approved by J. Scott Roberts, Asset Management Branch Head &

Supervisory Facility Planner, PWD

Beaufort, SC via email.

EJA

DSN

JAS

CUI

CUI

C U

I

12/15/2022

A ut od es k D oc s:

//2

V

M F

A T

F

M ai nt en an ce

H an ga r/

F m ai nt

H an ga r_

S ite

E L-

R V

T

.rv t

/5

/2

1:

:1

P

M

1" = 40'-0"

LI

G

H T

IN

G

S

IT

E P

LA

N

O

V E

R A

LL

ES101X

RLW RLW KLM

12871503

1" = 40'-0"

A1

OVERALL SITE PLAN - LIGHTING

A. SITE LIGHTING SHALL BE CONTROLLED VIA RELAY PANEL LRP1. SEE RELAY

PANEL RISER AND RELAY PANEL SCHEDULES ON SHEET EL601 IN VOLUME 2B.

SEE SHEET EL701 IN VOLUME 2B FOR LIGHTING FIXTURE SCHEDULE.

B. POLE MOUNTED FIXTURES WILL BE POSITIONED SUCH THAT THE EDGE OF

THE CONCRETE BASE IS LOCATED 12" FROM THE EDGE OF THE CURB.

C. COORDINATE FINAL LOCATION OF SITE LIGHTING WITH THE LANDSCAPING

PLANS.

D. UNDERGROUND CONDUIT AND CONDUCTOR RUNS ARE DEFINED AS

FOLLOWS: UL1 - 1" C (2)#10 + #10 GND, UL2 - 1"C (2)#8 + #10 GND.

1 SEE SHEET EL101D IN VOLUME 2B FOR CONTINUATION.

2 INTERCEPT EXISTING SECURITY FENCE LIGHTING CIRCUIT IN

EXISTING HANDHOLE AND EXTEND AS INDICATED.

3 2" C - (2)#10 + (1)#10 GND. FOR RESTRICTED AREA SECURITY

FENCE LIGHTING CIRCUIT. BURY AT 24" BELOW FINISHED

GRADE TO TOP.

4 PROVIDE 2" C - (2)#10 + (1)#10 GND. FROM HANDHOLE TO

LIGHTING FIXTURE. BURY AT 24" BELOW FINISHED GRADE TO

TOP. ROUTE CONDUCTORS IN HOLLOW POLE UP TO LIGHTING

FIXTURE.

5 FOR BASE BID OPTION WITHOUT PARKING GARAGE AND OSF,

BUILDING MOUNTED LUMINAIRE WILL BE TYPE W1D. SEE

VOLUME 2B EL101C AND EL101F FOR CIRCUITING INFORMATION

AND EL701 FOR LIGHTING FIXTURE SCHEDULE.

M

O D

P

/2

M

O D

P

A N

D M

O D

P

/2

PRIMARY

XFMR

SECONDARY

9KV SURGE

ARRESTER

BAYONET OIL EXPULSION

FUSES SIZED AS

REQUIRED

CURRENT

LIMITING FUSES

IN TANK

1500KVA PAD MOUNTED

TRANSFORMER "T-1"

12470Y/7200V PRIMARY -

480Y/277V SECONDARY,

5.75%Z

3 CT's, 1500:5WATT-HOUR ADVANCED

METER. SEE ADVANCED

METERING CONNECTION

DIAGRAM C4/EP504 FOR

ADDITIONAL

REQUIREMENTS.

#4/0 COPPER GROUNDING

ELECTRODE CONDUCTOR.

SEE B3/ES501 FOR DETAIL.

LOAD BREAK ELBOW

LOAD BREAK

SWITCHES

(TYPICAL FOR 3)

P-464

B727 B414C

B414A B414B

PAD MOUNTED SWITCH 819

12.47kW

1-

/C -2

A W

G

1-

/C -2

A W

G

1-

/C -2

A W

G

1-

/C -2

A W

G

1-1/C-2AWG

MEDIUM VOLTAGE DEMOLITION PLAN

P-464

PAD MOUNTED SWITCH PS819

1-

/C -2

A W

G

EP601

1HBHNSB1

PRIMARY

XFMR

SECONDARY

9KV SURGE

ARRESTER

BAYONET OIL EXPULSION

FUSES SIZES AS

REQUIRED

CURRENT

LIMITING FUSES

IN TANK

750KVA PAD MOUNTED

TRANSFORMER "T-5"

12470Y/7200V PRIMARY -

480Y/277V SECONDARY,

5.75%Z

3 CT's, 1000:5

#4/0 COPPER GROUNDING

ELECTRODE CONDUCTOR.

SEE B3/ES501 FOR DETAIL.

LOAD BREAK ELBOW

LOAD BREAK

SWITCHES

(TYPICAL FOR 3)

ES601

1AHSBN1

PAD MOUNTED SWITCH PS819A

600A, 15KV

WATT-HOUR ADVANCED

METER. SEE ADVANCED

METERING CONNECTION

DIAGRAM C3/ES601 FOR

ADDITIONAL

REQUIREMENTS.

VOLUME 1

VOLUME 2

HANGAR

APRON SHADE

STRUCTURES

100A 100A 20A 20A

600A, 15KV

100A

SPARE

POLE

2070POLE 2108

MAIN SUBSTATION

500A

50/51

1200A

50/51

DOMINION ENERGY SERVICE 113KV

22MVA, 113KV-12.47KV

52TC

50/51

100A

52TC

50/51

52TC

50/51

52TC

50/51

52TC

50/51

EXISTING OVERHEAD LINE LOAD

EXISTING LOAD:

ADDED LOAD:

150A 159A

600A

200A 200A 200A 200A

SPARE

200A

SPARE

SPARE

200A 200A 200A 200A 200A

600A

POLE

5 6

POLE 2108

MAIN SUBSTATION

500A

50/51

1200A

50/51

DOMINION ENERGY SERVICE 113KV

22MVA, 113KV-12.47KV

POLE

POLE

SPARE SPARESPARE

No 64299

STATE OF

S G

CY

ZRLA BUZ

O

H

CI

N

P R

O F

N

SS

OI

E

LA ENG

IN

E E

R

LICENSE

F LO RIDA

I K

ENGINEERS + SURVEYORS

KEY NOTES 00

NOTES:

1 2 3 4 5

3 4 5

D

C

B

A

SHEET OF

NAVFAC DRAWING NO.

CONSTR. CONTR. NO.

EPROJECT NO.:

SCALE:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

P -4

A

IR

C

R A

FT

M

A

IN

TE

N

A N

C E

H A

N G

A R

V

O

LU

M

E B

A S

E B

ID

W

IT

H

A D

D

IT

IO

N

A L

O P

TI

O

N S

D C

C O

R E

B E

A U

F O

R T

, S C

N O

R F

O

LK

, V A

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

M C

A S

B E

A U

F O

R T

FP ENGINEER

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

DES DRW CHK

SATISFACTORY TO DATE

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

A/E INFO

SEAL

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

1363603

DRAWFORM REVISION: 25 AUGUST 2020

NOTE:

IF THIS DRAWING IS LESS THAN 34" X 22"

IT IS A REDUCED SIZE DRAWING

D

C

B

A

1 2

KTB / RLH

Approved by J. Scott Roberts, Asset Management Branch Head &

Supervisory Facility Planner, PWD

Beaufort, SC via email.

EJA

DSN

JAS

CUI

CUI

C U

I

12/15/2022

A ut od es k D oc s:

//2

V

M F

A T

F

M ai nt en an ce

H an ga r/

F m ai nt

H an ga r_

S ite

E L-

R V

T

.rv t

/5

/2

1:

:3

P

M

12" = 1'-0"

S

IN

G

LE

L

IN

E D

IA

G

R A

M

M E

D

IU

M V

O L

T A

G E

ES600X

RLW RLW KLM

12871504

140912" = 1'-0" A1

MEDIUM VOLTAGE SINGLE LINE DIAGRAM

1 SEE SHEETS ES100, ES100A AND ES100B FOR DUCT BANK AND FEEDER

INFORMATION.

2 600A, 15KV, SF6 GAS INSULATED, PAD MOUNT SWITCH. LOAD SIDE

SWITCHES WILL BE EQUIPPED WITH VACUUM CIRCUIT INTERRUPTERS WITH

ELECTRONIC OVERCURRENT RELAYS.

3 REPLACEMENT POLE RISER, 5” SCHEDULE 80PVC CONDUIT WITH (3)1/C,

15KV, MV-105, #4/0 + (1)#2 600V GROUND (ALUMINUM). BURY AT 36” BELOW

FINISHED GRADE WITH WARNING TAPE AT 12” ABOVE THE CONDUIT.

4 EXISTING #2/0 QUAIL ACSR OVERHEAD LINE.

5 REMOVE #2 QUAIL ACSR OVERHEAD LINE AND REPLACE AS INDICATED ON

A1/ES600.

6 REMOVE 5"C - (3)#4 POLE RISER AND REPLACE AS INDICATED ON A1/ES600.

7 #2/0 QUAIL ACSR OVERHEAD LINE. 1

M

O D

P

/2

M

O D

P

A N

D M

O D

P

/2

LRP1 PARTIAL RELAY PANEL SCHEDULE

RELAY

NUMBER

CIRCUIT

PANEL CIRCUIT # LOAD DESCRIPTION

CONTROL

SEQUENCE CODE

6 1HEHN1 14 LTG - SE PARKING AND DRIVE POLE MOUNTED C

7 1HEHN1 15 LTG - NW PARKING AND DRIVE POLE MOUNTED C

8 1HEHN1 16 LTG - NORTH PAD POLE MOUNTED C

RELAY PANEL SCHEDULE NOTE: SEE PACKAGE 2B EL601 FOR REMAINDER OF SCHEDULE AND SEQUENCE CODE INFORMATION.

No 64299

STATE OF

S G

CY

Z

RLA BUZ

O

H

CI

N

P R

O F

N S

S

OI

E

LA ENG

IN

E E

R

LICENSE

F LO RIDA

I K

ENGINEERS + SURVEYORS

1'-0" = 1'-0" GRAPHIC SCALE

0 3"2"1" 4"½"

1 2 3 4 5

3 4 5

D

C

B

A

SHEET OF

NAVFAC DRAWING NO.

CONSTR. CONTR. NO.

EPROJECT NO.:

SCALE:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

P -4

A

IR

C

R A

FT

M

A

IN

TE

N

A N

C E

H A

N G

A R

V

O

LU

M

E B

A S

E B

ID

W

IT

H

A D

D

IT

IO

N

A L

O P

TI

O

N S

D C

C O

R E

B E

A U

F O

R T

, S C

N O

R F

O

LK

, V A

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

M C

A S

B E

A U

F O

R T

FP ENGINEER

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

DES DRW CHK

SATISFACTORY TO DATE

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

A/E INFO

SEAL

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

1363603

DRAWFORM REVISION: 25 AUGUST 2020

NOTE:

IF THIS DRAWING IS LESS THAN 34" X 22"

IT IS A REDUCED SIZE DRAWING

D

C

B

A

1 2

KTB / RLH

Approved by J. Scott Roberts, Asset Management Branch Head &

Supervisory Facility Planner, PWD

Beaufort, SC via email.

EJA

DSN

JAS

CUI

CUI

C U

I

12/15/2022

A ut od es k D oc s:

//2

V

M F

A T

F

M ai nt en an ce

H an ga r/

F m ai nt

H an ga r_

S ite

E L-

R V

T

.rv t

/5

/2

1:

:3

P

M

12" = 1'-0"

S

IT

E L

IG

H

T

IN

G S

C H

E D

U L

E S

ES701X

JAD JAD NGZ

12871505

SITE LIGHTING FIXTURE SCHEDULE

FIXTURE

TYPE FIXTURE DESCRIPTION VOLTAGE LAMP LUMEN CCT CRI LOAD MOUNTING NOTES

DETAIL

REFERENCE

SF1 HORIZONTAL FLOOD LIGHT, SINGLE PIECE ALUMINUM DIE CAST HOUSING, TEMPERED GLASS

LENS,ONE-PIECE SILICONE GASKET, DIE CAST ALUMINUM KNUCKLE WITH 5 DEGREE AIMING

INCREMENTS, AND WIDE FLOOD DISTRIBUTION, UL LISTED FOR WET LOCATION.

277V LED 43000 4000K 70 316 VA ON

STRUCTURE

MOUNT FIXTURE ON SHADE STRUCTURE FRAMING AT TOP OF VERTICAL SUPPORT MEMBERS PER

MANUFACTURER RECOMMENDATIONS

C2/ES506

SL3 SINGLE HEAD LED POLE TOP WITH EXTRUDED ALUMINUM DRIVER ENCLOSURE, DIE-CAST

ALUMINUM END-CAPS, SPECULAR OPTICAL REFLECTORS, RECTANGULAR EXTRUDED ALUMINUM

SUPPORT ARM, DARK BRONZE POWDER COAT FINISH WITH TYPE III DISTRIBUTION.

277V LED 7500 4000K 70 59 VA 25'-0" POLE SEE A2/ES506 FOR POLE DETAIL C1/ES506

SL4 SINGLE HEAD LED POLE TOP WITH EXTRUDED ALUMINUM DRIVER ENCLOSURE, DIE-CAST

ALUMINUM END-CAPS, SPECULAR OPTICAL REFLECTORS, RECTANGULAR EXTRUDED ALUMINUM

SUPPORT ARM, DARK BRONZE POWDER COAT FINISH WITH TYPE III DISTRIBUTION.

277V LED 5000 4000K 70 34 VA 15'-0" POLE SEE A2/ES506 FOR POLE DETAIL C1/ES506

SL5 SINGLE HEAD LED POLE TOP WITH EXTRUDED ALUMINUM DRIVER ENCLOSURE, DIE-CAST

ALUMINUM END-CAPS, SPECULAR OPTICAL REFLECTORS, RECTANGULAR EXTRUDED ALUMINUM

SUPPORT ARM, GRAY POWDER COAT FINISH WITH TYPE II NARROW DISTRIBUTION.

480V LED 11000 4000K 70 87 VA 45'-0" POLE,

BURIED 10'

IN GRADE.

SEE A3/ES506 FOR POLE DETAIL C1/ES506

SL6 SINGLE HEAD LED POLE TOP WITH EXTRUDED ALUMINUM DRIVER ENCLOSURE, DIE-CAST

ALUMINUM END-CAPS, SPECULAR OPTICAL REFLECTORS, RECTANGULAR EXTRUDED ALUMINUM

SUPPORT ARM, DARK BRONZE POWDER COAT FINISH WITH TYPE V WIDE DISTRIBUTION.

277V LED 7800 4000K 70 59 VA 25'-0" POLE SEE A2/ES506 FOR POLE DETAIL C1/ES506

SL7 SINGLE HEAD LED POLE TOP WITH EXTRUDED ALUMINUM DRIVER ENCLOSURE, DIE-CAST

ALUMINUM END-CAPS, SPECULAR OPTICAL REFLECTORS, RECTANGULAR EXTRUDED ALUMINUM

SUPPORT ARM, DARK BRONZE POWDER COAT FINISH WITH TYPE IV FORWARD THROW

DISTRIBUTION.

277V LED 7500 4000K 70 59 VA 25'-0" POLE SEE A2/ES506 FOR POLE DETAIL C1/ES506

M

O D

P

/2

M

O D

P

A N

D M

O D

P

/2

TYP

OPH

1 3 4 5 6 7 8 9 10

A

A.2

B

C

C.8

D

S1B

X3

X3

S1B X3

X3

G4DB

G4DB G4D G4DB G4D G4DB G4D G4DB G4D

G4D

G4D G4DB G4D G4DB G4DB G4D G4DB G4DG4DB G4DB

G4DB

G5DB

G5D

G5DB

G5D

G5DB

G5DB

G5D

G5DB

G5D

G5DB

G5DB G5D G5DB G5D G5DB G5D G5DB

G5D G5DB G5D G5DB

G5D

G5D

S1B

S1B

S1BS1B

S1B

G5DBG5DG5DB

PS302

STAIR 2

PS304

STAIR 4

PS303

STAIR 3

S1B

1PBLN1-9

(VIA PLRP1-48)

PS301

STAIR 1

G4D

SO1

SO1

SO1SO1

1PBLN1-10

1PBLN1-12

1PBLN1-11

(VIA PLRP1-50)

(VIA PLRP1-47)

(VIA PLRP1-49)

G4DG4DB G4DG4DB G4DG4DB G4DG4DB G4DB

G4D G4DB G4D G4DB G4D G4DB G4D

PE

51111111

1 1111111

1010101010101010101010

10 10 10 10 10 10 10 10 10 10 10

No 64299

STATE OF

S G

CY

Z

RLA BUZ

O

H

CI

N

P R

O F

N S

S

OI

E

LA ENG

IN

E E

R

LICENSE

F LO RIDA

I K

ENGINEERS + SURVEYORS

KEY NOTES 00

SHEET NOTES:

NOTES:

0 10'

1/16" = 1'-0" GRAPHIC SCALE

20' 40' 60'

N

PLAN

NORTH

1 2 3 4 5

3 4 5

D

C

B

A

SHEET OF

NAVFAC DRAWING NO.

CONSTR. CONTR. NO.

EPROJECT NO.:

SCALE:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

P -4

A

IR

C

R A

FT

M

A

IN

TE

N

A N

C E

H A

N G

A R

V

O

LU

M

E B

A S

E B

ID

W

IT

H

A D

D

IT

IO

N

A L

O P

TI

O

N S

D C

C O

R E

B E

A U

F O

R T

, S C

N O

R F

O

LK

, V A

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

M C

A S

B E

A U

F O

R T

FP ENGINEER

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

DES DRW CHK

SATISFACTORY TO DATE

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

A/E INFO

SEAL

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

1363603

DRAWFORM REVISION: 25 AUGUST 2020

NOTE:

IF THIS DRAWING IS LESS THAN 34" X 22"

IT IS A REDUCED SIZE DRAWING

D

C

B

A

1 2

KTB / RLH

Approved by J. Scott Roberts, Asset Management Branch Head &

Supervisory Facility Planner, PWD

Beaufort, SC via email.

EJA

DSN

JAS

CUI

CUI

C U

I

12/15/2022

A ut od es k D oc s:

//2

V

M F

A T

F

M ai nt en an ce

H an ga r/

F m ai nt

H an ga r_

P ar ki ng

F ac ili ty

-E L-

R V

T

.rv t

/5

/2

1:

:0

P

M

1/16" = 1'-0"

P A

R K

IN

G

G A

R A

G E

LI

G H

T

IN

G P

LA

N

T

H

IR

D F

LO

O

R

W /O

P V

P A

N E

L S

PEL103X

RLW RLW KLM

12871506

A B

KEYPLAN

1/16" = 1'-0"

A1

LIGHTING PLAN, THIRD FLOOR, OVERALL - W/O PV PANELS

A. LIGHTING FIXTURES G3D, G3DB, G4D AND G4DB WILL BE CONTROLLED VIA

LIGHTING RELAY PANEL "PLRP1" LOCATED IN ELECTRICAL ROOM P104. REFER

TO SHEET PEL601 FOR RELAY PANEL SYSTEM WIRING DIAGRAM AND

SCHEDULES.

B. PROVIDE AN UNSWITCHED PHASE CONDUCTOR TO ALL EMERGENCY BATTERY

BACK-UP LIGHTING FIXTURES AND EXIT SIGNS.

C. REFER TO SHEET PEG001 FOR LIGHTING FIXTURE SYMBOLS LEGEND. REFER TO

SHEET PEL701 FOR LIGHTING FIXTURE SCHEDULE.

1 MOUNT FIXTURE TO THE BACK OF THE METAL POST SUPPORT

STRUCTURE. MOUNT AT 9'-0" ABOVE LEVEL 3 FINISHED FLOOR, REFER TO

SHEET PAE582Y FOR MOUNTING DETAIL. CONCEAL BRANCH CIRCUITING

WITHIN MAIN POST.

2 1/2"C - (2)#10 + (1)#10 GND.

3 SEE C3/PEL301 FOR MOUNTING HEIGHTS AND CIRCUIT INFORMATION.

4 SEE C1/PEL301 FOR MOUNTING HEIGHTS AND CIRCUIT INFORMATION.

5 BUILDING MOUNTED PHOTOCELL CONNECTED TO LIGHTING CONTROL

PANEL "PLRP1" LOCATED IN ELECTRICAL ROOM P104. ORIENT NORTH.

MOUNT PHOTOCELL ON EXTERIOR WALL AT 12" BELOW TOP OF WALL TO

TOP OF DEVICE.

6 3/4"C - (2)#8 + (1)#8 GND.

7 1/2"C - (2)#10 + (1)#10 GND.

8 SEE A3/PEL301 FOR MOUNTING HEIGHTS AND CIRCUIT INFORMATION.

9 SEE A1/PEL301 FOR MOUNTING HEIGHTS AND CIRCUIT INFORMATION.

10 MOUNT FIXTURE TO PRECAST CONCRETE BEAM. MOUNT AT 9'-0" ABOVE

LEVEL 3 FINISHED FLOOR,

M

O D

P

/2

M

O D

P

A N

D M

O D

P

/2

1 3 4 5 6 7 8 9 10

A.2

B

C

C.8

D

B B B B B B B B B

B

B B BBB

B B B B B B B B B B B B BBB

A

B B B B B B B B B B BB

B B B B B B B B B B B

B

B

B

B

B

B

B

B

A

B

B

B

B

B

B

B

G L G

L

GL

GL

S

LO

P

E S

LO

P

E

S

LO

P E

DNP

A

A

A

A

A

A

S

LO

P E

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

DNP DNP

DNP

DNP

DNP

DNP

DNP

DNP

DNP

B

B

DNP

DNP

B

B

B

DNP

DNP

2 5 2

DNP DNP

ELEV - 27'-0"

ELEV - 39'-8"

ELEV - 32'-1"

ELEV - 27'-0"

ELEV - 27'-0"

7 7

ELEV - 27'-0"

ELEV - 27'-0"

ELEV - 27'-0"

ELEV - 39'-10"

ELEV - 36'-3"

ELEV - 36'-3"

ELEV - 39'-10"

ELEV - 36'-3"

ELEV - 39'-10"

ELEV - 36'-3"

ELEV - 39'-10"

No 64299

STATE OF

S G

CY

Z

RLA BUZ

O

H

CI

N

P R

O F

N S

S

OI

E

LA ENG

IN

E E

R

LICENSE

F LO RIDA

I K

ENGINEERS + SURVEYORS

KEY NOTES 00

SHEET NOTES:

NOTES:

1" = 20' GRAPHIC SCALE

20'0 60'40' 80'10'

N

PLAN

NORTH

1 2 3 4 5

3 4 5

D

C

B

A

SHEET OF

NAVFAC DRAWING NO.

CONSTR. CONTR. NO.

EPROJECT NO.:

SCALE:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

P -4

A

IR

C

R A

FT

M

A

IN

TE

N

A N

C E

H A

N G

A R

V

O

LU

M

E B

A S

E B

ID

W

IT

H

A D

D

IT

IO

N

A L

O P

TI

O

N S

D C

C O

R E

B E

A U

F O

R T

, S C

N O

R F

O

LK

, V A

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

M C

A S

B E

A U

F O

R T

FP ENGINEER

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

DES DRW CHK

SATISFACTORY TO DATE

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

A/E INFO

SEAL

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

1363603

DRAWFORM REVISION: 25 AUGUST 2020

NOTE:

IF THIS DRAWING IS LESS THAN 34" X 22"

IT IS A REDUCED SIZE DRAWING

D

C

B

A

1 2

KTB / RLH

Approved by J. Scott Roberts, Asset Management Branch Head &

Supervisory Facility Planner, PWD

Beaufort, SC via email.

EJA

DSN

JAS

12/15/2022

A ut od es k D oc s:

//2

V

M F

A T

F

M ai nt en an ce

H an ga r/

F m ai nt

H an ga r_

P ar ki ng

F ac ili ty

-E L-

R V

T

.rv t

/5

/2

1:

:1

P

M

1" = 20'-0"

P A

R K

IN

G

G A

R A

G E

L

IG

H

T N

IN

G

P R

O T

E C

T

IO

N P

LA

N

W

IT

H

O U

T P

V P

A N

E L

S

PEQ131X

RLW RLW KLM

12871507

1" = 20'-0" A1

LIGHTNING PROTECTION PLAN - WITH OUT PV PANELS

A. FURNISH AND INSTALL LIGHTNING PROTECTION SYSTEM IN ACCORDANCE

WITH NFPA 780 STANDARDS, AND UL96A.

B. SEE SHEET PEQ501 FOR LIGHTNING PROTECTION SYSTEM DETAILS.

C. ALL CONDUCTORS WILL BE FASTENED AT A MAXIMUM SPACING OF NOT MORE

THAN 3 FEET.

D. AIR TERMINAL WILL BE PLACED AT OR WITHIN 2 FEET OF THE ENDS OF EDGES

AN CORNER OF ROOF. AIR TERMINALS WILL BE SPACED AT 25 FEET MAXIMUM

BETWEEN AIR TERMINALS.

E. PROVIDE UL MASTER LABEL FOR THE LIGHTNING PROTECTION SYSTEM UPON

COMPLETE INSTALLATION OF THE LIGHTNING PROTECTION SYSTEM.

F. ALL CONDUITS ROUTED EXPOSED DOWN EXTERIOR WALL WILL BE SCHEDULE

80 PVC.

G. BOND THE REINFORCING STEEL IN THE GARAGE FOUNDATION TO THE

GROUND LOOP CONDUCTOR.

1 STRUCTURAL SUPPORT WALL.

2 1" SCHEDULE 40 PVC CONDUIT WITH DOWN CONDUCTOR SECURED TO EAST

SIDE OF COLUMN EXTERIOR. ROUTE EXPOSED DOWN BUILDING EXTERIOR

TO BELOW GRADE AND TURN OUT AND BOND TO THE GROUND LOOP AS

INDICATED. PAINT CONDUIT TO MATCH BUILDING EXTERIOR.

3 1" SCHEDULE 40 PVC CONDUIT WITH DOWN CONDUCTOR SECURED TO

INTERIOR STRUCTURAL SUPPORT WALL. ROUTE EXPOSED DOWN WALL TO

BELOW THE GROUND LEVEL SLAB AND TURN OUT AND BOND TO THE

GROUND LOOP AS INDICATED. PAINT EXPOSED CONDUIT TO MATCH WALL.

4 ROUTE CONDUCTOR EXPOSED DOWN CANOPY STRUCTURAL SUPPORT TO

THE DOWN CONDUCTOR AT LOWER WALL. BOND LIGHTNING PROTECTION

CONDUCTOR TO CANOPY STRUCTURAL SUPPORT.

5 ROUTE CONDUCTOR EXPOSED DOWN CANOPY STRUCTURE TO DOWN

CONDUCTOR. BOND THE LIGHTNING PROTECTION CONDUCTOR TO

CANOPY STRUCTURE STEEL.

6 ROUTE CONDUCTOR EXPOSED DOWN BUILDING EXTERIOR. CONNECT TO

CANOPY STRUCTURE DOWN CONDUCTOR BELOW SAFETY RAIL BOTTOM.

BOND DOWN CONDUCTOR TO SAFETY RAIL.

7 1" SCHEDULE 40 PVC CONDUIT WITH DOWN CONDUCTOR. ROUTE EXPOSED

DOWN BUILDING EXTERIOR TO BELOW GRADE. TURN OUT AND BOND TO

GROUND LOOP AS INDICATED. PAINT CONDUIT TO MATCH BUILDING

EXTERIOR COLOR.

8 ROUTE CONDUCTOR EXPOSED DOWN FROM CANOPY TO DOWN

CONDUCTOR MOUNTED TO BUILDING EXTERIOR. BOND LIGHTNING

PROTECTION CONDUCTOR TO CANOPY STRUCTURAL SUPPORT.

9 ROUTE CONDUCTOR EXPOSED DOWN FROM STAIRWELL ROOF TO DOWN

CONDUCTOR MOUNTED TO BUILDING EXTERIOR.

M

O D

P

/2

M

O D

P

A N

D M

O D

P

/2

ELECTRICAL
ES100X-ELECTRICAL SITE PLAN -OVERALL
ES100XA-ELECTRICAL SITE PLAN -HANGAR
ES101X-LIGHTING SITE PLAN -OVERALL
ES600X-SINGLE LINE DIAGRAM -MEDIUM VOLTAGE
ES701X-SITE LIGHTING SCHEDULES
PEL103X-PARKING GARAGE -LIGHTING PLAN -THIRD FLOOR -W/O PV PANELS
PEQ131X-PARKING GARAGE -LIGHTNING PROTECTION PLAN -WITH OUT PV PANELS

2025-11-05T15:35:42-0500

2025-11-05T15:36:12-0500

2025-11-05T15:36:12-0500

2025-11-05T15:36:12-0500

2025-11-05T15:36:12-0500

2025-11-05T15:36:12-0500

2025-11-05T15:36:13-0500

2025-11-22T19:31:43-0500

2025-11-22T19:32:12-0500

2025-11-22T19:31:43-0500

2025-11-22T19:31:44-0500

2025-11-22T19:31:44-0500

2025-11-22T19:31:44-0500

2025-11-22T19:31:45-0500

2025-11-22T19:31:45-0500

2025-11-22T19:32:13-0500

2025-11-22T19:32:14-0500

2025-11-22T19:32:14-0500

2025-11-22T19:32:14-0500

2025-11-22T19:32:14-0500

2025-11-22T19:32:15-0500

File details come from the government source that posted it. Updated .