Attachment L-4b Africa I WA 001 Redacted.pdf
PDF 126 KB Posted
- Attached to
- DRAFT RFP: Counter Nuclear Smuggling System Deployment Federal contract opportunity
- Solicitation number
- 89233123RNA000175_DRAFT
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment L-3 CNSSD Scenario Map - DRAFT.pptx | PPTX presentation | |
| CNSDD Master SOW__DRAFT.pdf | ||
| Attachment L-1a Relevant Corporate Experience Form DRAFT.docx | DOCX document | |
| Attachment L-2a - Key Personnel Resume Elements.docx | DOCX document | |
| Attachment L-4a Africa I Regional SOW.pdf | ||
| CNSSD Draft RFP__Sections L-M__3 Feb 2023.pdf | ||
| Attachment L-4c XXG1 SOW Redacted.pdf | ||
| Attachment L-1b Relevant Corporate Experience Summary Matrix DRAFT.docx | DOCX document | |
| Attachment L-2b - Letter of Commitment.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Task Order 89233120FNAXXXXXX Work Authorization 001
U.S. DEPARTMENT OF ENERGY
NATIONAL NUCLEAR SECURITY ADMINISTRATION
NUCLEAR SMUGGLING DETECTION AND DETERRENCE
COUNTER NUCLEAR SMUGGLING SYSTEMS DEPLOYMENT
Africa I Regional Task Order Work Authorization Task Order: 89233123FNAXXXXXX WA: 001
WA Type: Non-POE Milestone Start Date: Milestone End Date:
COR:
Debra Moone
Country Manager:
Matt Sick
Project Support:
Lauren Proctor
Task Name: XXX WA1
1.1 General Description:
XXX counter nuclear smuggling (CNS) equipment deployment and XXX Border Crossing CNS system deployment.
1.2 Work Description:
The work described in this task assignment includes the following elements of the Africa I Regional Statement of Work (SOW).
1.2.1 SOW Section 2 Items 2.2 through 2.8
1.2.2 SOW Section 3.2 All Items
Language for translation: XXX SDS packages shall be submitted and reviewed for 10%, 30%, and 90% XXX WA001 SRD and PEL is attached
This Work Authorization is issued via Technical Direction as described in the Africa I Regional Task Order Statement of Work. The contractor shall not be paid for work performed or costs incurred under this Work Assignment, prior to the date this Milestone Start Date. In addition, the contractor is not authorized to proceed beyond the Milestone End Date of this Work Assignment, unless this Work Authorization is revised through Technical Direction in writing by the Contracting Officer or Contracting Officer’s Representative.
| 1.2 Work Description: |
| 1.2.1 SOW Section 2 Items 2.2 through 2.8 |
| 1.2.2 SOW Section 3.2 All Items |
| Language for translation: XXX |
| SDS packages shall be submitted and reviewed for 10%, 30%, and 90% |
| XXX WA001 SRD and PEL is attached |