The file's text, extracted by GovTribe without its formatting.
K.1 General Req. & Summary
| Attachment K.1 General Requirements and Summary Price Schedule |
| Building A Cooling System Upgrades |
Bid / Offer Breakdown Sheet - By Division
DIVISION ITEM LABOR COST MATERIAL COST EQUIPMENT COST TOTAL COST SECTION TOTAL
| Division 1 General Requirements | | | $ - 0 |
| Payment & Performance Bond | $ - 0 | |
| Insurance | $ - 0 | |
| Mobilization | $ - 0 | |
| General Conditions - Construction Supplies / Tools | $ - 0 | |
| General Conditions - Purchased Parking | $ - 0 | |
| General Conditions - Computers | $ - 0 | |
| General Conditions - Copy Machines | $ - 0 | |
| General Conditions - Site Company Truck & Expenditures | $ - 0 | |
| General Conditions - Drawings and Specifications | $ - 0 | |
| General Conditions - Project Manager | $ - 0 | |
| General Conditions - Ass't Project Manager | $ - 0 | |
| General Conditions - Superintendent | $ - 0 | |
| General Conditions - Project Executive | $ - 0 | |
| General Conditions - Administrative Assistant | $ - 0 | |
| General Conditions - Cost Engineer | $ - 0 | |
| General Conditions - Scheduler | $ - 0 | |
| General Conditions - IT Department / Services | $ - 0 | |
| General Conditions - Communication Devices - Cell Phones | $ - 0 | |
| General Conditions - Field Office | $ - 0 | |
| General Conditions - Dumpsters | $ - 0 | |
| General Conditions - Other | $ - 0 | |
| Testing and commissioning , operation and maintenance manuals, punch list activities, project record documents/ as-built drawings, sustainable design documentation, and demonstration and training** | $ - 0 | |
| Subtotal | | $ - 0 | |
| Division 2 Site Work | | | $ 100,000.00 |
| Selective Demolition | $ - 0 | |
| Hazardous Material Abatement Allowance | $ 100,000.00 | |
| | $ - 0 | |
| | $ - 0 | |
| Subtotal | | $ 100,000.00 | |
| Division 3 Concrete | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Subtotal | $ - 0 | |
| Division 4 Masonry | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Subtotal | $ - 0 | |
| Division 5 Metals | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Subtotal | $ - 0 | |
| Division 6 Wood, Plastics, & Composites | | | $ - 0 |
| . | $ - 0 | |
| | $ - 0 | |
| | $ - 0 | |
| Subtotal | | $ - 0 | |
| Division 7 Thermal & Moisture Protection | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Subtotal | $ - 0 | |
| Division 8 Openings [Doors & Windows] | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Subtotal | $ - 0 | |
| Division 9 Finishes | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Subtotal | $ - 0 | |
| Division 10 Specialties | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Subtotal | $ - 0 | |
| Division 11 Equipment | | $ - 0 | |
| $ - 0 | | |
| $ - 0 | | |
| $ - 0 | | 0 |
| $ - 0 | | |
| $ - 0 | | |
| Division 12 Furnishings | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Subtotal | $ - 0 | |
| Division 13 Special Construction | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Subtotal | $ - 0 | |
| Division 14 Conveying Equipment | | 0.00 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Subtotal | 0.00 | |
| Division 21 Fire Suppression | | | $ - 0 |
| Fire Protection Systems and Equipment | $ - 0 | |
| | $ - 0 | |
| | $ - 0 | |
| Subtotal | | $ - 0 | |
| Division 22 Plumbing | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Division 23 HVAC | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| T | $ - 0 | |
| Division 26 Electrical | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Subtotal | $ - 0 | |
| Division 27 Communications | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Subtotal | $ - 0 | |
| Division 28 Electronic Safety & Security | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Subtotal | $ - 0 | |
| Miscellaneous | | $ - 0 |
| Temporary Cooling Allowance (Planning, coordination, drawings, set up and removal) | |
| Temporary Cooling Fuel Allowance | |
| Temporary Cooling Monthly Charge | |
TOTAL 100,000.00
Note: The Contractor is responsible to provide pricing in accordance with all the requirements of the contract. The items indentified within the CSI Divisions list major scope items, but do not preclude the Contractor from including all costs to execute the Contract.
Page &P
K.2 Hazmat Abatement Unit Price Attachment K.2 Hazardous Materials Abatement Unit Prices
Building A Cooling System Upgrades Bid / Offer Breakdown Sheet
No. ITEM UNIT UNIT COST
| Hazardous Material Abatement | |
| 1 | Removal of asbestos-containing pipe mastic/sealant less or equal than |
| 12”OD within negative pressure containment, per linear foot. | | LF |
| 2 | Removal of asbestos-containing pipe mastic/sealant less or equal than |
| 12”OD utilizing glovebag method, per linear foot. | | LF |
| 3 | Removal of asbestos-containing pipe mastic/sealant greater than 12”OD |
| within negative pressure containment, per linear foot. | | LF |
| 4 | Removal of asbestos-containing pipe mastic/sealant greater than 12”OD |
| utilizing glovebag method, per linear foot. | | LF |
| 5 | Removal of asbestos-containing duct mastic on metal duct and |
| fiberglass insulation, per linear foot. | | LF |
| 6 | Removal of asbestos-containing flooring materials (including floor tiles, |
vinyl sheeting, and carpet/linoleum (if not separated) within a reduced
| negative pressure containment, per square foot. | | SF | |
| 7 | Removal of presumed asbestos-containing fire doors, per door. | EA |
| 8 | Removal of asbestos-containing containing drywall/joint compound within negative pressure containment, per square foot. | SF |
| 9 | Removal of presumed asbestos-containing vapor barrier behind brick or | |
| CMU block, per square foot. | | SF | |
| 10 | Removal of presumed asbestos-containing window caulking, per | |
| window. | | EA | |
K.3 Chiller Rental Unit Price
| Attachment K.3 Chiller Rental Unit Price |
| Building A Cooling System Upgrades |
Bid / Offer Breakdown Sheet - By Division
DIVISION ITEM LABOR COST MATERIAL COST EQUIPMENT COST TOTAL COST SECTION TOTAL
| Division 1 General Requirements | | | $ - 0 |
| Payment & Performance Bond | $ - 0 | |
| Insurance | $ - 0 | |
| Mobilization | $ - 0 | |
| General Conditions - Construction Supplies / Tools | $ - 0 | |
| General Conditions - Purchased Parking | $ - 0 | |
| General Conditions - Computers | $ - 0 | |
| General Conditions - Copy Machines | $ - 0 | |
| General Conditions - Site Company Truck & Expenditures | $ - 0 | |
| General Conditions - Drawings and Specifications | $ - 0 | |
| General Conditions - Project Manager | $ - 0 | |
| General Conditions - Ass't Project Manager | $ - 0 | |
| General Conditions - Superintendent | $ - 0 | |
| General Conditions - Project Executive | $ - 0 | |
| General Conditions - Administrative Assistant | $ - 0 | |
| General Conditions - Cost Engineer | $ - 0 | |
| General Conditions - Scheduler | $ - 0 | |
| General Conditions - IT Department / Services | $ - 0 | |
| General Conditions - Communication Devices - Cell Phones | $ - 0 | |
| General Conditions - Field Office | $ - 0 | |
| General Conditions - Dumpsters | $ - 0 | |
| General Conditions - Other | $ - 0 | |
| Testing and commissioning , operation and maintenance manuals, punch list activities, project record documents/ as-built drawings, sustainable design documentation, and demonstration and training** | $ - 0 | |
| Subtotal | | $ - 0 | |
| Division 2 Site Work | | $ - 0 |
| $ - 0 | |
| $ - 0 |
| $ - 0 |
| Subtotal | $ - 0 |
| Division 3 Concrete | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Subtotal | $ - 0 | |
| Division 4 Masonry | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Subtotal | $ - 0 | |
| Division 5 Metals | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Subtotal | $ - 0 | |
| Division 6 Wood, Plastics, & Composites | | | $ - 0 |
| . | $ - 0 | |
| | $ - 0 | |
| | $ - 0 | |
| Subtotal | | $ - 0 | |
| Division 7 Thermal & Moisture Protection | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Subtotal | $ - 0 | |
| Division 8 Openings [Doors & Windows] | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Subtotal | $ - 0 | |
| Division 9 Finishes | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Subtotal | $ - 0 | |
| Division 10 Specialties | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Subtotal | $ - 0 | |
| Division 11 Equipment | | $ - 0 | |
| $ - 0 | | |
| $ - 0 | | |
| $ - 0 | | 0 |
| $ - 0 | | |
| $ - 0 | | |
| Division 12 Furnishings | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Subtotal | $ - 0 | |
| Division 13 Special Construction | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Subtotal | $ - 0 | |
| Division 14 Conveying Equipment | | 0.00 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Subtotal | 0.00 | |
| Division 21 Fire Suppression | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Subtotal | $ - 0 | |
| Division 22 Plumbing | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Division 23 HVAC | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| T | $ - 0 | |
| Division 26 Electrical | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Subtotal | $ - 0 | |
| Division 27 Communications | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Subtotal | $ - 0 | |
| Division 28 Electronic Safety & Security | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Subtotal | $ - 0 | |
Miscellaneous $ - 0
TOTAL 0.00
Note: The Contractor is responsible to provide pricing in accordance with all the requirements of the contract. The items indentified within the CSI Divisions list major scope items, but do not preclude the Contractor from including all costs to execute the Contract.
K.4 Alternate Deduct Bathroom
| Attachment K.3 Alternate Deduct for Bathrooms |
| Building A Cooling System Upgrades |
Bid / Offer Breakdown Sheet
# ITEM LABOR COST MATERIAL COST EQUIPMENT COST TOTAL COST SECTION TOTAL
| Floor 1 Bathroom | | | $ - 0 |
| Slab cutout | $ - 0 | |
| Toilet Partition Replacement | $ - 0 | |
| Shaft Expansion | $ - 0 | |
| Other | $ - 0 | |
| | $ - 0 | |
| | $ - 0 | |
| | $ - 0 | |
| | $ - 0 | |
| | $ - 0 | |
| | $ - 0 | |
| | $ - 0 | |
| Subtotal | | $ - 0 | |
| Floor 2 Bathroom | | | $ - 0 |
| Slab cutout | $ - 0 | |
| Toilet Partition Replacement | $ - 0 | |
| Shaft Expansion | $ - 0 | |
| Other | $ - 0 | |
| | $ - 0 | |
| | $ - 0 | |
| | $ - 0 | |
| | $ - 0 | |
| | $ - 0 | |
| | $ - 0 | |
| | $ - 0 | |
| Subtotal | | $ - 0 | |
| Floor 3 Bathroom | | | $ - 0 |
| Slab cutout | $ - 0 | |
| Toilet Partition Replacement | $ - 0 | |
| Shaft Expansion | $ - 0 | |
| Other | $ - 0 | |
| | $ - 0 | |
| | $ - 0 | |
| | $ - 0 | |
| | $ - 0 | |
| | $ - 0 | |
| | $ - 0 | |
| | $ - 0 | |
| Subtotal | | $ - 0 | |
TOTAL 0.00
Note: The Contractor is responsible to provide pricing in accordance with all the requirements of the contract. The items indentified within the CSI Divisions list major scope items, but do not preclude the Contractor from including all costs to execute the Contract.
image1.png