Attachment K - Offer_Breakdown_BLDA_Cooling_System_Upgrades.xlsx

XLSX spreadsheet 47 KB Posted

Attached to
DCSC-26-RFP-068 BLD A Cooling Upgrades
Solicitation number
DCSC-26-RFP-068
Issued by

About this file

This is a bid/offer breakdown sheet template for the Building A Cooling System Upgrades project at the DC Superior Courts Probate Division in Washington, DC. The document is structured as a pricing template organized by CSI (Construction Specifications Institute) divisions, requiring contractors to provide itemized costs broken down by labor, material, and equipment categories.

The template includes four main pricing sections: general requirements and summary (Division 1 through Division 28, plus miscellaneous items), hazardous materials abatement unit prices covering asbestos removal activities such as pipe mastic/sealant removal, duct mastic removal, flooring material removal, fire door removal, drywall/joint compound removal, vapor barrier removal, and window caulking removal, chiller rental pricing for temporary cooling equipment, and an alternate deduct option for bathroom modifications across three floors including slab cutouts, toilet partition replacements, and shaft expansions. The contractor is responsible for providing complete pricing in accordance with all contract requirements and must include all costs necessary to execute the contract beyond the major scope items identified in the CSI division listing. All pricing sections in the template currently show zero values, indicating this is a blank form awaiting contractor pricing submission.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

K.1 General Req. & Summary

Attachment K.1 General Requirements and Summary Price Schedule
Building A Cooling System Upgrades

Bid / Offer Breakdown Sheet - By Division

DIVISION ITEM LABOR COST MATERIAL COST EQUIPMENT COST TOTAL COST SECTION TOTAL

Division 1 General Requirements$ - 0
Payment & Performance Bond$ - 0
Insurance$ - 0
Mobilization$ - 0
General Conditions - Construction Supplies / Tools$ - 0
General Conditions - Purchased Parking$ - 0
General Conditions - Computers$ - 0
General Conditions - Copy Machines$ - 0
General Conditions - Site Company Truck & Expenditures$ - 0
General Conditions - Drawings and Specifications$ - 0
General Conditions - Project Manager$ - 0
General Conditions - Ass't Project Manager$ - 0
General Conditions - Superintendent$ - 0
General Conditions - Project Executive$ - 0
General Conditions - Administrative Assistant$ - 0
General Conditions - Cost Engineer$ - 0
General Conditions - Scheduler$ - 0
General Conditions - IT Department / Services$ - 0
General Conditions - Communication Devices - Cell Phones$ - 0
General Conditions - Field Office$ - 0
General Conditions - Dumpsters$ - 0
General Conditions - Other$ - 0
Testing and commissioning , operation and maintenance manuals, punch list activities, project record documents/ as-built drawings, sustainable design documentation, and demonstration and training**$ - 0
Subtotal$ - 0
Division 2 Site Work$ 100,000.00
Selective Demolition$ - 0
Hazardous Material Abatement Allowance$ 100,000.00
$ - 0
$ - 0
Subtotal$ 100,000.00
Division 3 Concrete$ - 0
$ - 0
$ - 0
$ - 0
Subtotal$ - 0
Division 4 Masonry$ - 0
$ - 0
$ - 0
$ - 0
Subtotal$ - 0
Division 5 Metals$ - 0
$ - 0
$ - 0
$ - 0
Subtotal$ - 0
Division 6 Wood, Plastics, & Composites$ - 0
.$ - 0
$ - 0
$ - 0
Subtotal$ - 0
Division 7 Thermal & Moisture Protection$ - 0
$ - 0
$ - 0
$ - 0
Subtotal$ - 0
Division 8 Openings [Doors & Windows]$ - 0
$ - 0
$ - 0
$ - 0
Subtotal$ - 0
Division 9 Finishes$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
Subtotal$ - 0
Division 10 Specialties$ - 0
$ - 0
$ - 0
$ - 0
Subtotal$ - 0
Division 11 Equipment$ - 0
$ - 0
$ - 0
$ - 00
$ - 0
$ - 0
Division 12 Furnishings$ - 0
$ - 0
$ - 0
$ - 0
Subtotal$ - 0
Division 13 Special Construction$ - 0
$ - 0
$ - 0
$ - 0
Subtotal$ - 0
Division 14 Conveying Equipment0.00
$ - 0
$ - 0
$ - 0
Subtotal0.00
Division 21 Fire Suppression$ - 0
Fire Protection Systems and Equipment$ - 0
$ - 0
$ - 0
Subtotal$ - 0
Division 22 Plumbing$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
Division 23 HVAC$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
T$ - 0
Division 26 Electrical$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
Subtotal$ - 0
Division 27 Communications$ - 0
$ - 0
$ - 0
$ - 0
Subtotal$ - 0
Division 28 Electronic Safety & Security$ - 0
$ - 0
$ - 0
$ - 0
Subtotal$ - 0
Miscellaneous$ - 0
Temporary Cooling Allowance (Planning, coordination, drawings, set up and removal)
Temporary Cooling Fuel Allowance
Temporary Cooling Monthly Charge
$ - 0
Subtotal

TOTAL 100,000.00

Note: The Contractor is responsible to provide pricing in accordance with all the requirements of the contract. The items indentified within the CSI Divisions list major scope items, but do not preclude the Contractor from including all costs to execute the Contract.

Page &P

K.2 Hazmat Abatement Unit Price Attachment K.2 Hazardous Materials Abatement Unit Prices

Building A Cooling System Upgrades Bid / Offer Breakdown Sheet

No. ITEM UNIT UNIT COST

Hazardous Material Abatement
1Removal of asbestos-containing pipe mastic/sealant less or equal than
12”OD within negative pressure containment, per linear foot.LF
2Removal of asbestos-containing pipe mastic/sealant less or equal than
12”OD utilizing glovebag method, per linear foot.LF
3Removal of asbestos-containing pipe mastic/sealant greater than 12”OD
within negative pressure containment, per linear foot.LF
4Removal of asbestos-containing pipe mastic/sealant greater than 12”OD
utilizing glovebag method, per linear foot.LF
5Removal of asbestos-containing duct mastic on metal duct and
fiberglass insulation, per linear foot.LF
6Removal of asbestos-containing flooring materials (including floor tiles,

vinyl sheeting, and carpet/linoleum (if not separated) within a reduced

negative pressure containment, per square foot.SF
7Removal of presumed asbestos-containing fire doors, per door.EA
8Removal of asbestos-containing containing drywall/joint compound within negative pressure containment, per square foot.SF
9Removal of presumed asbestos-containing vapor barrier behind brick or
CMU block, per square foot.SF
10Removal of presumed asbestos-containing window caulking, per
window.EA

K.3 Chiller Rental Unit Price

Attachment K.3 Chiller Rental Unit Price
Building A Cooling System Upgrades

Bid / Offer Breakdown Sheet - By Division

DIVISION ITEM LABOR COST MATERIAL COST EQUIPMENT COST TOTAL COST SECTION TOTAL

Division 1 General Requirements$ - 0
Payment & Performance Bond$ - 0
Insurance$ - 0
Mobilization$ - 0
General Conditions - Construction Supplies / Tools$ - 0
General Conditions - Purchased Parking$ - 0
General Conditions - Computers$ - 0
General Conditions - Copy Machines$ - 0
General Conditions - Site Company Truck & Expenditures$ - 0
General Conditions - Drawings and Specifications$ - 0
General Conditions - Project Manager$ - 0
General Conditions - Ass't Project Manager$ - 0
General Conditions - Superintendent$ - 0
General Conditions - Project Executive$ - 0
General Conditions - Administrative Assistant$ - 0
General Conditions - Cost Engineer$ - 0
General Conditions - Scheduler$ - 0
General Conditions - IT Department / Services$ - 0
General Conditions - Communication Devices - Cell Phones$ - 0
General Conditions - Field Office$ - 0
General Conditions - Dumpsters$ - 0
General Conditions - Other$ - 0
Testing and commissioning , operation and maintenance manuals, punch list activities, project record documents/ as-built drawings, sustainable design documentation, and demonstration and training**$ - 0
Subtotal$ - 0
Division 2 Site Work$ - 0
$ - 0
$ - 0
$ - 0
Subtotal$ - 0
Division 3 Concrete$ - 0
$ - 0
$ - 0
$ - 0
Subtotal$ - 0
Division 4 Masonry$ - 0
$ - 0
$ - 0
$ - 0
Subtotal$ - 0
Division 5 Metals$ - 0
$ - 0
$ - 0
$ - 0
Subtotal$ - 0
Division 6 Wood, Plastics, & Composites$ - 0
.$ - 0
$ - 0
$ - 0
Subtotal$ - 0
Division 7 Thermal & Moisture Protection$ - 0
$ - 0
$ - 0
$ - 0
Subtotal$ - 0
Division 8 Openings [Doors & Windows]$ - 0
$ - 0
$ - 0
$ - 0
Subtotal$ - 0
Division 9 Finishes$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
Subtotal$ - 0
Division 10 Specialties$ - 0
$ - 0
$ - 0
$ - 0
Subtotal$ - 0
Division 11 Equipment$ - 0
$ - 0
$ - 0
$ - 00
$ - 0
$ - 0
Division 12 Furnishings$ - 0
$ - 0
$ - 0
$ - 0
Subtotal$ - 0
Division 13 Special Construction$ - 0
$ - 0
$ - 0
$ - 0
Subtotal$ - 0
Division 14 Conveying Equipment0.00
$ - 0
$ - 0
$ - 0
Subtotal0.00
Division 21 Fire Suppression$ - 0
$ - 0
$ - 0
$ - 0
Subtotal$ - 0
Division 22 Plumbing$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
Division 23 HVAC$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
T$ - 0
Division 26 Electrical$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
Subtotal$ - 0
Division 27 Communications$ - 0
$ - 0
$ - 0
$ - 0
Subtotal$ - 0
Division 28 Electronic Safety & Security$ - 0
$ - 0
$ - 0
$ - 0
Subtotal$ - 0

Miscellaneous $ - 0

$ - 0
Subtotal$ - 0

TOTAL 0.00

Note: The Contractor is responsible to provide pricing in accordance with all the requirements of the contract. The items indentified within the CSI Divisions list major scope items, but do not preclude the Contractor from including all costs to execute the Contract.

K.4 Alternate Deduct Bathroom

Attachment K.3 Alternate Deduct for Bathrooms
Building A Cooling System Upgrades

Bid / Offer Breakdown Sheet

# ITEM LABOR COST MATERIAL COST EQUIPMENT COST TOTAL COST SECTION TOTAL

Floor 1 Bathroom$ - 0
Slab cutout$ - 0
Toilet Partition Replacement$ - 0
Shaft Expansion$ - 0
Other$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
Subtotal$ - 0
Floor 2 Bathroom$ - 0
Slab cutout$ - 0
Toilet Partition Replacement$ - 0
Shaft Expansion$ - 0
Other$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
Subtotal$ - 0
Floor 3 Bathroom$ - 0
Slab cutout$ - 0
Toilet Partition Replacement$ - 0
Shaft Expansion$ - 0
Other$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
Subtotal$ - 0

TOTAL 0.00

Note: The Contractor is responsible to provide pricing in accordance with all the requirements of the contract. The items indentified within the CSI Divisions list major scope items, but do not preclude the Contractor from including all costs to execute the Contract.

image1.png