Attachment K.2 - Dobbins-Fac 2015B (Tank 2)-2017.pdf
PDF 7 MB Posted
- Attached to
- POL Tank Inspection Dobbins AFB, Georgia
- Solicitation number
- W9128F23Q0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QA 21 Nov_Dobbins Tank Inspec Question 2.pdf | ||
| QA Nov Dobbins Tank Inspec.pdf | ||
| Attachment H - Return To Service Letter.docx | DOCX document | |
| Attachment A - General Installation Security Requirements.pdf | ||
| W9128F23Q0002_Dobbins Air Reserve Base.pdf | ||
| Attachment B - Fuel Storage Tank List.xlsx | XLSX spreadsheet | |
| Attachment C - Fuel Storage Tank Excel Document.xlsx | XLSX spreadsheet | |
| Attachment G - API Internal Template.docx | DOCX document | |
| Attachment D - Monthly Conctractors Progress Management and Status Report.xlsx | XLSX spreadsheet | |
| Attachment K.1 - Dobbins-Fac 2015A (Tank 1)-2015.pdf | ||
| Attachment J - STI External Template.docx | DOCX document | |
| Attachment E - API Out-of-Service Telecon Briefing Template.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers Omaha District
API 653 In-Service (Draft) Inspection Report
Dobbins Air Reserve Base, GA Facility 2015B
Tank 2
US Army Corps of Engineers Center of Expertise for Petroleum, Oils and Lubricants
USACE POL-TCX
26 April 2017
API 653 In-Service Inspection Report Dobbins ARB, Georgia
Table of Contents
ACRONYMS AND ABBREVIATIONS
GENERAL SUMMARY
THIS INSPECTION
PREVIOUS INSPECTION DATES
RECOMMENDED FUTURE INSPECTION DATES
GENERAL TANK INFORMATION
A. GENERAL PROJECT INFORMATION
1. API 653 Inspection
2. Site Information
3. Future Projects
B. TANK INSPECTION COMMENTS
1. Tank Construction
2. Tank Foundation
3. Tank Shell
4. Tank Appurtenances
5. Tank Coating
6. Tank Piping System
7. Fire Protection System
8. Secondary Containment
C. FINDINGS AND RECOMMENDATIONS
1. MANDATORY REPAIRS per API 653, UFC 3-460-01, or AW 78-24-27 Standards
2. SIGNIFICANT FINDINGS per API 653, UFC 3-460-01, or AW 78-24-27 Standards
3. RECOMMENDED REPAIRS as Part of Regular Maintenance
4. REPAIRS to Fully Comply with API 653, UFC 3-460-01, or AW 78-24-27 Standards
APPENDIX A: ENGINEERING CALCULATIONS AND DRAWINGS
SHELL ROUNDNESS SURVEY AND SETTLEMENT
SHELL THICKNESS CALCULATIONS
SHELL AND ROOF ULTRASONIC THICKNESS MEASUREMENTS
TANK DRAWINGS,
OSHA ACCESS STRUCTURE REPORT
APPENDIX B: API 653 CHECKLISTS FOR TANK INSPECTIONS
APPENDIX C: PHOTOGRAPHS
ACRONYMS AND ABBREVIATIONS
API American Petroleum Institute
AFFF Aqueous Film Forming Foam
ASME American Society of Mechanical Engineers
ASNT American Society of Non-Destructive Testing
ATG Automatic Tank Gauge
BBL Barrel
CFR Code of Federal Regulations
CP Cathodic Protection
DFT Dry Film Thickness
DBB Double-Block-and -Bleed
FAC Facility
HLA High Level Alarm
HLCS High Level Control Shutoff
HHLA High-High Level Alarm
LLA Low Level Alarm
LLLA Low-Low Level Alarm
MFL Magnetic Flux Leakage
MT Magnetic Particle Testing
NA Not Applicable
NACE National Association of Corrosion Engineers
NDT Non-Destructive Testing
NFPA National Fire Protection Association
PSI Pounds per Square Inch
PT Penetrant Testing
P/V Pressure/Vacuum
RP Recommended Practice
PST Product Saver Tank
TRV Thermal Relief Valve
UFC Unified Facilities Criteria
UFGS Unified Facilities Guide Specifications
UT Ultrasonic Testing
VT Visual Testing
GENERAL SUMMARY
Austin Brockenbrough & Associates, LLP (Brockenbrough) was retained by Omaha District USACE under Contract
No. W9128F-12-D-0006 Delivery Order 0029 to perform SPCC Mandated AST/UST Inspections at various locations. As required by this task, Brockenbrough executed a tank inspection site visit to Dobbins Air Reserve
Base located near Marietta, Georgia. An API 653 In-service (external) Inspection was conducted for Facility No.
2015B, locally known as Tank 2, on March 22, 2017. This inspection was performed in accordance with API
Standard 653, “Tank Inspection, Repair, Alteration, and Reconstruction,” and the referenced contract. All observations made during this in-service (external) inspection were made from the exterior of the tank.
Facility 2015B is a 35-foot diameter by 29-foot and 1-inch tall, single wall, vertical, field erected tank with a useable storage capacity of 3,500 barrels of jet fuel (F-24). The tank has a steel double deck internal floating roof and a retrofitted external overhanging corrugated and coated steel (barn) roof. A manufacturer’s data plate was not found. However, facility personnel indicated they believe the tank was constructed in 1954. A 2002 project completion report indicates the repairs completed at that time included replacing the tank bottom; providing an under-tank liner, cathodic protection, and leak detection; providing a 36-inch manhole in the floating roof and a double wiper perimeter seal; replacing the shell manhole with a 36-inch shell manhole; provided internal piping, and an 8-inch aluminum stilling well; and numerous other repairs.
Secondary containment is provided by concrete dike walls and basin. The dike drain was hydrostatically tested during the inspection. The leak detection ports and cathodic protection were also verified during the inspection.
Details of tank construction and appurtenances are included in the Tank Information Table on page 6 and in
Section ‘B’.
There are no Mandatory Repairs noted that need immediate attention. Additional noted deficiencies are discussed in more detail in Section ‘C’, and should be addressed in a timely manner. Photographs of the tank are included in
Appendix ‘C’.
The next API Standard 653 In-Service (visual external) Inspection should be performed by March 2022. The next ultrasonic thickness inspection of the shell should be performed by March 2032. Calculations included in the 2011
Out-of-service Inspection Report indicated the expected service life of the tank bottom exceeds 20 years.
Therefore, and per API 653, the out-of-service inspection interval could have been scheduled for 20 years.
However, the report recommended an inspection interval of 10 years based on the military guidelines applicable at that time. The current UFC 3-460-03 also requires out-of-service inspection to occur at least every 10 years of service. However, an upcoming revision allows the frequency to be extended as determined by a certified API 653 tank inspector. Therefore, an Out-of-service Inspection should be performed by October 2031. This inspection should include an examination of the tank bottom by magnetic flux leakage (MFL or MFE) technology, and a thorough code compliance evaluation.
THIS INSPECTION
API In-service (External) Inspection Date: 22 March 2017 Equipment Used:
Survey Equipment Automatic Level: Topcon AT-BS Calibration: June 2016
Robotic/Reflectorless Total Station: Topcon QS X-Trac 8 Calibrated: December 2015
Field Data Collector: Topcon FC-2500
Ultrasonic Thickness Gauge Manufacturer: NDT Systems Model Number: Nova TG110-DL
Transducer: TG-560P (Thru Paint) Calibration Method: Calibration Block
NDT Technician (s): Mike O’Connor
Inspector(s): Mike O’Connor
PREVIOUS INSPECTION DATES
API Out-of-Service (Internal) Inspection Date: October 2011 API In-Service (External) Inspection Date: NA
RECOMMENDED FUTURE INSPECTION DATES
API Out-of-Service (Internal) Inspection Date: October 2031 API Ultrasonic Thickness Inspection of Shell Date: March 2032 API In-Service (External) Inspection Date: March 2022
Mike O’Connor Mechanical Designer API 653 Inspector No. 6230
GENERAL TANK INFORMATION
ITEM DESCRIPTION
Owner U.S. Air Force
Location Dobbins Air Reserve Base
Facility Number 2015B
Tank Number Tank 2
State / Country Georgia / U.S.A.
City Marietta
Inspection Date March 22, 2017
Tank Manufacturer Unknown
Design Standard API 12C (assumed)
Date of Construction 1954 (per facility personnel)
Tank Contents Jet Fuel (F-24)
Tank Serial Number Unknown
Tank Diameter 35’-0”
Shell Height 29’-1” (nominal)
Product Height 29’-1” (limited by top of shell)
Tank Capacity 5,000 bbl nominal. 3,500 bbl useable.
Foundation Concrete Ringwall Flush with dike basin.
Construction
Bottom Double bottom. Thickness and weld type unknown. Cone down per 2002 completion report.
Shell 3rd through 5th Courses: 3/16-inch butt-welded plate.
1st and 2nd Course: 1/4-inch butt-welded plate.
Floating Roof Steel double-deck with double wiper seal.
Fixed Roof Overhanging corrugated and coated steel.
Material
Bottom Carbon steel of unknown grade.
Shell Carbon steel of unknown grade.
Floating Roof Carbon steel of unknown grade.
Fixed Roof Coated corrugated steel.
Cathodic Protection Impressed current.
Interior Coating System Interior assumed 100% coated, likely epoxy.
Exterior Coating System Epoxy/polyurethane assumed.
Level Gauging ITT Barton ATG, Varec tape gauge; 8” Aluminum manual gauge ladder well;
Vito water probe; Varec mechanical tape level gauge.
Overfill Protection Independent High and high-high level alarms, ATG Alarms, Float operated high level control valve (OCV).
Piping Receipt 6” Welded carbon steel
Issue 6” Welded carbon steel
Low Suction NA NA
Water Draw-off 1” Welded stainless steel
Level Alarms Scully low-low (2’-6”), low (3’-6”), high (23’-7”), and high-high (24’-11”), level alarms. ATG Alarms (measured approximate levels).
A. GENERAL PROJECT INFORMATION
1. API 653 Inspection
This project will perform API 653 Inspections of various tanks at facilities throughout the United States.
Additional consideration is given to federal, state, and local regulations as well as applicable military criteria and general industry standards.
For Tank Facility 2015B, an API Standard 653 In‐service (External) Inspection was performed.
2. Site Information
On March 22, 2017 Brockenbrough performed API 653 In‐Service (External) Inspection of Tank Facility
2015B (Tank 2) located at Dobbins Air Reserve Base in Marietta, Georgia. Dobbins Air Reserve Base is named in honor of Captain Charles M. Dobbins, a World War II C-47 pilot who died near Sicily. The installation is the home station of the host wing, the 94th Airlift Wing (94 AW) of the Air Force Reserve
Command (AFRC) and its fleet of Hercules C-130 aircraft, and is also the location of the headquarters for AFRC's Twenty-Second Air Force (22 AF). It is also home to the Army Aviation Service Facility #2
(AASF#2) of the Georgia Army National Guard and their fleet of UH-60 Blackhawks. Dobbins is also home to Marine and Navy Reserve units.
3. Future Projects
Facility personnel indicated that there are no future projects affecting the tank.
B. TANK INSPECTION COMMENTS
1. Tank Construction
Tank Facility 2015B is a nominal 5,000 bbl, 35‐foot diameter by 29-foot and 1-inch tall, aboveground, vertical, jet fuel, storage tank. The tank has a steel double deck internal floating roof, and a corrugated and coated steel overhanging external roof. Facility personnel indicated the tank was constructed in
1954. The 2002 Construction Report indicates a cone down, carbon steel, second bottom was installed at that time. Undocumented repairs performed since the 2011 out-of-service inspection report was written, include replacing the internal rolling ladder with a vertical ladder, installing the product return nozzle, and installation of an 8-inch ATG well.
2. Tank Foundation
The original tank bottom rests on what is likely a retrofitted concrete ring wall. The ringwall is flush with the secondary containment basin. A second bottom installed by the shell slotting method, rests on the abandoned portion of the shell approximately 10 inches above the original bottom. Four threaded and capped leak detection ports projecting through the abandoned shell (now foundation) provide leak detection. The foundation ringwall was visually evaluated during the inspection for broken concrete, spalling, cracks, and vegetation against the bottom of the tank. A shell settlement survey was performed during the inspection in accordance with Appendix B of API Standard 653. The shell settlement evaluation indicates the settlement of the bottom of the shell and perimeter of the tank bottom is acceptable.
https://en.wikipedia.org/wiki/World_War_II https://en.wikipedia.org/wiki/C-47 https://en.wikipedia.org/wiki/Sicily https://en.wikipedia.org/wiki/94th_Airlift_Wing https://en.wikipedia.org/wiki/Air_Force_Reserve_Command https://en.wikipedia.org/wiki/Air_Force_Reserve_Command https://en.wikipedia.org/wiki/Hercules_C-130 https://en.wikipedia.org/wiki/Twenty-Second_Air_Force https://en.wikipedia.org/wiki/Georgia_Army_National_Guard https://en.wikipedia.org/wiki/UH-60_Blackhawk https://en.wikipedia.org/wiki/United_States_Marine_Corps_Reserve https://en.wikipedia.org/wiki/United_States_Navy_Reserve
3. Tank Shell
The vertical and cylindrical shell consists of five butt‐welded courses. The exterior of the shell was visually inspected and evaluated for plumbness, roundness, peaking and banding. The shape of the shell does not appear to be within the allowable tolerances of API Standard 650. The lack of significant shell settlement suggests that tank was built out of round. However, the out of roundness does not seem to have any significant effect on the suitability of the tank for continued service. The coating was evaluated for deterioration. The ultrasonic thickness measurements of the shell and calculations included in Appendix A indicate the shell has more than 30 years of remaining life. The interior and exterior of the shell are coated and the exterior of the shell shows no sign of significant deterioration.
As the tank is used to store oil, deterioration of the interior of the shell since the previous inspection was performed is extremely unlikely. API 653 recommends ultrasonic thickness measurements of the shell be taken at least every 15 years.
4. Tank Appurtenances
a. Tank Roof
The tank’s corrugated and coated steel overhanging external roof is supported by vertical square tubing supports that rest on and are welded to the wind girder. The vertical roof supports also pass through and are welded to the rim angle. Condensation collects in the 1/4-inch gap between the vertical tubing roof supports and the shell, as indicated by the corrosion on the wind girder at the roof supports and on the shell behind the roof supports. The interior of the corrugated roof was examined from the gauging platform. There is some minor coating failure on the roof trusses. No other problems with the roof were noted.
b. Venting
The roof overhangs the shell and provides venting to the interior. The overhang is screened all around. The screens on the roof overhang are improperly installed in many areas and have large gaps.
c. Gauging
The tank’s ATG is manufactured by ITT Barton, and is installed through an 8‐inch full-length slotted gauge well. An adjacent 4-inch, full-length slotted, aluminum gauge well is fitted with a bling flange with two threaded and plugged holes. Manual gauging is performed through an 8-inch, fully slotted, aluminum, stilling well. The tank also has a Varec tape level gauge (autogauge), however, the tape is attached to the floating roof instead of to a float or weight resting on top of the floating roof.
d. Level Alarms
The tank has ATG alarms. The tank also has undocumented shell mounted low-low, low, high, and high-high level alarms. The alarms are noted in the 2011 out-of-service inspection report, but do not appear in the 2002 Final Construction Report. This suggests they were installed between 2002 and 2011. The flanges of the high and high-high level alarms are corroded.
e. Stairs and Platforms
The interior of the overhanging corrugated and coated steel roof is accessible by a circumferential stairway mounted on the shell of the tank. The upper portion of the stairway was extended outward prior to the 2002 repairs to accommodate the high level control valve float chamber that passes though the stairway upper steps. The high level alarms also pass through the stairway upper steps. The method used to extend the steps outward results in many unsealable flat surface-to-flat surface connections where water may collect and promote deterioration. The stairway top platform is inadequately supported on the outer edge and sags, which allows water to collect and to result in corrosion staining on the top of the platform. There is also corrosion on the balusters supporting the upper stairway handrail, which is observable only from the top of the stairs. The circumferential stairway step rise is generally 8 1/2 inches. The rise of the stairway bottom step above ground-level is 14 1/2 inches. OSHA requires the rise of stairway steps to be consistent from ground level to landing.
f. Grounding and Bonding
There are six grounding cables connected to ground lugs welded to the tank shell (foundation) below the second bottom.
5. Tank Coating
The interior appears to be 100% coated. The exterior coating is likely epoxy with a top coat of polyurethane. There is scattered corrosion on the underside of the wind girder. There is coating failure and corrosion on the water draw-off drain and return DBB valves.
6. Tank Piping System
Fuel is received into the tank via aboveground 6-inch aboveground carbon steel piping from the truck off-load stand adjacent to and north of the tank and is issued filtered via 6-inch aboveground carbon steel piping to the adjacent truck fillstand adjacent to and south of the tank. The water draw-off piping is connected by 1-inch stainless steel piping to a product saver tank located near the dike wall shared with the adjacent tank. The Product saver tank is also shared with the adjacent tank. Photographs in the 2011 out-of-service inspection report show the internal water draw-off piping drawing from a shallow (approximately 2 inches deep) tank bottom sump. Since the 2011 inspection, a product return shall nozzle has been installed and the product saver return pump has been connected to the product return shell nozzle by 1-inch stainless steel piping. There is no low suction piping; however, the main suction is near the sump and near to the tank bottom; and it appears the shared product saver tank may be used to transfer the fuel below the main suction to the adjacent tank. The same 1-inch product saver tank piping may be used to test the high level alarms and level control valve. The water draw-off system is unique, is not in accordance with the
DoD AST Standard AW 78-24-27; however, the tank is smaller than the smallest tank in the DoD
AST Standard and the system seems to work well for this size tank.
7. Fire Protection System
There are two fire hydrants within 300 feet of this tank.
8. Secondary Containment
The tank sits within a concrete secondary containment with concrete dike walls and basin. The secondary containment has a locked drain valve for drainage. The water level in the 24-inch diameter dike drain sump decreases less than 1/2-inch per hour with the dike drain valve closed. The secondary containment basin is sloped to a swale approximately 17 feet from the tank and to a drain located northeast of the tank. The receipt piping is routed over the swale north of the tank. The secondary containment was visually evaluated during the inspection. The volume of the secondary containment is sufficient to hold the contents of the tank full to the top of the tank shell as required by NFPA 30 plus more than one foot of freeboard as required by UFC 3-460-01 paragraph 8-14.2.1. There are numerous isolated holes in the secondary containment basin and dike wall expansion joints. The dike access concrete steps are not sealed to the dike wall. Tank bottom to ringwall foundation seal is failed sporadically around half of the tank circumference.
C. FINDINGS AND RECOMMENDATIONS
Tank Facility 2015B was found to be in generally fair condition. The tank is fully serviceable, with no mandatory deficiencies that would require immediate removal of the tank from service. However, there were several items observed, that are not in full compliance with federal, state, and local regulations or military criteria.
1. MANDATORY REPAIRS per API 653, UFC 3-460-01, or AW 78-24-27 Standards
Mandatory repairs represent items that require immediate attention in order to prevent imminent risk to system operators, equipment, or the adjacent environment. The tank would have to be taken out-of-service to complete these repairs. No Mandatory Repairs are required to be performed.
2. SIGNIFICANT FINDINGS per API 653, UFC 3-460-01, or AW 78-24-27 Standards
The following information identifies the significant findings found during the tank inspection, and includes repair recommendations and order of magnitude repair cost estimates. For basis of the cost estimate, it is assumed that the repairs will be completed by local action such as the Reoccurring
Maintenance and Minor Repair program.
a. Replace Overhanging Roof Vent Screens
OBSERVATION The roof overhangs the shell and provides venting to the interior. The overhang is screened all around. The screens on the roof overhang are improperly installed in many areas and have large gaps.
CODE REFERENCE: API 650 paragraph H-5.2.2 requires vent screens with 1/2-inch openings. DoD
Standard Design AW 78-24-27 requires the screen to be corrosion resistant.
RECOMMENDATION: Replace the vent screens on the roof overhang where they are improperly installed and/or have large gaps.
b. Repair the Circumferential Stairway
OBSERVATION: The circumferential stairway platform toeboards are not seal welded to the guardrail posts. The upper portion of the stairway was extended outward prior to the 2002 repairs to accommodate the high level control valve float chamber that passes though the stairway upper steps. The high level alarms also pass through the stairway upper steps. The method used to extend the steps outward results in many unsealable flat surface-to-flat surface connections where water may collect and promote deterioration. The stairway top platform deck plate is inadequately supported on the outer edge and sags, which allows water to collect, and which results in corrosion staining on the top of the platform. The circumferential stairway step rise is generally 8 1/2 inches.
The rise of the stairway bottom step above ground-level is 14 1/2 inches. OSHA requires the rise of stairway steps to be consistent from ground level to landing.
CODE REFERENCE: API 650, paragraph 5.1.3.7(a) and UFC 3-460-01, paragraph 8-11 require tank attachments (appurtenances) to be seal welded to inhibit corrosion streaking. 29 CFR 1910.24 paragraph (f) requires the rise of any flight of stairs to be uniform including at its base.
RECOMMENDATION: Seal weld the circumferential stairway platform toeboards to the guardrail posts. Replace the circumferential stairway upper steps that have been extended. Provide support for the outer edge of the stairway top platform deck plate. Provide a landing and step on the dike basin per OSHA for mounting the circumferential stairway.
c. Seal the Roof Supports to the Shell
OBSERVATION: The tank’s corrugated and coated steel, barn style, overhanging roof is supported by vertical square tubing supports that rest on, and are welded to, the wind girder. The vertical roof supports also pass through, and are welded to, the rim angle. Condensation collects in the 1/4-inch gap between the vertical tubing roof supports and the shell, as indicated by the corrosion on the wind girder at the roof supports and on the shell behind the roof supports.
CODE REFERENCE: API 650, paragraph 5.1.3.7(a) and UFC 3-460-01, paragraph 8-11 require tank attachments (appurtenances) to be seal welded to inhibit corrosion.
RECOMMENDATION: Seal the vertical tubing roof supports to the shell.
d. Repair External Coatings
OBSERVATION: There is corrosion on the wind girder at the roof supports and on the shell behind the roof supports, on the stairway top platform, roof access door, overhanging exposed roof support structure, upper handrail balusters, underside of the wind girder, high and high-high level alarm chamber flanges, and water draw-off drain and return 2-inch DBB valves. There is also corrosion on the conduit at the top and at the bottom of the stairs.
CODE REFERENCE: UFC 3-460-01 paragraph 8-3.10 requires the exterior of tanks to be coated.
RECOMMENDATION: Repair the coatings on the wind girder at the roof supports and on the shell behind the roof supports, on the stairway top platform, upper handrail balusters, underside of the wind girder, and water draw-off drain and return 2-inch DBB valves. Repair the coating on the conduit at the top, and at the bottom, of the stairs.
e. Repair the Secondary Containment
OBSERVATION: There are numerous isolated holes in the secondary containment basin and dike wall expansion joints. The dike access concrete steps are not sealed to the dike wall. The original tank bottom-to-ringwall foundation seal is failed sporadically around half of the tank circumference.
REFERENCE: NFPA 30 paragraph 22.11.2.4 and CFR 112.7(c)(1) require dike areas to be liquid tight.
RECOMMENDATION: Replace the sealant in the secondary containment basin and dike wall expansion joints. Seal the dike access concrete steps to the dike wall. Replace the original tank bottom-to-ringwall foundation seal.
f. Provide Piping Flexibility
OBSERVATION: Caulking at the piping penetrations through the dike wall are torn or disbonded from the piping due to expansion and contraction of piping going straight to the tank without any flexibility allowance.
CODE REFERENCE: UFC 3-460-01, paragraph 9-3.3 requires piping to be arranged to provide for expansion and contraction caused by changes in ambient temperature.
RECOMMENDATION: Provide an expansion loop or offset in the product piping inside the dike area.
If there are compression seals behind the caulk, the caulk should be removed to expose the link seals. The piping coatings should be repaired at the dike wall penetrations. If there are no compression seals behind the caulk, they should be provided.
g. Modify Thermal Relief Piping
OBSERVATION: The thermal relief valves (TRVs) on the issue and receipt isolation valves are installed in the horizontal position; the TRV piping includes check valves, and does not have testing tees. There is also no upstream isolation valve on the receipt TRV piping.
CODE REFERENCE: The manufacturers of thermal relief valves recommend installing the valves in the vertical position to avoid trapping debris in the valve seats. UFC 3-460-01 paragraph 9-3.5 requires TRV piping around product piping isolation valves and isolation ball valves on the TRV piping inlet and outlet. UFC 3-460-03, 6-6.3.1 requires TRV testing be performed annually. DoD
Standard Design AW 78-24-27 requires testing tees on thermal relief piping. Check valves are not required with balanced type thermal relief valves.
RECOMMENDATION: Reinstall the issue and receipt thermal relief valves in the vertical position.
Demolish the check valve in the thermal relief valve piping. Provide the thermal relief valve piping with testing tees. Provide an upstream isolation valve for the receipt TRV.
3. RECOMMENDED REPAIRS as Part of Regular Maintenance
Recommended repairs represent items that should be addressed in a timely manner in order to prevent future potential risks to system operators, equipment integrity, or the adjacent environment.
a. Remove Soil and Plants from Dike Area
OBSERVATION: There is soil and plant growth in the dike area.
CODE REFERENCE: UFC 3-406-03, Section 8.10.2 requires regular inspection and removal of debris and vegetation from diked areas.
RECOMMENDATION: Inspect dike areas and remove soil and plant growth from the diked area on a regular basis.
b. Reinstall Bolting
OBSERVATION: Two of the eight all-thread bolts on the receipt nozzle isolation valve flange, penetrate only hallway through the nut. The situation could potentially result in a spill.
CODE REFERENCE: UFGS Specification 33 52 43.13 Aviation Fuel Piping paragraph 2.1.6 and ASME
B31.1 Power Piping paragraph 135.3.4 require bolting to be installed completely through the nut.
RECOMMENDATION: Reinstall the bolting on the receipt nozzle isolation valve flange. Ensure the bolts are installed completely through the nuts.
c. Provide Tank Markings
OBSERVATION: There are no NFPA 704 placards on the tank shell for warning emergency responders of the hazards. There are no confined space labels on the shell manholes. The tank is not labeled with the Tank Number or Facility Number.
CODE REFERENCE: UFC 3-460-01 paragraph 2-18 requires tanks to be labeled with the tank number and facility number. UFC 3-460-01 paragraph 2-18 and NFPA 30 paragraph 21.7.2.1 require tanks be labeled in accordance with NFPA 704 to provide hazard information to emergency responders.
29 CFR 1910.146 (c)(1) (OSHA) requires confined spaces in the work place to be identified by danger signs or by any other equally effective means, of the existence and location of and the danger posed by the permit spaces.
RECOMMENDATION: Provide a hazard warning label in accordance with NFPA 704. Provide signs on the shell manhole covers and on the railing of the internal ladder access platform to warn personnel of the existence and danger of the permit required confined spaces in accordance with OSHA. Label the tank to indicate the Facility Number and Tank Number.
d. Power Wash Stairs
OBSERVATION: There are bird droppings on the circumferential stairway steps.
CODE REFERENCE: API 571 Damage Mechanisms Affecting Fixed Equipment in the Refining Industry, paragraph 4.3.2.3.h) reads, “Bird turds can also cause accelerated corrosion and unsightly stains”.
RECOMMENDATION: Power washing of the stairway should be performed on a regular basis.
4. REPAIRS to Fully Comply with API 653, UFC 3-460-01, or AW 78-24-27 Standards
These items represent repairs and/or upgrades that could be performed to bring the tank into full compliance with current standards, but that do not represent potential risks to system operators, equipment integrity, or the adjacent environment. Our recommendations to perform, or not to perform these repairs and/or upgrades, take into consideration the cost of the repair, the operational benefit of the repairs, the age of the tank/system, operator safety, environmental risks, and equipment integrity.
a. Provide a Steel Cone Roof and Aluminum Internal Floating Pan
OBSERVATION: The Tank has a steel double deck internal (originally external) floating roof under a retrofitted, overhanging, corrugated and coated barn style roof. Many of the appurtenances listed in UFC 3-460-01 are not possible with this type of roof.
CODE REFERENCE: UFC 3-460-01 and DoD Standard Design AW 78-24-27 require an aluminum internal floating pan and a steel cone roof for new construction. Some of the items listed in UFC 3-
460-01, Table 8-1 that are incompatible with the current roof include: roof manhole, inspection hatches, bolted cover for pan installation, water bottom sample well near the sump, and scaffold cable supports.
RECOMMENDATION: Replace the existing steel double deck internal floating roof and overhanging, corrugated and coated, barn style roof, with an aluminum internal floating pan and a steel cone roof.
b. Modify Secondary Containment
OBSERVATION: The secondary containment basin is sloped to a swale approximately 17 feet from the tank. The receipt and issue piping is routed over the swale.
CODE REFERENCE: NFPA 30 requires secondary containment to be sloped away from the tank for a distance of 50 feet or to the dike wall, whichever is less, and away from product piping for a distance of 50 feet.
RECOMMENDATION: Modify the secondary containment and drain to slope way from the tank all the way to the dike wall, and away from the product piping.
c. Provide Upper Shell Manhole
OBSERVATION: There is no upper shell manhole or landing in the circumferential stairway for accessing the top of internal floating roof in high leg position.
CODE REFERENCE: UFC 3-460-01 Table 8-1, Items c and k require a shell manhole above the high position of the internal floating pan and a landing in the circumferential stairway for accessing.
RECOMMENDATION: Provide a shell manhole above the high position of the internal floating roof or new pan and a landing in the circumferential stairway for accessing.
Receipt Piping
Swale
Dike Drain
Issue Piping
d. Provide Landing for Accessing Tank Alarms and Controls
OBSERVATION: There is no landing in the circumferential stairway for accessing the level control float or level alarm chambers.
CODE REFERENCE: UFC 3-460-01 Table 8-1, Item k requires new storage tanks to be provided with a spiral stairway top platform for accessing the high level shut-off and alarms.
RECOMMENDATION: Provide a landing in the circumferential stairway for accessing and maintaining the high level shut-off and alarms.
APPENDIX A: ENGINEERING CALCULATIONS AND DRAWINGS
SHELL ROUNDNESS SURVEY AND SETTLEMENT
The shape of the shell appears to exceed the allowable API 650 tolerance of plus or minus 1/2-inch of a new tank shell radius. Based on the circumference of the shell measured near the bottom, the radius of the shell should be
17 feet and 6 inches. However, the measured radii of the shell, varies at the bottom from 17 feet 5 and 1/8 inches in the southwest to 17 feet 8 and 1/4 inches in the northwest. Also, the measured radii of the shell, varies at the top from 17 feet and 5 inches in the southwest to 17 feet 6 and 7/8 inches in the west. The tank bottom and roof should restrain the shell from deflection near the bottom and near the top. That there did not appear to be any significant distortion of the shell, would seem to suggest the tank was built out-of-round. It is noted that the tolerance for out-of-roundness has been included in API 650 since at least before 1993. API 650 1st Edition was published in 1960. However, it has not been until later years that the industry has had the laser surveying technology and methods available to it to measure it in the upper shell courses. It should be noted that API
653,10.5.3 – 3rd Edition (published in 2001), and later editions, allow the shell out-of-roundness (radial deviation), at higher than one foot above a bottom of a reconstructed tank, to be as much as three times greater (1 1/2 inches), a subject not addressed in API 653 prior to the year 2001. As measuring the out-of-roundness using such methods is not normally included in an API 653 Inspection of an existing and not reconstructed tank, and as the out-of-roundness does not appear to be a detriment to the structural integrity of the tank, no action is required or recommended at this time.
Austin Brockenbrough & Associates, L.L.P. Job No. 17-013.01
Location: Dobbins ARB Date: 04/13/2017
Subject: Tank 2015B Shell Radius Survey Page 1 of 4
Measured Circumference at Bottom = 109.96
Calculated Diameter = 35.00
Calculated Radius = 17.50
Distance Out
From Radial of
Centerline Deviation Deviation (in) Plumb (in)
South 17.46 -0.04 -0.43 0.197 S+N 0.29 -0.98
17.50 0.00 0.02 3.201 0.79
17.50 0.00 0.05 6.2 0.62
17.51 0.01 0.07 9.199 0.55
17.50 0.00 -0.02 12.201 0.25
17.50 0.00 -0.01 15.2 -0.16
17.49 -0.01 -0.13 18.204 -0.23
17.48 -0.02 -0.26 21.211 -0.31
17.49 -0.01 -0.13 24.206 -0.12
17.50 0.00 0.05 27.196 -0.16
Weld Elevation----> 105.07
Southeast 17.49 -0.02 -0.18 0.198 SE+NW 0.42 -0.18
17.55 0.05 0.64 3.201 1.76
17.59 0.09 1.03 6.189 2.10
17.58 0.08 0.92 9.179 2.42
17.56 0.06 0.68 12.176 2.05
17.55 0.05 0.55 15.173 2.40
17.53 0.03 0.40 18.177 2.57
17.54 0.04 0.48 21.165 3.12
17.53 0.03 0.41 24.164 3.18
17.55 0.05 0.59 27.143 2.92
Weld Elevation----> 105.08
Height
Above
Chime
Diameter
Deviation (in)
Location: Dobbins ARB Date: 03/01/2017
Subject: Tank 2015B Shell Radius Survey Page 2 of 4
Distance Out
From Radial of
Centerline Deviation Deviation (in) Plumb (in)
East 17.49 -0.01 -0.11 0.198 E+W 0.78 0.01
17.51 0.01 0.08 3.2 1.38
17.53 0.03 0.40 6.197 1.91
17.52 0.02 0.22 9.197 1.33
17.50 0.00 0.01 12.2 0.90
17.48 -0.02 -0.29 15.21 0.32
17.44 -0.06 -0.76 18.233 -0.08
17.46 -0.04 -0.43 21.222 0.28
17.47 -0.03 -0.36 24.221 -0.40
17.50 0.00 -0.04 27.202 0.20
Weld Elevation----> 105.10
Northeast 17.51 0.01 0.10 0.201 NE+SW -0.86 0.10
17.53 0.03 0.36 3.2 -0.31
17.52 0.02 0.23 6.197 -0.50
17.50 0.00 0.00 9.2 -0.79
17.48 -0.02 -0.23 12.208 -0.85
17.49 -0.01 -0.12 15.207 -0.88
17.49 -0.02 -0.18 18.211 -1.16
17.47 -0.03 -0.31 21.223 -1.31
17.47 -0.03 -0.31 24.228 -1.28
17.48 -0.02 -0.23 27.222 -1.02
Weld Elevation----> 105.10
Height
Above
Chime
Diameter
Deviation (in)
Subject: Tank 2015B Shell Radius Survey Page 3 of 4
Distance Out
From Radial of
Centerline Deviation Deviation (in) Plumb (in)
North 17.56 0.06 0.72 0.205 -1.13
17.56 0.06 0.77 3.199
17.55 0.05 0.58 6.195
17.54 0.04 0.48 9.192
17.52 0.02 0.28 12.193
17.49 -0.01 -0.14 15.205
17.49 -0.01 -0.10 18.203
17.50 0.00 -0.05 21.203
17.50 0.00 0.01 24.199
17.48 -0.02 -0.20 27.214
Weld Elevation----> 105.10
Northwest 17.55 0.05 0.60 0.205 0.60
17.59 0.09 1.13 3.199
17.59 0.09 1.07 6.19
17.63 0.13 1.50 9.173
17.61 0.11 1.37 12.164
17.65 0.15 1.85 15.136
17.68 0.18 2.17 18.107
17.72 0.22 2.64 21.065
17.73 0.23 2.77 24.034
17.69 0.19 2.33 27.042
Weld Elevation----> 105.08
Height
Above
Chime
Subject: Tank 2015B Shell Radius Survey Page 4 of 4
Distance Out
From Radial of
Centerline Deviation Deviation (in) Plumb (in)
West 17.57 0.07 0.89 0.205 1.64
17.61 0.11 1.30 3.201
17.63 0.13 1.51 6.191
17.59 0.09 1.12 9.186
17.57 0.07 0.89 12.184
17.55 0.05 0.61 15.186
17.56 0.06 0.67 18.179
17.56 0.06 0.71 21.174
17.50 0.00 -0.04 24.25
17.52 0.02 0.24 27.189
Weld Elevation----> 105.09
Southwest 17.42 -0.08 -0.96 0.19 -0.96
17.44 -0.06 -0.67 3.199
17.44 -0.06 -0.73 6.206
17.43 -0.07 -0.79 9.213
17.45 -0.05 -0.62 12.215
17.44 -0.06 -0.76 15.225
17.42 -0.08 -0.98 18.24
17.42 -0.08 -1.00 21.249
17.42 -0.08 -0.97 24.257
17.43 -0.07 -0.79 27.252
Weld Elevation----> 105.08
Height
Above
Chime
Location: Dobbins ARB Date: 4/13/2017
Subject: Tank 2015B - Shell Settlement Evaluation By: Mike O'Connor
API 653 Appendix B
Optimum cosine curve, B 2.2.4.e) Z = a + b x cos(theta + c)
Diameter (D) = 35 (ft)
Number of equally spaced data points (ft)= 8
L = Arc length between measurement points (ft) = 13.74
Tank Height (H) = 29.1 (ft)
Relative elevation of chime.
* Z U S
0 105.07 0.00 0.00 0.00 0.01
1 105.08 0.01 0.01 0.00 0.00
2 105.10 0.03 0.02 -0.01 -0.01
3 105.10 0.03 0.03 0.00 0.00
4 105.10 0.03 0.03 0.00 -0.01
5 105.08 0.01 0.03 0.02 0.02
6 105.09 0.02 0.02 0.00 -0.01
7 105.08 0.01 0.01 0.00 0.00
8 105.07 0.00 0.00 0.00 0.00
Maximum out-of-plane deflection = 0.02
* = measured elevation
*HI (Height of Instrument)
Z = calculated ridged body tilt (in)
U = out-of-plane settlement =
S = out-of-plane deflection z-y
Y = yield sterength of shell material (PSI) = 30,000
E = Youngs modulas of elasticity (lbf/in2) = 29*10^6
S allowable (in) (API 653 B.3.2.1) = (L^2*Y*11)/(2EH)*12 = 0.44 in
R^2 = (Syy - SSE) / Syy = 0.60 not >=0.9 therefore cosine curve is invalid.
Evaluation by the Arc Length Method described in API 653 B.2.2.5.1 is required.
Location: Dobbins ARB Date: 4/13/2017
Subject: Tank 2015B - Shell Settlement Evaluation By: Mike O'Connor
API 653 B.2.2.5.1 Evaluation by Settlement Arc Length Method
Per B.3.2.2, K = 10.5
Settlement arc length (ft), Sarc
Out of plate settlement at Point i (Si)
Allowable settlement at point i (Smax) = MIN[K*Sarc*(D/H)*(Y/E), 4]
Point Sarc (ft) Si (in) Smax
0 55.0 0.03 0.72 OK
5 16.0 0.02 0.21 OK
Evaluation of the settlement by the arc length method indicates the settlement is within acceptable limits.
Si < Smax →
Si < Smax →
0.00
0.01
0.02
0.03
0.04
0 2 4 6 8 10
Measured Elevation (in)
Si5Si0
SHELL THICKNESS CALCULATIONS
Job No.: 17-013.01
Job Title: Inspect AST Dobbins AFB
Subject: FAC 2015B Shell Calculations
By: Mike O'Connor Date: 4/13/17
API-12C
API 653
SHELL CALCULATIONS
Diameter 35 feet Wind Velocity 125 mph
Shell Height 29.08 feet
Freeboard 0 feet Nom Shell Thk 0.181
Design Fill Height 29.08 feet
Specific Gravity 0.80 API 650 Maximum height of unstiffened shell: 37.2 feet
0.84 API 653
Joint Efficiency 0.85 API 650
Material unknown
Yield Strength 30,000 psi (assumed)
Tensile Strength 55,000 psi (assumed)
Original Design Corrosion Allowance
0.093 in (2mm)
Required thickness
Lower Upper
Two
CoursesCourses
Allowable Stress 23595 ####
Height Product Required Thickness
Course (feet) Depth 1/4" min
5 6.16 6.16
4 5.96 12.12
3 5.96 18.08
2 5.96 24.04
1 5.04 29.08 min 2017 Corrosion Estimated UTM Visual current net 1954 Rate Service Life Inspection Inspection
Course UTM* thick Thickness * in/yr yrs. Interval Interval
5 0.184 0.184 0.220 0.001 >30 15 5
4 0.202 0.202 0.220 0.000 >30 15 5
3 0.181 0.181 0.220 0.001 >30 15 5
2 0.246 0.246 0.250 0.000 >30 15 5
1 0.230 0.230 0.250 0.000 >30 15 5
* The original thicknesses are assumed based on required design thicknessess, overtolerance and the range of the UTMs.
P.O. Box 4800 4800 W. Hundred Road Chester, Virginia 23831 Phone: 804-748-8746 Fax: 804-748-7849 www.brockenbrough.com
0.107
0.100
2.6(H-1)DG
0.081
0.116
0.110
0.134
0.170
0.143
0.100
0.100
0.100
2.6HDG
SE
0.219
0.197
0.025
0.053
API-650
Original
Hydro
2250020000
API-653
Original
Design
SESE
(psi)
2.6(H-1)D
SHELL AND ROOF ULTRASONIC THICKNESS MEASUREMENTS
Job No.: 17-013.01
Job Title: Inspect AST Dobbins AFB
Subject: Tank 2015B UT Data
By: Mike O'Connor Date: 4/13/17
SHELL UTM DATA (0.001 inches)
1 4 7
2 5 8
3 6 9
Typical Shell Plate UTMs.
1 2 3 4 5 6 7 8 9
1-1 231 232 230 232 233 234
1-2 238 241 239 237 241 240
1-3 250 249 243 251 257 251 251 245 249
1-4 247 249 246 244 246 244
1-5 242 245 243 246 247 245
1-6 238 243 241 241 242 241 237 240 240
Insert Plates
I1 498 499 535 504 502 541
I2 544 548 494 501 498 494
UTMs Taken From Stairway
2-1 246 255 247
2-2
2-3
2-4
2-5
2-6
3-1 195 201 181 4-1 202 208 205 5-1 184 189 188
3-2 4-2 5-2
3-3 4-3 5-3 3-4 4-4 5-4 3-5 4-5 5-5
3-6 4-6 5-6
P.O. Box 4800 4800 W. Hundred Road Chester, Virginia 23831 Phone: 804-748-8746 Fax: 804-748-7849 www.brockenbrough.com
TANK DRAWINGS,
The following drawings are pages extracted from the 2011 out-of-service inspection report.
OSHA ACCESS STRUCTURE REPORT
OSHA Circumferential Stairway Data
OSHA Rq’d Actual
(in) min (in) max (in)
Handrail Height 29 1/2 OK 30 34 Step Width 30 OK 22 NA
Step Rise 8 1/2 OK NA NA Bottom Step Rise 14 1/2 Not OK 9 1/2 10 1/2
BOTTOM STEP
RISE
APPENDIX B: API 653 CHECKLISTS FOR TANK INSPECTIONS
UL SWRI
API Other
Protected
Type: Type:
Size: Date Installed:
Carbon Steel End Conn: Size: 6" Material: Carbon Steel End Conn: Size: 6"
Issue To:
Interior Coating:
Double Bottom
Unknown
Concrete
91' by 91' by 5'
Level Alarms:
Material: Welded
Coated
Plastic / Fiberglass
Other:
Closed Top Dike
Change of Service:
Last Repair:
Tank Coatings:
Exterior Coating:
Epoxy - Polyurethane (assumed)
Epoxy (assumed)
Tank Outside Dimensions:
Insulated
Tank Facility No.:
Local Tank ID No.:
March 22, 2017
2015B
Tank Manufacturer:
Tank Construction Date:
Tank 2
Single Wall
Tank Inspector Name:
Jet A(F-24)
5000 bbl
3500 bbl
API 653 EXTERNAL INSPECTION CHECKLIST
Dobbins AFBProject Site:Project Name:
Project Location:
Brockenbrough Job No.:
SPCC Mandated AST Inspections - Group 5
Various Locations
General Inspection Information
17-013.01
Submitted to:
Contract No.:
USACE - Omaha
W9128F-12-D-0006
Inspection Date:
Design Std
Horizontal
Mike O'Connor
2003 new bottom
Receipt From:
Inspector Certification Number:
Tank Construction and Configuration
Rectangular
Double Wall
Fire Resistant
Secondary Containment, Overfill, and CRDM
Welded
Refueler truck via loading stand issue filter-separators
35'-0" dia by 29'-1"
NA
Commercial truck via off-load stand receipt filter-separators
FML
Nominal Capacity:
Useable Capacity:
Open Type DikeVertical horizontal leak detection ports
Overfill Protection:
Release Prevention Barrier
Overfill Protection / Level Alarms:
High-high, High, Low, and Low-low 6" hydraulic operated diaphragm control valve, OCV, SS
Receipt Piping Configuration Issue Piping Configuration
Tank Piping
Secondary Containment
Oct 2011 (OOS)
Tank Specifications
Previous Tank Inspection Date:
Continuous Release Detection Monitoring
Type:
Date Installed:
Current Product:
API 653 EXTERNAL INSPECTION CHECKLIST
Dobbins AFBProject Site:Project Name: SPCC Mandated AST Inspections - Group 5
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Proper operation of dike drains
Check for: Some small plants growing in windblown dirt in dike area.
C.1.1.7 Cathodic Protection a) b)
C.1.1.6 Housekeeping
Buildup of trash, vegetation, and other inflammables
Settlements into the base
C.1.1.2 Asphalt d) a)
3V, 3.3 A b)
c) Cavities under foundation; vegetation against bottom of tank
Broken concrete, spalling, and cracks, especially under backup bars used in welding butt-welded annular rings under the shell
Leaching of oil which has left rock filler exposed indicating hydrocarbon leakage
Tank settlement into asphalt base
Review cathodic protection potential readings
Site drainage away from the tank, associated piping, and manifolds
Check for:
Presence of crushed rock under the steel bottom which usually results in severe underside corrosion.
C.1.1.4 Rock
C.1.1.5 Site Drainage
Measure foundation levelness and bottom elevations (See Annex B) See settlement survey calcs.
ITEM
C.1.1 Foundation
Tank bottom to ringwall foundation seal failure sporadically around 1/2 of tank circumference.
Swale is 17 feet from tank. Receipt piping over swale.
Check for:
Indications of bottom leakage at drain openings in ring, back of water-draw basins, and top surface of ring a) b)
Run-off rainwater from shell draining away from the tank
Check for :C.1.1.3 Oiled Dirt or Sand
e) Settlement around perimeter of tank
Check for:
STATUSTASK
Check for:
Tank Settlement
COMMENTS
C.1.1.1 Concrete Ring
C.1.2.1 External Visual Inspection
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A No access
C.1.2.3 Riveted Shell Inspection
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A c)
Pitting on support welds to shell, especially on shell plates b)
Check for:
Grooving, corrosion, pitting, and coating failures a) b) c) a) d)
C.1.2. Shells
Bottom-to-Foundation Seal
e) Drawings of riveted seams if available. Otherwise, dimension and sketch (or photograph) the rivet pattern: no. of rows, rivet size, pitch length, butt-riveted or lap-riveted joints
Full fillet lap-welded vertical seams to increase joint efficiency b)
Corrosion loss and wear on the rivets
C.1.2.2 Internal (Floating Roof
Tank)
Check for:
c)
Broken welds and corrosion damage
(paint failure, pitting, corrosion, product buildup), especially where it occurs at tack-welded junction
Reinforcing pads welded to shell at supports
Leaks and identify the location by sketch or photo
C.1.2.4 Wind Girder (Floating
Roof Tanks) a)
Check for:
Rivet and seam leaks on external surface
Check for:
Corrosion and thinning on plate and weld after cleaning the bottom angle area
Paint failures, pitting, and corrosion
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Adequate manholes flange and cover thickness on mixer manholes
Caulk at piping penetrations at dike wall are torn due to expansion and contraction of piping going straight to tank without any flexibility allowance.
a) Leaks on autogauge tape guide and lower sheave housing (floating swings)
b) Damage on autogauge head
Check for:
C.1.3.3 Autogauge System
Anchored piping which would be hazardous to the tank shell or bottom connections during earth movement
Adequate thermal pressure relief of piping to the tank
h) Damage on welds on shell-mounted davit clips above valves 6 inches and larger g)
COMMENTSTASK
e)
ITEM
Fire fighting system componentsb)
C.1.3.2 Tank Piping Manifolds b)
Check for:
Flange leaks and leaks around bolting d)
a) Leaks at piping manifolds, flanges, and valves
C.1.3 Shell Appurtenances
STATUS
Shell plate dimpling around nozzles, caused by excessive pipe deflection f)
Check for:
c)
Cracks or signs of leakage on weld joint at nozzles, manholes, and reinforcing plates
C.1.3.1 Manholes and Nozzles c) d) a)
Leaks at sample connections and proper valve operation
Damage and test the accuracy of temperature indicators e)
TRVs installed horizontal, piping is SS with no electrical isolation, no isolation valve upstream, and no testing tee.
Proper operation of regulators for tanks with purge gas systems
Receipt nozzle bolting not properly installed. Bolts penetrate only halfway through the nuts.
Sealing of insulation around manholes and nozzles
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
c) Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Attached to pan.
f)
C.1.3.6 Mixer
Leaks in circulation pump and operating problems c) a) b)
ITEM TASK STATUS
C.1.3.3 Autogauge System c) d)
C.1.3.4 Shell-mounted Sample
Station (PST) a)
Inspect condensate drain for presence of oil indicating leakage
C.1.3.5 Heater (Shell Manhole
Mounted) e) g)
Actual product level compared to the reading on the autogauge. Make note. (max. variation is 2 in.)
No more than 2 feet of tape are exposed at the end of the tape guide when the roof is in lowest position
(floating roof tanks)
h) Condition of board and legibility of board-type autogauges
i) Freedom of movement of marker and float
COMMENTS
Proper mounting flange and support
Leakage
Tape 20'-3 3/16"; ATG 20'-3 7/16"
Condition of power lines and connections to mixer
Check for:
b)
Proper movement of tape by bumping the checker on autogauge headSize and construction material of the autogauge tape guide and make note
(floating roof tanks)
Proper movement of tape. Ask the operator if the tape tends to hang up during tank roof movement (floating roof tanks).
Check for:
Function of valves and plugging in sample lines, including drain or return-to-tank line
Bracing and supports for sample lines and equipment
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
b) Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Check for:C.1.3.10 Swing Lines: Cable
Material and Condition a) Corrosion over entire length, for non-stainless steel cable
Wear or fraying on all types of cable
C.1.3.11 Swing Lines: Product
Sample Comparison
Check for water or gravity differences that would indicate a leaking swing joint
C.1.3.7 Swing Lines: Winch a)
Operation
C.1.3.12 Swing Lines: Target b)
ITEM TASK
Check for leaks at threaded and flanged joints
C.1.3.9 Swing Lines: Identify
Ballast Varying Need
Check for significant difference in stock specific gravity
Floating: With tank half full or more, lower the swing line, then let out the cable and check if the swing has pulled cable tight, indicating that the winch is operating properly
Target should indicate direction of swing opening (up or down) and height above bottom where suction will be lost with swing on bottom support
STATUS COMMENTS
Indicator: Check that the indicator moves in the proper direction.
Floating swing line indicators show a lower level as cable is wound up on the winch. Non-floating swing line indicators show the opposite c)
C.1.3.8 Swing Lines: External
Guide System
Non-floating: Raise, then lower the swing line with the winch and check for cable lightness to confirm the swing line lowered properly
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
C.1.4.2 Deck Plate External
Corrosion
STATUS
C.1.4.4 Level of Floating Roof At several locations, measure distance from roof rim to a horizontal weld seam above the roof.