This document contains a bid schedule for a federal construction contract opportunity. The U.S. Food and Drug Administration is soliciting bids to install a new water well at its National Center for Toxicological Research facility in Jefferson, Arkansas. The bid schedule provides pricing tables for 58 line items covering well installation and related piping, metering, fittings and valves. Bidders are to provide unit pricing and extensions for each item. The schedule also includes an additive alternate for driveway construction with 8 additional line items. Bidders must specify their total proposed price in both words and figures in the designated sections. Mobilization and demobilization costs up to 5% of the base bid subtotal will be paid separately regardless of any selected alternates. Responses are due by the date specified in Amendment 1 to Solicitation FDA-SOL-1224382.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Proposal of Address: _______________________________________________ Phone: ________________ The Contractor shall install new Water Well and provide all piping, meter, fittings and valves at the National Center for Toxicological Research located in Jefferson, AR:

BID SCHEDULE

ITEM DESCRIPTION QTY. UNIT UNIT

PRICE

PRICE

EXTENSION

1 $ $

2 $ $

3 $ $

4 $ $

5 $ $

6 $ $

7 $ $

8 $ $

9 $ $

10 $ $

11 $ $

12 $ $

13 $ $

14 $ $

15 $ $

16 $ $

17 $ $

ITEM DESCRIPTION QTY. UNIT UNIT PRICE PRICE

EXTENSION

18 $ $

19 $ $

20 $ $

21 $ $

22 $ $

23 $ $

24 $ $

25 $ $

26 $ $

27 $ $

28 $ $

29 $ $

30 $ $

31 $ $

32 $ $

33 $ $

34 $ $

35 $ $

36 $ $

37 $ $

ITEM DESCRIPTION QTY. UNIT UNIT PRICE

PRICE

EXTENSION

38 $ $

39 $ $

40 $ $

41 $ $

42 $ $

43 $ $

44 $ $

45 $ $

46 $ $

47 $ $

48 $ $

49 $ $

50 $ $

51 $ $

52 $ $

53 $ $

54 $ $

55 $ $

56 $ $

57 $ $

ITEM DESCRIPTION QTY. UNIT UNIT PRICE

PRICE

EXTENSION

58 $ $

SUBTOTAL $

59 $ $

ADDITIVE ALTERNATE NO. 1

60 $ $

61 $ $

62 $ $

63 $ $

64 $ $

65 $ $

66 $ $

67 $ $

68 $ $

TOTAL ADDITIVE ALTERNATE NO. 1 $

TOTAL $

Base Bid ___________________________________________________________________________

Additive Alternative No. 1 – Building 85 Driveway ________________________________________

**NOTE: Prices indicating the total amount of the bid must be shown in both words and figures. Written prices will control in case of a discrepancy. Mobilization/Demobilization will be paid at bid price as long as it does not exceed 5% of the base bid subtotal even if alternates are bid and selected. Additive Alternate items unit price

Attachment J3 - Cost Proposal Bid Schedule 1
Attachment J3 - Cost Proposal Bid Schedule 2
Attachment J3 - Cost Proposal Bid Schedule 3
Attachment J3 - Cost Proposal Bid Schedule 4
Attachment J3 - Cost Proposal Bid Schedule 5

File details come from the government source that posted it. Updated .