This statement of work and related solicitation document outline requirements for the installation of a new production water well at the National Center for Toxicological Research in Jefferson, Arkansas. The National Center for Toxicological Research requires a new water well capable of producing over 300,000 gallons per day to support animal research activities. The scope of work includes installing a new 800 GPM well with outer casing, inner casing and screen; conducting pump testing and installing a water meter and electrical components. Additional requirements consist of constructing a concrete slab, fencing, and capping the existing backup well in accordance with state regulations. Offerors must be licensed to drill potable wells in Arkansas. The period of performance is 12 months. The place of performance is the National Center for Toxicological Research facility. Interested parties should review the specifications and drawings included in the attachments. This solicitation is issued by the Department of Health and Human Services Food and Drug Administration Office of Acquisition and Grant Services to fulfill the stated requirements.

View the file

Other files for this federal contract opportunity

Other files attached to Amendment 1 -Construction of Production Water Well at NCTR, newest first.
File Type Posted
Amendment 1_rdw.pdf PDF
FDA_SOL_75F40120R00024 .pdf PDF
Attachment J6 - Past Performance Evaluation Questionnaire.pdf PDF
Attachment J11 - COVID19 Visitor Questionnaire at JL.pdf PDF
Attachment J4 - Wage Detemination AR.pdf PDF
Attachment J8 - FDA Form 3398.pdf PDF
Attachment J9 - Certification of Current Arkansas State Contractors License.pdf PDF
Attachment J2 - Drawings.pdf PDF
Attachment J7 - FORM FDA 3391.pdf PDF
Attachment J5 - Sample Client Letter.pdf PDF
Attachment J1 - Project Manual.pdf PDF
Attachment J3 - Cost Proposal Bid Schedule.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Background: The National Center for Toxicological Research installed a water well in August 2016. Our back up well was installed in 1951 and is no longer reliable. If we were to have a failure to our existing well, we have no way to produce water to support animal research. During the summer months we produce over 300,000 gallons of water per day.

Purpose: To install a new water well to support research for the National Center for Toxicological Research

Scope: The United States Food and Drug Administration, Office of Facilities Engineering and Mission Support Services at the National Center for Toxicological Research located in Jefferson, Arkansas has a need to install a new water well. The contractor shall install a new water well, all pumping connections for the well to the existing water lines, perform all electrical work, install driveway and security fencing, and cap existing water well #14.

The construction of an 800 GPM production well with 12" outer casing, 8" inner casing, and screen.

Conduct testing of the pump and install water meter. Provide concrete slab at well (5’x5’x5’ trapezoidal 5’ at base 4’ at top start 1’ below finish grade) and perimeter fencing (chain link #9 gauge galvanized steel see specification). Consisting of 950' of outer casing, 100’ of inner casing and 50’ of screen. Provide thrust blocks for all piping as required per standard details. The contractor is requested to provide the normal scope of work as required by the Arkansas Department of Health.

The Contractor shall provide all wiring, conduit, starter, transformer and variable speed drive/with by pass in accordance with the attached specifications and drawings. Provide electrical service from switch existing transformer to proposed well site, control wiring for start/stop control with an HOA (hand, off, auto switch), and provide 2” conduit with turn-up with cap from the transformer to New Well start/stop switch with pull string. All electrical enclosures shall be National Electrical Manufacturers Association (NEMA) 4 enclosures. Provide all earthwork including excavation, bedding, backfill and compaction. Provide trench detail per drawings, 3 or 4 per surface requirements.

Provide miscellaneous metal support (unistrut) in concrete for all devices with concrete slab 4’ clear in front of devices. Provide concrete slab for transformer. The work shall be completed in accordance with all state regulations (Arkansas Department of Health) and forthcoming construction documents. The contractor shall be licensed in the State of Arkansas to drill potable wells. Provide product submittals, permits, closeout documents including As-Builts as required for a full and complete project.

The Contractor shall provide all piping, meter, fittings and valves. Provide one 10” shut-off valve at the connection of existing well #14 to new service pipe connection tee. Provide check valve at well with shut-off valves for flushing port and sample port. Piping shall be 10” C900 PolyVinyl Chloride (PVC). Also provide 2” conduit with pull string from New Well to Well #14 with turn-up and capped. Provide all earthwork including excavation, bedding, backfill and compaction. Provide a minimum cover of (4’) feet measured vertically from the flow line of parallel ditches. Provide a (10”) inch shut-off valve with pedestal at connection of C900 to existing Well #14 piping. All bedding shall be a minimum of (6”) inch. The work shall be completed in accordance with all state regulations (Arkansas Department of Health) and forthcoming construction documents. The contractor shall be licensed in the State of Arkansas for potable well drilling.

The contractor shall cap existing Well #14 in accordance with all state regulations (Arkansas Department of Health) and the drawings and specifications.

The Contractor shall provide the connection of the new C900 to the existing piping at Well #14 by means of a “Wet Tap”. The base bid is the supply of water will be diverted so that Well # 14 can be shut off; no water flow.

Performance Requirements/Deliverables:

Inspection and Acceptance: The State of Arkansas has many requirements for installing a potable water well. The contractor will assume all responsibility for submitting water samples, drilling logs, soil samples, etc… Please review specifications and drawings.

Place of Performance/Shipping Destinations:

Food and Drug Administration, Arkansas Regional Laboratory 3900 NCTR Rd.

Jefferson, AR

72079

Period of Performance: 12 months

Specifications: Please see attached drawings and specifications.