Attachment_J_-_Quality_Assurance_Surveillance_Plan.docx

DOCX document 709 KB Posted

Attached to
Cloud Hosting Solutions III
Solicitation number
140G0122R0010
Issued by

About this file

This Quality Assurance Surveillance Plan outlines performance monitoring for a technical services contract to assist the United States Geological Survey with cloud migration. Key details include monitoring of metrics such as on-time ticket closure, communication standards, cloud platform establishment within 60 days of approval, and consistent user experience reporting. Performance will be evaluated through periodic surveillance, customer complaints, and annual architecture reviews to ensure standards defined in the Performance Work Statement are met. Unacceptable performance will be addressed through discrepancy reports documented in the Contractor Performance Assessment Reporting System. Technical representatives will provide annual ratings to assess if performance meets or exceeds standards defined for critical elements including work backlog latency, user support, security risk identification, and invoicing timeliness.

View the file

Other files

File Type Posted
Sol_140G0122R0010_Amd_0010.pdf PDF
Final_Solicitation_Documents_0010.zip ZIP file
FINAL_RFP_12_10_2022_0009.docx DOCX document
Sol_140G0122R0010_Amd_0009.pdf PDF
Attachment_L_-_Hourly_Rates_0009.xlsx XLSX spreadsheet
Q_A_12_10_2022_0009.pdf PDF
Sol_140G0122R0010_Amd_0008.pdf PDF
Sol_140G0122R0010_Amd_0007.pdf PDF
Sol_140G0122R0010_Amd_0006.pdf PDF
Sol_140G0122R0010_Amd_0005.pdf PDF
140G0122R0010_FINAL_RFP_Attachments_0005.zip ZIP file
Q_A_10_14_2022_0004.pdf PDF
Sol_140G0122R0010_Amd_0004.pdf PDF
Sol_140G0122R0010_Amd_0003.pdf PDF
Sol_140G0122R0010_Amd_0002.pdf PDF
140G0122R0010_Amendment_1_0001.pdf PDF
Sol_140G0122R0010_Amd_0001.pdf PDF
Attachment_G_-_Non-Disclosure_Agreement.docx DOCX document
Attachment_B_-_Past_Performance_Questionnaire.docx DOCX document
Attachment_I_-_Questions_Spreadsheet.xlsx XLSX spreadsheet
Attachment_H_-_Subcontracting_Plan_Model.pdf PDF
Attachment_A_-_Experience_Project_Data_Sheet.docx DOCX document
Attachment_E_-_Sample_Task_Order_NWIS_WQP.pdf PDF
Attachment_K_-_Supplier_Risk_Questionnaire.pdf PDF
Attachment_F_-_Sample_Task_Order_Data_Lake.pdf PDF
DRAFT_RFQ_140G0122R0010_Clauses.pdf PDF
Attachment_D_-_Day_1_Task_Order_-_Transition.pdf PDF
Sol_140G0122R0010.pdf PDF
Attachment_C_-Small_Business_Participation_Commitment_Document.docx DOCX document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of the Interior U.S. Geological Survey

Quality Assurance Surveillance Plan

Contract #:

Version 1.0

February 2021

QASP-XX

Version <X.0>

- 4 - QASP-XX

Version <X.0> Quality Assurance Surveillance Plan Contract #:

February 2021

Document Owner:

Kim Scott Primary Technical Evaulation Team Lead (TEC)

USGS, ACIO

Approved By:

XXXX

Contracting Officer’s Representative

USGS, ACIO

Document History

Document Number
Document Version
Publication Date
Change Description
QASP-
Version 1.0

Contents

Document Historyiii
Contentsiv
Section 1Introduction1
1.1Background1
1.2Purpose and Scope1
1.3Terminology1
Section 2Roles and Responsibilities3
2.1Government Roles and Responsibilities3
2.1.1Contracting Officer (CO)3
2.1.2Contracting Officer’s Representative (COR)3
2.1.3Technical Representive (TR)3
2.1.4Other Key Government Representatives3
2.2Contractor Roles and Responsibilities4
2.2.1TSSC Task Manager4
2.2.2Other TSSC Representatives4
Section 3Performance Standards5
Section 4Methods of Surveillance6
4.1Periodic Surveillance6
4.2Customer Complaint Surveillance6
4.3USGS Actions6
Section 5Documenting Performance7
5.1Ratings7
5.2Acceptable Performance7
5.3Unacceptable Performance7
5.3.1Contract Discrepancy Report (CDR)7
Appendix ACPARS Form8
Appendix BContract Discrepancy Report Form10

Introduction Background The United States Geological Survey (USGS) requires technical services for science, engineering and technical support necessary to assist the USGS in fulfilling its mission. These requirements include, but are not limited to, technical support for Cloud migration in the functional areas of statistical analysis, algorithm development, data analysis, software engineering, systems engineering, network engineering, information technology, information assurance/security, cloud operations, processing, systems maintenance, archiving and data management, along with user support.

Purpose and Scope This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

•What will be monitored
•How monitoring will take place
•Who will conduct the monitoring
•How monitoring efforts and results will be documented

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.

This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government will coordinate changes with the contractor. Updates will ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions will be retained in the contract file.

Roles and Responsibilities Government Roles and Responsibilities Contracting Officer (CO) CO: Victoria Floyd

The CO will ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and will safeguard the interests of the United States in the contractual relationship. The CO will also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Contracting Officer’s Representative (COR)

COR: XXXXXXTBD

The COR is responsible for the technical administration of the contract, assuring proper Government surveillance of the contractor’s performance and keeping a quality assurance file. At the conclusion of the contract or when requested by the CO, the COR will provide documentation to the CO. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The contractor shall refer any changes they deem may affect contract price, terms, or conditions to the CO for action.

Technical Representive (TR)/Task Order Monitor (TOM)

TR: ? TBD

The primary TR/TOM is typically the USGS Project Manager or key technical staff member that will serve as the primary interface with the CHSIII task manager. The TR is also the primary interface with the COR. The TR will prepare and sign task order documents, review deliverables, review invoices monthly, monitor task funding, and provide feedback to the COR.

Other Key Government Representatives Other: Tim Quinn, John Bechtell, Paul Exter, Keel Ross, Ken Klinner???

Other DOI/USGS staff may assist the Primary Technical Representative in the duties listed above.

Contractor Roles and Responsibilities CHSIII Task Manager The Cloud integrator (known as CHSIII Task Manager) will assign a task manager that will act as the primary interface with the USGS Technical Representative.

Other CHSIII Representatives The Cloud integrator has other staff assisting the TSSC Task Manager such as financial representatives, division managers, and other support staff that may also assist with various roles and responsibilities.

Performance Standards The table below identifies the Critical Performance Elements and the respective Performance Standards and Acceptable Quality Levels (AQLs) which the Government will use to determine contractor performance.

Critical Performance Element

Frequency
Performance Standard
PWS Reference
AQL
CHSIII Work work backlog and latency
Weekly status meeting (communication).
The Contractor shall track, report and verify closure of all Data Center Services tickets and capture all customer inquiries within the CRM tool.

100% of customer closeouts are verified within 5 business days

Develop and maintain strong working relationships between Contractor and the Government Contracting Officers/ Contracting Officer Representives
Monthly status report meeting (communication).
The Contractor shall develop strong communication channels and working relationships between the government Government (USGS) and our Bureau partners.

Status communication occurs monthly with a shared opportunities/challenges log with identified actions

Support of multi Cloud platform enviroments
Within 30 days of government Government approval
The Contractor establish an environment for the government Government to transition on premise work activities to the platform identified.

95% of IT service management tools and processes are delivered within 60 days of government Government approval

Delivering optimal IT services
Within 24 hours of delivery
The Contractor shall verify services provisioned are operational.

100% of provisioned services are verified within 2 days

Consistent User user Experience experience across Bureau’s (multi)
Quarterly
The Contractor shall review and employ consistent customer onboarding processes, track cloud service usage metrics, and obtain customer feedback.

Report

IT Security risks

Work with Al/Willett Comment by Scott, Kimberly: Kim’s action

Others? Brainstorming

Architecture design
Annual
The Contractor shall provide to the Government an annual architecture review that encompasses critical design recommendations.

Report and brief on design

Invoicing
Monthly
Submit a preliminary invoice to the relevant Bureau/Task Order COR and CO by the 15th of the month for the previous month for pre-approval prior to submission into the IPP

Invoices

Methods of Surveillance The Government reserves the right to perform inspections and surveillance to evaluate the Contractor’s compliance to the contract terms and performance of the requirements in the PWS. The Government will make every effort to ensure that the surveillance methods described below are conducted in an objective, fair, and consistent manner.

Periodic Surveillance This action occurs when the COR or other Government official observes a deficiency. Examples include evidence from accidents, incidents, or delays. Regardless of where in the line-of-duty the COR observes contractual procedures not being followed, he/she has an obligation to document and report the deficiency to the Contracting Officer.

Customer Complaint Surveillance This action is instituted when the COR receives a complaint from a stakeholder regarding contractor service. The COR will obtain the complaint in writing and then investigate to determine its validity. If the complaint is deemed valid, the COR will immediately notify the Contracting Officer (CO) for action. The COR will notify both the Contract Task Manager and the complainant of the Government’s response to their complaint.

USGS Actions Regardless of the surveillance method, the COR will always contact the contractor's manager or contract task manager (representative) when a defect is identified and inform the manager of the specifics of the problem. The COR, with assistance from the TRs and Other Key Government Personnel, will be responsible for monitoring the contractor’s performance in meeting a specific performance standard/AQL.

Surveillance results may be used as the basis for actions (to include payment deductions) against the contractor. In such cases, the Inspection of Services clause in the Contract becomes the basis for the CO’s actions

Documenting Performance

Ratings Contractor performance will be rated using the Contractor Performance Assessment Report System (CPARS). Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. The sample Task Order Performance Report in Appendix A provides the rating guidelines. USGS Technical Representatives for each task order will provide annual ratings for their areas to the COR. The COR will summarize the ratings in the CPAR System annually.

Acceptable Performance The Government will document positive performance. The most common format used for this action will be via CPARS. Any report may become a part of the supporting documentation for fixed fee payments, award fee payments, or other actions.

Unacceptable Performance When unacceptable performance occurs, the COR will inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR will document the discussion and place it in the COR file.

Contract Discrepancy Report (CDR) When the COR determines formal written communication is required, the COR will prepare a Contract Discrepancy Report (CDR) and present it to the contractor's manager or on-site representative. A CDR template is attached to this QASP in Appendix B.

The contractor shall be required to acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor must present this corrective action plan to the COR. The Government will review the contractor's corrective action plan to determine acceptability.

Any CDR will become a part of the supporting documentation for contract payment deductions, fixed fee deductions, award fee nonpayment when applicable. The Government will use any completed CDR as part of an overall evaluation of Contractor performance when determining present or future contractual actions.