This is an API 653 inspection report dated April 15, 2020 for Tank 1 (Facility 4312) at Robins Air National Guard Base in Warner Robins, Georgia, conducted by Pond under USACE contract W9128F-17-D-0016.
The report details the inspection of a 7,077 barrel (297,234 gallon) Jet A (F-24) storage tank constructed in 1998 and altered in 2016. The tank is 36'-8" in diameter and 40'-0" high, with a welded steel construction and aluminum honeycomb internal floating roof. Key findings include: no mandatory repairs required to remove the tank from service; recommended short-term repairs within 5 years including tank shell and fixed roof recoating, sealing of grounding cable penetrations, and installation of a double block and bleed valve; and long-term repairs including replacement of corroded Enraf ATG fasteners, confined space labeling replacement, and addition of an NFPA emergency responder diamond. The next required inspections are: monthly routine in-service inspections, external visual inspection by April 2025, external visual inspection with ultrasonic testing by April 2035, and internal inspection by March 2025.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Gilbane Tanks K1002 and W0003 – Post Repair API 653 Inspections
June 19, 2019
All Pond marketing materials are printed on papers containing post-consumer recycled fibers and are FSC Certified.
June 5, 2020
Ronald J. Weiser
Project Manager ronald.j.wieser@usace.army.mil
USACE, Omaha District
Contract Number: W9128F-17-D-0016
Task Order Number: W9128F20F0026
Submittal Number: 024
Per SOW para 2.4.1 & 2.4.1.2, see attached for the following documents:
1. Robins ANG – Tank 1 (Facility 4312) In-Service Inspection Report (Final)
2. Robins ANG – Tank 1 (Facility 4312) - Attachment C
Respectfully submitted, Pond
Anthony E, Chinn, EIT
Program Manager | Mechanical Integrity chinna@pondco.com
678-591-5242
CC: John Anna - john.anna@us.af.mil
Michael Deeker - michael.deeker@dla.mil
Rueben Watson - ruben.watson@dla.mil
Daniel Cook - Daniel.1.cook@dla.mil
Michael Washington - michael.a.washington@dla.mil
James Lee - james.b.lee85.mil@mail.mil
Derek Jaudon - derek.s.jaudon.mil@mail.mil
Timothy Fetz - timothy.a.fetz.nfg@mail.mil mailto:ronald.j.wieser@usace.army.mil mailto:chinna@pondco.com mailto:john.anna@us.af.mil mailto:michael.deeker@dla.mil mailto:ruben.watson@dla.mil mailto:Daniel.1.cook@dla.mil mailto:michael.a.washington@dla.mil mailto:derek.s.jaudon.mil@mail.mil mailto:timothy.a.fetz.nfg@mail.mil
US Army Corps of Engineers Omaha District
API 653 In-Service Inspection Report
Robins Air National Guard Facility 4312
Tank 1
US Army Corps of Engineers Center of Expertise for Petroleum, Oils and Lubricants
(USACE POL-MCX)
4/15/2020
API 653 Inspection Report Robins ANG, Georgia
Table of Contents
Table of Contents
ACRONYMS AND ABBREVIATIONS
GENERAL SUMMARY
INSPECTION DATE
STATE REGULATIONS
PREVIOUS INSPECTION DATES
RECOMMENDED FUTURE INSPECTION DATES
GENERAL TANK INFORMATION
A. GENERAL PROJECT INFORMATION
1. API 653 IN-SERVICE (EXTERNAL) INSPECTION
2. SITE INFORMATION
B. TANK INSPECTION COMMENTS
1. TANK CONSTRUCTION
2. TANK FOUNDATION
3. CATHODIC PROTECTION
4. TANK SHELL
5. FIXED ROOF
6. TANK APPURTENANCES
7. TANK AND PIPING COATING
8. TANK PIPING SYSTEM
9. FIRE PROTECTION SYSTEM
10. SECONDARY CONTAINMENT
C. FINDINGS AND RECOMMENDATIONS
1. MANDATORY REPAIRS PER API 650/653, UFC 3-460-01/3-460-03, OR DoD AW 78-24-27
2. SHORT-TERM RECOMMENDED REPAIRS
3. LONG-TERM RECOMMENDED REPAIRS
APPENDIX A: ENGINEERING CALCULATIONS AND DRAWINGS
NEXT INSPECTION
API/OSHA ACCESS STRUCTURE REPORT
APPENDIX B: API 653 CHECKLISTS FOR TANK INSPECTIONS
APPENDIX C: PHOTOGRAPHS
ACRONYMS AND ABBREVIATIONS
ANG Air National Guard
API American Petroleum Institute
ATG Automatic Tank Gauge
BBL Barrel
CP Cathodic Protection
DB&B Double Block and Bleed
DFT Dry Film Thickness
DoD Department of Defense
HHLA High-High Level Alarm
HLA High Level Alarm
HLCV High Level Control Valve
IAW In Accordance With
IFR Internal Floating Roof
LLA Low Level Alarm
LLLA Low-Low Level Alarm
MT Magnetic Particle Testing
NDT Non-Destructive Testing
NFPA National Fire Protection Association
OOS Out-of-Service
OSHA Occupational Health and Safety Administration
PST Product Saver Tank
PT Dye Penetrant Testing
RMMR Recurring Maintenance and Minor Repair
STARS Surveillance Target Attack Radar System
TLG Tape Level Gauge
UFC Unified Facilities Criteria
USACE United States Army Corps of Engineers
UTT Ultrasonic Thickness Testing
VT Visual Testing
GENERAL SUMMARY
Pond was retained by the United States Army Corps of Engineers (USACE) to provide an in-service tank inspection for Tank 1 (Facility 4312) at Robins Air National Guard (ANG) in Warner Robins, Georgia.
The in-service inspection was performed 15 April 2020. Results of this inspection identified recommended repairs/upgrades to fully comply with applicable sections of American Petroleum Institute (API) 650/653, Unified
Facilities Criteria (UFC) 3-460-01/3-460-03, Department of Defense (DoD) Standard Design AW 78-24-27, National
Fire Protection Association (NFPA) 407, Occupational Health and Safety Administration (OSHA) guidelines, and industry standards.
Tank 1 is a welded, steel, vertical, aboveground Jet A (F-24) storage tank. The tank was constructed by Industrial
Alloy Fabricators in 1998 to API 650 standards and altered by Cape in 2016 to API 653 4th edition, addendum 3. The tank is 36’-8” in diameter and 40’-0” high with a nominal capacity of 7,077 barrels (BBL) (297,234 gallons).
Testing and inspection activities were performed in accordance with (IAW) applicable sections of API 653, 5th
Edition. This report contains a detailed account of the tank inspection, non-destructive testing (NDT) methods, and conclusions derived from the inspection and testing activities. Findings from this inspection are further detailed in
Section B – Tank Inspection Comments. Recommended repairs and upgrades identified in Section B are further classified and listed in Section C – Findings and Recommendations.
INSPECTION DATE
API In-Service (External) Inspection Date: 15 April 2020 Equipment Used:
Manufacturer: GE Krautkramer Ultrasonic Thickness Gauge Model Number: DMS GO+ Calibration Method: One-Point Calibration
Manufacturer: Fischer Technologies Dry Film Thickness (DFT) Gauge Model Number: Dual Scope MPOR Calibration Method: Calibration to Known Thickness Standard
Manufacturer: Technidea Corporation Model Number: ZipLevel Pro 2000 Calibration Method: Manufacturer Calibrated
Inspector(s):
Andrew D. Morrissette Christopher A. Walker, EIT
STATE REGULATIONS
State Regulation for API In-Service Tank Inspections: N/A State Regulation for API Out-of-Service Tank Inspections: N/A
PREVIOUS INSPECTION DATES
API Out-of-Service (OOS) (Internal) Inspection Date: March 2015 API In-Service (External) Inspection Date: March 2015
RECOMMENDED FUTURE INSPECTION DATES
API OOS (Internal) Inspection Date: March 2025* API In-Service (External) Inspection Date: April 2025 *OOS inspection date based on the previous OOS inspection report dated March 2015.
Andrew D. Morrissette Christopher A. Walker, EIT
Integrity Engineer Integrity Engineer
API 653 Inspector # 80109 API 570 Inspector # 85282
ASNT NDT Level I/II ASNT NDT Level I/II
GENERAL TANK INFORMATION
ITEM DESCRIPTION
Owner Georgia ANG / US Air Force
Location Robins ANG
Facility Number Facility 4312
Tank Number Tank 1
State / Country Georgia, USA
City Warner Robins
Inspection Date 15 April 2020
Tank Manufacturer Industrial Alloy Fabricators, Inc.
Design Standard API 650
Date of Construction 1998
Tank Contents Jet-A (F-24)
Tank Serial Number S/E 424-2
Tank Diameter 36’-8”
Shell Height 40’-0”
Max Product Height 37’-7 ½”
Tank Capacity 7,077 BBL (297,234 gallons)
Foundation Concrete Pad
Construction
Bottom: Butt-Welded / Cone-Down(1)
Shell: Butt-Welded
Fixed Roof: Lap-Welded
Floating Roof: Aluminum Honeycomb Pan
Material
Bottom: Carbon Steel A-36(2)
Shell: Carbon Steel A-36(2)
Fixed Roof: Carbon Steel A-36(2)
Floating Roof: Aluminum
Cathodic Protection (CP) None – Concrete Pad Foundation
Interior Coating System Epoxy-Polyamide(2)
Exterior Coating System Epoxy-Polyamide with Urethane Topcoat(2)
Level Gauging Enraf Automatic Tank Gauge (ATG) Varec Tape Level Gauge (TLG)
Overfill Protection High Level Alarm (HLA) / High-High Level Alarm (HHLA) / High-Level Control Valve (HLCV) Float Pilot
Piping Receipt: 8-inch Stainless Steel
Main Suction: 12-inch Stainless Steel
Low Suction: 4-inch Stainless Steel
Water Draw-Off: 2-inch Stainless Steel
Level Alarms HLA/HHLA; Low Level Alarm (LLA) / Low-Low Level Alarm (LLLA)
Notes:
(1) Based on previous out-of-service inspection report dated March 2015.
(2) Construction drawings were available for review and comparison.
A. GENERAL PROJECT INFORMATION
1. API 653 IN-SERVICE (EXTERNAL) INSPECTION
The in-service inspection was performed 15 April 2020. Results of this inspection identified recommended repairs/upgrades to fully comply with applicable sections of API 650/653, UFC 3-460-
01/3-460-03, DoD Standard Design AW 78-24-27, NFPA 407, OSHA guidelines, and industry standards.
2. SITE INFORMATION
The 116th Air Control Wing is a wing of the Georgia ANG/United States Air Force, stationed at Robins
Air Force Base, Georgia. If activated for federal service, the wing is gained by Air Combat Command.
The 116th Air Combat Command is the only ANG unit operating the E-8C Joint Surveillance Target
Attack Radar System (STARS), an airborne ground surveillance and battle management aircraft. Joint
STARS detects, locates, classifies, tracks and targets ground movements on the battlefield, communicating real-time information through secure data links with United States command posts.
B. TANK INSPECTION COMMENTS
1. TANK CONSTRUCTION
Tank 1 is a welded, carbon steel, vertical, aboveground Jet A (F-24) storage tank. The tank was constructed by Industrial Alloy Fabricators in 1998 to API 650 standards and altered by Cape in 2016 to
API 653 4th edition, addendum 3. The tank is 36’-8” in diameter and 40’-0” high with a nominal capacity of 7,077 BBL (297,234 gallons).
2. TANK FOUNDATION
Tank 1 rests on a concrete pad foundation. The tank is provided one (1) leak detection port, which was dry during inspection. The tank is provided with twenty (20) wind and seismic anchors. Tank wind and seismic anchors are distorted, warped, and may be under excess stress. One (1) anchor bolt is not of adequate length and does not exceed the associated hex nut. An analysis for the wind and seismic anchors should be performed to verify that current anchors are adequate.
A settlement evaluation was performed during the inspection. The settlement evaluation showed no signs of tank shell deformation and no visual signs of excessive piping stress were observed. See
Appendix A for settlement results.
3. CATHODIC PROTECTION
The tank is resting on a concrete pad and therefore, a CP system is not necessary. No evidence of bottom-side corrosion was observed in the previous OOS inspection report dated March 2015.
4. TANK SHELL
The tank shell is equipped with five (5) fully coated, butt-welded, carbon steel courses. Shell plates were examined using ultrasonic thickness testing (UTT) and visual testing (VT) methods. Nine (9) UTT measurements were taken on each plate of the 1st shell course. Ten (10) UTT measurements were taken on each of the 2nd through 5th shell courses using the spiral staircase for access. UTT measurements indicated no significant signs of metal loss on shell plates.
Tank 1 is not provided an emergency responder diamond IAW NFPA 704. Emergency responder diamonds are the established standard system for identification of hazardous materials present for emergency responders. Strapping charts are provided for Tank 1; however, current strapping charts are in 1/8-inch increments, whereas UFC mandates strapping charts be in 1/16-inch increments.
Refer to Drawing A-1, “Shell Layout”, in Appendix A for shell plate locations and Table 1, “Shell UTT
Measurements”, in Appendix A for shell plate UTT measurements.
5. FIXED ROOF
The tank fixed roof was examined using UTT and VT methods. Five (5) UTT measurements were taken on each fixed roof plate. UTT measurements indicated no significant signs of metal loss on fixed roof plates. Various depressions were observed on the fixed roof with water staining. No signs of significant corrosion were observed at depressions during inspection.
Refer to Drawing A-2, “Fixed Roof Layout”, in Appendix A for fixed roof plate locations and Table 2, “Fixed
Roof UTT Measurements”, in Appendix A for fixed roof plate UTT measurements.
6. TANK APPURTENANCES
a. TANK SHELL
Tank 1 is equipped with twelve (12) shell nozzle penetrations: two (2) 36-inch manways, one (1) 4-inch low suction, one (1) 12-inch main suction, one (1) 24-inch by 24-inch flush clean out, two (2) ¾-inch LLA/LLLA penetrations, one (1) 2-inch water draw-off, one (1) 2-inch product saver tank (PST) return, two (2) ¾-inch HLA/HHLA/HLCV float pilot assembly penetrations, and one (1) 8-inch receipt.
Clearance between the Manway 1 reinforcing pad toe weld and shell-to-bottom weld is approximately 2 ½-inches, whereas API mandates a minimum 3-inch clearance. No visual signs of stress cracking were observed.
Refer to Drawing A-1, “Shell Layout”, in Appendix A for shell nozzle locations and Table 3, “Shell
Nozzle/Repad UTT Measurement”, in Appendix A for nozzle and associated reinforcement pad UTT measurements.
b. FIXED ROOF
The fixed roof is provided sixteen (16) nozzle penetrations: two (2) 3-inch internal floating roof (IFR) anti-rotation cables, three (3) 12-inch temperature sensors, two (2) 36-inch by 30-inch IFR inspection hatches, two (2) 3-inch IFR grounding cables, one (1) 24-inch center vent, one (1) 8-inch blind flange, one (1) 2 ½-inch Varec TLG penetration, one (1) 72-inch by 24-inch IFR installation hatch, one (1) 10-inch sampling hatch, one (1) 10-inch Enraf ATG, and one (1) 4-inch Vito temperature/water probe.
Coating on IFR inspection hatches, three (3) temperature sensors, sampling hatch, Enraf ATG, and
IFR grounding cables exhibits chalking and base metal exposure with surface corrosion. One (1) IFR grounding cable and one (1) anti-rotation cable nozzles are provided with machined holes, allowing water ingress to the tank, which may collect on top of the floating pan. No evidence of water accumulation was observed on the floating pan during inspection. Confined space labeling at each of the two (2) fixed roof inspection hatches exhibits fading and peeling. The screen for the center vent is not properly attached to the vent, presenting a gap that allows wildlife to enter the tank.
Refer to Drawing A-2, “Fixed Roof Layout”, in Appendix A for shell nozzle locations and Table 3, “Nozzle/Repad UTT Measurement”, in Appendix A for nozzle and associated reinforcement pad UTT measurements.
c. GAUGING
The tank is provided with an Enraf ATG and Vito temperature/water probe for automatic gauging.
The Vito temperature/water probe is not provided a fully slotted stilling well to allow for proper temperature/water gauging during filling and issuing operations. Ten (10) fasteners on the Enraf
ATG exhibit general corrosion and one (1) fastener is missing. The tank is provided a sampling hatch for manual gauging and sampling operations.
d. LEVEL ALARMS
The tank is provided with independent, shell mounted level alarms in the low, low-low, high, and high-high positions as well as a HLCV for overfill protection. According to facility personnel, all level alarms and the HLCV float pilot are functioning properly.
e. STAIRS AND PLATFORMS
The tank is provided a spiral staircase with one (1) upper platform for fixed roof access, one (1) work platform for access to the HLA/HHLA/HLCV float pilot assembly, and one (1) mid-platform for access to Manway 2. The HLA/HHLA chamber extends into the path of the spiral staircase, allowing 21 ½-inches clearance between the appurtenance and staircase railing. OSHA mandates a minimum 26-inches clearance between appurtenances and staircase railings.
f. GROUNDING AND BONDING
The tank shell is equipped with four (4) grounding cables. Grounding cables are in good condition with no sign of damage, detachment, or deterioration. Sealant provided at four (4) grounding cable foundation penetrations exhibit voids, shrinkage, and disbondment, allowing a pathway for fluid to escape in the event of a spill.
7. TANK AND PIPING COATING
External coating for the tank shell and fixed roof is epoxy-polyamide with a urethane topcoat. External tank shell and fixed roof coating exhibits widespread chalking, indicating the coating system is near the end of its life cycle. Prior to recoat, it is recommended to perform a coating condition survey, including an adhesion test, or review a previous coating condition survey to determine whether a full recoat is required or if a topcoat reapplication will suffice.
A DFT survey was performed on the external tank shell and fixed roof. Refer to Table 4, “DFT
Measurements”, in Appendix A for tank shell and fixed roof DFT results.
Piping provided for Tank 1 is of stainless-steel construction and is not coated.
8. TANK PIPING SYSTEM
Piping within the containment dike is constructed of stainless steel and is in good overall condition with no signs of stress or corrosion. Flow arrows for the receipt and suction piping exhibit fading and peeling.
The tank receipt piping is not provided a double block and bleed (DB&B) valve directly upstream of the
HLCV to permit isolation of system components for maintenance or repair.
9. FIRE PROTECTION SYSTEM
For internal fire protection, an aluminum honeycomb IFR with double wiper seal is provided. The IFR is in good overall condition with no visual signs of damage or deterioration. Visual inspection of the IFR was limited due to accessibility.
10. SECONDARY CONTAINMENT
Tank 1 is located within a 90-foot long by 90-foot wide concrete secondary containment with containment dike walls 6-feet 6-inches high. The capacity of the secondary containment is approximately
393,850 gallons and meets the 1-foot capacity requirement of UFC. The secondary containment and associated control joint and cracking sealant are in good overall condition with no signs of deterioration.
C. FINDINGS AND RECOMMENDATIONS
Based on the in-service API 653 inspection of Tank 1 (Facility 4312) located at Robins ANG in Warner Robins, Georgia, preliminary repair/upgrade recommendations have been identified. The following recommendations outline observations from this inspection. All repair recommendations are based on applicable sections of API 650/653, UFC 3-460-01/3-460-03, DoD AW 78-24-27, NFPA 407, and industry standards.
1. MANDATORY REPAIRS PER API 650/653, UFC 3-460-01/3-460-03, OR DoD AW 78-24-27
Mandatory repairs represent items that require immediate attention in order to prevent imminent risk to system operators, equipment integrity, or the adjacent environment. The tank should be removed from service until these repairs are completed.
No mandatory repairs are required to remove Tank 1 from service.
2. SHORT-TERM RECOMMENDED REPAIRS
Short-term recommended repairs are repairs that will assist in maintaining tank operability and serviceability or are required to meet current codes. Short-term recommended repairs should be performed within five (5) years of the inspection date.
2.1 Tank Shell Coating
OBSERVATION: External coating for the tank shell exhibits widespread chalking, indicating the coating system is near the end of its life cycle.
REFERENCE: UFC 3-460-01, Section 8-3.10
RECOMMENDATION: Provide a full recoat of the tank shell, approximately 5,500 ft2. Prior to recoat, perform a coating condition survey, or review the previous coating condition survey, to determine if a full recoat is required or if a topcoat reapplication is sufficient.
2.2 Fixed Roof Coating
OBSERVATION: External coating for the tank fixed roof exhibits widespread chalking, indicating the coating system is near the end of its life cycle.
REFERENCE: UFC 3-460-01, Section 8-3.10
RECOMMENDATION: Provide a full recoat of the tank fixed roof, approximately 1,300 ft2. Prior to recoat, perform a coating condition survey, or review the previous coating condition survey, to determine if a full recoat is required or if a topcoat reapplication is sufficient.
2.3 Fixed Roof Nozzle and Appurtenance Coatings
OBSERVATION: Coating on IFR inspection hatches, three (3) temperature sensors, manual gauging hatch, Enraf ATG, and two (2) threaded caps exhibit chalking and base metal exposure with surface corrosion.
REFERENCE: UFC 3-460-01, Section 8-3.10
RECOMMENDATION: Provide approximately 60 ft2 of spot coating repair on the fixed roof nozzles and appurtenances.
2.4 Grounding Cable Penetration Sealant
OBSERVATION: Sealant provided at four (4) grounding cable foundation penetrations exhibit voids, shrinkage, and disbondment, allowing a pathway for fluid to escape in the event of a spill.
REFERENCE: UFC 3-460-03, Section 8-10.2.2
RECOMMENDATION: Provide approximately 4 linear feet of flexible, fuel-resistant, UV-resistant sealant at four (4) grounding cable foundation penetrations. Note: This will be accomplished as part of a recurring maintenance and minor repair (RMMR) service order.
2.5 Tank Seismic and Wind Anchor Bolts
OBSERVATION: Tank seismic and wind anchors are distorted, warped, and may be under excess stress. One (1) anchor bolt is not of adequate length and does not exceed the associated hex nut.
REFERENCE: UFC 3-460-03, Section 8-4.1 (C); API 650, Section 5.12
RECOMMENDATION: Perform a stress analysis on seismic and wind anchors to determine if the anchors are of adequate size, operations, and demographics.
2.6 Manway 1 Weld Spacing
OBSERVATION: Manway 1 reinforcing pad weld spacing at the shell-to-bottom weld is approximately 2 ½-inches.
REFERENCE: API 650, Figure 5.6
RECOMMENDATION: Perform magnetic particle (MT) or dye penetrant (PT) testing at the Manway 1 reinforcing pad. Note: This will be accomplished as part of a RMMR service order.
2.7 Receipt DB&B Valve
OBSERVATION: The product receipt does not have a DB&B valve directly upstream of the HLCV.
REFERENCE: AW 78-24-27, Sheet D.12 Detail 3; UFC 3-460-01, Section 6-5 (D)
RECOMMENDATION: Provide one (1) DB&B valve upstream of the HLCV to permit isolation of system components for maintenance or repair.
2.8 IFR Grounding Cables and Anti-Rotation Cable
OBSERVATION: The IFR grounding cable and anti-rotation cable nozzles are provided with machined holes, allowing water ingress to the tank.
REFERENCE: UFC 3-460-03, Section 2-4.2 (F)
RECOMMENDATION: Plug or seal the IFR grounding cable and anti-rotation cable nozzles to avoid water ingress to the tank.
2.9 Stilling Wells
OBSERVATION: The Vito temperature/water probe is not provided a fully slotted stilling well to allow for proper temperature/water gauging during filling and issuing operations and is located at the perimeter of the tank.
REFERENCE: UFC 3-460-01, Table 8.1 (W)
RECOMMENDATION: Fully slot the stilling well provided for the Vito temperature/water probe and move the probe to the blind flange located adjacent to the center vent. The Vito temperature/water probe should be as close to the center sump as possible for accurate water readings.
3. LONG-TERM RECOMMENDED REPAIRS
Long-term repairs that relate to repair/upgrade of an asset to bring it up to the current standard from the standard at time of construction. Long-term repairs represent items that should be addressed in a timely manner in order to prevent future potential risks to system operators, equipment integrity, or the adjacent environment.
3.1 Enraf ATG
OBSERVATION: Ten (10) fasteners on the Enraf ATG exhibit general corrosion and one (1) fastener is missing.
REFERENCE: BMP
RECOMMENDATION: Replace eleven (11) fasteners at the Enraf ATG with stainless steel fasteners and provide isolation at each fastener.
3.2 Inspection Hatch Confined Space Labeling
OBSERVATION: Confined space labeling at each of the two (2) fixed roof inspection hatches exhibit fading and peeling.
REFERENCE: UFC 3-460-01, Section 2.17 (b)
RECOMMENDATION: Replace confined space labeling at each of the two (2) fixed roof inspection hatches.
3.3 HLA/HHLA/HLCV Float Pilot Clearance
OBSERVATION: Clearance between the HLA/HHLA/HLCV float pilot and spiral staircase railing is
21 ½-inches, which is less than the 26-inch clearance required by OSHA.
REFERENCE: OSHA 1910.25(d)(1)
RECOMMENDATION: Extend the spiral staircase treads or work platform to allow proper clearance for the HHLA.
3.4 NFPA Diamond
OBSERVATION: Tank 1 is not provided with a NFPA emergency responder diamond IAW NFPA
704.
REFERENCE: UFC 3-460-01, Section 2-17 (C)
RECOMMENDATION: Provide NFPA responder diamond for the tank.
3.5 Piping Flow Arrows
OBSERVATION: Flow arrows for the receipt and main suction piping exhibit fading and peeling.
REFERENCE: UFC 3-460-01, Section 2-17
RECOMMENDATION: Provide or replace product designation labeling and flow arrows for piping in IAW
MIL-STD-161H.
3.6 Center Vent Screen
OBSERVATION: The center vent screen is not properly attached to the vent, allowing wildlife to enter the tank.
REFERENCE: UFC 3-460-03, Section 8-2
RECOMMENDATION: Secure the vent screen to the center vent.
3.7 Strapping Charts
OBSERVATION: Current strapping charts provided for Tank 1 are in 1/8-inch increments where
UFC mandates strapping charts be in 1/16-inch increments.
REFERENCE: UFC 3-460-01, Section 8-3.13
RECOMMENDATION: Provide the tank with strapping charts in 1/16-inch increments.
APPENDIX A: ENGINEERING CALCULATIONS AND DRAWINGS
NOZZLE
SCHEDULE
NOZZLE SIZE NOTES
MW1 36" MANWAY
MW2 36" MANWAY
N1 4" LOW SUCTION
N2 12" MAIN SUCTION
N3 24" x 24" FLUSH CLEAN-OUT
N4 3/4" LLA/LLLA
N5 3/4" LLA/LLLA
N6 2" PST RETURN
N7 2" WATER DRAW-OFF
N8 3/4" HLA/HHLA/HLCV FLOAT PILOT
N9 3/4" HLA/HHLA/HLCV FLOAT PILOT
N10 8" RECEIPT
7'-10"
1-1
GROUNDING
CABLE (TYP. 4)
8'-0"
8'-0"
8'-0"
8'-0"
VAREC
MW1
1-2 1-3 1-4 1-5
2-1 2-2 2-3 2-42-5
4-5 4-1 4-2 4-34-4
3-5 3-1 3-2 3-3 3-4
5-4 5-5 5-1 5-2 5-3
MW2
N1
N2
N3
N4
N5
N6 N7
N10
N8
N9
ANCHOR (TYP. 20)
0'-2"
CONCRETE PAD
VAREC TLG
SUPPORT (TYP.4)
SPIRAL STAIRCASE
FULL PERIMETER
HAINDRAIL
CONDUIT SUPPORT
(TYP.8)
LEVEL ALARM SUPPORT
(TYP.4)
INSERT PLATE
OVERFLOW VENT
(TYP.2)
VAREC
TLG
C O
N T
R A
C T
N
O
F I L E
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
D
2 3
C
A
B
M A
R K
A P
P R
D A
T E
F I
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L O
T
S
C A
L E
P
L O
T
D
A T
E
D A
T E
M A
R K
D E
S C
R I P
T I O
N
D E
L I V
E R
Y
O
R D
R
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
U S
A
R M
Y
C
O R
P S
F
E
N G
I N
E E
R S
O M
A H
A
N
E
O M
A H
A
D
I S
T R
I C
T
W A
R N
B
I N
S
G
A
R O
B I N
S
A
N G
T A
K
A C
I L
I T
Y
L
A Y
O U
T
N T
S
N A
W
F
D
W
F
F
A N
S I
B
P a r k w a y
L a n e
S u i t e
P e a c h t r e e
C o r n e r s
G
A
P h o n e
F a x
J O
B
N
O
C A
W
A E
C
C R
P
N A
TANK INFORMATION
TANK NO.: TANK 1 (FACILITY 4312)
MANUFACTURER: INDUSTRIAL ALLOY FABRICATORS
YEAR BUILT: 1998
TANK DIAMETER: 36'-8"
TANK HEIGHT: 40'-0"
NOMINAL CAPACITY: 7,077 BBL
PRODUCT: JET-A (F-24)
PRODUCT SPECIFIC GRAVITY: 0.84
GPS COORDINATES: 32.642189°, -83.604161°
N A
S H
E L
L
L
A Y
O U
T
A-1
NOTES:
1. REFER TO TABLE 1, "SHELL UTT MEASUREMENTS", IN
APPENDIX A FOR INDIVIDUAL SHELL PLATE UTT READINGS.
2. REFER TO TABLE 3, "NOZZLE/REPAD UTT MEASUREMENTS",
FOR NOZZLE DATA.
SPIRAL
STAIRCASE
NOZZLE
SCHEDULE
NOZZLE SIZE NOTES
N11 3" IFR ANTI-ROTATION CABLE
N12 12" TEMPERATURE SENSOR
N13 2 1/2" VAREC TLG
N14 36" x 30" IFR INSPECTION HATCH
N15 3" IFR GROUNDING CABLE
N16 12" TEMPERATURE SENSOR
N17 24" CENTER VENT
N18 8" BLIND FLANGE
N19 72" x 24" IFR INSTALLATION HATCH
N20 12" TEMPERATURE SENSOR
N21 3" IFR GROUNDING CABLE
N22 36" x 30" IFR INSPECTION HATCH
N23 10" SAMPLING HATCH
N24 10" ENRAF ATG
N25 4" VITO WATER/TEMPERATURE PROBE
N26 3" IFR ANTI-ROTATION CABLE
N12
N11
N13
N14
N15
N16
N17
N18
N19
N20
N21 N22
N23
N24
N25
N26
PERIMETER HANDRAIL
SUPPORT (TYP.17)
C O
N T
R A
F I
M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
D
2 3
C
A
B
M A
R K
A P
P R
D A
T E
F I
M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L O
T
S
C A
L E
P
L O
T
D
A T
E
D A
T E
M A
R K
D E
S C
R I P
T I O
N
D E
L I V
E R
Y
O
R D
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
O M
A H
A
N
E
O M
A H
A
D
I S
T R
I C
T
W A
R N
B
I N
S
G
A
R O
B I N
S
A
N G
T A
A C
I L
I T
Y
L
A Y
O U
T
N T
S
N A
W
F
D
W
F
F
A N
S I
B
P a r k w a y
L a n e
S u i t e
P e a c h t r e e
C o r n e r s
G
A
P h o n e
F a x
J O
B
N
O
C A
W
A E
C
C R
P
N A
TANK INFORMATION
TANK NO.: TANK 1 (FACILITY 4312)
MANUFACTURER: INDUSTRIAL ALLOY FABRICATORS
YEAR BUILT: 1998
TANK DIAMETER: 36'-8"
TANK HEIGHT: 40'-0"
NOMINAL CAPACITY: 7,077 BBL
PRODUCT: JET-A (F-24)
PRODUCT SPECIFIC GRAVITY: 0.84
GPS COORDINATES: 32.642189°, -83.604161°
N A
F I X
D
O
F
L
A Y
O U
T
A-2
C O
N T
R A
F I
M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
D
2 3
C
A
B
M A
R K
A P
P R
D A
T E
F I
M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L O
T
S
C A
L E
P
L O
T
D
A T
E
D A
T E
M A
R K
D E
S C
R I P
T I O
N
D E
L I V
E R
Y
O
R D
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
O M
A H
A
N
E
O M
A H
A
D
I S
T R
I C
T
W A
R N
B
I N
S
G
A
R O
B I N
S
A
N G
T A
A C
I L
I T
Y
L
A Y
O U
T
N T
S
N A
W
F
D
W
F
F
A N
S I
B
P a r k w a y
L a n e
S u i t e
P e a c h t r e e
C o r n e r s
G
A
P h o n e
F a x
J O
B
N
O
C A
W
A E
C
C R
P
N A
TANK INFORMATION
TANK NO.: TANK 1 (FACILITY 4312)
MANUFACTURER: INDUSTRIAL ALLOY FABRICATORS
YEAR BUILT: 1998
TANK DIAMETER: 36'-8"
TANK HEIGHT: 40'-0"
NOMINAL CAPACITY: 7,077 BBL
PRODUCT: JET-A (F-24)
PRODUCT SPECIFIC GRAVITY: 0.84
GPS COORDINATES: 32.642189°, -83.604161°
N A
LEGEND:
- PLATE DEPRESSION WITH WATER STAINING
NOTES:
1. REFER TO TABLE 2, "FIXED ROOF UTT MEASUREMENTS", IN
APPENDIX A FOR INDIVIDUAL ROOF PLATE UTT READINGS.
2. REFER TO TABLE 3, "NOZZLE/REPAD UTT MEASUREMENTS",
FOR NOZZLE DATA.
TABLE 1 - SHELL UTT MEASUREMENTS
Fixed Roof
Shell Course 5
Plate 5-1 Plate 5-2 Plate 5-3 Plate 5-4 Plate 5-5
.244 .244 .245
N/A
.243 .247 .245
.245 .247 .244
.241
Avg. .245
Circumferential Weld C5
Shell Course 4
Plate 4-1 Plate 4-2 Plate 4-3 Plate 4-4 Plate 4-5
.244 .247 .247
.247 .249 .247
.246 .247 .245
.246
Avg. .247
Circumferential Weld C4
Shell Course 3
Plate 3-1 Plate 3-2 Plate 3-3 Plate 3-4 Plate 3-5
.246 .247 .245
.244 .245 .246
.247 .246 .244
.244
Avg. .245
Circumferential Weld C3
Shell Course 2
Plate 2-1 Plate 2-2 Plate 2-3 Plate 2-4 Plate 2-5
.241 .248 .247
.246 .245 .245
.247 .246 .245
.247
Avg. .246
Circumferential Weld C2
Shell Course 1
Plate 1-1 Plate 1-2 Plate 1-3 Plate 1-4 Plate 1-5
.245 .244 .242 .225 .246 .246 .246 .247 .247 .246 .247 .246 .247 .249 .247
.247 .247 .248 .249 .248 .248 .247 .247 .244 .245 .245 .247 .248 .249 .247
.248 .245 .248 .247 .248 .248 .245 .246 .248 .245 .243 .247 .245 .249 .248
Avg. .246 .245 .246 .246 .248
Circumferential Weld C1
Thickness represented in inches.
Average shell course 1: .246”
Average shell course 2: .246”
Average shell course 3: .245”
Average shell course 4: .247”
Average shell course 5: .245”
TABLE 2 – FIXED ROOF UTT MEASUREMENTS
Plate 1 Plate 2 Plate 3 Plate 4 Plate 5
.194 .196 .183 .180 .180 .186 .188 .188 .187 .189
.195 .180 .184 .190 .188
.197 .194 .183 .179 .181 .185 .189 .187 .183 .185
Avg. .195 .181 .183 .188 .186
Plate 6 Plate 7 Plate 8 Plate 9 Plate 10
.246 .246 .244 .241 .243 .244 .246 .244 .188 .195
.246 .244 .242 .245 .197
.249 .247 .243 .244 .242 .244 .246 .247 .189 .194
Avg. .247 .243 .243 .246 .193
Plate 11 Plate 12 Plate 13 Plate 14 Plate 15
.242 .242 .243 .241 .189 .189 .177 .182 .183 .182
.243 .243 .191 .183 .186
.245 .244 .244 .241 .193 .187 .178 .179 .190 .186
Avg. .243 .242 .190 .180 .185
Plate 16 Plate 17 Plate 18 Plate 19 Plate 20
.182 .183 .175 .179 .184 .181 .184 .182 .188 .184
.186 .180 .184 .185 .183
.181 .186 .182 .182 .184 .181 .185 .187 .182 .186
Avg. .184 .180 .183 .185 .185
Plate 21 Plate 22 Plate 23 Plate 24 Plate 25
.184 .182 .183 .183 .191 .178 .184 .184 .180 .178
.180 .183 .184 .184 .178
.184 .184 .180 .181 .185 .187 .184 .184 .180 .180
Avg. .183 .182 .185 .184 .179
Plate 26 Plate 27 Plate 28 Plate 29 Plate 30
.190 .191 .187 .186 .186 .189 .182 .183 .170 .178
.189 .191 .187 .182 .175
.190 .189 .188 .184 .189 .189 .180 .186 .173 .175
Avg. .190 .187 .188 .183 .174
Plate 31 .180 .181 .179 .186 .182 Avg. .182 Thickness represented in inches.
Average fixed roof (3/16-inch nominal): .185”
Average fixed roof (1/4-inch nominal): .244”
TABLE 3 - NOZZLE / REPAD UTT MEASUREMENTS
Nozzle Nozzle Size
(Diameter or Width/Height)
Repad Shape
Repad Size (W X H)
Repad Thickness
Nozzle Thickness H1 H2
Nozzle Location (Measured circumferentially from Manway 1)
Notes
0⁰ 90⁰ 180⁰ 270⁰
MW1 36" B 78" .245 .298 .295 .290 .298 3'-3 ½" 0'-2 ½" 0'-0" Manway 1
MW2 36" B 78" .255 .290 .298 .293 .297 8'-10" 7'-1" 19'-0" Manway 2
N1 4'' B 12" .240 .315 .322 .316 .306 2'-6" 2'-0" 19'-3" Low Suction
N2 12" B 27" .311 .493 .484 .487 .494 2'-6" 1'-4 ½" 24'-0" Main Suction
N3 24" x 24" D 72" x 36" .307 .362 .358 .355 .365 1'-0" - 33'-6" Flush Clean Out
N4 ¾" - - - .244 .240 .243 .235 3'-9" 3'-8 ½" 44'-0" LLA/LLLA
N5 ¾" - - - .241 .244 .236 .241 2'-6 ½" 2'-6" 44'-0" LLA/LLLA
N6 2" - - - .200 .192 .229 .230 0'-6 ½" 0'-5 ½" 47'-0" PST Return
N7 2" - - - .223 .218 .199 .218 0'-6 ½" 0'-5 ½" 49'-0" Water Draw-Off
N8 ¾" - - - .241 .236 .238 .244 4'-0" 3'-11" 48'-0" HLA/HHLA/HLCV Float Pilot
N9 ¾" - - - .245 .238 .234 .238 2'-0" 1'-11" 48'-0" HLA/HHLA/ HLCV Float Pilot
N10 8" B 20" .256 .480 .516 .490 .488 1'-4" 0'-7 ½" 110'-6" Receipt
N11 3" - - - TH TH TH TH Fixed Roof IFR Anti-Rotation Cable
N12 12" - - - Obst. Obst. Obst. Obst. Fixed Roof Temperature Sensor
N13 2 ½" - - - TH TH TH TH Fixed Roof Varec TLG
N14 36" x 30" F 44" x 38" .141 .142 .142 .141 .141 Fixed Roof IFR Inspection Hatch
N15 3" - - - .193 .215 .202 .208 Fixed Roof IFR Grounding Cable
N16 12" - - - Obst. Obst. Obst. Obst. Fixed Roof Temperature Sensor
N17 24" - - - .315 .314 .315 .310 Fixed Roof Center Vent
N18 8" B 18" .236 .302 .306 .306 .324 Fixed Roof Blind Flange
N19 72" x 24" - - - .242 .251 .307 .240 Fixed Roof IFR Installation Hatch
N20 12'' - - - Obst. Obst. Obst. Obst. Fixed Roof Temperature Sensor
N21 3" - - - .199 .215 .198 .199 Fixed Roof IFR Grounding Cable
N22 36" x 30" F 44" x 38" .141 .141 .133 .127 .125 Fixed Roof IFR Inspection Hatch
N23 10" B 24" .241 .319 .313 .314 .307 Fixed Roof Sampling Hatch
N24 10" B 24" .236 .319 .325 .322 .320 Fixed Roof Enraf ATG
N25 4" - - - .219 .219 .221 .219 Fixed Roof Vito Temperature/Water Probe
N26 3" - - - TH TH TH TH Fixed Roof IFR Anti-Rotation Cable
Thickness measurements are in inches. Obst.: Obstruction due to minimal surface area.
H1 = Centerline of pipe to edge of tank chime TH = Threaded
H2 = Edge of tank or chime to toe weld of reinforcement pad or nozzle Repad shapes:
TABLE 4 – DFT MEASUREMENTS
External Shell Coating Thickness
Average Standard Deviation Number of Readings Minimum Maximum
9.78 2.28 30 4.71 13.62
External Fixed Roof Coating Thickness
Average Standard Deviation Number of Readings Minimum Maximum
12.84 2.43 15 8.48 17.79
Thicknesses are represented in mils.
TABLE 5 – SHELL SETTLEMENT MEASUREMENTS
Point Arc Length
(ft.)
Tank Chime
(ft.)
1 0.00 1.313 2 14.40 1.271 3 31.09 1.260 4 47.78 1.219 5 64.47 1.229 6 81.16 1.240 7 97.85 1.260 8 114.53 1.313
Settlement points were measured clockwise from MW1.
The listed data should be used in future API inspections for comparison.
API-653 APPENDIX B SHELL SETTLEMENT EVALUATION
(para. B.2.2.4)
Report No Client Inspector Vessel Date
Robins ANG Tank 1 USACE Andrew Morrissette (POND) Tank 1 04/20/2020
Base Elev Max Elev Elev
FT 1.219 1.313 0.094 R^2 = 0.960
IN 14.628 15.756 1.128
API-653 APPENDIX B SHELL SETTLEMENT EVALUATION
Report No.: Robins ANG Tank 1
D H Roof Type L 1st Crs Plt Spec Y E
36.667 40 F 14.40 Unknown 30000 29000000
Where:
D = Tank Diameter, in ft H = Tank Height, in ft Roof Type: F = fixed, O = Open L = Arc length between measurement points, in ft (32' max) (greatest dist. allowed based on even # of points) Y = Yield strength of shell 1st course , in pounds per Sq.Inch (psi) E - Young's modulus, in pounds per Sq.Inch (psi)
= Angle theta at elevation point, in degrees PE = Predicted elevation, in ft Ui = Measured out-of-plane settlement in relation to a cosine curve, in ft Si = Deflection, in ft, (out-of-plane distortion) Smax = Maximum allowed deflection, in ft, (out-of-plane distortion)
Smax =((L^2*Y*11)/2*(E*H)) = 0.029
Point Elevation PE Ui Si Results
1 1.313 0 1.313 0.000 0.007 SAT
2 1.271 45 1.299 -0.028 -0.025 SAT
3 1.260 90 1.266 -0.006 0.015 SAT
4 1.219 135 1.233 -0.014 -0.016 SAT
5 1.229 180 1.219 0.010 0.013 SAT
6 1.240 225 1.233 0.007 0.005 SAT
7 1.260 270 1.266 -0.006 -0.016 SAT
8 1.313 315 1.299 0.014 0.017 SAT
SHELL MINIMUM THICKNESS CALCULATIONS
Tank Shell Minimum Thickness and Remaining Life Calculations Date 04/20/2020
File No. Report No. Client Tank No. Temp. (degF) Initials
3791 Robins ANG Tank 1 USACE Tank 1 Andrew Mo tmin = 2.6(H-1)DG
SE
Where:
H = The height above the bottom of the course of study to the maximum liquid level height of the product, in ft. For corroded or pitted areas, H = the height from the bottom of the corroded or pitted area to the maximum liquid level height of the product, in ft.
tmin = The calculated minimum acceptable shell thickness, in inch (cannot be less than
0.10 inch for any course). The minimum acceptable shell thickness allowed by API-653 and STI-SP001 for tank size, in inch .
D = Nominal diameter of tank, in ft.
G = Highest specific gravity of the contents (including test water if tank will, or may, be tested in the future).
S = Maximum allowable stress, in psi. For welded tanks; use the smaller of 0.80Y of 0.429T for bottom and second course or the smaller of 0.88Y or 0.472T for all other courses. For riveted tanks; S = 21000 psi. For STI Tank Inspections S = 26000 psi (E = 1)
Y = Specified minimum yield strength of the plate, in psi; use 30000 psi if not known (N/A for riveted tanks).
T = The smaller of the specified minimum tensile strength of the plate or 80000 psi; use 55000 psi if not known (N/A for riveted tanks).
E = Original joint efficiency for the tank. For welded tanks; use API-653, Table 2-1 ; use E =
1.0 when evaluating the retirement thickness in a corroded plate, when away from welds or joints by at least the greater of one inch or twice the plate thickness. For riveted tanks; use E = 1.0 for shell plates greater than 1 inch away from rivets; use the value of E from API- 653 Table 2-1 when within 1 inch of rivets. For STI Tank Inspections E = 1 where S = 26000 psi.
D (ft) 36.67 G 0.84 E 0.85 Fill Height (ft) 37.6
Material Crs H (ft) H (ft) S (psi) tmin (inch) Course 1 A 36 8 37.6 24900 0.138 Course 2 A 36 8 29.6 24900 0.108 Course 3 A 36 8 21.6 27400 0.100 Course 4 A 36 8 13.6 27400 0.100 Course 5 A 36 7.83 5.6 27400 0.100
SHELL REMAINING LIFE CALCULATIONS
Corrosion rates were determined using assumed nominal thicknesses and UTT measurements taken during this inspection.
Tank Shell Minimum Thickness and Remaining Life Calculations Date 04/20/2020
File No. Report No. Client Tank No. Temp. (degF) Initials
3791 Robins ANG Tank 1 USACE Tank 1 Andrew Mo
Ca = tact-tmin = Remaining Corrosion Allowance (inch) Cr = tprev-tact / Y = Corrosion Rate (inch/Yr) RL = Ca / Cr = Remaining Life (year)
Y = 22 = Tank age (year)
Where:
Ca = Remaining corrosion allowance of the shell course under consideration, in inch.
Cr = Corrosion rate of the shell course under consideration, in inch per year.
FHc = Calculated fill Height = (SEtact/2.6DG+1) + (product height below course of interest), in ft.
tact = Minimum thickness measurement of the shell course under consideration, as recorded at the time of inspection, in inch.
tmin = minimum required thickness of shell course, at the maximum allowable fill height, in inch.
tprev = previous thickness measurement of shell course under consideration, as recorded at last inspection or nominal thickness if no previous thickness measurements, in inch.
RL = Estimated remaining life of the shell course under consideration, in year.
Y = Time span between thickness readings or age of the tank if nominal thickness is used for tprev, in year.
tprev tact tmin Ca Cr RL FHc Course 1 0.250 0.246 0.138 0.108 0.0002 591 66.02 Course 2 0.250 0.246 0.108 0.138 0.0002 758 74.02 Course 3 0.250 0.245 0.100 0.145 0.0002 638 88.25 Course 4 0.250 0.247 0.100 0.147 0.0001 1078 96.84 Course 5 0.250 0.245 0.100 0.145 0.0002 638 104.25
AST ATMOSPHERIC STORAGE TANK FIXED ROOF EVALUATION
MINIMUM THICKNESS, REMAINING LIFE, PRESSURE CALCULATIONS
Date 04/20/2020
File No Report No Client Inspector Tank No Temp(degF)
1871 Robins ANG Tank 1 USACE Andrew Morrissette
(POND)
Tank 1
Where;
Ca = remaining corrosion allowance of the tank component under consideration, in inch (t act - t min).
Cr = corrosion rate of the tank component under consideration, in inch per year (t prev - t act / Y).
oz = unit of measurement, (weight, in ounces, per square inch), (16 oz per pound) psi = unit of measurement, (weight, in pounds, per square inch) RL = estimated remaining life of the tank component under consideration, in year (Ca / Cr).
t act = actual thickness measurement of the tank component under consideration, as recorded at the time of inspection, in inch.
t min = minimum required thickness of tank component, at the design MAWP at the design temperature (200 degF for atm AST's), in inch (greater of psi/wt or 0.090").
t nom = design nominal thickness of tank component under consideration, in inch.
t prev = previous thickness measurement of the tank component under consideration, as recorded at last inspection or nominal thickness if no previous thickness measurements, in inch.
t yn = thickness of the tank component under consideration at the next inspection at twice the calculated corrosion rate, in inch (t act - (2*Cr*Yn).
wt = weight of plate per cubic inch.
wc = unit of measurement, (height, in inch, of water column bearing on 1 Sq.Inch area), (27.7 wc per pound) Y = time span between thickness readings or age of the tank component if tnom is used for tprev, in year.
Yn = estimated time span to next inspection of the tank component under consideration, in year.
ROOF PLATES - REMAINING LIFE
Y t prev (inch) t act (inch) t min (inch) Cr (inch/Yr) Ca (inch) RL
22 0.188 0.185 0.090 0.00014 0.095 697
ROOF MAXIMUM ALLOWABLE INTERNAL PRESSURE
Material Category wt
0.2833
Yn tyn psi oz. wc
0.000 0.000
RELIEF VALVE SETTING EVALUATION
Setting unit
0.00 PSI = 0.000 (psi)
MAX Allowed
0.000 oz
Relief setting is satisfactory
Corrosion rates were determined using assumed nominal thicknesses and UTT measurements taken during this inspection.
The fixed roof is provided with plate nominal thicknesses of 3/16-inch and 1/4-inch. Calculations were conducted on 3/16-inch plates, as they are the limiting factor in the fixed roof remaining life.
NEXT INSPECTION
The interval between tank inspections (both internal and external) should be determined by the tank service history.
Inspection intervals can be adjusted based on known corrosion rates. Corrosion rates can only be determined when a comparison is made between UTT measurements taken over an interval of time. In this case, corrosion rates were determined using assumed nominal thicknesses and UTT measurements taken during this inspection. Listed below are recommended inspection intervals:
1. Routine In-service Inspection
Facility personnel shall perform a visual inspection of the tank exterior surfaces and associated piping. Gross defects, leaks, shell distortions, signs of settlement, and corrosion should all be monitored along with the foundation condition (including tank chime-to-foundation joint), coating, and appurtenances.
a. Interval: Monthly
2. External Visual Inspection
Formal visual external inspection shall be performed by an API certified inspector every five (5) years or RCA/4N years (where RCA is the difference between the measured shell thickness and the minimum required thickness and
N is the shell corrosion rate), whichever is less. Based on the review of shell thickness measurements, the 5-year interval will govern the next external visual inspection. This inspection includes inspection requirements listed in a routine in-service inspection as well as a visual inspection of the tank grounding system.
b. Interval: Five (5) years; April 2025
3. External Visual Inspection with Ultrasonic Thickness Testing
An API certified inspector with the assistance of an NDT examiner shall perform this inspection. UTT measurements shall be taken to verify thickness of the tank shell and associated components. Obtained UTT measurements are used to determine corrosion rates and remaining life of the tank shell. UTT measurements of shell plates can be performed with the tank in service and scheduled at a maximum interval of fifteen (15) years or RCA/2N, whichever is less.
Based on shell thickness measurements and corrosion rates, the recommended interval for this inspection is fifteen
(15) years.
c. Interval: Fifteen (15) years; April 2035
4. Internal Inspection
An API certified inspector with the assistance of an NDT examiner shall perform this inspection. This inspection consists of verifying that the tank bottom is not severely corroded and/or leaking, identifying and evaluation tank bottom settlement, and inspection requirements listed in both external visual inspections. The next OOS API 653 inspection is based on recommendations from the previous OOS inspection report dated March 2015.
d. Interval: Ten (10) years; March 2025
API/OSHA ACCESS STRUCTURE REPORT
API/OSHA Stairway Data
API Required OSHA Required
Handrail Actual (in) Min (in) Max (in) Min (in) Max (in) Pass/Fail
Height: 31 ½ 30 34 30 38 Pass
Width: 36 28 N/A 22 N/A Pass
APPENDIX B: API 653 CHECKLISTS FOR TANK INSPECTIONS
Tank In-Service Inspection Checklist
Item Completed
X
C.1.1 Foundation
Measure foundation levelness and bottom elevations (see Appendix A for extent of measurements). X
C.1.1.1 Concrete Ring a Inspect for broken concrete, spalling, and cracks, particularly under backup bars used in welding butt-welded annular rings under the shell.
X b Inspect drain openings in ring, back of water draw basins and top surface of ring for indications of bottom leakage.
X c Inspect for cavities under foundation and vegetation against bottom of tank. X d Check that runoff rainwater from the shell drains away from tank. X e Check for settlement around perimeter of tank. X
C.1.1.2 Asphalt X a Check for settling of tank into asphalt base which would direct runoff rain water under the tank instead of away from it.
N/A b Look for areas where leaching of oil has left rock filler exposed, which indicates hydrocarbon leakage. N/A
C.1.1.3 Oiled Dirt or Sand a Check for settlement into the base which would direct runoff rain water under the tank rather than away from it.
N/A
C.1.1.4 Rock a Presence of crushed rock under the steel bottom usually results in severe underside corrosion. Make a note to do additional bottom plate examination (ultrasonic, hammer testing, or turning of coupons) when the tank is out of service.
N/A
C.1.1.5 Site Drainage a Check site for drainage away from the tank and associated piping and manifolds. X b Check operating condition of the dike drains. X
C.1.1.6 Housekeeping a Inspect the area for buildup of trash, vegetation, and other inflammables buildup. X
C.1.1.7 Cathodic Protection a Review cathodic protection potential readings. N/A
C.1.2 Shells
C.1.2.1 External Visual Inspection a Visually inspect for paint failures, pitting, and corrosion. X b Clean off the bottom angle area and inspect for corrosion and thinning on plate and weld. X c Inspect the bottom-to-foundation seal, if any. X
C.1.2.2 Internal (Floating Roof Tank) a Visually inspect for grooving, corrosion, pitting, and coating failures. X
C.1.2.3 Riveted Shell Inspection a Inspect external surface for rivet and seam leaks. N/A b Locate leaks by sketch or photo (location will be lost when shell is abrasive cleaned for painting). N/A c
Inspect rivets for corrosion loss and wear.
Tank In-Service Inspection Checklist Continued
Item Completed
X d Inspect vertical seams to see if they have been full fillet lap-welded to increase joint efficiency. N/A e If no record exists of vertical riveted seams, dimension, and sketch (or photograph) the rivet pattern:
number of rows, rivet size, pitch length, and note whether the joint is butt-riveted or lap-riveted.
N/A
C.1.2.4 Wind Girder (Floating Roof Tanks) a Inspect wind girder and handrail for corrosion damage (paint failure, pitting, corrosion product buildup), especially where it occurs at tack-welded junction, and for broken welds.
N/A b Check support welds to shell for pitting, especially on shell plates. N/A c Note whether supports have reinforcing pads welded to shell. N/A
C.1.3 Shell Appurtenances
C.1.3.1 Manways and Nozzles a Inspect for cracks or signs of leakage on weld joint at nozzles, manways, and reinforcing plates. X b Inspect for shell plate dimpling around nozzles, caused by excessive pipe deflection. X c Inspect for flange leaks and leaks around bolting. X d Inspect sealing of insulation around manways and nozzles. N/A e Check for inadequate manway flange and cover thickness on mixer manways. N/A
C.1.3.2 Tank Piping Manifolds a Inspect manifold piping, flanges, and valves for leaks. X b Inspect firefighting system components. X c Check for anchored piping which would be hazardous to the tank shell or bottom connections during earth movement.
X d Check for adequate thermal pressure relief of piping to the tank. X e Check operation of regulators for tanks with purge gas systems. X f Check sample connections for leaks and for proper valve operation. N/A g Check for damage and test the accuracy of temperature indicators. N/A h Check welds on shell-mounted davit clips above valves 6 in. and larger. N/A
C.1.3.3 Autogauge System a Inspect autogauge tape guide and lower sheave housing (floating swings) for leaks. X b Inspect autogauge head for damage. X c Bump the checker on autogauge head for proper movement of tape. X d Identify size and construction material of autogauge tape guide (floating roof tanks). N/A e Ask operator if tape tends to hang up during tank roof movement (floating roof tanks). X f Compare actual product level to the reading on the autogauge (maximum variation is 2 in.). X g On floating roof tanks, when the roof is in the lowest position, check that no more than two ft of tape are exposed at the end of the tape guide.
N/A h Inspect condition of board and legibility of board-type autogauges. N/A i Test freedom of movement of marker and float. N/A
C.1.3.4 Shell-Mounted Sample Station a Inspect sample lines for function of valves and plugging of lines, including drain or return-to-tank line.
N/A b Check circulation pump for leaks and operating problems.
Completed
X c Test bracing and supports for sample lines and equipment. N/A
C.1.3.5 Heater (Shell Manway Mounted) a Inspect condensate drain for presence of oil indicating leakage. N/A
C.1.3.6 Mixer a Inspect for proper mounting flange and support. N/A b Inspect for leakage. N/A c Inspect condition of power lines and connections to mixer. N/A
C.1.3.7 Swing Lines: Winch Operation a Non-floating. Raise, then lower the swing line with the winch, and check for cable tightness to confirm that swing line lowered properly.
Floating. With tank half full or more, lower the swing line, then let out cable and check if swing has pulled cable tight, indicating that the winch is operating properly.
c
Indicator. Check that the indicator moves in the proper direction: Floating swing line indicators show a lower level as cable is wound up on the winch. Non-floating swing line indicators show the opposite.
C.1.3.8 Swing Lines: External Guide System a Check for leaks at threaded and flanged joints. N/A
C.1.3.9 Swing Lines: Identify Ballast Varying Need a Check for significant difference in stock specific gravity. N/A
C.1.3.10 Swing Lines: Cable Material and Condition a For nonstainless steel cable, check for corrosion over entire length. N/A b All cable: check for wear or fraying. N/A
C.1.3.11 Swing…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .