Attachment J.5 Price Template.xlsx
XLSX spreadsheet 60 KB Posted
- Attached to
- NOAA WP-3D Orion Maintenance
- Solicitation number
- 1305M220RNMAN0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment A0002 SF 30.pdf | ||
| A0001.1305M220RNMAN0003 FormSF33.pdf | ||
| Amendment A0001 SF 30.pdf | ||
| Attachment J.2 Past Performance Information Form.docx | DOCX document | |
| Attachment J.3 Past Performance Questionnaire.docx | DOCX document | |
| Attachment J.1- Statement of Work.pdf | ||
| 1305M220RNMAN0003 FormSF33.pdf | ||
| Attachment J.4 Labor Category Definitions.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ordering Period (1)
| CLIN 0001 Ordering Period I | ||||||
| Item | Description | Qty | Unit | Unit Price | Extended Price | |
| 0001 | 52 Week Day Phase Inspection- Complete phase inspections as required for a Lockheed Orion WP-3D aircraft in accordance with manufacturer's maintenance manual and statement of work. This includes a separate discrepancy report for each item needing repair. | 4 | EA | $ | ||
| 0002 | Hourly Inspections: Conduct hourly inspections as required for a Lockheed Orion WP-3D aircraft in accordance with manufacturer's maintenance manual and statement of work. This includes a separate discrepancy report for each item needing repair. | Info Only | ||||
| 0002A | 200 Hour Inspection | 6 | EA | $ | ||
| 0002B | 600 Hour Inspection | 4 | EA | $ | ||
| 0002C | 1200 Hour Inspection | 2 | EA | $ | ||
| 0002D | 1800 Hour Inspection | 2 | EA | $ | ||
| 0003 | P3 Calendar Inspection. Calendar inspections as required for a Lockheed Orion WP-3D aircraft in accordance with manufacturer's maintenance manual and statement of work. This includes a separate discrepancy report for each item needing repair. | |||||
| ( 7, 45, 56, 90, 365) | 10 | EA | $ | |||
| 0004 | Unscheduled inspections, maintenance and aircraft on ground (AOG) occurrences for NOAA WP-3D aircraft. | |||||
| 1 | Lot (NTE) | $250,000.00 | ||||
| Regular Loaded Labor Rate | $ | |||||
| Overtime Loaded Labor Rate (T/H) | $ | |||||
| Overtime Loaded Labor Rate (D/T) | $ | |||||
| New Parts Discount: ___% from cost | % | |||||
| Other Parts Discount: ___% from cost | % | |||||
| 0005 | Over and above items: repair over and above discrepancies found during inspections to include parts and labor | 1 | Lot (NTE) | $150,000.00 | ||
| Regular Loaded Labor Rate | $ | |||||
| Overtime Loaded Labor Rate (T/H) | $ | |||||
| Overtime Loaded Labor Rate (D/T) | $ | |||||
| New Parts Discount: ___% from cost | % | |||||
| Other Parts Discount: ___% from cost | % | |||||
| 0006 | Labor (In accordance with Definitions in J.4) | 1 | Lot (NTE) | $150,000.00 | ||
| Engineer I | $ | |||||
| Engineer II | $ | |||||
| Engineer III | $ | |||||
| Technical Specialist I | $ | |||||
| Technical Specialist II | $ | |||||
| Technician I | $ | |||||
| Technician II | $ | |||||
| Aircraft Mechanic I | $ | |||||
| Aircraft Mechanic II | $ | |||||
| Aircraft Avionic Technician I | $ | |||||
| Aircraft Avionic Technician II | $ | |||||
| Aerospace Engineer I | $ | |||||
| Aerospace Engineer II | $ | |||||
| Aerospace Engineer III | $ | |||||
| Aerospace Structural Welder | $ | |||||
| 0007 | Training - NOAA Site | 1 | Lot (NTE) | $2,500.00 | ||
| Regular Loaded Labor Rate | $ | |||||
| 0008 | Training - Contractor Site | 1 | Lot (NTE) | $2,500.00 | ||
| Regular Loaded Labor Rate | $ | |||||
| TOTAL | $555,000.00 |
Ordering Period (2)
| CLIN 1001 Ordering Period 2 | |||||
| Item | Description | Qty | Unit | Unit Price | Extended Price |
| 1001 | 52 Week Day Phase Inspection- Complete phase inspections as required for a Lockheed Orion WP-3D aircraft in accordance with manufacturer's maintenance manual and statement of work. This includes a separate discrepancy report for each item needing repair. | 4 | EA | $ | |
| 1002 | Hourly Inspections: Conduct hourly inspections as required for a Lockheed Orion WP-3D aircraft in accordance with manufacturer's maintenance manual and statement of work. This includes a separate discrepancy report for each item needing repair. | Info Only | |||
| 1002A | 200 Hour Inspection | 6 | EA | $ | |
| 1002B | 600 Hour Inspection | 4 | EA | $ | |
| 1002C | 1200 Hour Inspection | 2 | EA | $ | |
| 1002D | 1800 Hour Inspection | 2 | EA | $ | |
| 1003 | P3 Calendar Inspection ( 7, 45, 56, 90, 365) | 10 | EA | $ | |
| 1004 | Unscheduled inspections, maintenance and aircraft on ground (AOG) occurrences for NOAA WP-3D aircraft. | ||||
| 1 | Lot (NTE) | $250,000.00 | |||
| Regular Loaded Labor Rate | $ | ||||
| Overtime Loaded Labor Rate (T/H) | $ | ||||
| Overtime Loaded Labor Rate (D/T) | $ | ||||
| New Parts Discount: ___% from cost | % | ||||
| Other Parts Discount: ___% from cost | % | ||||
| 1005 | Over and above items: repair over and above discrepancies found during inspections to include parts and labor | 1 | Lot (NTE) | $150,000.00 | |
| Regular Loaded Labor Rate | $ | ||||
| Overtime Loaded Labor Rate (T/H) | $ | ||||
| Overtime Loaded Labor Rate (D/T) | $ | ||||
| New Parts Discount: ___% from cost | % | ||||
| Other Parts Discount: ___% from cost | % | ||||
| 1006 | Labor (In accordance with Definitions in J.4) | 1 | Lot (NTE) | $150,000.00 | |
| Engineer I | $ | ||||
| Engineer II | $ | ||||
| Engineer III | $ | ||||
| Technical Specialist I | $ | ||||
| Technical Specialist II | $ | ||||
| Technician I | $ | ||||
| Technician II | $ | ||||
| Aircraft Mechanic I | $ | ||||
| Aircraft Mechanic II | $ | ||||
| Aircraft Avionic Technician I | $ | ||||
| Aircraft Avionic Technician II | $ | ||||
| Aerospace Engineer I | $ | ||||
| Aerospace Engineer II | $ | ||||
| Aerospace Engineer III | $ | ||||
| Aerospace Structural Welder | $ | ||||
| 1007 | Training - NOAA Site | 1 | Lot (NTE) | $2,500.00 | |
| Regular Loaded Labor Rate | $ | ||||
| 1008 | Training - Contractor Site | 1 | Lot (NTE) | $2,500.00 | |
| Regular Loaded Labor Rate | $ | ||||
| TOTAL | $555,000.00 |
Ordering Period (3)
| CLIN 2001 Ordering Period 3 | |||||
| Item | Description | Qty | Unit | Unit Price | Extended Price |
| 2001 | 52 Week Day Phase Inspection- Complete phase inspections as required for a Lockheed Orion WP-3D aircraft in accordance with manufacturer's maintenance manual and statement of work. This includes a separate discrepancy report for each item needing repair. | 4 | EA | $ | |
| 2002 | Hourly Inspections: Conduct hourly inspections as required for a Lockheed Orion WP-3D aircraft in accordance with manufacturer's maintenance manual and statement of work. This includes a separate discrepancy report for each item needing repair. | Info Only | |||
| 2002A | 200 Hour Inspection | 6 | EA | $ | |
| 2002B | 600 Hour Inspection | 4 | EA | $ | |
| 2002C | 1200 Hour Inspection | 2 | EA | $ | |
| 2002D | 1800 Hour Inspection | 2 | EA | $ | |
| 2003 | P3 Calendar Inspection ( 7, 45, 56, 90, 365) | 10 | EA | $ | |
| 2004 | Unscheduled inspections, maintenance and aircraft on ground (AOG) occurrences for NOAA WP-3D aircraft. | ||||
| 1 | Lot (NTE) | $250,000.00 | |||
| Regular Loaded Labor Rate | $ | ||||
| Overtime Loaded Labor Rate (T/H) | |||||
| Overtime Loaded Labor Rate (D/T) | |||||
| New Parts Discount: ___% from cost | % | ||||
| Other Parts Discount: ___% from cost | % | ||||
| 2005 | Over and above items: repair over and above discrepancies found during inspections to include parts and labor | 1 | Lot (NTE) | $150,000.00 | |
| Regular Loaded Labor Rate | $ | ||||
| Overtime Loaded Labor Rate (T/H) | $ | ||||
| Overtime Loaded Labor Rate (D/T) | $ | ||||
| New Parts Discount: ___% from cost | % | ||||
| Other Parts Discount: ___% from cost | % | ||||
| 2006 | Labor (In accordance with Definitions in J.4) | 1 | Lot (NTE) | $150,000.00 | |
| Engineer I | $ | ||||
| Engineer II | $ | ||||
| Engineer III | $ | ||||
| Technical Specialist I | $ | ||||
| Technical Specialist II | $ | ||||
| Technician I | $ | ||||
| Technician II | $ | ||||
| Aircraft Mechanic I | $ | ||||
| Aircraft Mechanic II | $ | ||||
| Aircraft Avionic Technician I | $ | ||||
| Aircraft Avionic Technician II | $ | ||||
| Aerospace Engineer I | $ | ||||
| Aerospace Engineer II | $ | ||||
| Aerospace Engineer III | $ | ||||
| Aerospace Structural Welder | $ | ||||
| 2007 | Training - NOAA Site | 1 | Lot (NTE) | $2,500.00 | |
| Regular Loaded Labor Rate | $ | ||||
| 2008 | Training - Contractor Site | 1 | Lot (NTE) | $2,500.00 | |
| Regular Loaded Labor Rate | $ | ||||
| TOTAL | $555,000.00 |
Ordering Period (4)
| CLIN 3001 Ordering Period 4 | |||||
| Item | Description | Qty | Unit | Unit Price | Extended Price |
| 3001 | 52 Week Day Phase Inspection- Complete phase inspections as required for a Lockheed Orion WP-3D aircraft in accordance with manufacturer's maintenance manual and statement of work. This includes a separate discrepancy report for each item needing repair. | 4 | EA | $ | |
| 3002 | Hourly Inspections: Conduct hourly inspections as required for a Lockheed Orion WP-3D aircraft in accordance with manufacturer's maintenance manual and statement of work. This includes a separate discrepancy report for each item needing repair. | Info Only | |||
| 3002A | 200 Hour Inspection | 6 | EA | $ | |
| 3002B | 600 Hour Inspection | 4 | EA | $ | |
| 3002C | 1200 Hour Inspection | 2 | EA | $ | |
| 3002D | 1800 Hour Inspection | 2 | EA | $ | |
| 3003 | P3 Calendar Inspection ( 7, 45, 56, 90, 365) | 10 | EA | $ | |
| 3004 | Unscheduled inspections, maintenance and aircraft on ground (AOG) occurrences for NOAA WP-3D aircraft. | ||||
| 1 | Lot (NTE) | $250,000.00 | |||
| Regular Loaded Labor Rate | $ | ||||
| Overtime Loaded Labor Rate (T/H) | $ | ||||
| Overtime Loaded Labor Rate (D/T) | $ | ||||
| New Parts Discount: ___% from cost | % | ||||
| Other Parts Discount: ___% from cost | % | ||||
| 3005 | Over and above items: repair over and above discrepancies found during inspections to include parts and labor | 1 | Lot (NTE) | $150,000.00 | |
| Regular Loaded Labor Rate | $ | ||||
| Overtime Loaded Labor Rate (T/H) | $ | ||||
| Overtime Loaded Labor Rate (D/T) | $ | ||||
| New Parts Discount: ___% from cost | % | ||||
| Other Parts Discount: ___% from cost | % | ||||
| 3006 | Labor (In accordance with Definitions in J.4) | 1 | Lot (NTE) | $150,000.00 | |
| Engineer I | $ | ||||
| Engineer II | $ | ||||
| Engineer III | $ | ||||
| Technical Specialist I | $ | ||||
| Technical Specialist II | $ | ||||
| Technician I | $ | ||||
| Technician II | $ | ||||
| Aircraft Mechanic I | $ | ||||
| Aircraft Mechanic II | $ | ||||
| Aircraft Avionic Technician I | $ | ||||
| Aircraft Avionic Technician II | $ | ||||
| Aerospace Engineer I | $ | ||||
| Aerospace Engineer II | $ | ||||
| Aerospace Engineer III | $ | ||||
| Aerospace Structural Welder | $ | ||||
| 3007 | Training - NOAA Site | 1 | Lot (NTE) | $2,500.00 | |
| Regular Loaded Labor Rate | $ | ||||
| 3008 | Training - Contractor Site | 1 | Lot (NTE) | $2,500.00 | |
| Regular Loaded Labor Rate | $ | ||||
| 3009 | Standard Depot Level Maintenance (SDLM) inspection with 100% corrosion removal | 1 | EA | $ | |
| TOTAL | $555,000.00 |
Ordering Period (5)
| CLIN 4001 Ordering Period 5 | |||||
| Item | Description | Qty | Unit | Unit Price | Extended Price |
| 4001 | 52 Week Day Phase Inspection- Complete phase inspections as required for a Lockheed Orion WP-3D aircraft in accordance with manufacturer's maintenance manual and statement of work. This includes a separate discrepancy report for each item needing repair. | 4 | EA | $ | |
| 4002 | Hourly Inspections: Conduct hourly inspections as required for a Lockheed Orion WP-3D aircraft in accordance with manufacturer's maintenance manual and statement of work. This includes a separate discrepancy report for each item needing repair. | Info Only | |||
| 4002A | 200 Hour Inspection | 6 | EA | $ | |
| 4002B | 600 Hour Inspection | 4 | EA | $ | |
| 4002C | 1200 Hour Inspection | 2 | EA | $ | |
| 4002D | 1800 Hour Inspection | 2 | EA | $ | |
| 4003 | P3 Calendar Inspection ( 7, 45, 56, 90, 365) | 10 | EA | $ | |
| 4004 | Unscheduled inspections, maintenance and aircraft on ground (AOG) occurrences for NOAA WP-3D aircraft. | ||||
| 1 | Lot (NTE) | $250,000.00 | |||
| Regular Loaded Labor Rate | $ | ||||
| Overtime Loaded Labor Rate (T/H) | $ | ||||
| Overtime Loaded Labor Rate (D/T) | $ | ||||
| New Parts Discount: ___% from cost | % | ||||
| Other Parts Discount: ___% from cost | % | ||||
| 4005 | Over and above items: repair over and above discrepancies found during inspections to include parts and labor | 1 | Lot (NTE) | $150,000.00 | |
| Regular Loaded Labor Rate | $ | ||||
| Overtime Loaded Labor Rate (T/H) | $ | ||||
| Overtime Loaded Labor Rate (D/T) | $ | ||||
| New Parts Discount: ___% from cost | % | ||||
| Other Parts Discount: ___% from cost | % | ||||
| 4006 | Labor (In accordance with Definitions in J.4) | 1 | Lot (NTE) | $150,000.00 | |
| Engineer I | $ | ||||
| Engineer II | $ | ||||
| Engineer III | $ | ||||
| Technical Specialist I | $ | ||||
| Technical Specialist II | $ | ||||
| Technician I | $ | ||||
| Technician II | $ | ||||
| Aircraft Mechanic I | $ | ||||
| Aircraft Mechanic II | $ | ||||
| Aircraft Avionic Technician I | $ | ||||
| Aircraft Avionic Technician II | $ | ||||
| Aerospace Engineer I | $ | ||||
| Aerospace Engineer II | $ | ||||
| Aerospace Engineer III | $ | ||||
| Aerospace Structural Welder | $ | ||||
| 4007 | Training - NOAA Site | 1 | Lot (NTE) | $2,500.00 | |
| Regular Loaded Labor Rate | $ | ||||
| 4008 | Training - Contractor Site | 1 | Lot (NTE) | $2,500.00 | |
| Regular Loaded Labor Rate | $ | ||||
| TOTAL | $555,000.00 |
Ordering Period (6)
| CLIN 5001 Ordering Period 6 | |||||
| Item | Description | Qty | Unit | Unit Price | Extended Price |
| 5001 | 52 Week Day Phase Inspection- Complete phase inspections as required for a Lockheed Orion WP-3D aircraft in accordance with manufacturer's maintenance manual and statement of work. This includes a separate discrepancy report for each item needing repair. | 4 | EA | $ | |
| 5002 | Hourly Inspections: Conduct hourly inspections as required for a Lockheed Orion WP-3D aircraft in accordance with manufacturer's maintenance manual and statement of work. This includes a separate discrepancy report for each item needing repair. | Info Only | |||
| 5002A | 200 Hour Inspection | 6 | EA | $ | |
| 5002B | 600 Hour Inspection | 4 | EA | $ | |
| 5002C | 1200 Hour Inspection | 2 | EA | $ | |
| 5002D | 1800 Hour Inspection | 2 | EA | $ | |
| 5003 | P3 Calendar Inspection ( 7, 45, 56, 90, 365) | 10 | EA | $ | |
| 5004 | Unscheduled inspections, maintenance and aircraft on ground (AOG) occurrences for NOAA WP-3D aircraft. | ||||
| 1 | Lot (NTE) | $250,000.00 | |||
| Regular Loaded Labor Rate | $ | ||||
| Overtime Loaded Labor Rate (T/H) | $ | ||||
| Overtime Loaded Labor Rate (D/T) | $ | ||||
| New Parts Discount: ___% from cost | % | ||||
| Other Parts Discount: ___% from cost | % | ||||
| 5005 | Over and above items: repair over and above discrepancies found during inspections to include parts and labor | 1 | Lot (NTE) | $150,000.00 | |
| Regular Loaded Labor Rate | $ | ||||
| Overtime Loaded Labor Rate (T/H) | $ | ||||
| Overtime Loaded Labor Rate (D/T) | $ | ||||
| New Parts Discount: ___% from cost | % | ||||
| Other Parts Discount: ___% from cost | % | ||||
| 5006 | Labor (In accordance with Definitions in J.4) | 1 | Lot (NTE) | $150,000.00 | |
| Engineer I | $ | ||||
| Engineer II | $ | ||||
| Engineer III | $ | ||||
| Technical Specialist I | $ | ||||
| Technical Specialist II | $ | ||||
| Technician I | $ | ||||
| Technician II | $ | ||||
| Aircraft Mechanic I | $ | ||||
| Aircraft Mechanic II | $ | ||||
| Aircraft Avionic Technician I | $ | ||||
| Aircraft Avionic Technician II | $ | ||||
| Aerospace Engineer I | $ | ||||
| Aerospace Engineer II | $ | ||||
| Aerospace Engineer III | $ | ||||
| Aerospace Structural Welder | $ | ||||
| 5007 | Training - NOAA Site | 1 | Lot (NTE) | $2,500.00 | |
| Regular Loaded Labor Rate | $ | ||||
| 5008 | Training - Contractor Site | 1 | Lot (NTE) | $2,500.00 | |
| Regular Loaded Labor Rate | $ | ||||
| 5009 | Standard Depot Level Maintenance (SDLM) inspection with 100% corrosion removal | 1 | EA | $ | |
| TOTAL | $555,000.00 |
Ordering Period (7)
| CLIN 6001 Ordering Period 7 | |||||
| Item | Description | Qty | Unit | Unit Price | Extended Price |
| 6001 | 52 Week Day Phase Inspection- Complete phase inspections as required for a Lockheed Orion WP-3D aircraft in accordance with manufacturer's maintenance manual and statement of work. This includes a separate discrepancy report for each item needing repair. | 4 | EA | $ | |
| 6002 | Hourly Inspections: Conduct hourly inspections as required for a Lockheed Orion WP-3D aircraft in accordance with manufacturer's maintenance manual and statement of work. This includes a separate discrepancy report for each item needing repair. | Info Only | |||
| 6002A | 200 Hour Inspection | 6 | EA | $ | |
| 6002B | 600 Hour Inspection | 4 | EA | $ | |
| 6002C | 1200 Hour Inspection | 2 | EA | $ | |
| 6002D | 1800 Hour Inspection | 2 | EA | $ | |
| 6003 | P3 Calendar Inspection ( 7, 45, 56, 90, 365) | 10 | EA | $ | |
| 6004 | Unscheduled inspections, maintenance and aircraft on ground (AOG) occurrences for NOAA WP-3D aircraft. | ||||
| 1 | Lot (NTE) | $250,000.00 | |||
| Regular Loaded Labor Rate | $ | ||||
| Overtime Loaded Labor Rate (T/H) | $ | ||||
| Overtime Loaded Labor Rate (D/T) | $ | ||||
| New Parts Discount: ___% from cost | % | ||||
| Other Parts Discount: ___% from cost | % | ||||
| 6005 | Over and above items: repair over and above discrepancies found during inspections to include parts and labor | 1 | Lot (NTE) | $150,000.00 | |
| Regular Loaded Labor Rate | $ | ||||
| Overtime Loaded Labor Rate (T/H) | $ | ||||
| Overtime Loaded Labor Rate (D/T) | $ | ||||
| New Parts Discount: ___% from cost | % | ||||
| Other Parts Discount: ___% from cost | % | ||||
| 6006 | Labor (In accordance with Definitions in J.4) | 1 | Lot (NTE) | $150,000.00 | |
| Engineer I | $ | ||||
| Engineer II | $ | ||||
| Engineer III | $ | ||||
| Technical Specialist I | $ | ||||
| Technical Specialist II | $ | ||||
| Technician I | $ | ||||
| Technician II | $ | ||||
| Aircraft Mechanic I | $ | ||||
| Aircraft Mechanic II | $ | ||||
| Aircraft Avionic Technician I | $ | ||||
| Aircraft Avionic Technician II | $ | ||||
| Aerospace Engineer I | $ | ||||
| Aerospace Engineer II | $ | ||||
| Aerospace Engineer III | $ | ||||
| Aerospace Structural Welder | $ | ||||
| 6007 | Training - NOAA Site | 1 | Lot (NTE) | $2,500.00 | |
| Regular Loaded Labor Rate | $ | ||||
| 6008 | Training - Contractor Site | 1 | Lot (NTE) | $2,500.00 | |
| Regular Loaded Labor Rate | $ | ||||
| TOTAL | $555,000.00 |
Ordering Period (8)
| CLIN 7001 Ordering Period 8 | |||||
| Item | Description | Qty | Unit | Unit Price | Extended Price |
| 7001 | 52 Week Day Phase Inspection- Complete phase inspections as required for a Lockheed Orion WP-3D aircraft in accordance with manufacturer's maintenance manual and statement of work. This includes a separate discrepancy report for each item needing repair. | 4 | EA | $ | |
| 7002 | Hourly Inspections: Conduct hourly inspections as required for a Lockheed Orion WP-3D aircraft in accordance with manufacturer's maintenance manual and statement of work. This includes a separate discrepancy report for each item needing repair. | Info Only | |||
| 7002A | 200 Hour Inspection | 6 | EA | $ | |
| 7002B | 600 Hour Inspection | 4 | EA | $ | |
| 7002C | 1200 Hour Inspection | 2 | EA | $ | |
| 7002D | 1800 Hour Inspection | 2 | EA | $ | |
| 7003 | P3 Calendar Inspection ( 7, 45, 56, 90, 365) | 10 | EA | $ | |
| 7004 | Unscheduled inspections, maintenance and aircraft on ground (AOG) occurrences for NOAA WP-3D aircraft. | ||||
| 1 | Lot (NTE) | $250,000.00 | |||
| Regular Loaded Labor Rate | $ | ||||
| Overtime Loaded Labor Rate (T/H) | $ | ||||
| Overtime Loaded Labor Rate (D/T) | $ | ||||
| New Parts Discount: ___% from cost | % | ||||
| Other Parts Discount: ___% from cost | % | ||||
| 7005 | Over and above items: repair over and above discrepancies found during inspections to include parts and labor | 1 | Lot (NTE) | $150,000.00 | |
| Regular Loaded Labor Rate | $ | ||||
| Overtime Loaded Labor Rate (T/H) | $ | ||||
| Overtime Loaded Labor Rate (D/T) | $ | ||||
| New Parts Discount: ___% from cost | % | ||||
| Other Parts Discount: ___% from cost | % | ||||
| 7006 | Labor (In accordance with Definitions in J.4) | 1 | Lot (NTE) | $150,000.00 | |
| Engineer I | $ | ||||
| Engineer II | $ | ||||
| Engineer III | $ | ||||
| Technical Specialist I | $ | ||||
| Technical Specialist II | $ | ||||
| Technician I | $ | ||||
| Technician II | $ | ||||
| Aircraft Mechanic I | $ | ||||
| Aircraft Mechanic II | $ | ||||
| Aircraft Avionic Technician I | $ | ||||
| Aircraft Avionic Technician II | $ | ||||
| Aerospace Engineer I | $ | ||||
| Aerospace Engineer II | $ | ||||
| Aerospace Engineer III | $ | ||||
| Aerospace Structural Welder | $ | ||||
| 7007 | Training - NOAA Site | 1 | Lot (NTE) | $2,500.00 | |
| Regular Loaded Labor Rate | $ | ||||
| 7008 | Training - Contractor Site | 1 | Lot (NTE) | $2,500.00 | |
| Regular Loaded Labor Rate | $ | ||||
| TOTAL | $555,000.00 |
Ordering Period (9)
| CLIN 8001 Ordering Period 9 | |||||
| Item | Description | Qty | Unit | Unit Price | Extended Price |
| 8001 | 52 Week Day Phase Inspection- Complete phase inspections as required for a Lockheed Orion WP-3D aircraft in accordance with manufacturer's maintenance manual and statement of work. This includes a separate discrepancy report for each item needing repair. | 4 | EA | $ | |
| 8002 | Hourly Inspections: Conduct hourly inspections as required for a Lockheed Orion WP-3D aircraft in accordance with manufacturer's maintenance manual and statement of work. This includes a separate discrepancy report for each item needing repair. | Info Only | |||
| 8002A | 200 Hour Inspection | 6 | EA | $ | |
| 8002B | 600 Hour Inspection | 4 | EA | $ | |
| 8002C | 1200 Hour Inspection | 2 | EA | $ | |
| 8002D | 1800 Hour Inspection | 2 | EA | $ | |
| 8003 | P3 Calendar Inspection ( 7, 45, 56, 90, 365) | 10 | EA | $ | |
| 8004 | Unscheduled inspections, maintenance and aircraft on ground (AOG) occurrences for NOAA WP-3D aircraft. | ||||
| 1 | Lot (NTE) | $250,000.00 | |||
| Regular Loaded Labor Rate | $ | ||||
| Overtime Loaded Labor Rate (T/H) | $ | ||||
| Overtime Loaded Labor Rate (D/T) | $ | ||||
| New Parts Discount: ___% from cost | % | ||||
| Other Parts Discount: ___% from cost | % | ||||
| 8005 | Over and above items: repair over and above discrepancies found during inspections to include parts and labor | 1 | Lot (NTE) | $150,000.00 | |
| Regular Loaded Labor Rate | $ | ||||
| Overtime Loaded Labor Rate (T/H) | $ | ||||
| Overtime Loaded Labor Rate (D/T) | $ | ||||
| New Parts Discount: ___% from cost | % | ||||
| Other Parts Discount: ___% from cost | % | ||||
| 8006 | Labor (In accordance with Definitions in J.4) | 1 | Lot (NTE) | $150,000.00 | |
| Engineer I | $ | ||||
| Engineer II | $ | ||||
| Engineer III | $ | ||||
| Technical Specialist I | $ | ||||
| Technical Specialist II | $ | ||||
| Technician I | $ | ||||
| Technician II | $ | ||||
| Aircraft Mechanic I | $ | ||||
| Aircraft Mechanic II | $ | ||||
| Aircraft Avionic Technician I | $ | ||||
| Aircraft Avionic Technician II | $ | ||||
| Aerospace Engineer I | $ | ||||
| Aerospace Engineer II | $ | ||||
| Aerospace Engineer III | $ | ||||
| Aerospace Structural Welder | $ | ||||
| 8007 | Training - NOAA Site | 1 | Lot (NTE) | $2,500.00 | |
| Regular Loaded Labor Rate | $ | ||||
| 8008 | Training - Contractor Site | 1 | Lot (NTE) | $2,500.00 | |
| Regular Loaded Labor Rate | $ | ||||
| TOTAL | $555,000.00 |
Ordering Period (10)
| CLIN 9001 Ordering Period 10 | |||||
| Item | Description | Qty | Unit | Unit Price | Extended Price |
| 9001 | 52 Week Day Phase Inspection- Complete phase inspections as required for a Lockheed Orion WP-3D aircraft in accordance with manufacturer's maintenance manual and statement of work. This includes a separate discrepancy report for each item needing repair. | 4 | EA | $ | |
| 9002 | Hourly Inspections: Conduct hourly inspections as required for a Lockheed Orion WP-3D aircraft in accordance with manufacturer's maintenance manual and statement of work. This includes a separate discrepancy report for each item needing repair. | Info Only | |||
| 9002A | 200 Hour Inspection | 6 | EA | $ | |
| 9002B | 600 Hour Inspection | 4 | EA | $ | |
| 9002C | 1200 Hour Inspection | 2 | EA | $ | |
| 9002D | 1800 Hour Inspection | 2 | EA | $ | |
| 9003 | P3 Calendar Inspection ( 7, 45, 56, 90, 365) | 10 | EA | $ | |
| 9004 | Unscheduled inspections, maintenance and aircraft on ground (AOG) occurrences for NOAA WP-3D aircraft. | ||||
| 1 | Lot (NTE) | $250,000.00 | |||
| Regular Loaded Labor Rate | $ | ||||
| Overtime Loaded Labor Rate (T/H) | $ | ||||
| Overtime Loaded Labor Rate (D/T) | $ | ||||
| New Parts Discount: ___% from cost | % | ||||
| Other Parts Discount: ___% from cost | % | ||||
| 9005 | Over and above items: repair over and above discrepancies found during inspections to include parts and labor | 1 | Lot (NTE) | $150,000.00 | |
| Regular Loaded Labor Rate | $ | ||||
| Overtime Loaded Labor Rate (T/H) | $ | ||||
| Overtime Loaded Labor Rate (D/T) | $ | ||||
| New Parts Discount: ___% from cost | % | ||||
| Other Parts Discount: ___% from cost | % | ||||
| 9006 | Labor (In accordance with Definitions in J.4) | 1 | Lot (NTE) | $150,000.00 | |
| Engineer I | $ | ||||
| Engineer II | $ | ||||
| Engineer III | $ | ||||
| Technical Specialist I | $ | ||||
| Technical Specialist II | $ | ||||
| Technician I | $ | ||||
| Technician II | $ | ||||
| Aircraft Mechanic I | $ | ||||
| Aircraft Mechanic II | $ | ||||
| Aircraft Avionic Technician I | $ | ||||
| Aircraft Avionic Technician II | $ | ||||
| Aerospace Engineer I | $ | ||||
| Aerospace Engineer II | $ | ||||
| Aerospace Engineer III | $ | ||||
| Aerospace Structural Welder | $ | ||||
| 9007 | Training - NOAA Site | 1 | Lot (NTE) | $2,500.00 | |
| Regular Loaded Labor Rate | $ | ||||
| 9008 | Training - Contractor Site | 1 | Lot (NTE) | $2,500.00 | |
| Regular Loaded Labor Rate | $ | ||||
| TOTAL | $555,000.00 |
File details come from the government source that posted it. Updated .