Amendment A0002 SF 30.pdf

PDF 161 KB Posted

Attached to
NOAA WP-3D Orion Maintenance
Solicitation number
1305M220RNMAN0003
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name and Title of Signer (Type or Print) 16A. Name and title of Contracting Officer (Type or Print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States of America

(Signature of Contracting Officer)

16C. Date Signed

(Signature of person authorized to sign)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITIONS UNUSABLE Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. Contract ID Code Page of Pages

1 2

2. Amendment/Modification No. 3. Effective Date 4. Requisition/Purchase Req. No. 5. Project No. (if applicable)

A0002 07/09/2020 NMAN6000-19-00726

6. Issued By Code AJ930073 7. Administered By (If other than Item 6) Code NOAA/Eastern Acquisition Division 200 Granby Street, Suite 405 Norfolk, VA 23510

See Block 6

8. Name and Address of Contractor (No., Street, County, and Zip Code) (X) 9A. Amendment of Solicitation No.

X

1305M220RNMAN0003

9B. Date (See Item 11)

JUNE 10, 2020

10A. Modification of Contract/Order No.

10B. Date (See Item 13)

Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended X is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG-

MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT

IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

1. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.

B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)

Set fourth item 14, pursuant to the authority of FAR 43.103 (b)

C. This supplemental agreement is entered into pursuant to authority of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, X is required to sign this document and return 1 copies to the issuing office.

14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

SEE ATTACHED PAGED

The purpose of amendment A0002 to soliciation 1305M220RNMAN0003 is to answer the following questions:

1. Are Offerors required to have Customers/References complete attachment J.3 – Past Performance

Questionnaire for contracts where a CPAR exists?

Answer: Per attachment J.2 the Offeror may choose to select CPARS and/or the Past Performance Questionnaire (attachment J.3)

2. If there is a relevant CPAR, should Offerors include that with the proposal submission?

Answer: See answer to question #1

3. Should the due dates of July 10, 2020 on Attachments J.2 and J.3 be changed to reflect the updated proposal due date?

Answer: The extended proposal submission date applies to all documents.

4. Section L states that for Volume I, Business Proposal, Attachment J.4 CLIN 0006 Labor Rates and Attachment J.5 Price Evaluation Template shall be submitted with this Volume. Should the J.4 and J.5 attachments be included with Volumes I and III (Price Proposal)?

Answer: The Offeror is to submit attachments J.4 and J.5 with Volume III

5. Attachment J.4 lists the labor category descriptions. Are Offerors to populate that sheet with labor rates and submit with Volume 1 and/or Volume III? There do not appear to be designated cells to do this, but we can add a column if that is the desired format.

Answer: The Offeror is to submit pricing for each labor category and level as designated in attachment J.5 in their submission with volume III.

As a result of this amendment the proposal submission period is NOT extended and additional inquiries will NOT be accepted.

File details come from the government source that posted it. Updated .