Attachment J.5.2 - RTOP W900KK-23-R-TS02 Small Business Lot QASP CTC.docx

DOCX document 165 KB Posted

Attached to
U. S. Army Training Support Center (ATSC), Training Support Systems Enterprise (TSS-E) Contract
Solicitation number
W900KK22R0016
Issued by

About this file

This document contains a Quality Assurance Surveillance Plan (QASP) for a firm fixed price task order to provide technical support and recommendations for operations support of the Army Sustainable Range Program at Fort Eustis, Virginia.

The contractor shall manage personnel with appropriate credentials to accomplish the mission, which includes identifying, developing, planning, managing, analyzing, and supporting Combat Training Center live fire fielding tasks and future requirements. The contractor must coordinate information flow among live fire stakeholders, provide subject matter expert support at meetings and presentations, and submit monthly status reports and trip reports.

The QASP identifies performance standards and acceptance criteria for each requirement. It describes surveillance methods including 100% inspection, random sampling, and periodic inspection. Customer feedback will also be collected. Non-conformances will be documented using a Contract Discrepancy Report, with levels defined as minor, major, and critical. Data analysis will be used to identify cost, schedule, and performance risks and adjust surveillance. The Contracting Officer's Representative will submit monthly status reports.

View the file

Other files

File Type Posted
Attachment L.1 - Preaward_Survey_of_Prospective_Contractor_Accounting_System_Checklist.pdf PDF
Attachment L.2 - Cost Pricing Workbook.xlsx XLSX spreadsheet
TSSE_Draft Solicitation W900KK-22-R-0016.pdf PDF
Attachment L.3 - DFAR 252-215-7009-Proposal-Adequacy-Checklist.pdf PDF
Attachment J.1 - MAIDIQ Performance Work Statement.docx DOCX document
Attachment J.2 Non-Disclosure Agreement and Conflict of Interest Statement.docx DOCX document
Attachment J.4.4 - RTOP W900KK-23-R-TS01 Unrestricted Lot WD 15-4341 Rev 20.pdf PDF
Attachment J.5.5 - RTOP W900KK-23-R-TS02 Small Business Lot Questions and Answers.xlsx XLSX spreadsheet
Attachment J.5 - RTOP W900KK-23-R-TS02 Small Business Lot.docx DOCX document
Attachment J.5.1 - RTOP W900KK-23-R-TS02 Small Business Lot PWS CTC.docx DOCX document
Attachment J.4 - RTOP W900KK-23-R-TS01 Unrestricted Lot.docx DOCX document
Attachment J.5.4 - RTOP W900KK-23-R-TS02 Small Business Lot WD 15-5629 Rev 18.pdf PDF
Attachment J.5.3 - RTOP W900KK-23-R-TS02 Small Business Lot Pricing Worksheet.xlsx XLSX spreadsheet
Attachment J.1.1 -MAIDIQ - Questions and Answers.xlsx XLSX spreadsheet
Attachment J.4.5 - RTOP W900KK-23-R-TS01 Unrestricted Lot Questions and Answers.xlsx XLSX spreadsheet
Attachment J.4.3 - RTOP W900KK-23-R-TS01 Unrestricted Lot Pricing Worksheet.xlsx XLSX spreadsheet
Attachment J.4.1 - RTOP W900KK-23-R-TS01 Unrestricted Lot PWS SRP.docx DOCX document
Attachment J.4.2 - RTOP W900KK-23-R-TS01 Unrestricted Lot QASP SRP.docx DOCX document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CTC Live Fire Support Quality Assurance Surveillance Plan

FOR

TRADOC Capability Manager Ranges Army Training Support Center Fort Eustis, Virginia

June 10, 2022

W900KK-23-R-0016

Lot 2 Small Business

RTOP W900KK-23-R-TS02

W900KK-23-R-0016

Lot 2 Small Business

RTOP W900KK-23-R-TS02

TABLE OF CONTENTS

Subject Page Number

1. Overview 1

2. Description of Services 3

3. Roles and Responsibilities 4

4. Contract Quality Requirements 5

5. Government Surveillance 7

6. Non-Conforming Performance 10

7. Deduct Plan 11

8. Data Analysis 11

9. Acceptance of Services 11

10. COR Status Report 12

11. Enterprise Contractor Manpower Reporting Application (e-CMRA) 12

12. Contractor Performance Assessment Reporting System (CPARS)13
13. Combating Trafficking In Persons13
14. COR/Quality Assurance Surveillance Files13

15. QASP Changes 13

1. OVERVIEW

1.1 Purpose. This Quality Assurance Surveillance Plan (QASP) is a Government developed document used to ensure that the Government receives quality services, and pays only for conforming services actually provided. The objective of this firmed fixed price Task Order is to acquire/provide technical support and recommendations necessary for operations support of the Army Sustainable Range Program (SRP); provide review and analysis of program requirements and technical reports and, provide recommendations for Army-wide policies and procedures to ensure sustainment of quality ranges and training lands necessary for realistic conditions for training Soldiers to standard at FT Eustis, VA and as defined in this Performance Work Statement (PWS), section five (5). Government-furnished property and services for those items specified in the PWS are exempt from this QASP. The Contractor shall perform to the standards specified in TRADOC and Doctrine Command (TRADOC), Capability Manager-Ranges (TCM – Ranges) Operations Support PWS. This Quality Assurance Surveillance Plan (QASP) identifies the methods and procedures the Government will use to ensure it receives the services to the desired standard, as identified in the PWS.

1.2 Intent. The intent of this QASP is to:

· Ensure Contractor performance meets or exceeds contract terms, conditions and specifications,

· Hold the Contractor accountable for quality control,

· Encourage the Contractor to take appropriate steps to control and improve quality

· Ensure all sections of FAR 46 are applied as required and applicable.

Accordingly, the Government will perform surveillance on the contract in accordance with this QASP, but reserves the right to monitor the contract in any manner necessary, at any time necessary, and at all places necessary to ensure that the services rendered conform to contract requirements. The Government also reserves the right to perform quality assurance at the Subcontractor level, and at the contractor's place of business. Sub-contract service providers shall be accountable to the Contractor who, in turn is responsible to the Government. Resolution of non-conforming services discovered at the Subcontractor level will be addressed with the prime Contractor. The Government will not exercise any supervisory controls over the contract service providers performing the services herein.

2. DESCRIPTION OF SERVICES

2.1 Scope of Work. The Contractor shall provide technical support and recommendations necessary for operations support of the Army Sustainable Range Program (SRP). Provide review and analysis of program requirements and technical reports. Provide recommendations for Army-wide policies and procedures to ensure sustainment of quality ranges and training lands necessary to provide realistic conditions for training soldiers to standard.

2.1.2 The Contractor shall be responsible for managing a sufficient workforce and provide a labor mix with appropriate credentials to accomplish the mission. The Contractor shall notify the Contracting Officer (KO) of any real or potential pitfalls in the personnel arena. This notification does not relieve the Contractor of any performance.

2.2 Type of Contract. This will be a Firm Fixed Price contract.

3. ROLES AND RESPONSIBILITIES.

3.1 Government.

3.1.1 Contracting Officer (KO). The KO is the only person authorized to direct changes in any of the requirements under this contract. In the event the Contractor effects any such change at the direction of any person other than the KO, the change will be considered to have been made without authority, and solely at the risk of the Contractor. No changes in, or deviation from the terms and conditions shall be affected, without a written modification to the contract, executed by the KO authorizing such changes.

3.1.2 Contracting Officer’s Representative (COR). The COR will monitor all technical and performance aspects of the contract, and assist the (KO) in contract administration. The COR is authorized to perform the following functions:

· Assure that the Contractor performs the technical requirements of the contract

· Perform inspections necessary in connection with contract performance

· Maintain written and oral communications with the Contractor concerning technical and performance aspects of the contract

· Issue written interpretations of technical requirements, including Government drawings, designs, and specifications

· Monitor Contractor's performance and documents and notifies both the Contracting Officer and Contractor of all deficiencies

· Coordinate availability of Government furnished property

· Provide site entry of Contractor personnel

ACC and MICC do not use other acronyms to refer to and describe a COR. Terms such as the “COTR, “TM”, etc. will not be used. Some personnel may be assigned as Alternate CORs/OnSite CORs (OSCOR), but other than a statement to that effect and what actions the KO expects that ACOR/OSCOR to take in the absence of the primary COR, there is no difference between a COR an Alternate COR/OnSite COR, or other government surveillance personnel assigned to conduct contract oversight. Throughout the remainder of this QASP, The term “COR’ will be used to refer to all government surveillance personnel assigned to monitor the contractor’s performance on this contract.

A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost, price, or delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

The Contracting Officer shall use the DoD Contracting Officer Representative Tracking (CORT) Tool to electronically track COR nominations, appointments, terminations, and training certifications for each COR appointed to conduct oversight on this contract. The COR will upload their surveillance documents, such as Monthly Status Reports (MSR), COR trip reports, correspondence with the contractor, and other miscellaneous documents into the CORT Tool within their online CORT Profile for this contract. The CORT Tool is available within the WAWF suite of tools at: https://wawf.eb.mil/.

3.1.2.1 Alternate Contracting Officer’s Representative (ACOR)/On Site Contracting Officer’s Representative. The Alternate COR/On Site COR is an employee of the U.S. Government provided by the Requiring Activities (RA) and appointed by the Contracting Officer to provide additional surveillance personnel in monitoring and documenting the contractor’s performance. These alternate surveillance support personnel may serve as on-site representatives of the COR in performance of actual contract surveillance, if they meet all COR training and experience requirements and are appointed by the contracting officer as Alternate CORs (ACOR)/On Site COR in the DPAP CORT Tool. This term will apply to other government surveillance personnel as defined in Army Regulation 70-13, paragraph 2-2 g.

4. CONTRACT QUALITY REQUIREMENTS.

4.1 Quality Control Program. The Government will evaluate the adequacy of the Contractor’s Quality Control Plan (QCP) performance under this contract in accordance with this QASP. The Contractor’s quality control program is the means by which he assures himself that all work complies with the requirement of the contract PWS. It is essential that Government Surveillance Personnel understand that Quality Control (QC) is the responsibility of the contractor, and not the government.

As such, the government will focus their efforts on validating if the contractor is maintaining an adequate quality control inspection systems that ensures the contractor maintains evidence that services provided conform to contract quality requirements. The Contractor shall provide inspection data to the Government on request for validation.

The Contractor’s QCP shall include a process that can identify, prevent, and ensure nonrecurrence of defective services. See Attachment 7.

4.2 Government Quality Assurance. This QASP describes what the Government will do to ensure that the Contractor has performed in accordance with the performance standards within the PWS.

This QASP describes:

· How the performance standards will be applied: o The Performance Standard for each requirement in the PWS will be applied as prescribed in the PWS. Ensure that each Performance requirement within the PWS includes a Measurable performance standard in terms of quality, timeliness, or quantity.

· Ensure the method of assessing contractor performance against performance standards is included in this QASP

· Ensure each Performance Requirement includes an acceptable quality limit (AQL). AQL is the worst tolerable performance that is still considered acceptable. For example; if “the contractor shall provide personnel support within 2 hours”, the AQL may be: + or - (+/-) 15 minutes. See attachment 9, QASP Surveillance Item Requirements

· Which performance elements will be surveilled (Surveillance Checklist, attachment 4) o All performance activities will be surveilled through-out the Period of Performance, using a risk based approach to selecting Checklist items from Attachment 8, List of Contractor Requirements. The selected items will be populated on the Monthly Checklist and placed on the Surveillance Schedule for each period surveilled.

· When the surveillance will be scheduled (Surveillance Schedule, attachment 3) o A sample of Checklist items will be selected from Attachment 8, List of Contractor Requirements. These selected items for each month will be placed on the Surveillance Checklist and scheduled surveillance on the Monthly Schedule. Surveillance may be scheduled on a daily, weekly or monthly frequency. However, each contractor requirement must be audited for compliance prior to invoice payment being made.

· The Acceptable Quality Limit (AQL) o The AQL will be determined by the Requiring Activity, i.e., the COR, and referenced in attachment 9, QASP Surveillance Item Requirements for each Performance requirement.

· The nature of Government contract quality assurance actions that include the number of observations made and the number and type of defects (defect rate)

· Personnel conducting contractor performance surveillance will use attachment 4, Surveillance Checklist, or equivalent to answer the Performance question asked, and provide comments in the area provided on the checklist. These comments and metrics from the Checklist will be included on each MSR submitted during the Period of Performance.

5. GOVERNMENT SURVEILLANCE.

5.1. Methods of Surveillance. The following Methods of Surveillance may be utilized in monitoring the Contractors’ performance:

· 100% Inspection will be reserved for the highest risk areas where consequence of failure may affect life or limb, or there is likelihood of mission failure

· Random Sampling Will be used when a service is performed on a frequent basis and a statistically valid sample can be selected for audit. This is most appropriate method for frequently recurring tasks

· Periodic Inspection Will be used when planned sampling of a service is at a specific predetermined date and time. This is most appropriate for tasks that occur infrequently, yet on a scheduled basis

· Customer Feedback. Not a valid method of surveillance, but a good indicator of areas where surveillance should be conducted or intensified.

The DA Form 5477, Customer Complaint Record, Attachment 2, will be placed at convenient locations for the end user of these services, and made available to document/record all complaints. The COR will collect the Customer Complaints each surveillance cycle and investigate for validity ASAP.

The following procedures will be followed when a complaint is received.

· The COR/ACOR will investigate to determine the validity of the complaint

· If the complaint is determined to be invalid, the COR will inform the person who submitted the complaint of the reason(s) as soon as practical

· For validated complaints that are true contractual non-conformances, the procedures in paragraph 6 below will be applied

· A Customer Complaint Log will be used to document each validated customer complaint and attached to the COR Monthly Surveillance Report in the CORT Tool

4.2 Government Quality Assurance. This QASP describes what the Government will do to ensure that the Contractor has performed in accordance with the performance standards within the PWS.

This QASP describes:

· How the performance standards will be applied: o The Performance Standard for each requirement in the PWS will be applied as prescribed in the PWS. Ensure that each Performance requirement within the PWS includes a Measurable performance standard in terms of quality, timeliness, or quantity.

· Ensure the method of assessing contractor performance against performance standards is included in this QASP

· Ensure each Performance Requirement includes an acceptable quality limit (AQL). AQL is the worst tolerable performance that is still considered acceptable. For example; if “the contractor shall provide personnel support within 2 hours”, the AQL may be: + or - (+/-) 15 minutes. See attachment 9, QASP Surveillance Item Requirements

· Which performance elements will be surveilled (Surveillance Checklist, attachment 4) o All performance activities will be surveilled through-out the Period of Performance, using a risk based approach to selecting Checklist items from Attachment 8, List of Contractor Requirements. The selected items will be populated on the Monthly Checklist and placed on the Surveillance Schedule for each period surveilled.

· When the surveillance will be scheduled (Surveillance Schedule, attachment 3) o A sample of Checklist items will be selected from Attachment 8, List of Contractor Requirements. These selected items for each month will be placed on the Surveillance Checklist and scheduled surveillance on the Monthly Schedule. Surveillance may be scheduled on a daily, weekly or monthly frequency. However, each contractor requirement must be audited for compliance prior to invoice payment being made.

· The Acceptable Quality Limit (AQL) o The AQL will be determined by the Requiring Activity, i.e., the COR, and referenced in attachment 9, QASP Surveillance Item Requirements for each Performance requirement.

· The nature of Government contract quality assurance actions that include the number of observations made and the number and type of defects (defect rate)

· Personnel conducting contractor performance surveillance will use attachment 4, Surveillance Checklist, or equivalent to answer the Performance question asked, and provide comments in the area provided on the checklist. These comments and metrics from the Checklist will be included on each MSR submitted during the Period of Performance.

5. GOVERNMENT SURVEILLANCE.

5.1. Methods of Surveillance. The following Methods of Surveillance may be utilized in monitoring the Contractors’ performance:

· 100% Inspection will be reserved for the highest risk areas where consequence of failure may affect life or limb, or there is likelihood of mission failure

· Random Sampling Will be used when a service is performed on a frequent basis and a statistically valid sample can be selected for audit. This is most appropriate method for frequently recurring tasks

· Periodic Inspection Will be used when planned sampling of a service is at a specific predetermined date and time. This is most appropriate for tasks that occur infrequently, yet on a scheduled basis

· Customer Feedback. Not a valid method of surveillance, but a good indicator of areas where surveillance should be conducted or intensified.

The DA Form 5477, Customer Complaint Record, Attachment 2, will be placed at convenient locations for the end user of these services, and made available to document/record all complaints. The COR will collect the Customer Complaints each surveillance cycle and investigate for validity ASAP.

The following procedures will be followed when a complaint is received.

· The COR/ACOR will investigate to determine the validity of the complaint

· If the complaint is determined to be invalid, the COR will inform the person who submitted the complaint of the reason(s) as soon as practical

· For validated complaints that are true contractual non-conformances, the procedures in paragraph 6 below will be applied

· A Customer Complaint Log will be used to document each validated customer complaint and attached to the COR Monthly Surveillance Report in the CORT Tool.

5.2. Surveillance Schedule. A Surveillance Schedule (Attachment 3) will be created each month utilizing the DA 5475, COR Surveillance Schedule, or locally generated equivalent. The schedule is “FOR OFFICIAL USE ONLY” and is not releasable to anyone other than authorized Government personnel. Each Month’s Surveillance Schedule will be completed at the beginning of each month during the Period of Performance (PoP) to schedule the upcoming month surveillance activity. Completed Surveillance Schedules will be filed in the online Contracting Officer’s Representative Tracking Tool (CORT) (https://wawf.eb.mil) file for this contract, either as an attachment to Monthly COR Status Report (MSR) or uploaded separately in the Miscellaneous Documents Section of the CORs’ CORT file.

5.3. Surveillance Checklist. A Surveillance Checklist (Attachment 4) will be created each month utilizing the DA 5476, COR Surveillance Checklist, or locally generated equivalent. The Checklist is “FOR OFFICIAL USE ONLY” and is not releasable to anyone other than authorized Government personnel. Each Month’s Surveillance Checklist will be completed with the Surveillance Schedule. Completed Surveillance Checklist will be filed in the online Contracting Officer’s Representative Tracking Tool (CORT) (https://wawf.eb.mil) file for this contract, either as an attachment to Monthly COR Status Report (MSR) or uploaded separately in the Miscellaneous Documents Section of the CORs’ CORT file.

5.4. Surveillance Documentation. Each months’ Completed Surveillance Documentation, to include the Monthly Surveillance Report (MSR) must be filed in the online Contracting Officer’s Representative Tracking Tool (CORT; https://wawf.eb.mil) file for this contract, either as an attachment to MSR, or uploaded separately in the Miscellaneous Documents Section of the CORs’ online CORT file.

6. Non-Conforming Performance. A Non-conformance occurs when the Contractor fails to meet the terms, conditions and/or specifications of the Contract/Task Order. All instances of non-conformance must be documented by the COR. The COR will provide the details of the non-conformance using the Contract Discrepancy Report (CDR), DA Form 5479, Attachment 5, to the KO, who will notify the Contractor of each nonconformance occurrence, unless the KO has authorized the COR to submit directly to the contractor, and copy the KO. Resolution of any non-conformance discovered at the Subcontractor level will be addressed with the prime Contractor. Non-conformances are classified as either: Level I (Minor); Level II (Major); or Level III (Critical).

6.1 Level I (Minor). Level I non-conformance is not likely to materially reduce the usability of services for their intended purpose or is a departure from established standards having little bearing on completing the contract requirement. Minor non-conformances can usually be corrected on the spot and can be issued to the Contractor through either a verbal or written Contract Discrepancy Report (CDR). However, the Government is required to document verbal Level I CDRs. The COR may issue verbal Level I CDRs directly to the appropriate level of Contractor management. The COR will notify the KO as soon as practical when a verbal Level I CDR is issued and document them in their Monthly Reports. If the non-conformance cannot be corrected on the spot, the Contractor shall be given a suspense date to correct the deficiency. The KO will issue and sign written Level I CDRs, Attachment 5.

6.2 Level II (Major). Level II non-conformance is likely to result in failure of the services to meet contract requirements. Also, repeated discrepancies, a large number of documented Level I CDRs and trends indicating failure of the Contractor’s quality control program can be classified as Level II CDRs. The KO issues all Level II CDRs in writing, Attachment 5. The COR will notify the KO as soon as practical when a major non-conformance is identified.

6.3 Level III (Critical). Level III non-conformances result in hazardous or unsafe conditions due to the manner in which the services are performed; prevent or impact a vital agency mission as a result of performance; or are for repeated or uncorrected Level II CDRs. The Contracting Office Director or Deputy Director issues written Level III CDRs. The COR is responsible for notifying the KO immediately upon discovery of a critical non-conformance.

6.4 Documenting CDRs. The COR will provide the details of the non-conformance using the Contract Discrepancy Report, DA Form 5479, Attachment 5. If the Requiring activity prefers to issue a locally developed CDR, documentation must include as a minimum: the Contract or Task Order number; reference to the specific contract requirement; the specific discrepancy to the requirement; where it was discovered; the date and time it was discovered; Contractor representative who was notified; and the suspense date for Contractor response/corrective action.

6.5 Tracking and Resolving CDRs. All CDRs, verbal and written, regardless of issuer will be included in the COR’s Monthly Report. The COR and KO shall track CDRs to ensure the Contractor identifies and takes appropriate corrective action to the root cause and the specific non-conformance is corrected within the required timeline. The KO will make a final written determination of the Government’s remedies if the non-conformance is not corrected by the Contractor after receiving notice and a reasonable opportunity to correct the work. IAW MICC Desk Book (24 June 2016), 46.102 Policy.

7. Deduct Plan. This acquisition does include a Deduct Plan.

8. Data Analysis. Data Analysis will be performed to identify trends in cost, schedule and/or performance risks. The results of Data Analysis will be documented in COR Monthly Status Reports (MSR) and may be used to make adjustments to surveillance schedules and/or checklist items to increase or decrease surveillance, based on performance trends. Negative trends noted using Government data/observations could result in issuing the Contractor a Contract Discrepancy Report. Trends noted using Contractor data will not result in a CDR unless the Contractor has not addressed the negative trend. QASP changes based on Data Analysis will be coordinated with the Contracting Officer for approval.

9. Acceptance of Services. When all services have been deemed acceptable and there is documented, objective, quality evidence to support acceptable performance, the COR will accept the services provided and authorize payment to the Contractor. Acceptance and payment will be made by approving the Contractor’s Receiving Reports in Wide Area Workflow at https://wawf.eb.mil/ as an iRAPT Inspector, and/or Acceptor.

10. COR Status Report. COR Status Reports, or Monthly Status Reports (MSR) will be submitted on a monthly basis to the Contracting Officer via the CORT Tool. MSR reports must be uploaded into the CORT Tool, using the “Smart Form” Monthly Surveillance Report. MSR reports will be due NLT the 10th day of the month following the month of surveillance. COR Status Reports will provide a synopsis of the Contractors performance for the inclusive dates of the report. The synopsis must contain a summary of surveillances performed, Customer Feedback if any, CDRs if any, an analysis of the Contractors performance, recommended adjustments to surveillance schedules, and any other pertinent contract information IAW FAR 46.104, and the COR Appointment Letter. Completed Surveillance Checklists and CDRs, if any, will be included as attachments to COR Status Reports, or referenced in the MSR for that month and uploaded separately in the Miscellaneous Documents Section of the CORs’ Online CORT file for this contract. See para 4.2.

11. Enterprise Contractor Manpower Reporting Application (e-CMRA). Reporting Labor Hours. The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor shall report all Contractor manpower (including subcontractor manpower) required for performance of this contract. The Contractor shall completely fill in all the information in the format using the following web address: https//www.ecmra.mil

The required information includes the following:

1. Contracting Officer (KO), Contracting Officer’s Representative (COR) name;

1. Contract number, including task and delivery order number;

1. Beginning and ending dates covered by reporting period;

1. Contractor’s name, address, phone number, e-mail address, identity of Contractor employee entering data;

1. Estimated direct labor hours (including sub-Contractors);

1. Estimated direct labor dollars paid this reporting period (including sub-Contractors);

1. Total payments (including sub-Contractors);

1. Predominant Federal Service Code (FSC) reflecting services provided by Contractor (and separate predominant FSC for each sub-Contractor if different); i. Estimated data collection cost;

1. Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the Contractor with its UIC for the purposes of reporting this information);

a. Locations where Contractor and sub-Contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website);

1. Presence of deployment or contingency contract language; and Number of Contractor and sub-Contractor employees deployed in theater this reporting period (by country).

While inputs may be reported any time during the FY, The COR shall ensure the contractor submits all data shall no later than October 31 of each calendar year. The COR shall verify that the Contactor has complied with the required contractor manpower reporting annually and document the results in the CORs’ Online CORT File, CMRA section. Contracting officers shall ensure that the requirement to report contractor manpower is included in all contracts, task/delivery orders and modifications.

12. Contractor Performance Assessment Reporting System (CPARS). Documented surveillance data (COR Status Reports, Completed Surveillance Checklists, Customer Feedback and CDRs, if any) will be used to support CPARS ratings. CPARS will be completed in accordance with AFARS, Subpart 5142.15 – Contractor Performance Information.

13. Combating Trafficking In Persons (CTIP). In accordance with PGI 222.17 and FAR 52.222-50, the KO will be notified immediately of any information from any source that alleges a Contractor employee, subcontractor and/or subcontractor employee has engaged in conduct that violates the United States Government “zero” tolerance policy regarding trafficking in persons.

14. COR/Quality Assurance Surveillance Files. The official COR/Quality Assurance Surveillance File will be maintained in the on-line CORT Tool, IAW DoDI 5000.72, and DFARS PFI 201.602-2.

15. QASP Changes. This QASP is a living document and, as such, may be changed as needed based on Data Analysis (trends), contract modifications by the KO, etc. The COR will send any recommended changes to the Contracting Officer for approval and the Contracting Officer must approve all changes.

Attachments:

1. Performance Requirements Summary (PRS), DA Form 5473

2. Customer Complaint Record, DA Form 5477

3. Surveillance Schedule, DA Form 5475

4. Surveillance Checklist(s)

5. Contract Discrepancy Report, DA Form 5479

Attachment 1 Performance Requirements Summary (PRS)

Required Services
Performance Standard
Acceptable Quality
Method of Surveillance

(5.1, 5.1.1, 5.1.2, 5.1.3) SME Support.

Identify, develop, plan, manage, analyze, and support CTC LF fielding tasks and future requirements.
E-mail/Microsoft Office/error free and signed by the PM.
100%

(5.2, 5.2.1) Coordinate with Stakeholders.

Coordinate information flow among LF stakeholders.
E-mail/Microsoft Office/error free and signed by the PM.
100%

(5.3, 5.3.1, 5.3.2, 5.3.3, 5.3.4) SME Support at meetings, conferences and presentations.

Provide written records of meetings, conferences, working groups, etc. and prepare briefings and presentations.
E-mail/Microsoft Office/error free and signed by the PM.
100%

(5.3.4) Trip Reports.

Submitted report to the On-site COR within three working days of completion of travel.
E-mail/Microsoft Office/error free and signed by the PM.

100%

(12.1) Monthly Status Reports.

MSRs are due NLT the 18th of each month.
E-mail/Microsoft Office/error free and signed by the PM.
100%

Attachment 2 Customer Complaint Record, DA Form 5477

Attachment 3 Surveillance Schedule, DA Form 5475

End of Attachment 3

Attachment 4 Surveillance Checklist (s)

COR Inspection Checklist & Data Report (Fixed Firm Price Contract)
Meeting Contract Requirements

Contractor:

Contract Number:

Service Provided:

COR Name:

Date:
YES
No
N/A

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments summary, to include, positive trends, negative trends, concerns, customer comments, and any additional COR comments:

End of Attachment 4

Attachment 5 Contract Discrepancy Report DA Form 5479 image1.emf

DATE OF COMPLAINT TIME OF COMPLAINT

NATURE OF COMPLAINT

CONTRACT REFERENCE

VALIDATION

DATE CONTRACTOR INFORMED COMPLAINT TIME CONTRACTOR INFORMED OF COMPLAINT

ACTION TAKEN BY CONTRACTOR (Responsible officer)

RECEIVED AND VALIDATED BY

ORGANIZATION

INDIVIDUAL

NOTE: ( ) Used for in-house operation.

CUSTOMER COMPLAINT RECORD

For use of this form, see DA PAM 5-20; the proponent agency is ACSIM.

SOURCE OF COMPLAINT

(Responsible officer) (Responsible officer)

DA FORM 5477, MAR 2008 PREVIOUS EDITIONS ARE OBSOLETE. APD PE v1.01ES initiator:ralph.gaines@us.army.mil;wfState:distributed;wfType:email;workflowId:b71742b09d8a4c49a6eb59ab36d6e236

DATE OF COMPLAINT:

TIME OF COMPLAINT:

ORGANIZATION INDIVIDUAL SOURCE OF COMPLAINT:

NATURE OF COMPLAINT:

CONTRACT REFERENCE:

VALIDATION:

DATE CONTRACTOR INFORMED COMPLAINT Responsible officer:

TIME CONTRACTOR INFORMED OF COMPLAINT Responsible officer:

ACTION TAKEN BY CONTRACTOR Responsible officer:

RECEIVED AND VALIDATED BY:

NOTE Used for inhouse operation:

undefined: Off

Text2:

SubmitButton1:

image2.emf

DATE

COR/QAE SURVEILLANCE SCHEDULE

When completed stamp "FOR OFFICIAL USE ONLY"

DA FORM 5475, MAR 2008 APD PE v1.00

DATE

SERVICE

PREVIOUS EDITIONS ARE OBSOLETE.

image3.emf

6.

2. 3.

PREPARED ORAL NOTIFICATION RETURNED BY CONTRACTOR ACTION COMPLETE

4. DISCREPANCY OR PROBLEM (Describe in Detail: Include reference in PWS / Directive: Attach continuation sheet if necessary.)

5. SIGNATURE OF CONTRACTING OFFICER

7.

8. CONTRACTOR RESPONSE AS TO CAUSE, CORRECTIVE ACTION AND ACTIONS TO PREVENT RECURRENCE. ATTACH

1. CONTRACT NUMBER

9. SIGNATURE OF CONTRACTOR REPRESENTATIVE 10. DATE

11. GOVERNMENT EVALUATION (Acceptance, partial acceptance, rejection: attach continuation sheet if necessary)

12. GOVERNMENT ACTIONS (Payment deduction, cure notice, show cause, other.)

CONTRACT DISCREPANCY REPORT

TO: (Contractor and Manager Name)

DATES

CLOSE OUT

CONTRACTOR

NOTIFIED

NAME AND TITLE SIGNATURE DATE

QAE

CONTRACTING

OFFICER

CONTINUATION SHEET IF NECESSARY. (Cite applicable Q.A. program procedures or new A.W. procedures.)

DA FORM 5479, MAR 2008 APD PE v1.01ES

FROM: (Name of QAE)

TO: (Contracting Officer) FROM: (Contractor)

PREVIOUS EDITIONS ARE OBSOLETE.

File details come from the government source that posted it. Updated .