Attachment J.32, DDBC Proposed Productive Hours UPDATE.xlsx
XLSX spreadsheet 21 KB Posted
- Attached to
- Distribution and Warehousing Services at DLA Distribution Bartstow, CA Federal contract opportunity
- Solicitation number
- SP3300-21-R-5008
- Issued by
- Defense Logistics Agency Distribution
About this file
This solicitation notice and related documents outline requirements for distribution and warehousing services at the Defense Logistics Agency facility in Barstow, California. The scope of work includes receiving, storage, inventory management, packaging, issue processing, shipping, and distribution support for repair parts and secondary items. The incumbent contractor is Technica, LLC under contract SP3300-17-D-5002, which expires in September 2022. The follow-on requirement will be solicited as a 100% small business set-aside under solicitation number SP3300-21-R-5008, with an estimated period of performance from July 2022 through June 2027 including a three-month transition period. The NAICS code is 493110 with a size standard of $30 million. The solicitation and technical library attachments can be accessed through the Safe Access File Exchange system by requesting the documents from the contracting points of contact.
View the file
Other files for this federal contract opportunity
Show all 50
Distribution and Warehousing Services at DLA Distribution Bartstow, CA has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Proposed Productive Labor Hours | |||||||||
| Instructions: See Section L of the RFP. *Note - The standard mearsurement of time to be used for the Standard Times in Column D shall be number of hours e.g. 5 minutes =.0833 hours. All figures shall be rounded to the tenthousandths decimal place. | |||||||||
| **Add rows below as necessary | Productive Hours | ||||||||
| PWS Paragraph | Proposed Labor Category | Specific Activity and Labor Category Responsibilities | Standard Time or Assumptions | Y1 3mo Transition | Y1 (9M0) | Y2 | Y3 | Y4 | Y5 |
| C-1.3 Personnel | |||||||||
| C-1.3.1 Key Personnel Labor Categories | |||||||||
| C-1.3.1 Key Personnel Labor Categories | |||||||||
| C-1.3.1 Key Personnel Labor Categories | |||||||||
| C-1.3.1 Key Personnel Labor Categories | |||||||||
| C-1.3.1 Key Personnel Labor Categories | |||||||||
| C-1.3.1 Key Personnel Labor Categories |
| C-1.4 Security |
| C-1.5 Safety and Occupational Health (SOH) |
C-1.6 Radiation Protection Program
C-1.7 Electrostatic Discharge (ESD) Control Program
| C-1.8 Transition Plan |
| C-1.9 Surge, Sustainment and Disaster Recovery Efforts |
| C-1.10 Preparedness Exercises |
C-1.11 Contract Transition-Out and Continuity of Service Plan
| C-3.1 Government Property (GP) |
| C-3.1.3 Information Technology (IT) Assets and Data Systems |
| C-3.2 Government Material |
C-3.3 Government Training
Section C-4 Contractor Requirements
| C-4.2 Equipment |
| C-4.2.1 Government Accountable Property |
| C-4.2.2 Operating Equipment |
C-4.3 Materials and Supplies
| C-4.4 Equipment Maintenance |
| C-4.5 Support Services |
| C-4.6 Training |
| Section C-5 Specific Tasks |
| Section C-5.1 Distribution Services and Performance Requirements |
| C-5.1.4 Quality Control Plan (QCP) |
| C-5.1.5 Customer Service Plan and Support |
| Section C-5.2 Receiving |
| C-5.2.1 In-Bound Traffic Management |
| C-5.2.2 Off-Load and Tally: Weight Band 1 |
| C-5.2.2 Off-Load and Tally: Weight Band 2 |
| C-5.2.2 Off-Load and Tally: Weight Band 3 |
| C-5.2.2 Off-Load and Tally: Weight Band 4 |
| C-5.2.3 Receipt Process Documentation: Weight Band 1 |
| C-5.2.3 Receipt Process Documentation: Weight Band 2 |
| C-5.2.3 Receipt Process Documentation: Weight Band 3 |
| C-5.2.3 Receipt Process Documentation: Weight Band 4 |
| C-5.2.4 Product Receipt Evaluation: Weight Band 1 |
| C-5.2.4 Product Receipt Evaluation: Weight Band 2 |
| C-5.2.4 Product Receipt Evaluation: Weight Band 3 |
| C-5.2.4 Product Receipt Evaluation: Weight Band 4 |
| C-5.2.4.1 Supply Discrepancy Reports (SDR) |
| C-5.2.4.2 Non-Procurement Receipts (Customer Returns/STOs/RDOs): Weight Band 1 |
| C-5.2.4.2 Non-Procurement Receipts (Customer Returns/STOs/RDOs): Weight Band 2 |
| C-5.2.4.2 Non-Procurement Receipts (Customer Returns/STOs/RDOs): Weight Band 3 |
| C-5.2.4.2 Non-Procurement Receipts (Customer Returns/STOs/RDOs): Weight Band 4 |
| C-5.2.4.3 New Procurement (NP): Weight Band 1 |
| C-5.2.4.3 New Procurement (NP): Weight Band 2 |
| C-5.2.4.3 New Procurement (NP): Weight Band 3 |
| C-5.2.4.3 New Procurement (NP): Weight Band 4 |
| C-5.2.5.1 Material Potentially Possessing Explosive Hazard (MPPEH) |
| C-5.2.5.2 Controlled Material |
| C-5.2.5.3 Critical Safety Items (CSI) |
| C-5.2.5.4 Customer Returns Improvement Initiative (CRII) |
| C-5.2.5.5 Electrostatic Discharge Sensitive (ESDS) Material |
| C-5.2.5.6 Hard to Handle Material |
| C-5.2.5.7 Hazardous Material (HAZMAT) |
| C-5.2.5.8 Radioactive Material (RAM) |
| C-5.2.5.9 Frustrated Material |
| C-5.2.5.10 Misdirected Material |
| C-5.2.5.11 Receipts Lost In-Transit |
| C-5.2.5.12 Shelf Life Material |
| C-5.2.5.13 Magnetic Material |
| C-5.2 Summary |
| Section C-5.3 Warehousing |
| C-5.3.1 Stow of Receipts: Weight Band 1 |
| C-5.3.1 Stow of Receipts: Weight Band 2 |
| C-5.3.1 Stow of Receipts: Weight Band 3 |
| C-5.3.1 Stow of Receipts: Weight Band 4 |
| C-5.3.2 General Warehousing/Storage Requirements |
| C-5.3.3 Care of Supplies In Storage (COSIS) |
| C-5.3.3.1 Special Inspections |
| C-5.3.4.1 Material Potentially Possessing Explosive Hazard (MPPEH) |
| C-5.3.4.2 Controlled Material |
| C-5.3.4.3 Hazardous Material (HAZMAT) |
| C-5.3.4.4 Radioactive Material (RAM) |
| C-5.3.4.5 Shelf-Life Material |
| C-5.3.5 AutoCAD Planographs / DSS Location Identification / Storage Space Management Report (SSMR) |
| C-5.3.6 Weight and Cube National Stock Number (NSN) Program |
| C-5.3.7 Rewarehousing of Material: Weight Band 1 |
| C-5.3.7 Rewarehousing of Material: Weight Band 2 |
| C-5.3.7 Rewarehousing of Material: Weight Band 3 |
| C-5.3.7 Rewarehousing of Material: Weight Band 4 |
| C-5.3.8 Issue of Material (On-base): Weight Band 1 |
| C-5.3.8 Issue of Material (On-Base): Weight Band 2 |
| C-5.3.8 Issue of Material (On-Base): Weight Band 3 |
| C-5.3.8 Issue of Material (On-Base): Weight Band 4 |
| C-5.3.8 Issue of Material (Off-Base): Weight Band 1 |
| C-5.3.8 Issue of Material (Off-Base): Weight Band 2 |
| C-5.3.8 Issue of Material (Off-Base): Weight Band 3 |
| C-5.3.8 Issue of Material (Off-Base): Weight Band 4 |
| C-5.3.8 Issue of Material (Transshipments Off-Base): Weight Band 1 |
| C-5.3.8 Issue of Material (Transshipments Off-Base): Weight Band 2 |
| C-5.3.8 Issue of Material (Transshipments Off-Base): Weight Band 3 |
| C-5.3.8 Issue of Material (Transshipments Off-Base): Weight Band 4 |
| C-5.3.8 Issue of Material (Transshipments On-Base) |
| C-5.3.8 Issue of Material (DROs): Weight Band 1 |
| C-5.3.8 Issue of Material (DROs): Weight Band 2 |
| C-5.3.8 Issue of Material (DROs): Weight Band 3 |
| C-5.3.8 Issue of Material (DROs): Weight Band 4 |
| C-5.3.8 Rewarehousing Picks |
| C-5.3.8.1 Processing Issue Release Orders |
| C-5.3.8.2 Open/Unconfirmed Material Release Orders (MROs) |
| C-5.3.8.3 Stock Selection |
| C-5.3.8.4 Issue Cancellations |
| C-5.3.9.1 Controlled Material |
| C-5.3.10 Local Delivery Issues |
| C-5.3.11 Issues to DLA Disposition Services |
| C-5.3.11.1 Non-Hazardous Material Disposals |
| C-5.3.11.1.2 Classified |
| C-5.3.10.1.3 Critical Safety Items (CSI) |
| C-5.3.11.1.4 Demilitarization (DEMIL) |
| C-5.3.11.2 Hazardous Material (HAZMAT) Disposals |
| C-5.3.11.3 Recycling Control Program (RCP) |
| C-5.3.12 Shipment Preparation: Weight Band 1 |
| C-5.3.12 Shipment Preparation: Weight Band 2 |
| C-5.3.12 Shipment Preparation: Weight Band 3 |
| C-5.3.12 Shipment Preparation: Weight Band 4 |
| Section C-5.4 Physical Inventory Control |
| C-5.4.1 Physical Inventory Control (F2B 1st Counts) |
| C-5.4.1 Physical Inventory Control (F2B 2nd Counts) |
| C-5.4.1 Physical Inventory Control (F2B TPIC M) |
| C-5.4.1 Physical Inventory Control (F2B 3rd Counts) |
| C-5.4.1 Physical Inventory Control (F2B Causative Research) |
| C-5.4.1.1 DSS Inventories (TPIC "C") |
| C-5.4.1.1 DSS Inventories (TPIC "E") |
| C-5.4.1.1 DSS Inventories (TPIC "H") |
| C-5.4.1.1 DSS Inventories (TPIC "I") |
| C-5.4.1.1 DSS Inventories (TPIC "J") |
| C-5.4.1.1 DSS Inventories (TPIC "K") |
| C-5.4.1.1 DSS Inventories (TPIC "M") |
| C-5.4.1.1 DSS Inventories (TPIC "A") |
| C-5.4.1.1 DSS Inventories (TPIC "R") |
| C-5.4.1.1 DSS Inventories (TPIC "S") |
| C-5.4.1.1 DSS Inventories (TPIC "T") |
| C-5.4.1.1 DSS Inventories (TPIC "V") |
| C-5.4.1.1 DSS Inventories (TPIC "Z") |
| C-5.4.1.2 Research of Potential or Actual Physical Inventory Adjustments |
| C-5.4.2 Denial Research |
| C-5.4.3 Item Data Maintenance |
| C-5.4.4 Location Surveys |
| C-5.4.5 ADHOC Discrepancy Research and Resolution |
| C-5.4.6 Potential Book to Book Processing |
| C-5.4.7 Incoming Supply Discrepancy Report (ISDR) Research and Resolution |
| Section C-5.5 Transportation |
| C-5.5.2 Traffic Management |
| C-5.5.3 Shipping / Outloading |
| C-5.5.4 Transshipments |
| C-5.5.5 Astray Freight (Government Cargo Recovery Effort (GOCARE)) Program |
| C-5.5.6.1 Foreign Military Sales (FMS) |
| C-5.5.6.2 Grant Aid Programs |
| C-5.5.6.3 Shelf Life For FMS Material |
| C-5.5.7.1 Material Potentially Possessing Explosive Hazard (MPPEH) |
| C-5.5.7.2 Controlled Material |
| C-5.5.7.3 Hazardous Material (HAZMAT) |
| C-5.5.7.4 Radioactive Material (RAM) |
| C-5.5.8 Deployment Support |
| Section C-5.6 Packaging |
| C-5.6.1 Preservation, Packaging, Packing and Marking (PPPM): X-Small |
| C-5.6.1 Preservation, Packaging, Packing and Marking (PPPM):Small |
| C-5.6.1 Preservation, Packaging, Packing and Marking (PPPM): Medium |
| C-5.6.1 Preservation, Packaging, Packing and Marking (PPPM): Large |
| C-5.6.1 Preservation, Packaging, Packing and Marking (PPPM): X-Large |
| C-5.6.1 Preservation, Packaging, Packing and Marking (PPPM): XX-Large |
| C-5.6.2 Container Reclamation |
| C-5.6.3 Container Fabrication Support: Small |
| C-5.6.3 Container Fabrication Support: Medium |
| C-5.6.3 Container Fabrication Support: Large |
| C-5.6.3 Container Fabrication Support: X-Large |
| C-5.6.3 Container Fabrication Support: Fiberboard Containers |
| C-5.6.4 Specialized Container Fabrication Support |
| C-5.6.5 Wood Packaging Material (WPM) |
| C-6.6 Mandatory Reports -CDRLs not addressed elsewhere (A005 AND A010-A015) in J.1 and J.2 |
| Section C-5.7M Site Specific Functions |
C-5.7.1M Load and Off-load Support
| C-5.7.2M Level I/Subsafe (L1/SS) Material |
| C-5.7.2.1M L1/SS Receipt STOWs |
| C-5.7.2.2M L1/SS Warehousing |
| C-5.7.2.2.1M L1/SS Storage |
| C-5.7.2.2.2M L1/SS Issue |
| C-5.7.4M Retail Support |
| C-5.7.4.1 Warehousing and Inventory Requirements Retail Support *NOTE* This section shall be performed IAW the Stow of Receipts IAW C-5.3, Warehousing, and all sub-paragraphs and C-5.4 Inventory and all sub-paragraphs. |
C-5.7.4.2M Local Delivery
C-5.7.4.3M Line Side Stock
C-5.7.4.4M Material Consolidation Support for Vehicle Repair/Maintenance
Attachment J.32
SP330016R5003
Contractor Proposed Productive Labor Hours
Attachment J.32
SP330016R5003
Contractor Proposed Productive Labor Hours
File details come from the government source that posted it. Updated .