Attachment J-8 -Cost-Price Proposal.xlsx
XLSX spreadsheet 10 KB Posted
- Attached to
- GPO 5th Floor SID Smartcard Room Design/Build Construction Federal contract opportunity
- Solicitation number
- 040ADV-25-R-0001
- Issued by
- Government Publishing Office
About this file
This is a pricing template spreadsheet (Attachment J-8) for a design-build construction project to relocate the SID smartcard facility on the 5th floor of the Government Publishing Office building. The template is structured with three main Contract Line Item Numbers (CLINs): CLIN 0001 covers the design phase including site surveys, travel, design development, and design administration; CLIN 0002 encompasses the construction phase including mobilization, 200-day construction management, demolition labor and materials; and CLIN 0003 addresses quality assurance/quality control, bonds, and design contingency. Each CLIN includes provisions for overhead, G&A, and profit calculations.
The template is designed for bidders to input firm-fixed prices for each line item, with a formula to calculate the total price. While no actual pricing is shown in the document (total shows $0.00), the structure provides insight into the expected scope and phases of the smartcard relocation project at the GPO facility located at 732 N. Capitol Street, Washington, DC.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 040ADV-25-R-0001.pdf | ||
| Attachment J-3 - Architectural and Existing Floor Plans of GPO Building A 5th Floor.pdf | ||
| Attachment J-6 - Lighting Layout for 5th Floor.jpg | JPG image | |
| Attachment J-9 - Past Performance Questionnaire.doc | DOC document | |
| Attachment J-1 - Pictures of the Renovation Site - Reduced.pdf | ||
| Attachment J-2 - Conceptual Drawings of the Overall Space Design.pdf | ||
| Attachment J-4 - HVAC Service Area for 5th Floor.pdf | ||
| Attachment J-5 - Sprinkler System Layout for 5th Floor.pdf | ||
| Attachment J-7 - Power Plan for 5th Floor.jpg | JPG image |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| CLIN | Description | Firm Fixed Price | Notes/Comment |
| CLIN 0001 | Design Phase for 5th floor SID smartcard relocation Project | ||
| Site Survey (Architectural, Civil, HVAC, Fire, etc) | |||
| Travel | |||
| Design Development | |||
| Design Administration | |||
| Overhead, G&A | |||
| Profit |
| CLIN 0002 | Construction Phase for 5th floor SID smartcard Relocation Project |
| Mobilization of Personnel & Equipment | |
| Construction Management for 200 Calander Days | |
| Demolition | |
| Labor and Materials | |
| Overhead, G&A | |
| Profit |
| CLIN 0003 | Quality Assurance/Quality Control |
| Bonds | |
| Design Contingency | |
| Overhead, G&A | |
| Profit |
Total Price $0.00