Attachment J-5 - Sprinkler System Layout for 5th Floor.pdf
PDF 55 MB Posted
- Attached to
- GPO 5th Floor SID Smartcard Room Design/Build Construction Federal contract opportunity
- Solicitation number
- 040ADV-25-R-0001
- Issued by
- Government Publishing Office
About this file
This file is a technical drawing showing the sprinkler system layout for the 5th floor of GPO Building A, specifically for room A-501 which is being renovated for a Smart Card Reader manufacturing hub. The drawing appears to be an architectural diagram detailing the placement and specifications of fire protection sprinkler systems that will need to be installed or modified as part of the design-build renovation project at 732 N. Capitol Street in Washington, DC.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment J-8 -Cost-Price Proposal.xlsx | XLSX spreadsheet | |
| 040ADV-25-R-0001.pdf | ||
| Attachment J-3 - Architectural and Existing Floor Plans of GPO Building A 5th Floor.pdf | ||
| Attachment J-6 - Lighting Layout for 5th Floor.jpg | JPG image | |
| Attachment J-9 - Past Performance Questionnaire.doc | DOC document | |
| Attachment J-7 - Power Plan for 5th Floor.jpg | JPG image | |
| Attachment J-1 - Pictures of the Renovation Site - Reduced.pdf | ||
| Attachment J-2 - Conceptual Drawings of the Overall Space Design.pdf | ||
| Attachment J-4 - HVAC Service Area for 5th Floor.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .