Attachment J-4 -Cost-Price Proposal.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
GPO G-Street Sidewalk Repair
Solicitation number
040ADV-26-R-0010
Issued by

About this file

This is a Cost-Price Proposal pricing template for the G Street Sidewalk Repair project, a Firm Fixed Price (FFP) contract solicitation (040ADV-26-R-0010) issued by the Government Publishing Office. The template is structured to capture comprehensive pricing across multiple cost categories and line items for concrete and structural repair work.

The proposal template includes a primary cost summary sheet requiring offerors to provide pricing for mobilization, general conditions, insurance, labor, quality assurance/quality control, bonds, overhead and G&A, and profit with a total price field. A unit price sheet breaks down eight specific repair and restoration line items: topside concrete spall repairs (1,000 sq.ft.), full depth concrete spall repairs (1,600 sq.ft.), stone spall repairs (100 sq.ft.), epoxy crack injection, lead-based paint abatement, new paint coatings, temporary support and attachment items with electrical work, and temporary removal and replacement of items with electrical and plumbing work. A labor categories sheet lists ten position types expected to perform the work: traffic coating applicator, concrete repair specialist, laborer, carpenter, electrician journeyman, plumber journeyman, painter, lead paint abatement specialist, and flag man. This template is used to evaluate proposals on a lowest-price technically acceptable (LPTA) basis, with the successful offeror providing all labor, materials, equipment, and supervision for sidewalk and vault ceiling structural repair and restoration work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

CLINDescriptionFirm Fixed PriceNotes/Comment
CLIN 0001G Street Sidewalk Repair
Mobilization
General Conditions
Insurance
Labor
Quality Assurance/Quality Control
Bonds
Overhead, G&A
Profit

Total Price $0.00

Sheet2

Unit Price – Base BidQuantityPrice
1Topside concrete spall repairs (2-inches deep).$ /sq.ft.1,000 sq.ft.$
2Full depth concrete spall repairs (8-inches +/- deep).$ /sq.ft.1,600 sq.ft.$
3Stone spall repairs$ /sq.ft.100 sq.ft.$
4Epoxy crack injection in concrete.$ / lf.ft.150 sq.ft$
5Lead based paint abatement at slab soffit and structural framing.$ /sq.ft.All$
6New paint coatings at garage slab soffit and structural framing.$ /sq.ft.All$
7Temporary support items attached to concrete soffit and framing and detach/reattach items from concrete at affected areas, as required. Include required electrical work by a licensed electrician.$ /sq.ft.As indicated$

8 Temporary remove and replace items attached to concrete slab at affected areas, as required. Include required electrical and plumbing work by a licensed electrician/plumber. $ /sq.ft. As indicated $

Sheet3

Labor Category
Traffic Coating Applicator
Concrete Repair Specialist
Laborer
Carpenter
Electrician Journeyman
Plumber Journeyman
Painter
Lead Paint Abatement Specialist
Flag Man

File details come from the government source that posted it. Updated .