About this file

This file is a Schedule of Prices (SoP) for a Department of Defense Education (DoDEA) contract for maintenance and repair services of kitchen equipment and systems. The contract (Solicitation Number N4008425B0411) is issued by the Naval Facilities Engineering Command and covers a base period plus four option periods, each lasting one year. The pricing structure includes recurring and non-recurring line items for PM (Preventive Maintenance) Program Services for various kitchen equipment systems, including cube ice makers, dishwashers, food waste disposers, refrigeration, ovens, warmers, kettles, and water heating systems.

The pricing document details comprehensive service offerings with specific line items for emergency, urgent, and routine work across multiple contract periods. Non-recurring work includes unit-priced labor hour work and direct material/construction equipment provisions, which must be negotiated by the Contracting Officer. The contract allows for flexible task order-based work with predetermined pricing mechanisms, covering a range of maintenance and repair services for kitchen equipment at DoDEA school locations. The total contract value and specific unit prices are not explicitly stated in the document, but the pricing is structured in Japanese Yen (YEN) with detailed breakdowns for each contract line item (CLIN) and exhibit period.

View the file

Other files

File Type Posted
SF 1449 - N4008425B0411.pdf PDF
N4008425B0411_Attachment (3) PreBid Inquiry Form.xlsx XLSX spreadsheet
25B0411SOW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SoP

SCHEDULE OF PRICE
Date:
NAME OF OFFEROR OR CONTRACTOR:
LINE ITEMITEMQ'TYUNITAMOUNT
NO.
Item 0001Recurring, Base Period1LS¥
Provide PM Program Services for
Various Kitchen Equipment and Systems a Period of One Year.
Item 0002Non-Recurring, Base Period1LS¥
Provide Unit Priced Task Work(NTE)
Upon Receipt of a Task Order
Item 0003Recurring, First Option Period1LS¥
Provide PM Program Services for
Various Kitchen Equipment and Systems a Period of One Year.
Item 0004Non-Recurring, First Option Period1LS¥
Provide Unit Priced Task Work(NTE)
Upon Receipt of a Task Order
Item 0005Recurring, Second Option Period1LS¥
Provide PM Program Services for
Various Kitchen Equipment and Systems a Period of One Year.
Item 0006Non-Recurring, Second Option Period1LS¥
Provide Unit Priced Task Work(NTE)
Upon Receipt of a Task Order
Item 0007Recurring, Third Option Period1LS¥
Provide PM Program Services for
Various Kitchen Equipment and Systems a Period of One Year.
Item 0008Non-Recurring, Third Option Period1LS¥
Provide Unit Priced Task Work(NTE)
Upon Receipt of a Task Order
Item 0009Recurring, Fourth Option Period1LS¥
Provide PM Program Services for
Various Kitchen Equipment and Systems a Period of One Year.
Item 0010Non-Recurring, Fourth Option Period1LS¥
Provide Unit Priced Task Work(NTE)
Upon Receipt of a Task Order

TOTAL: (LINE ITEM 0001 through 0010) ¥

CLIN 9000 Exhibit A (Base Period)

CLIN 9001 Exhibit B (First Option Period)

CLIN 9002 Exhibit C (Second Option Period)

CLIN 9003 Exhibit D (Third Option Period)

CLIN 9004 Exhibit E (Fourth Option Period)

NOTE:The number of Placeholders established depends on the maximum number of lines
of accounting anticipated on an individual task order.

Detail line items for task order is located in Attachment J-0200000-14

CLIN = CONTRACT LINE ITEM
LS = LUMP SUM
NTE = NOT-TO-EXCEED
Q'TY = QUANTITY

&"Times New Roman,Regular"B-&P

B~4th_Recurring

Attachment J-0200000-14
Exhibit Line Item Numbers (ELINs)
Solicitation/Contract No.: N40084-25-B/D-0411
EXHIBIT A B C D E - CLIN 9000 9001 9002 9003 9004
Provide Prices for Recurring Work in accordance with Section C, Spec Item 3
ELIN/Sub-ELINs A001 through E001
ELIN/Sub-ELINAnnex/Sub-annexSpec ItemDescriptionQuantityUnit of MeasureUnit PriceTotal Price
1502000Facility Investment
A~E001DODEA
Emergency, Urgent, and Routine (E/U/R) Work
A~E001AA15020003.1.1Emergency - Refer to J-1502000-0412MO
A~E001AB15020003.1.2Urgent - Refer to J-1502000-0412MO
A~E001AC15020003.1.3Routine - Refer to J-1502000-0412MO
Preventive Maintenance (PM) Program
A~E001AD15020003.2.1Cube Ice Maker Systems2SA
A~E001AE15020003.2.2Dishwasher Systems2SA
A~E001AF15020003.2.3Food Waste Disposer Systems2SA
A~E001AG15020003.2.4Refrigeration Systems2SA
A~E001AH15020003.2.5Oven Systems2SA
A~E001AJ15020003.2.6Warmer Systems2SA
A~E001AK15020003.2.7Kettle Systems2SA
A~E001AL15020003.2.8Water Heating Systems2SA¥ -

Total Recurring Work: ¥ -

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6'

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height, Free-Standing

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

With Barbwire, 7' Fence Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height, Free-Standing

B~4th_Non-Recurring

Attachment J-0200000-14
Exhibit Line Item Numbers (ELINs)
Solicitation/Contract No.: N40084-25-B/D-0411
EXHIBIT A B C D E - CLIN 9000 9001 9002 9003 9004
Line Item 0002, 0004, 0006, 0008, 0010 - Non-Recurring Price - Base Period, First, Second, Third, Fourth Option Period
Provide Prices for Non-Recurring Work in accordance with Section C, Spec Item 4
ELINs A B C D E 700 through A B C D E 701
ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of MeasureUnit PriceExtended Price
A B C D E 700Unit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO.The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.

Task order completion times will be specified on each task order.

240LH¥ -
A B C D E 701Direct Material and Construction Equipment - MUST BE NEGOTIATED BY KO.The Contractor shall provide all materials and construction equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.2 Direct Material and Construction Equipment Requirements.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Direct Material Costs and Construction Equipment.

Task order completion times will be specified on each task order.

1LS¥ -
Total Non-Recurring Work:¥ -

NAVFAC UOM

NAVFAC - Units of Measure
AAnnualFRFramePGPackage
ACAcreFTFootPIPillow
AMAmpouleFVFivePMPlate
ATAssortmentFYFiftyPRPair
AYAssemblyGGGreat GrossPTPint
BABallGIGillPXPellet
BDBundleGLGallonPZPacket
BEBaleGMGramQTQuart
BFBoard FootGNGrainRARation
BGBagGPGroupRDRound
BKBookGRGrossRLReel
BLBarrelHDHundredRMReam
BOBoltHFHundred FeetRORoll
BQBriquetHKHankRXThousand Rounds
BRBarHPHundred PoundsSASemi-Annual
BTBottleHRHoursSBSquare Mile
BXBoxHSHundred Square FeetSCSquare Centimeters
CACartridgeHWHundred WeightSDSkid
CBCarboyHYHundred YardsSESet
CCCubic CentimeterINInchSFSquare Foot
CDCubic YardJRJarSHSheet
CEConeKGKilogramSISquare Inch
CFCubic FootKMKilometerSKSkein
CGCentigramKRCaratSLSpool
CICubic InchKTKitSMSquare Meter
CKCakeLBPoundSOShot
CLCoilLFLinear FootSPStrip
CMCentimeterLGLengthSQSquare
CNCanLHLabor HoursSXStick
COContainerLILiterSYSquare Yard
CUCurieLMLinear MeterTCTruckload
CYCylinderLOLotTDTwenty-Four
CZCubic MeterLSLump SumTETen
DADaysLYLinear YardTFTwenty-Five
DCDecagramMCThousand Cubic FeetTGGross Ton
DEDecimeterMEMealTNTon
DGDecigramMFThousand FeetTOTroy Ounce
DLDeciliterMGMilligramTSThirty-Six
DMDramMIMileTTTablet
DODollarsMLMilliliterTUTube
DRDrumMMMillimeterUNUnit
DWPennyweightMOMonthsUSUS U.S.P Unit
DZDozenMRMeterVIVial
EAEachMXThousandWKWeek
ENEach CollectionOTOutfitYDYard
EXExposureOZOunceYRYears
FDFoldPDPad

File details come from the government source that posted it. Updated .