DEPARTMENT OF THE NAVY

SWRMC (NMD)

ACU ONE (ACU 53257)

SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED

SPECIFICATION NUMBER: SSSD-015-21

INCLUDES ALL CHANGES THROUGH 11/6/2020

INDEX

SHIP: ACU ONE (ACU 53257) SSSD-015-21

ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.

CATEGORY I. FY-21 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.

ITEM_NO. TITLE CHANGE DATE CHANGE

009-01 General Criteria; accomplish 10/01/2019 Original

009-02 Environmental Compliance Report for Material Usage; accomplish 10/01/2019 Original

009-03 Toxic and Hazardous Substance; control 10/01/2019 Original

009-04 Quality Management System; provide 10/01/2019 Original

009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;

accomplish

03/06/2020 CH-2

009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping;

accomplish

07/24/2019 Original

009-08 Shipboard Fire Protection and Fire Prevention; accomplish 10/01/2019 Original

009-10 Asbestos-Containing Material (ACM); control 10/01/2019 Original

009-18 Mine Warfare Ships Magnetic Material; control 04/30/2018 Original

009-19 Provisioning Technical Documentation (PTD); provide 10/01/2018 Original

009-20 Government Property; control 10/01/2017 Original

009-21 Logistics and Technical Data; provide 10/01/2018 Original

009-23 Interference; remove and install 10/01/2018 Original

009-24 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness;

accomplish

10/01/2019 Original

009-34 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 10/01/2018 Original

009-39 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for Commercial Equipment/Component; accomplish

10/01/2018 Original

009-40 Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a Naval Facility; provide

10/01/2019 Original

009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration;

provide and manage

01/14/2020 CH-1

009-61 Shipboard Use of Fluorocarbons; control 07/18/2014 Original

009-67 Integrated Total Ship Testing; manage 04/30/2018 Original

009-69 Heavy Weather/Mooring Plan; provide 04/30/2018 Original

009-70 Confined Space Entry, Certification, Fire Protection, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish

10/01/2019 Original

009-72 Physical Security at a Private Contractor Facility; accomplish 10/01/2019 Original

009-73 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, and repair

10/01/2018 Original

009-74 Occupational, Safety and Health Plan; accomplish 01/14/2020 CH-1

009-80 Ship Facilities; maintain 11/18/2016 Original

009-81 Compartment Closeout; accomplish 10/01/2019 Original

009-82 Installation of Equal Component Vice Specified Component; report 03/26/2018 Original

009-84 Threaded Fastener Requirements; accomplish 03/06/2020 CH-2

009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide

03/06/2018 Original

009-99 Ship Departure Report; provide 07/18/2014 Original

009-100 Ship's Stability; maintain 03/06/2018 Original

ITEM_NO. TITLE CHANGE DATE CHANGE

009-101 Ship Transit and Berthing; accomplish 03/26/2018 Original

009-106 Work Authorization Form Coordinator (WAFCOR); provide 10/01/2017 Original

009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 10/01/2017 Original

009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 11/18/2016 Original

009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration; provide and manage

04/30/2018 Original

009-117 Combat Systems, Light-Off Suport; provide 10/01/2019 Original

009-118 CG Deck Loading; accomplish 07/18/2014 Original

009-120 Fact Finding and Critique of Unplanned Event; manage 03/06/2018 Original

009-122 Temporary Padeye; install and remove 10/01/2018 Original

009-125 Boats Less Than 65 Feet Long; accomplish 07/11/2020 CH-3

CHANGE DATETITLEITEM NO.

CATEGORY II. FY-21 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER

CHANGE

009-12 Weld, Fabricate, and Inspect; accomplish 10/01/2019 Original

009-32 Cleaning and Painting Requirements; accomplish 03/06/2020 CH-2

ITEM NO. TITLE

LCU 1665-Hazardous Waste Produced on Naval Vessels; control077-11-001

LCU-1665 Bow Ramp Electrical System; repair320-11-001

LCU 1665- Bow Ramp, Chain, Cable, Sheave and Related Components; inspect, repair, align and test

584-31-001

SHIP: ACU ONE (ACU 53257) ITEM NO: 077-11-001

COAR: 26 PCN: CU65-L003

CMP: NONE

PLANNER: POMERINKE, GALE

SSP: SSSD-015-21 1 of 5 ITEM NO: 077-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: LCU 1665-Hazardous Waste Produced on Naval Vessels; control

1.2 Location of Work:

1.2.1 Throughout the craft

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Resource Conservation and Recovery Act (RCRA)

2.2 Federal Hazardous Materials Transportation Act, 49 U.S.C. 5103

2.3 Applicable Hazardous Waste Manifest Form

2.4 10 U.S.C. 7311

3. REQUIREMENTS:

3.1 Manage and dispose of all hazardous waste listed in 3.5, including water in each ballast tank in accordance with 2.1 and 2.2.

3.1.1 When a Navy generator number is required by this Work Item, submit the original of 2.3 to the SUPERVISOR for assignment of Environmental Protection Agency (EPA) or delegated state environmental agency identification number.

3.1.2 Manage and transport for Navy disposal, Navy-generated

hazardous waste listed in 3.5 in accordance with 2.1 and 2.2, as designated by the SUPERVISOR.

3.1.2.1 Consider existing interior coatings to be removed by the invoking work items of this contract to contain lead, cadmium and chromium.

3.1.3 Submit one legible copy of 2.3 signed by the owner or operator of the disposal facility to the SUPERVISOR within 48 hours of receipt from owner or operator of disposal facility.

3.2 Complete documentation required by 2.1 and 2.2, using EPA or delegated state environmental agency identification number in accordance with 2.4.

3.2.1 Documentation related to hazardous waste generated solely by the physical actions of Ship's Force or Navy employees (termed Navy- Generated Hazardous Waste) on board the vessel shall only bear a generator identification number issued to the Navy pursuant to applicable law. The contractor shall obtain SUPERVISOR'S concurrence with the categorization of the waste as Navy-generated before completion of the manifest. The manifest prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.

3.2.2 Documentation related to hazardous waste generated solely by

SHIP: ACU ONE (ACU 53257)

SSP: SSSD-015-21 2 of 5 ITEM NO: 077-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

the physical actions of contractor personnel (termed Contractor- Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law.

Regardless of the presence of other material in or on the shipboard systems or structure which may have qualified a waste stream as hazardous, where the contractor performs work on a system or structure using materials (whether or not the use of such materials was specified by the Navy) which by themselves would cause the waste from such work to be a hazardous waste, documentation related to such waste shall only bear a generator number issued to the contractor.

3.2.3 Documentation related to hazardous waste generated by the combined physical actions of Navy and contractor personnel (termed Co-Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law and shall also cite in the remarks block a generator identification number issued to the Navy pursuant to applicable law. When the contractor merely drains a system and such drainage creates hazardous waste or the contractor performs work on system or structure using materials which by themselves would not cause the waste from such work to be hazardous waste but such work nonetheless creates a hazardous waste, documentation related to such waste shall bear a generator identification number issued to the contractor and shall also cite in the remarks block a generator identification number issued to the Navy. The contractor shall sign the generator certification on the Uniform Hazardous Waste Manifest whenever use of the manifest is required for disposal. The contractor shall obtain SUPERVISOR's concurrence with the categorization of the wastes as co-generated before completion of the manifest. Manifests prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.

3.3 If the contractor, while performing work at a Government facility, cannot obtain a separate generator identification number from the state in which the availability will be performed, the contractor shall notify the SUPERVISOR within three business days of receipt of written notification by the state. After obtaining approval of the SUPERVISOR, the contractor shall use the Navy site generator identification number and insert in the remarks block the contractor generator identification number issued for the site where his main facilities are located.

3.4 If, for availabilities at a contractor-owned or controlled facility, the Navy cannot obtain a separate generator identification number for use at a contractor facility, the Navy shall notify the contractor within three business days of receipt of notification by the state. The contractor shall dispose of hazardous waste in accordance with 2.1, 2.2, and 3.2.3.

3.5 Hazardous waste, as identified in 2.1, expected to be produced during performance of this Job Order:

AMOUNT

TYPE NAVY CO-GENERATED CONTRACTOR

Asbestos Insulation material

Acid Solutions (may include _____ ____________ __________

SSP: SSSD-015-21 3 of 5 ITEM NO: 077-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

spent sulfamic, citric, chromic, nitric, sulfuric, hydrochloric, etc.)

Ethylene Glycol (Antifreeze) _____ ____________ __________

Sodium Hydroxide _____ ____________ __________

Cleaning Solvents _____ ____________ 5 gallons

Sodium Phosphates (Tri, Bi, _____ ____________ __________ or Mono)

Fluorocarbons _____ ____________ __________

Morpholine _____ ____________ __________

Sodium Chromates _____ ____________ __________

Hydrazine _____ ____________ __________

Methyl Ethyl Ketone _____ ____________ __________

Spent Abrasive Blast Material _____ ____________ 2 tons

(contaminated with a known hazardous waste)

Trichloroethane _____ ____________ __________

Miscellaneous Chemicals _____ ____________ __________

(Ignitable)

Miscellaneous Chemicals _____ ____________ __________

(Corrosive)

Miscellaneous Chemicals _____ ____________ __________

(TCLP Toxic)

Miscellaneous Chemicals _____ ____________ __________

(Reactive)

Oil (Synthetic), _____ ____________ including hydraulic fluid

Paints (Enamel, Latex, _____ ____________ 7 gallons

Epoxy, thinners, oil based, rubber paint, non-skid, lacquer, remover, varnishes)

Paints (May include lead, _____ ____________ _________ cadmium, or chrome)

Paint Strippers (phenols, _____ ____________ ______ lead, chromium)

SSP: SSSD-015-21 4 of 5 ITEM NO: 077-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

Paint Chips _____ ____________ 5 pounds

Sludge (Contaminated with _____ ____________ _________ a known hazardous waste)

Diesel Fuel _____ ____________

Contaminated oil/water

Oily Waste Tank/ ballast water ____ ________ __ 1500 gallons

3.6 Notify the SUPERVISOR at least one working day prior to shipment of hazardous waste for disposal.

3.7 Submit one legible copy, in hard copy or electronic media, of a report identifying type, amount, and disposal cost of waste listed in 3.5 that was removed during the performance of this Job Order to the

SUPERVISOR.

3.7.1 The report shall include analysis or other method used to identify the waste and state whether each listed waste was hazardous (with generator assignment), non-hazardous, or did not exist.

3.7.1.1 Chemical analysis shall be accomplished by laboratories with state or EPA approved quality assurance programs.

3.7.2 The contractor shall make an effort to minimize hazardous waste generation by reducing the volume or toxicity by neutralizing, recycling, or otherwise removing it from the requirements of Subtitle C of 2.1 and include a description of such efforts in the report.

3.8 Nothing contained in this Work Item shall relieve the contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits in connection with hazardous waste handling and disposal in the performance of this contract.

4. NOTES:

4.1 The waste listed in 3.5 is based on the best information available at the time of preparation of the solicitation. Hazardous waste generated during the actual performance of the work may vary in type or amount from waste listed in 3.5 which may result in renegotiation for credit or increase pursuant to Paragraph (b) of 2.4. The contractor is expected to use best management practice to identify and dispose of all hazardous waste. Some of the substances listed in 3.5 may be neutralized, recycled, or otherwise removed from the requirements of Subtitle C of 2.1. Inclusion of these substances in the waste listed in

3.5 does not preclude the contractor from taking action consistent with

2.1 to reduce or eliminate the hazardous constituents of any waste required to be disposed of under the contract in accordance with 2.2.

Processes that add hazardous constituents to the bilges may require that bilge water be disposed of as a hazardous waste.

4.1.1 The types and amounts of wastes listed in 3.5 are estimates of waste to be disposed of under this contract as required by 2.4. They are not estimates of the amount of the work involved in generating that waste. The work requirements of each individual Work Item specify the actual work to be accomplished.

SSP: SSSD-015-21 5 of 5 ITEM NO: 077-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

4.2 Hazardous wastes are determined by one or more of the following methods:

4.2.1 Chemical analysis which shows that the material

characteristics of ignitability, corrosivity, reactivity, and/or toxicity (Toxicity Characteristic Leachate Procedure - TCLP) exceed the limits for that material in 40 CFR 261.20 Subpart C.

4.2.2 Reference to a Material Safety Data Sheet (MSDS), or

4.2.3 Applying knowledge of the hazardous characteristics of the waste in light of the materials or the process used.

4.3 Asbestos, bilge water, oil/water including sludge, debris and other contaminants, sludge which includes solids and sludge from ballast tanks, CHT tanks, voids, oily waste tanks, fuel ballast tanks, fuel oil tanks, skegs (West coast), PCB's (Maryland), etc., apply only in those states listing them as hazardous waste. When an availability is to be performed in a state where these items are hazardous waste, an estimate of the amount to be generated shall be included in 3.5.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.

SHIP: ACU ONE (ACU 53257) ITEM NO: 320-11-001

COAR: 26 PCN: CU65-L006

CMP: NONE

PLANNER: POMERINKE, GALE

SSP: SSSD-015-21 1 of 2 ITEM NO: 320-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: LCU-1665 Bow Ramp Electrical System; repair

1.2 Location of Work:

1.2.1 Main Deck Port Side Frame 12

1.2.2 Ramp Handling Machinery Compartment (2-12-0-Q)

1.2.3 Main Deck Starboard Frame 14

1.2.4 Pilot House (1-27-1-C)

1.2.5 Conning Station 01 Level Above Pilot House

1.3 Identification:

1.3.1 Quantity (4 EA) Bow Ramp Winch Push Button Remote Switches

1.3.2 Quantity (One EA) Bow Ramp Winch Controller

1.3.3 Quantity (One EA) Bow Ramp Limit Switch

1.3.4 Quantity (One EA) Bow Ramp Hand Crank Limit Switch

1.3.5 Quantity (One EA) Bow Ramp Slack Cable Limit Switch

2. REFERENCES:

2.1 Standard Items

2.2 S-9169-BH-OMP-010, Technical Manual for LCU 1646 Class Bow Ramp Winch System, JAN 2016

2.3 302-6109497, Power System Mod Bow Ramp Limit SW Instl

2.4 302-2889639 Rev E, Power Distribution System Below Vehicle Deck

2.5 302-2889640 Rev D, Power Distribution System Vehicle Deck & Above

2.6 302-2889638 Rev G, Electrical Wireways

2.7 302- 2889637 Rev E, Electrical Distribution Elementary Wiring Diagram

2.8 MIL-STD-1310, Shipboard Grounding and Other Techniques For Electromagnetic Compatability and Safety

3. REQUIREMENTS:

(V)(G) "OPERATIONAL TEST"

3.1 Accomplish an operational test of the entire system to include all safety devices, limit switches, controller and push button switches.

Cycle ramp 3 each times in all control stations to check for proper operation using 2.2 for guidance.

3.1.1 Visually inspect components for evidence of casualties or deteriorating conditions.

SSP: SSSD-015-21 2 of 2 ITEM NO: 320-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

3.1.2 Submit one legible copy of report, in hard copy or electronic media, listing the results of the requirements of 3.1 to the

SUPERVISOR.

3.2 Template from existing shipboard condition and configuration, remove, repair, disassemble, install and preserve the Bow Ramp Electrical System, including but not limited to components identified in 1.3 using

2.2 through 2.8 for guidance.

3.2.1 Disconnect electrically and mechanically, remove and repair or replace with new each component listed in 1.3 using the results of

3.1.2. in accordance with 2.2 through 2.8.

3.2.1.1 Remove and replace with new 2 EA remote pushbutton

located in 1.2.3 using 2.2 and 2.4 through 2.7 for guidance.

3.2.1.2 Remove, template from existing and replace with new the component in 1.3.3 and test for proper operation in accordance with 2.2 and 2.3.

3.3 Ground and bond electrical equipment in accordance with 2.8.

(V)(G) "OPERATIONAL TEST"

3.4 Accomplish an operational test of the entire system to include all safety devices, limit switches and push button switches. Cycle ramp 3 each times in all control stations to check for proper operation using

2.2 for guidance.

3.4.1 Operational test shall be conducted on all control stations including the conning and pilot house.

3.5 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: ACU ONE (ACU 53257) ITEM NO: 584-31-001

COAR: 26 PCN: CU65-0232

CMP: NONE

PLANNER: POMERINKE, GALE

SSP: SSSD-015-21 1 of 3 ITEM NO: 584-31-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: LCU 1665- Bow Ramp, Chain, Cable, Sheave and Related Components; inspect, repair, align and test

1.2 Location of Work:

1.2.1 Main Deck Forward

1.2.2 Ramp Handling Machinery Compartment (2-12-0-Q)

1.2.3 Port and STBD Forecastle

1.3 Identification:

1.3.1 Quanity (2 EA) Port and STBD Bow Ramp Chains, including detachable links, shackles and turnbuckles

1.3.2 Quanity (2 EA) Port and STBD Bow Ramp Winch Cables

1.3.3 Quantity (2 EA) Port and STBD Bow Ramp Welps Anchor Chain Sheaves including pins and bushings

2. REFERENCES:

2.1 Standard Items

2.2 122-2889612 Rev F, Bow Ramp and Mechanical Details

2.3 108-2889601 Rev A, Forecastle Deck, Side Plating & Framing

2.4 169-5110389 Rev A, Bow Ramp Fabrication and Installation

2.5 S9169-BH-OMP-010, Technical Manual for LCU 1646 Class Bow Ramp Winch System, JAN 2016

2.6 S9AA0-AB-GOS-010, General Specifications for Overhaul of Surface Ships, Section 575, Military Vehicle Handling and Stowage Systems

2.7 805-5110541, Docking Plan

3. REQUIREMENTS:

3.1 Dry-berth LCU 1665 in accordance with 2.7 and provide 50 AMPS of shore power and stair tower or brow while dry berthed or pier side at contractor's facility.

3.1.1 Provide Tug Boat to move craft from NAB Coronado to

contractor's facility. The tug must have a minimum of 800 shaft horsepower.

3.1.2 Clean craft's underwater hull and each fitting to ensure removal of dirt, slime, marine growth, fouling and other foreign substances.

3.1.3 Wash down and maintain clean the entire dry berth area to remove silt, mud and debris immediately after the craft is dry berthed.

3.1.4 Schedule production work to allow returning craft to access-able pier side waterborne condition, including shore power and brow, SSP: SSSD-015-21 2 of 3 ITEM NO: 584-31-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

a minimum of 10 working days to support crew light off preparations.

3.2 Lower and support the bow ramp and remove the equipment listed in

1.3.1 through 1.3.3, using 2.2, 2.4 and 2.5 for guidance.

3.2.1 Restore to original dimensions each Port and STBD Wildcat sheave structure as shown in 6-B, 6-D and 7-A of 2.2 and using 2.3 for guidance.

3.2.1.1 Remove existing and install new up to 160 square feet of Item 12 or 13 and up to 80 square feet of Item 10, 11, 14, 15 or 16 of 2.2 in way of repairs.

3.2.1.2 Remove existing and install new 4EA Item 25 of 2.2, Port and STBD.

3.2.1.3 Remove existing and install new up to 4 linear feet of Item 8 of 2.4 in way of damage located on the STBD edge of the Bow Ramp.

3.2.1.4 Accomplish the requirements of 009-12 of 2.1 including Table 2, Column A, Lines One through 7.

3.2.1.5 Accomplish the requirements of 009-12 of 2.1 including Table 2, Line 10 or 11 for the attachment welds associated with Item 25 in 3.2.1.2.

3.2.1.6 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces to match surrounding areas.

3.2.2 Install new the following for both Port and STBD: Item 20 wildcat sheave, Item 21 bushings, Item 26 thrust washers, item 27 locking plate including fasteners, item 22 and 23 pin and retaining ring including new grease fitting in accordance with 2.2.

3.2.2.1 Accomplish the requirements of 009-12 of 2.1 including Table One, Column F, Lines One through 10 for items 22 and 23 of 3.2.2.

3.2.2.2 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces to match existing.

3.2.2.3 Lubricate each wildcat sheave pin and bushing with

grease conforming to MIL-C-10924 Type GAA.

3.2.3 Install new the following for both Port and STBD: Items 6 and 5, wire rope and spelter sockets, Items 8, 4, 3, 7, anchor chain, detachable link, turnbuckle and shackle in accordance with 2.2 and 2.5.

3.2.3.1 Provide certification document for spelter socket

installation pull tests to the SUPERVISOR.

3.2.3.2 Substitute commercial stud weld anchor chain for die

lock anchor chain, item 8 of 2.2.

3.2.3.3 Accomplish the requirements of 009-32 of 2.1 including Table 5, Line 13 for anchor chains Item 8 and detachable links item 4 of 2.2.

3.2.4 Adjust new installed cables and chains in accordance with 2.5

SSP: SSSD-015-21 3 of 3 ITEM NO: 584-31-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

(V)(G) "BREAK AWAY TORQUE"

3.3 Adjust bow ramp winch torque limiter coupling to break-away torque, in accordance with 2.5.

(V)(G) "WEIGHT TEST"

3.4 Weight test the bow ramp handling winches rigging systems and components using 2.6 as guidance and as follows: static load test equal to 200% of the rated load (using 12,000 lbs of weight on the bow ramp), a dynamic load test equal to 150% of the rated load (using 4,500 lbs of weight on the bow ramp) and a rated load test (use ramp as installed).

Note: The weights for the testing uses the bow ramp as an additional weight with the indicated weights.

(V)(G) "OPERATIONAL TEST"

3.5 Conduct an operational test of the bow ramp, bow ramp winch and sheaves in accordance with 2.5 by lowering and raising the bow ramp through 5 complete cycles.

3.5.1 Allowable binding, unusual noise or wobble: None.

3.6 Submit one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of 3.3, 3.4, and

3.5 to the SUPERVISOR.

3.7 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 Possible source for wildcat sheave in 3.2.2 is Smith Berger Marine Inc, 7915 10th AV S, Seattle WA, 98108, (206) 764-4650.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

File details come from the government source that posted it. Updated .