Attachment IX-Sample Location Photos.pdf
PDF 6 MB Posted
- Attached to
- Test Pit and Soil Borings
- Solicitation number
- 6913G626Q300055
About this file
This is a Statement of Work Attachment consisting of a photograph log documenting planned subsurface investigation locations at the Royal Electric Yard facility in Sykesville, Maryland. The log contains 16 photographs taken on August 27, 2026, by photographer Volpe, documenting ten planned soil boring locations (ROYAL-SB-101 through ROYAL-SB-110) and six planned test pit locations (ROYAL-PIT-101 through ROYAL-PIT-106). Each photograph entry includes a photo number, facility name, date, photographer name, geographic location, and a detailed description of the specific investigation location depicted. Soil boring locations are identified with yellow arrow markers indicating precise points within vegetated areas and near trees throughout the yard. Test pit locations are marked with yellow dashed-line rectangles outlining the boundaries of planned excavation areas, with several showing visible surface features including discarded tires, fallen logs, and other debris. All photographs serve as pre-investigation documentation of conditions at the facility prior to conducting subsurface soil sampling and testing activities. The log is prepared under the U.S. Department of Transportation Volpe Center oversight and provides visual reference material for the planned scope of work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Attachment 3 – Royal Electric Yard Photograph Log
1. Photo No: 1 2. Facility Royal Electric Yard
3. Date: 08/27/2026 4. Photographer: Volpe
5. Location: Sykesville, MD
6. Description: Planned soil boring location ROYAL-SB-101
1. Photo No: 2 2. Facility Royal Electric Yard
3. Date: 08/27/2026 4. Photographer: Volpe
6. Description: Planned soil boring location ROYAL-SB-102
1. Photo No: 3 2. Facility Royal Electric Yard
3. Date: 08/27/2026 4. Photographer: Volpe
6. Description: Planned soil boring location ROYAL-SB-103
1. Photo No: 4 2. Facility Royal Electric Yard
6. Description: Planned soil boring location ROYAL-SB-104
1. Photo No: 5 2. Facility Royal Electric Yard
3. Date: 08/27/2026 4. Photographer: Volpe
6. Description: Planned soil boring location ROYAL-SB-105
1. Photo No: 6 2. Facility Royal Electric Yard
6. Description: Planned soil boring location ROYAL-SB-106
1. Photo No: 7 2. Facility Royal Electric Yard
3. Date: 08/27/2026 4. Photographer: Volpe
6. Description: Planned soil boring location ROYAL-SB-107
1. Photo No: 8 2. Facility Royal Electric Yard
6. Description: Planned soil boring location ROYAL-SB-108
1. Photo No: 9 2. Facility Royal Electric Yard
3. Date: 08/27/2026 4. Photographer: Volpe
6. Description: Planned soil boring location ROYAL-SB-109
1. Photo No: 10 2. Facility Royal Electric Yard
6. Description: Planned soil boring location ROYAL-SB-110
1. Photo No: 11 2. Facility Royal Electric Yard
3. Date: 08/27/2026 4. Photographer: Volpe
6. Description: Planned test pit location ROYAL-PIT-101
1. Photo No: 12 2. Facility Royal Electric Yard
6. Description: Planned test pit location ROYAL-PIT-102
1. Photo No: 13 2. Facility Royal Electric Yard
3. Date: 08/27/2026 4. Photographer: Volpe
6. Description: Planned test pit location ROYAL-PIT-103
1. Photo No: 14 2. Facility Royal Electric Yard
6. Description: Planned test pit location ROYAL-PIT-104
1. Photo No: 15 2. Facility Royal Electric Yard
3. Date: 08/27/2026 4. Photographer: Volpe
6. Description: Planned test pit location ROYAL-PIT-105
1. Photo No: 16 2. Facility Royal Electric Yard
6. Description: Planned test pit location ROYAL-PIT-106