Attachment IV Fire and Safety Requirements 24Q0005 ARMAG Gate Maintenance 18 March 2024.pdf
PDF 252 KB Posted
- Attached to
- ATC ARMAG GATE MAINTENANCE
- Solicitation number
- W9124C24Q0005
About this file
This document is an attachment titled "Attachment IV Fire and Safety Requirements" related to a federal contract opportunity for ATC ARMAG GATE MAINTENANCE. The attachment outlines the fire prevention, safety program, and safety requirements for the contractor performing this work at Fort Jackson. Key details include:
The contractor must comply with Army and NFPA fire prevention and protection guidelines, and the government has the right to inspect safety standards and compliance. The contractor must implement an OSHA-compliant safety program and provide a site-specific safety plan. Contractor personnel must use required protective equipment. The contractor must provide safety training to employees, including on unexploded ordnance and accident/damage reporting procedures. The contractor is responsible for reporting accidents, injuries, and damage to government property per Army regulations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X. FIRE AND SAFETY REQUIREMENTS
X-1. Fire Prevention and Protection:
a. The Contractor and Contractor employees shall comply with AR 420-90, Fire and Emergency Services, and National Fire Prevention Association guidelines.
b. Installation fire prevention personnel may make periodic routine inspections for compliance.
X-2. Safety Program:
a. The Contractor shall implement a safety program to ensure that all operations and activities comply with Occupational Safety and Health Administration (OSHA) standards and other safety and health local general consensus standards. Contractor shall provide a copy of Site Specific Safety Plan to the government (Fort Jackson Installation Safety) for review prior to start of project work on Fort Jackson.
b. The Contractor shall be thoroughly familiar with all safety and health requirements of this PWS in accordance with OSHA national consensus standards, including the requirement to establish a site specific standard operating procedure in accordance with OSHA Directives CPL 02-00-124 and CPL 2-0.124--Multi-Employer Citation Policy (Dec. 10, 1999), Multi-employer Worksite Policy.
c. The Government has the right to inspect and test all services related to safety standards, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.
X-3. Protective Items: To comply with OSHA, Contractor personnel shall use protective clothing and equipment whenever and wherever required in the performance of services as determined in the contractors standard operating procedures related to tasks included in this PWS.
X-4. Safety Instruction:
a. The Contractor shall provide initial indoctrination and continuing instruction to all employees to enable employees to conduct their work in a safe manner and to recognize and report hazardous conditions to the appropriate offices for corrective or abatement action. Initial indoctrination shall be provided for safe work practices; proper use, care, and maintenance of equipment; reporting hazards, accidents, and mishaps;
unexploded ordnance; employee responsibility for accident prevention and fire prevention; fire evacuation routes and internal shelter areas.
b. Unexploded munitions training: Unexploded munitions items at Fort Jackson may exist throughout the post. All contractor personnel are required to take a short educational class (3Rs video) on what to do if they suspect unexploded munitions at Fort Jackson. The video can be viewed at the following web site:
https://authoring.denix.osd.mil/uxo/3rs-training/
Once complete with the video training, download your completion certificate and provide a copy to Fort Jackson Safety Office or your Contracting Officer Representative (COR).
Remember, munitions are dangerous.
X-5. Notification of Accidents and Damage to Government Equipment Property:
a. General requirements for reporting accidents and loss or damage to Government property are contained in AR 385-10, and DA PAM 385-40 for the Performance of Contract Property Administration.
b. Damage to Government property must be reported regardless of the dollar amount of damage. The Contractor shall provide immediate notification of property damage to the hand receipt holder and the COR. The Contractor shall prepare a Report of Accident, U.S. Army Accident Report, DA Form 285. Forward the original and one copy to the KO within five (5) workdays after a reportable accident occurs.
X-6. Injuries: The Contractor shall immediately notify the designated Government representative of any injury to a Contractor employee. The Government will advise the Contractor if additional information or forms are required. The Contractor shall prepare an OSHA form 301 and forward to the COR and KO within five (5) workdays after a recordable accident occurs. OSHA Accident reporting for contracted employees will be the responsibility of the contractor in accordance with 29 CFR 1904 and 1925.