Attachment II - Statement of Work - Specification.pdf

PDF 985 KB Posted

Attached to
Aviation Availability: USCGC HARRIET LANE FY27 AA
Solicitation number
70Z08026QMECP0031
Issued by
Not on record

About this file

This is a Specification for Dockside Repairs document for USCGC HARRIET LANE (WMEC-270A), Revision 0, dated July 22, 2026, for Fiscal Year 2027.

The specification encompasses 14 work items totaling comprehensive maintenance and repair services for the Coast Guard cutter. Mandatory work items include: 28 Volt DC Helo Power Supply load testing; 400 Hz Power Supply load testing with qualified technical representative requirements; windspeed transmitter/anemometer removal, inspection, and reinstallation; aviation fuel flow meter calibration; helicopter talon grid inspection and testing with pull testing to 13,700 pounds; helicopter operating area deck preservation using MIL-PRF-24667 non-skid coating system; hangar joint rubber seal renewal; hangar stationary station aluminum plating repair; interior deck covering renewal (130 square feet of rubber deck tile in Avionics Workshop); aviation fuel service tank cleaning and inspection (two 890-gallon tanks); and aviation fuel stowage/overflow tank cleaning and inspection (four tanks totaling approximately 18,685 gallons capacity). Optional work items include partial preservation of aviation fuel service and storage tanks. The final work item requires renewal of hull plating (2 square feet) and flight deck line-up light on HY-100 steel, requiring certified welders. Government will furnish replacement anemometers, flow meter, Talon Grid stanchion bolt assemblies, and a line-up light guide assembly. All work requires compliance with SFLC Standard Specifications for general requirements, welding, preservation, and cable testing. Critical inspection items must be completed within the first 25 percent of the contract period, with condition-found reports required within 40 percent. Environmental protection, hazardous waste management, and naval facility compliance requirements are mandated.

View the file

Other files

File Type Posted
Amendment 0002_Questions_Answers.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Amendment 0001_Questions_Answers.pdf PDF
Attachment I - Schedule of Services - Blank Price Schedule.xls XLS spreadsheet
70Z08026QMECP0031.pdf PDF
STATEMENT OF WORK.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC HARRIET LANE (WMEC 903)

SPECIFICATION FOR DOCKSIDE REPAIRS

FY2027

Developed By: Colin D Gregory

(Rev-0, 22 July 2026)

USCGC HARRIET LANE (WMEC-270A) DOCKSIDE AVAILABILITY FY2027

ii (Rev-0)

TABLE OF CONTENTS

Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property ............................................................................... vii Consolidated List of Critical Inspection Items .......................................................................................... viii Principal Characteristics ............................................................................................................................... ix General Requirements WORK ITEM 1: 28 Volt DC Helo Power Supply, Load Test WORK ITEM 2: 400 Hz Power Supply (FCX Systems Inc), Load Test WORK ITEM 3: Windspeed Transmitter, Anemometer, Remove and Reinstall WORK ITEM 4: Flow Meter (Aviation Fuel), Calibrate WORK ITEM 5: Helo Talon Grids, Inspect and Test WORK ITEM 6: Decks, Helicopter Operating Areas, Preserve WORK ITEM 7: Hangar Joint, Renew WORK ITEM 8: Hangar Stationary Station, Plating, Repair WORK ITEM 9: Deck Covering, Interior, Wet and Dry, Renew WORK ITEM 10: Tanks, Aviation Fuel Service, Clean And Inspect WORK ITEM 11: Tanks (Aviation Fuel Stowage And Overflow), Clean And Inspect WORK ITEM 12: Tanks, Aviation Fuel Service, Preserve, Partial (OPTIONAL) WORK ITEM 13: Tanks, Aviation Fuel Storage, Preserve, Partial (OPTIONAL) WORK ITEM 14: Hull Plating and Line up Light, Renew iii (Rev-0)

REVISIONS RECORD

This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

iv (Rev-0)

CONSOLIDATED LIST OF REFERENCES

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.

All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.

COAST GUARD DRAWINGS

Coast Guard Drawing 901 WMEC 113-001, Rev E, Tank Top PL & FR Fwd FR 101

Coast Guard Drawing 901 WMEC 113-002, Rev A, Tank Top PL & FR Aft 182

Coast Guard Drawing 901 WMEC 113-003, Rev G, Tank Top PL & FR, FR 101-182

Coast Guard Drawing 901 WMEC 116-001, Rev D, CVK Fwd 101 & G Long 2

Coast Guard Drawing 901 WMEC 116-002, Rev E, CVK Aft 182

Coast Guard Drawing 901 WMEC 116-003, Rev E, CVKFr 101-182 & G Long. 2&4

Coast Guard Drawing 901 WMEC 121-001, Rev D, Long Tank Bhds, Aft 182

Coast Guard Drawing 901 WMEC 122-001, Rev H, Transv Bhds 12 & 26

Coast Guard Drawing 901 WMEC 122-002, Rev G, Transv Bhds 47, 78 & 82

Coast Guard Drawing 901 WMEC 122-003, Rev G, Transv Bhds 103, 117

Coast Guard Drawing 901 WMEC 122-004, Rev F, Transv. Bhds. 165, 169, 151.6

Coast Guard Drawing 901 WMEC 122-005, Rev F, Transv Bhds 186 & 190

Coast Guard Drawing 901 WMEC 122-006, Rev F, Transv Bhds 196, 207, 228 & 242

Coast Guard Drawing 901 WMEC 136-003, Rev K, 01 Level Pl & Fr 101-182

Coast Guard Drawing 901 WMEC 153-001, Rev K, 03 Level Pl & Fr

Coast Guard Drawing 901 WMEC 171-001, Rev J, Main Mast

Coast Guard Drawing 901 WMEC 184-008, Rev G, Misc Navigation Fdns

Coast Guard Drawing 901 WMEC 186-003, Rev-, Talon Grid Foundation & Structural Mod 01 Level

Coast Guard Drawing 901 WMEC 314-005, Rev B, 28.5 VDC Hlcptr Start Rect Replacement Diagram

Coast Guard Drawing 901 WMEC 314-006, Rev D, 400Hz Hlcptr Svce Freqconv Installation Diagram

Coast Guard Drawing 901 WMEC 422-003, Rev N, Night Flight Operations Blk, Iwd, Arr & Elem

Coast Guard Drawing 901 WMEC 431-003, Rev J, Main IC Switchboard Arrangements, Elem Wrg Diag

& Dets

Coast Guard Drawing 901 WMEC 494-001, Rev T, Meteorological System Block & Isometric W.D.

Coast Guard Drawing 901 WMEC 542-001, Rev J, JP-5 System Diagram

Coast Guard Drawing 901 WMEC 542-002, Rev H, JP-5 Sys - A&D

Coast Guard Drawing 901 WMEC 588-004, Rev A, Helicopter Hangar/Hull Interface

Coast Guard Drawing 901 WMEC 634-001, Rev G, Deck Covering Schedule v (Rev-0)

Coast Guard Drawing 901 WMEC 634-002, Rev-, 270 Ft WMEC C & A, Pnt, Dk Cov & Insul Mod Helo

Securing Grid Instl

Coast Guard Drawing 901 WMEC 801-004, Rev K, General Arrangement 01 Level

Coast Guard Drawing 905 WMEC 588-010, Rev D, Hangar A & D

Coast Guard Drawing FL-588-003, Rev A, Talon Grid, Supporting Skirt & Cover Fabrication & Instl

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors

Manual

Coast Guard Technical Publication (TP) 2711, SWBS 437, Jan 1992, Wind Transmitter

Coast Guard Technical Publication (TP) 3368, Jun 2020, Talon Helicopter Landing Grid - Type 18-22-01

Multiple Class Cutters

Coast Guard Technical Publication (TP) 3945, SWBS 492, Dec 2004, Visual Landing Aids on Air

Capable Ships (NAVAIR 51-50ABA-1)

Coast Guard Technical Publication (TP) 4931, Aug 2009, Section 321A, Precision Frequency Converters

Coast Guard Technical Publication (TP) 5461, SWBS 421, Nov 2012, Anemometer – Model 120 & 122

Coast Guard Technical Publication (TP) 7099, SWBS 314, Oct 2009, Rectifier Power Supply - 28 VDC, 300 A

Coast Guard Technical Publication (TP) 9146, July 2022, Rotary Meter Model Type 40 and Register

Operating, Maintenance, and Parts Manual Red Seal Measurement

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General

Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and

Allied Processes

Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2022, Shipboard

Electrical Cable Test

Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary

Machine Systems

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures

Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2022, Install Interior

Deck Covering Systems

Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2022, Temporary

Hull Accesses

OTHER REFERENCES

American Society for Testing and Materials (ASTM) A193 , June 2025, Standard Specification for Alloy-

Steel and Stainless Steel Bolting for High Temperature or High Pressure Service and Other Special

Purpose Applications

ASTM International (ASTM) D5363, 2016, Standard Specification for Anaerobic Single-Component

Adhesives (AN)

Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for

Shipyard Employment

MIL-PRF-16173, 2017, Corrosion Preventive Compound, Solvent Cutback, Cold-Application

MIL-PRF-24667C, March 2018, Coating System, Non-Skid, for Roll, Spray, or Self-Adhering

Application vi (Rev-0)

MIL-STD-1399 Section 300, Part 1, 25 September 2018, Low Voltage Electric Power, Alternating

Current

NAVAIR SI-ACS-AFB-1P, 01 July 2020, Air Capable Ship Aviation Facilities Bulletin No. 1P

Naval Air Warfare Center (NAVAIR) Drawing 621055, Rev G, Visual Landing Aids Installation

WMEC-270 Class Ships

Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C-6183B, 2019, Cork and Rubber Composition Sheet; For Aromatic Fuel and Oil Resistant Gaskets vii (Rev-0)

CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK

ITEM

MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED

COST

($/UNIT)

3 Y **Anemometer NSN: 6600-00-709-9947 2 ea. 5,316.00

4 N **Meter, Impeller

Type, Liquid

NSN: 6680-01-726-0030 1 ea. 4,300.00

4 N ** ASM Flange

Assembly 1 ½ inch

Cast Iron, Oval Buna

NSN: 4730-01-F22-6578 1 ea. 167.83

5 N Screw, Cap, 5/8-11

UNC 2A x 3in.

NSN: 5305-01-393-1827 24 ea. 25.65

5 N Screw, Cap, M12-1.75 x 42 mm

NSN: 5305-01-584-6095 12 ea. 33.75

5 N **Talon Grid

Stanchion Bolt

Assembly, Including

Locking Nut

NSN: 5340-01-481-3786 60 ea. 31.50

5 N Nut, Self-locking, M14x2.0-6H

NSN: 5310-01-598-3243 1 pg. 1006.80

14 N LIGHT, GUIDE

ASSEMBLY

NSN: 6210-00-878-1127 1 168.61

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

viii (Rev-0)

CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS

The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.1.4

(Inspection report particulars)):

Work

Item Title

5 Helo Talon Grids, Inspect and Test

All other inspection reports on individual work items requiring condition found reports should be provided within the first 40% of the availability contract period.

ix (Rev-0)

PRINCIPAL CHARACTERISTICS

270' WMEC (A-CLASS)

PHYSICAL

Length overall 270' 0"

Length between perpendiculars 255' 0"

Beam molded 38' 0"

Depth molded, main deck amidships

01 level amidships

23' 6"

31' 4"

Full load displacement 1,902.2 long tons

Draft, full load to baseline amidships 14' 3"

Highest projection above baseline

*height approximated

≈ 110' 0"

Shore tie voltage requirements 2 cables, 400A / 450V, 3 phase

Frame spacing 1' 0"

MACHINERY

Main propulsion 2 ALCO Model 18-251-F Diesel Engines, 3,600 BHP each

Ship’s service generators 2 Caterpillar Model C-18 6056464 Diesel engines each coupled to its own Weg model GPW/355B3T AC Generator.

565 KW each @ 0.8 power factor, 450VAC, 3 phase, 60 cycle

Emergency generators Caterpillar Model C-18 6056464 Diesel engine coupled to a

Weg model GPW/355B3T AC Generator. 565 KW @ 0.8 power factor, 450VAC, 3 phase, 60 cycle

Number of propellers 2

Propeller diameter 9' 0"

Number of blades, Each 4

Pitch Controllable

Shaft RPM 260

Shaft diameter 10.55" at exit of hull

Anchor & chain Two 4,000 lb Navy Stockless Anchors, 8 shots of chain each

TANK CAPACITIES

Diesel fuel total (95%) 79,210 gal.

JP-5 total (95%) 25,890 gal.

Potable water total (100%) 8,553 gal.

Hydraulic & lube oil total (95%) 2,237 gal.

1 (Rev-0)

00000_0725_FLT

REC_00000_FLT_Commercial Project @ CG Facility (0121)

General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.

1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and

'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is

Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.

2. REFERENCES

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General

Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and

Allied Processes

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures

OTHER REFERENCES

Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for

Shipyard Employment

3. REQUIREMENTS

3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements in this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

2 (Rev-0)

3.2 Fire watch requirements. The Contractor must refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec

0000, in accomplishing the following task:

• Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.

• Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.

3.3 Preservation requirements. The Contractor must accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec

6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. The Contractor must obtain a written KO authorization to deviate from any coatings required in SFLC Std Spec 6310 Appendix C before work.

3.3.3 In-process quality control measures. The Contractor must abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces”).

3.3.3.1 Quality control requirements. The Contractor must abide by the following when performing preservation related inspections. The following measurements must be randomly spaced throughout for the purposes of providing a representation of the entire prepared or coated surface.

3.3.3.1.1 Surface profile measurements. One surface profile measurement must be taken for every 200 square feet for the first 1000 square feet; for each additional 500 square feet or less, one profile measurement must be taken.

Profile measurements must be taken in accordance with SFLC Std Spec 6310, paragraph 3.1.8.3 (Surface profile measurements). A “measurement” for surface profile is defined as follows:

• ASTM D4417, Method B: One profile measurement is the average (mean) of 10 individual readings.

• ASTM D4417, Method C: One profile measurement is the average (mean) of 2 individual readings.

3.3.3.1.2 Soluble salt conductivity measurements. 5 conductivity measurements must be taken every 1000 square feet. For submerged (immersed) applications conductivity measurements must not exceed 30 microsiemens/cm.

For non-submerged (non-immersed) applications conductivity measurements must not exceed 70 microsiemens/cm. If a conductivity check fails, clean the surface in accordance with SFLC Std Spec 6310, paragraph 3.1.8.5 (Soluble salt removal).

3.3.3.1.3 Coating thickness measurements. Three area measurements must be taken for the first 1000 square feet;

for each additional 1000 square feet, perform an additional area measurement. A “measurement” for coating thickness is defined as follows:

• SSPC-PA 2 defines an area measurement as 5 separate spot measurements randomly spaced throughout a 100 square foot area.

• SSPC-PA 2 defines a spot measurement as 3 gage readings and each new gage reading the probe must be moved to a new location within a 1.5-inch diameter circle defining the spot.

3.4 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.

3 (Rev-0)

3.5 Environmental protection requirements. The Contractor must adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:

3.5.1 Contractor operated (non USCG) facilities. The Contractor must provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at

Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor must plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor must comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item must not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is Large Quantity

Generator (LQG).

3.5.1.2 Plans and permits. The Navy Facility has unit specific permits including the following:

• Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.

• National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an

NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.

• Air Emission Permit: Unit has an Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.

3.5.1.3 Navy Base Requirements. The Contractor is required to follow all regulations and procedures regarding pier laydown, weight moment requirements and all information documented in the attached J-13 and J-18 documents.

3.5.2 Test and procedures. The Contractor is required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work must be done by qualified laboratories; and where required by law, the laboratories must be certified.

3.5.3 Regulatory notifications. The Contractor is responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The

Contractor must submit copies of all regulatory notifications to the Contracting Officer and the local Facility

Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications must be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System

(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.

3.5.4 Environmental manager. The Contractor must appoint in writing an Environmental Manager for the project, who is responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager must ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’

Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out;

ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous

4 (Rev-0)

Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental

Records binder and required documentation, including environmental permits compliance and close-out.

3.5.5 HW disposal. Contractor must comply with SFLC Std Spec 0000 Appendix B, Requirements For

Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).

3.5.6 Additional Requirements. The Contractor must be aware of the following:

3.5.6.1 No Contractor or Subcontractor must have the authority to sign a Hazardous Waste Manifest using the

Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast

Guard facility without COR or KO-approval.

3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor must prepare for and comply with local and state regulations.

3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor must furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.

3.6 Local Policy. The Contractor must refer to site (e.g., Base) Regulations and Instructions for details regarding local policies (e.g., crane services, parking, or facility usage).

3.6.1 This availability is to be conducted at an US Navy facility. The Contractor must comply with all US Naval facility instructions (e.g. NAVFAC P-307 for Weight Handling Program Management, etc.)

3.6.2 Security. Contractor personnel must comply with all current badging and security procedures required to gain access to any Government site (e.g. DBIDS) Access to Naval Installations sites may only be gained by obtaining a badge (either permanent or temporary) from the security office. It is the contractor’s responsibility to check for and obtain changes and updated information at each installation on a continual basis. Further information can be found at: https://www.cnic.navy.mil/regions/cnrma/om/contractor_verification_”.

3.7 SFLC Standard Specification approved changes. Approved updates to the 2022 SFLC Standard Specifications will appear here.

4. NOTES

4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

5 (Rev-0)

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

VESSEL NAME HULL # WORK ITEM

WORK ITEM TITLE

LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).

Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

NAME OF QP-1/AMPP INSPECTOR SIGNATURE CERT. # DATE / TIME

NAME OF CG REPRESENTATIVE SIGNATURE UNIT DATE/TIME

6 (Rev-0)

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

VESSEL NAME HULL #

WORK ITEM

Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.

DATE

TIME

ACTIVITY (SURFACE

PREPARATION, PRIMER COAT,

BARRIER COAT, TOP COAT,

ETC…)

LOCATION (FRAME &

DECK, RELATION TO

EQUIPMENT, ETC.)

TEMPERATURE % REL.

HUMID-

ITY

DEW

PT.

SURFACE AMBIENT ΔT

| DP -

SURFACE |

7 (Rev-0)

QA-3a - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)

VESSEL NAME HULL # WORK ITEM

LOCATION OF WORK (FRAME REFERENCES) AREA (SQFT)

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/AMPP No. 2

SSPC-SP WJ-2/AMPP WJ-2

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area)

Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS

PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS

DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:

NAME OF QP-1/AMPP INSPECTOR SIGNATURE CERT. # DATE /

TIME

8 (Rev-0)

QA-3b - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)

VESSEL NAME HULL # WORK ITEM

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/AMPP No. 2

SSPC-SP WJ-2/AMPP WJ-2

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area)

Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA

RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO

SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Mean Mils Reading (IAW ASTM D4417-Method B for above 10 readings (by column):

Mean Reading

(mils)

9 (Rev-0)

QA-4 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)

VESSEL NAME HULL # WORK ITEM

SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.

DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)

10 (Rev-0)

QA-5 - QUALITY ASSURANCE DATA FORM

(COATING THICKNESS)

(Use one sheet for each sequence)

VESSEL NAME HULL #

WORK ITEM

COATING MFG PRODUCT NAME

BATC

H #

INDUCTI

ON TIME

COATING SYSTEM

SEQUENCE

(PRIMER/TOUCHUP/3RD

COAT, ETC.)

DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.

SPOT 1 2 3 4 5

AVERAGE

VALUE

*BASE METAL READING

(BMR)

*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.

LOCATION (FRAME REFERENCE):

SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS

1 AVG. BMR DEVIATION

3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS

AVG.

LOCATION (FRAME REFERENCE):

SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS

1 AVG. BMR DEVIATION

3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS

AVG.

LOCATION (FRAME REFERENCE):

SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS

1 AVG. BMR DEVIATION

3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS

AVG.

APPLICATION METHOD (AIRLESS,

CONVENTIONAL SPRAY, ROLLED)

AVERAGE DFT

11 (Rev-0)

4.2 Tank and Void Assessment form.

12 (Rev-0)

13 (Rev-0)

31410_CNJ_0821_210_270

REC_31410_210_270_270 WMEC ‘A’ Class (ALL) (0221)

WORK ITEM 1: 28 Volt DC Helo Power Supply, Load Test

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to load test the 28 Volt DC Helo

Power Supply.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 901 WMEC 314-005, Rev B, 28.5 VDC Hlcptr Start Rect Replacement

Diagram

COAST GUARD PUBLICATIONS

Coast Guard Technical Publication (TP) 7099, SWBS 314, Oct 2009, Rectifier Power Supply - 28

VDC, 300 A

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

OTHER REFERENCES

NAVAIR SI-ACS-AFB-1P, 01 July 2020, Air Capable Ship Aviation Facilities Bulletin No. 1P

3. REQUIREMENTS

3.1 General. The Contractor must refer to the Coast Guard drawing(s) listed under Section 2 (References) for guidance in accomplishing this work item.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

14 (Rev-0)

3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).

3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

3.2 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.

3.3 Load test 28 VDC helo start rectifier. The Contractor must load test the 28 VDC Helo Start Rectifier in accordance with NAVAIR Air Capable Ship Aviation Facilities Bulletin (latest revision as cited in

Section 2 References) and using Coast Guard Drawing 901 WMEC 314-005 and TP 7099, as guidance.

Submit completed Data Sheet via CFR.

3.3.1 In the event the load test for the 28 VDC helo start rectifier fails, the Contractor must troubleshoot and identify faulty component and submit CFR for repairs.

3.3.2 Once repairs are complete, the Contractor must re-conduct load test in accordance with paragraph

3.3 (Load test 28 VDC helo start rectifier).

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

3.4 Operational test, post repairs. After completion of work, the Contractor must thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.

3.5 Report. The Contractor must submit a CFR for the completed Data Sheet in Section 4.1.

4. NOTES

4.1 Data sheet.

15 (Rev-0)

28 VOLT DC HELO START POWER SUPPLY TEST DATA SHEET (SHEET 1 OF 2)

HULL NUMBER_________________

TABLE 1: PERFORMANCE TEST DATA1

AMPS OUTPUT

VOLTS2

NOMINAL ACTUAL

1. The calibrated load bank must be connected to the Power Supply using the helo start cable supplied with the cutter used for starting the aircraft. The cable must be adjusted prior to conducting the test so that its length is sufficient to service the aircraft in its normal landing position on the flight deck. If required to make connections to the load bank, it is permissible to conduct the test before installing the helicopter end plug.

2. The voltage at the aircraft end of all installed system servicing cables must be between 24.0 to 29.0 volts for steady state load currents from 0 to 300 amperes.

3. Perform full load test at 300A for 60 minutes. Record values at the conclusion of the full load test.

Increase no-load voltage to 28.5V prior to start of this burn-in test to ensure output voltage will not drop below 24.0 during the burn-in period.

16 (Rev-0)

28 VOLT DC HELO START POWER SUPPLY TEST DATA SHEET (SHEET 2 OF 2)

Name Plate Data of the Power Supply

Make________________________________ Model_______________________________

Serial No.____________________________

Calibrated Load Bank Information

Make________________________________ Model_______________________________

Serial No.___________________________________ Calibration Due Date_________________

Calibrated Hand Held Voltage Meter

Make________________________________ Model_______________________________

Serial No.___________________________________ Calibration Due Date_________________

Certification of Test Results

The voltage at the aircraft end of all installed system servicing cables shall be between 24.0 to 29.0 volts for steady state load currents from 0 to 300 amperes.

Name of Testing Facility or Company_____________________________________

Test Conductor_____________________________________ Date_________________

Test Supervisor/QC_________________________________ Date__________________

17 (Rev-0)

31420_CNJ_0921_210_270

REC_31420_210_270_270 WMEC ‘A’ Class (ALL) (0221)

WORK ITEM 2: 400 Hz Power Supply (FCX Systems Inc), Load Test

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to load test the 400 HZ FCX power supply.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 901 WMEC 314-006, Rev D, 400Hz Hlcptr Svce Freqconv Installation

Diagram

COAST GUARD PUBLICATIONS

Coast Guard Technical Publication (TP) 4931, Aug 2009, Section 321A, Precision Frequency

Converters

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

OTHER REFERENCES

NAVAIR SI-ACS-AFB-1P, 01 July 2020, Air Capable Ship Aviation Facilities Bulletin No. 1P

MIL-STD-1399 Section 300, Part 1, 25 September 2018, Low Voltage Electric Power, Alternating Current

3. REQUIREMENTS

3.1 General. The Contractor must refer to the Coast Guard drawing(s) listed under Section 2 (References) as guidance in accomplishing this work item.

3.1.1 CIR.

None.

3.1.2 Tech Rep. The Contractor must provide the services of a Qualified Technical Representative who is

18 (Rev-0) familiar with the FCX Systems Inc. PFC 400 Hz Power Supply equipment/system, to accomplish the following on site:

• Advise on manufacturer's proprietary system information.

• Ensure compliance with manufacturer's procedures and standards during system disassembly, inspection, and reassembly as applicable.

3.1.2.1 Ensure the Tech Rep has experience with the system/equipment stated above and demonstrated on their résumé.

3.1.2.2 Submit the name and résumé of the Tech Rep to the COR at the Arrival Conference.

3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000 (Vessel component, space, and equipment protection).

3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, (Interferences).

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

3.2 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR

3.3 Load test. The Contractor must perform load test of the 400 HZ FCX Solid State Frequency Converter in accordance with MIL-STD-1399 Section 300, Part 1 and NAVAIR Air Capable Ship Aviation

Facilities Bulletin (latest revision as cited in Section 2 References), using Coast Guard Drawing 901

WMEC 314-006 and TP 4931 as guidance. Submit a CFR.

3.3.1 In the event the load test for the 400 HZ (FCX) Power Supply fails, troubleshoot and identify faulty component and submit CFR for repairs.

3.3.2 Once repairs are complete, re-conduct load test in accordance with paragraph 3.3 (400 HZ (FCX)

Power Supply, load test). Submit CFR.

3.4 Operational test, post repairs. After completion of work, the Contractor must thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.

3.5 Report. The Contractor must submit a CFR for the completed Data Sheet in Section 4.1.

4.1 Data sheet.

19 (Rev-0)

400 HZ HELICOPTER POWER SUPPLY TEST DATA SHEET (SHEET 1 OF 2)

HULL NUMBER___________________

TABLE 1: PERFORMANCE TEST DATA1,2

AMPS3

(NOMINAL)

VOLTS4,5 AMPS6 FREQUENCY6,7

AN BN CN A B C

Continuity between pins “E” and “F”

Satisfactory □

Plug pin “N” grounded to the ship’s hull and not interrupted by the disconnect switch.

Satisfactory □

1. The 400Hz Helicopter Service System must be tested by connection to a suitably sized load bank and operated at loads from 2 amps up to the load specified for the Coast Guard H-65 Helicopter (10 KVA).

2. The power supply must be connected to the load bank using the cable supplied to the cutter for aircraft servicing.

If necessary to make the connection to the load bank, the test may be conducted prior to attachment of the helicopter end plug. The cable must be adjusted to the length necessary to service the aircraft in its normal landing position on the flight deck.

3. The required amperage for this test is calculated as:

I = P/[(E)(3)1/2]

At P = 10 kVA (for H-65 Helicopter), and E = 200V (line to line), the maximum current required is 28.9 amps.

4. Verify the voltage output is between the limits of 113.0 to 118.0 Volts RMS, line-to-neutral, for steady state loads from no load to full rated load , at 0.7 lagging power factor. To allow for flexibility in loading techniques, the acceptable power factor range is from 0.7 lagging to 0.8 leading power factor.

5. The maximum allowable voltage unbalance is 3.0 volts RMS throughout the load range. Voltage unbalance = maximum difference between RMS phase voltage amplitudes at the utilization equipment terminals (Vmax – Vmin).

6. Verify the phase rotation and frequency is in accordance with Type III power requirements of MIL-STD-1399

Section 300, Part 1.

7. Frequency range must be between 398 to 402 Hz (400 Hz +/- 0.5%).

8. Perform burn-in test at 29A for 60 minutes. Record values at the conclusion of the full load test.

20 (Rev-0)

400 HZ HELICOPTER POWER SUPPLY TEST DATA SHEET (SHEET 2 OF 2)

4.1.1 Name Plate Data of the Power Supply

Make________________________________ Model_______________________________

Serial No.____________________________

4.1.2 Calibrated Load Bank Information

Make________________________________ Model_______________________________

Serial No.___________________________________ Calibration Due Date_________________

4.1.3 Calibrated Hand Held Voltage Meter

Make________________________________ Model_______________________________

Serial No.___________________________________ Calibration Due Date_________________

4.1.4 Calibrated Hand Held Ammeter

Make________________________________ Model_______________________________

Serial No.___________________________________ Calibration Due Date_________________

4.1.5 Certification of Test Results

• The phase rotation and frequency is IAW the Type III power requirements of MIL-STD-1399

Section 300 Part 1.

• Voltage does not fall outside of the range of 118 Volts to 113 Volts, line-to-neutral, for the entire load range at 0.7 lagging power factor. To allow for flexibility in loading techniques, the acceptable power factor range is from 0.7 lagging to 0.8 leading power factor.

• Frequency must not fall outside of the range of 398 Hz to 402 Hz.

• Continuity must exist between pins “E” and “F”. Plug pin “N” must be grounded to the ship’s hull and not be interrupted by the disconnect switch.

Name of Testing Facility or Company_____________________________________

Test Conductor_____________________________________ Date_________________

Test Supervisor/QC_________________________________ Date__________________

21 (Rev-0)

43700_0525_210_270

WORK ITEM 3: Windspeed Transmitter, Anemometer, Remove and Reinstall

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to remove both port and stbd anemometer wind speed transmitters, inspect, and turn over to the COR for a period of up to 14 days and then reinstall both port and stbd wind speed transmitters.

1.2 Government-furnished property.

MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED

COST

($/UNIT)

Y **Anemometer NSN: 6600-00-709-9947 2 ea. 5,316.00

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 901 WMEC 171-001, Rev J, Main Mast

Coast Guard Drawing 901 WMEC 184-008, Rev G, Misc Navigation Fdns

Coast Guard Drawing 901 WMEC 431-003, Rev J, Main IC Switchboard Arrangements, Elem

Wrg Diag & Dets

Coast Guard Drawing 901 WMEC 494-001, Rev T, Meteorological System Block & Isometric

W.D.

COAST GUARD PUBLICATIONS

Coast Guard Technical Publication (TP) 2711, SWBS 437, Jan 1992, Wind Transmitter

Coast Guard Technical Publication (TP) 5461, SWBS 421, Nov 2012, Anemometer – Model 120

& 122

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2022, Shipboard Electrical Cable Test

OTHER REFERENCES

22 (Rev-0)

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).

3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec

0000, (Interferences). Known interferences include, but are not limited to the following:

• Height above the main deck.

• Electrical wiring.

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

3.2 Operational test, initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.

NOTE

Historically, mounting bolt has been found to be seized to the anemometer housing and/or mast mounting post requiring reconditioning of the mast mounting post and/or anemometer housing.

3.3 Staging or scaffolding. The Contractor must erect suitable staging or scaffolding in accordance with

29 CFR 1915, Subpart E (Scaffolds, Ladders and Other Working Surfaces) to facilitate preservation at the locations and no later than the deadlines identified in Table 1:

TABLE 1 - STAGING AND SCOFFOLDING LOCATIONS

LOCATION STAGING OR SCAFFOLDING DEADLINE

Bridge Deck Scaffolding 7

1. Deadline = the number days (no later than) after the availability start date by which staging must be erect.

3.3.1 Protect the deck and distribute staging weight over at least a four square foot area by placing substantial wooden pads where each part of the staging contacts the vessel's decks.

3.3.2 Disassemble and remove the staging upon completion of work or when designated by the Coast

Guard Inspector.

23 (Rev-0)

3.4 Inspection (by Contractor). The Contractor must visually inspect anemometer mounting post, anemometer housing and associated hardware for excessive deterioration and any other defects using

Coast Guard Drawing 901 WMEC 184-008 and TP 5461 as guidance. Submit a CFR.

NOTE

COR will need to coordinate with NAVAIR to complete inspection during the

14 day inspection period. COR should obtain any required NAVAIR certification of the anemometer(s) prior to releasing to the Contractor for reinstallation.

3.5 Wind speed transmitter removal. The Contractor must remove the port and stbd windspeed transmitters using Coast Guard Drawings 901 WMEC 171-001, 901 WMEC 184-008, 901 WMEC 431-

003, and 901 WMEC 494-001 and TP’s 2711 and 5461 as guidance. Upon removal, the Contractor must turn over the removed wind speed transmitters to the COR for inspection for a period of up to 14 days.

3.6 Wind speed transmitter install. Upon completion of Coast Guard inspection, the Contractor must reinstall the port and stbd windspeed transmitters. Make all electrical and mechanical connections using

Coast Guard Drawings 901 WMEC 171-001, 901 WMEC 184-008, 901 WMEC 431-003, and 901

WMEC 494-001 and TP’s 2711 and 5461 as guidance.

3.7 Government’s right for change out. The Contractor must be aware that the Government reserves the right to furnish a new anemometer wind speed transmitter for installation in place of the existing anemometer wind speed transmitter. If the Government exercises this right, the Contractor must return the removed anemometer wind speed transmitter to the Coast Guard Property Administrator as an MTI item.

3.8 Electrical checks. Perform continuity checks and insulation resistance measurements for the reinstalled anemometers in accordance with SFLC Std Spec 3041. Submit a CFR.

3.9 Operational test, post repairs. After completion of work and in the presence of the Coast Guard

Inspector, the Contractor must thoroughly test and demonstrate the equipment listed below to be in satisfactory operating condition.

• Port and Stbd Anemometers

This section is not applicable to this work item.

24 (Rev-0)

50400_1025_210_270

REC_50400_210_270_270’ WMEC ‘A’ Class (ALL) (1025)

WORK ITEM 4: Flow Meter (Aviation Fuel), Calibrate

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to inspect and calibrate the instrumentation identified in Table 1.

TABLE 1 - INSTRUMENTATION

DESCRIPTION SYSTEM USE RATING

1 ½ inch Flow meter JP-5 Helicopter refueling 50 GPM

1.2 Government-furnished property.

MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED

COST

($/UNIT)

N **Meter, Impeller Type, Liquid NSN: 6680-01-726-0030 1 ea. 4,300.00

N ** ASM Flange Assembly 1 ½ inch Cast Iron, Oval Buna

NSN: 4730-01-F22-6578 1 ea. 167.83

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 901 WMEC 542-001, Rev J, JP-5 System Diagram

Coast Guard Drawing 901 WMEC 542-002, Rev H, JP-5 Sys - A&D

COAST GUARD PUBLICATIONS

Coast Guard Technical Publication (TP) 9146, July 2022, Rotary Meter Model Type 40 and

Register Operating, Maintenance, and Parts Manual Red Seal Measurement

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

OTHER REFERENCES

None

25 (Rev-0)

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000,…

This is the start of the file's text. The full file is on GovTribe.