Attachment I Work Specifications Package.pdf
PDF 2 MB Posted
- Attached to
- APL-67 MAINTENANCE WOO
- Solicitation number
- N6264925RAA01
About this file
This document is a Navy Ship Repair Specification for the USS APL 67, containing multiple work items for ship maintenance and repair to be executed by September 30, 2024. The specification covers five primary work items: (1) welding a kettle foundation in the main galley, (2) preserving and touching up accessible voids, (3) repairing chill water lagging, (4) overhauling primary and secondary CHT (Collection, Holding, and Transfer) pump assemblies, and (5) resurfacing the cosmetic polymeric deck covering on the main quarterdeck.
The work items involve detailed technical requirements such as surface preparation, paint application, equipment testing, and component replacement. Each item specifies precise locations, quantities, and technical standards, including references to military specifications like MIL-PRF-24613 and SSPC-SP 10. The specification requires contractors to perform tasks like hydroblasting deck drains, conducting borescope inspections, bench testing equipment, and ensuring environmental and safety compliance. All work is to be completed using FY26 Standard Items and guided by specific Navy technical references, with careful attention to surface preparation, equipment restoration, and documentation of all processes.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
JRMC
APL 67 (APL 67)
SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED
SPECIFICATION NUMBER: YOKO-701-26
INCLUDES ALL CHANGES THROUGH 8/2/2025
Carlos.Cardona New Stamp
INDEX
SHIP: APL 67 (APL 67) YOKO-701-26
ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.
CATEGORY I. FY-26 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.
ITEM_NO. TITLE CHANGE DATE CHANGE
009-001 General Criteria; accomplish 09/04/2024 Original
009-002 Environmental Compliance Report for Material Usage; accomplish 07/22/2024 Original
009-003 Toxic and Hazardous Substance; control 07/22/2024 Original
009-004 Quality Management System; provide 09/16/2024 Original
009-005 Temporary Access; accomplish 09/16/2024 Original
009-006 Maintaining Protection and Cleanliness from Non-Radioactive Operations;
accomplish
07/22/2024 Original
009-007 Confined Space Entry, and Certification; accomplish 09/04/2024 Original
009-008 Shipboard Fire Protection and Fire Prevention; accomplish 09/30/2024 Original
009-010 Asbestos-Containing Material (ACM); control 09/16/2024 Original
009-018 Mine Warfare Ships Magnetic Material; control 09/04/2024 Original
009-019 Provisioning Technical Documentation (PTD); provide 07/22/2024 Original
009-020 Government Property; control 07/22/2024 Original
009-021 Alteration Verification, Logistic and Technical Data; provide 07/22/2024 Original
009-023 Interference; remove and install 09/16/2024 Original
009-024 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness; accomplish 09/16/2024 Original
009-034 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 07/22/2024 Original
009-039 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for
Commercial Equipment/Component; accomplish
07/22/2024 Original
009-040 Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a
Naval Facility; provide
07/22/2024 Original
009-060 Schedule and Associated Report for CNO Availability; provide and manage 09/16/2024 Original
009-061 Shipboard Use of Fluorocarbons; control 09/16/2024 Original
009-067 Integrated Total Ship Testing; manage 09/16/2024 Original
009-068 Availability Work Certification (AWC) Data for Chief of Naval Operations (CNO)
Availabilities; provide
09/16/2024 Original
009-069 Heavy Weather/Mooring Plan; provide 09/16/2024 Original
009-070 Confined Space Entry, Certification, Fire Protection, Fire Prevention and
Housekeeping for Unmanned Vessels; accomplish
09/16/2024 Original
009-072 Physical Security at a Private Contractor Facility; accomplish 09/16/2024 Original
009-073 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, and repair
09/16/2024 Original
009-074 Occupational, Safety and Health Plan; accomplish 09/16/2024 Original
009-080 Ship Facility; maintain 09/16/2024 Original
009-081 Compartment Closeout; accomplish 09/16/2024 Original
009-082 Installation of Equal Component Vice Specified Component; report 07/22/2024 Original
009-084 Threaded Fastener Requirement; accomplish 07/22/2024 Original
009-088 Collection, Holding and Transfer (CHT) and Motor Gasoline (MOGAS) Tank, Space, and Piping, including Sewage or MOGAS-Contaminated Tank, Space, and Piping; certify
09/16/2024 Original
009-093 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution
Prevention Act (PPA) Information; provide
07/22/2024 Original
Page 1 of 4 EXECUTING WORK
ITEM_NO. TITLE CHANGE DATE CHANGE
009-099 Ship Departure Report; provide 09/16/2024 Original
009-100 Ship's Stability; maintain 09/16/2024 Original
009-101 Ship Transit and Berthing; accomplish 09/16/2024 Original
009-106 Work Authorization Form Coordinator (WAFCOR); provide 09/16/2024 Original
009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 07/22/2024 Original
009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 07/22/2024 Original
009-111 Schedule and Associated Report for Non-CNO Availability; provide and manage 09/16/2024 Original
009-117 Combat Systems, Light-Off Suport; provide 09/17/2024 Original
009-118 CG Deck Loading; accomplish 07/22/2024 Original
009-120 Fact Finding and Critique of Unplanned Event; manage 09/17/2024 Original
009-122 Temporary Padeye; install and remove 09/17/2024 Original
009-125 Boat 65 Feet (20meters) Long and Less; accomplish 09/17/2024 Original
009-126 Schedule Model Review (SMR); accomplish 09/17/2024 Original
Page 2 of 4 EXECUTING WORK
CATEGORY II. FY-26 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER.
TITLE CHANGE DATEITEM NO. CHANGE
009-011 Insulation and Lagging; accomplish 09/16/2024 Original
009-012 Weld, Fabricate, and Inspect; accomplish 09/16/2024 Original
009-026 Deck Covering; accomplish 09/25/2024 Original
009-032 Cleaning and Painting Requirements; accomplish 09/25/2024 Original
009-058 Pump and Driver Shaft Alignment; accomplish 07/22/2024 Original
009-104 Vibration Testing and Analysis; accomplish 09/16/2024 Original
Page 3 of 4 EXECUTING WORK
ITEM NO. TITLE
Weld Foundation; accomplish120-11-001
Accessible Void; preserve (touch up)123-21-001
Chill Water Lagging repair508-10-001
Primary and Secondary CHT Pump Assembly; overhaul593-11-001
Cosmetic Polymeric Deck Covering (PRC) System Resurfacing;
accomplish
634-11-001
Page 4 of 4 EXECUTING WORK
SHIP: APL 67 (APL 67) ITEM NO: 120-11-001
COAR: 18 PCN: AP67-L185
SERV-L001
CMP: NONE
PLANNER: LOFTIS, OLEN
SSP: YOKO-701-26 1 of 1 ITEM NO: 120-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Weld Foundation; accomplish
1.2 Location of Work:
1.2.1 Main Galley (1-14-0-Q)
1.3 Identification:
1.3.1 No. 3 Large Kettle Foundation
2. REFERENCES:
2.1 Standard Items, FY26
3. REQUIREMENTS:
3.1 Accomplish the requirements of 009-012, for welding of the 6 X 6 square inch steel plate of Kettle foundation at location 1.2.1.
3.1.1 Chip and grind surfaces flush in way of repairs accomplished in paragraph 3.1.
3.2 Accomplish the requirements of 009-026 of 2.1, including Table One, Line One, Column A, and Attachment C, for removal of existing and installation of new One Square Foot of cosmetic polymeric deck covering system (PRC) conforming to MIL-PRF-24613 Type I Class 2, for deck located in 1.2 using 2.2 for guidance.
3.3 Accomplish the requirements of 009-032 of 2.1 for new and disturbed areas.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.
SHIP: APL 67 (APL 67) ITEM NO: 123-21-001
COAR: 18 PCN: AP67-L183
CMP: NONE
PLANNER: LOFTIS, OLEN
SSP: YOKO-701-26 1 of 2 ITEM NO: 123-21-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Accessible Void; preserve (touch up)
1.2 Location of Work:
1.2.1 Void (3-28-0-V)
1.2.2 Void (3-33-0-V)
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items, FY26
3. REQUIREMENTS:
3.1 Accomplish the requirements to conduct touch up painting of 750 square feet of each defective painted surface, for each tank located in 1.2, as designated by the SUPERVISOR.
3.1.1 The requirements of Surface Preparation shall be a Near white metal blast to SSPC-SP 10 specifications and coating shall be Full Coat, Sherwin Williams Fast Clad ER Epoxy, White, 20-30 mils DFT.
3.1.2 Preserve a total of 450 square feet for tank located in 1.2.1.
3.1.3 Preserve a total of 300 square feet for tank located in 1.2.2.
3.2 Accomplish the requirements of 009-011 of reference 2.1 for replacement of Lagging in entirety of Void listed in 1.2.1.
3.2.1 Procure and install Commerical Grade Desiccants Moisture Absorbers and install inside Fixed Ballast Containment at each location in 1.2
3.3 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
4. NOTES:
4.1 Known source for material listed in 3.2.1:
www.weirbags.co.uk/container-desiccants
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.
SHIP: APL 67 (APL 67)
SSP: YOKO-701-26 2 of 2 ITEM NO: 123-21-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
SHIP: APL 67 (APL 67) ITEM NO: 508-10-001
COAR: 18 PCN: AP67-L182
CSWT FILE NO: 508-001 (LSD 41) CMP: NONE
REVISED: 30 SEP 2024 PLANNER: LOFTIS, OLEN
SSP: YOKO-701-26 1 of 1 ITEM NO: 508-10-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Chill Water Lagging repair
1.2 Location of Work:
1.2.1 STBD Exterior Walkway (FM 4 to FM 13)
1.3 Identification:
1.3.1 Quantity (35 LF), 2 Inch Chill Water Pipe Lagging, Located in 1.2.1
1.3.2 Quantity (35 LF), New CRES Vent Duct Covering
2. REFERENCES:
2.1 NAVSEA Standard Items, FY26 Basic
2.2 801-8816423, General Arrangement Drawings
2.3 8816525, A/C Chilled Water Drawing
3. REQUIREMENTS:
3.1 Accomplish the requirements of 009-011 of 2.1. for replacement of Lagging on Chill Water piping at location in 1.2 for system listed in 1.3, using 2.2 and 2.3 for guidance.
3.1.1 Accomplish the requirements of 009-032 of 2.1 for new
insulation, lagging, and each reusable cover to match each surrounding area.
3.1.2 Accomplish the requirements to install new CRES Lagging Protective cover on all newly installed lagging.
3.2 Accomplish the requirements of 009-032 of 2.1 for each new and disturbed surface.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.
SHIP: APL 67 (APL 67) ITEM NO: 593-11-001
COAR: 18 PCN: AP67-L184
AP67-L187
CMP: NONE
PLANNER: LOFTIS, OLEN
SSP: YOKO-701-26 1 of 3 ITEM NO: 593-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Primary and Secondary CHT Pump Assembly; overhaul
1.2 Location of Work:
1.2.1 CHT Equipment Room (2-15-1-E)
1.2.2 Main Galley (1-14-0-Q)
1.2.3 Industrial Laundry (01-4-1-Q)
1.3 Identification:
1.3.1 Quantity (2 EA), Primary and Secondary CHT Pumps, PENTAIR Hydromatic, Model 30MMP Pump Assembly - CONEX SPARES
1.3.1.1 Quantity (2 EA), Motor, Electric, Model: HHI7.5-18-213T- 1.0SF, Frame: 213T, Volts: 230/460, AMPS: 19.0/9.5, Phase: 3, Hertz: 60, RPM: 1760
1.3.2 Quantity (2 EA), Primary and Secondary CHT Pumps, PENTAIR Hydromatic, Model 30MMP Pump Assembly - ONBOARD UNITS
1.3.2.1 Quantity (2 EA), Motor, Electric, Model: HHI7.5-18-213T- 1.0SF, Frame: 213T, Volts: 230/460, AMPS: 19.0/9.5, Phase: 3, Hertz: 60, RPM: 1760
1.3.3 Quantity (5 EA), Deck Drain System
1.3.4 Quantity (3 EA), Deck Drain System
2. REFERENCES:
2.1 Standard Items, FY26 Basic
2.2 PENTAIR Reference Manual, PENTAIR Hydromatic Pump, Model MMP; Self- Priming Sewage and Trash Pumps; Installation, Operation and Service Manual with Parts List
2.3 8816511, Plumbing Drain System
2.4 S9086-RK-STM-010, CH-505; Piping Systems
3. REQUIREMENTS:
3.1 Open, ventilate, empty, clean, disinfect, render dry, and maintain the CHT tank and Pumps listed in 1.2 including each adjacent equipment, space, or each piping system where the scope of each repair will result in a need for certification during the performance of this Job Order.
3.1.1 Each tank must be certified by qualified MARINE CHEMIST to be "Safe for Entry" and conditions must be maintained throughout the availability.
3.1.2 Ensure that each harmful vapor, fume, and mist are ventilated to the exterior of the vessel.
(I)(G) "SHOP BENCH TEST"
SSP: YOKO-701-26 2 of 3 ITEM NO: 593-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.2 Accomplish the requirements to Receive, Bench Test, and Install, 2 each, RFI Spare Pumps listed in 1.3.1 from Barge Maintenance CONEX Box and onto the Barge.
3.2.1 Accomplish the requirements of 009-058 of 2.1.
3.3 Accomplish the requirements of 009-104 of 2.1 for Motors listed in 1.3.1.1.
3.4 Remove from Ship, transport, and Overhaul existing CHT Pumps listed in 1.3.2, using all attachments of 2.2 for guidance.
3.4.1 Restore each mating surface exposed by the equipment removal.
Repair by removing each high spot, burr, abrasion, and foreign matter, where removal can be accomplished by hand tool.
3.4.2 Clean each exposed part free of debris, leaving no residue or injurious effects.
3.4.3 Inspect each part for wear and defects, using 2.2 for
guidance.
3.4.3.1 Submit one legible copy, in hard copy or approved
transferable media, of a report listing results of the requirements of 3.3.2 through 3.3.4 to the SUPERVISOR.
3.5 Remove existing, fit, and install new each part provided in 5.1, using 2.2 for guidance.
(V)(G) "SHOP TEST"
3.6 Accomplish a shop test of the equipment listed in 1.3 at nominal system pressure using 2.2 as guidance. Allowable leakage: None.
3.7 Upon successful completion of Overhaul and Testing of the 2 each existing CHT Pumps, Crate and secure each equipment.
3.7.1 Ship crated material to and from authorized repair facility and Barge Maintenance CONEX box as directed by the SUPERVISOR.
3.7.2 Visually inspect equipment for general condition and
completeness before packing and crating and return crated material to the SUPERVISOR for final disposition.
3.8 Utilizing High Pressure Water system, accomplish an "end to end" Hydroblast cleaning of each Deck Drain at locations 1.3.3 and 1.3.4, using reference 2.3 and 2.4 for guidance.
3.8.1 Accomplish a pre-work unobstructed flow test for each deck drain Located in 1.2.2, using Fresh water for 30 minutes.
3.8.2 Upon completion of Hydroblast, conduct additional Mechanically cleaning for any deck drain system in location 1.3.3 that are showing signs of blockage, ensuring each drain is free of contamination, without causing damage or deterioration to interior metal surfaces of pipe.
3.9 Deliver old CHT Motors listed in 1.3.2.1 to SRF Facility for further adjudication.
(V)(G) "BORESCOPE INSPECTION"
SSP: YOKO-701-26 3 of 3 ITEM NO: 593-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.10 Conduct Borescope of each Piping system at each location Hydroblasting occurred in accordance with reference 2.4.
(V)(G) "WATER DRAINAGE TEST"
3.11 Accomplish a running water test of each Piping system for 30 minutes, demonstrate unobstructed flow.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
TOTAL
QUANTITY
PROVIDED NAME Of PART
PIECE
NO.
REF
NO.
NATIONAL
STOCK
NO.
REQ
PARA NO.
1. 2 EA
000790071 - O- Ring 1/16 x 1.114
27 ID
#2-024
2. 2 EA
002410041 O-Ring 3/16 x 3.350
28 ID
#2-340
3. 2 EA
001500231 O-Ring 1/8 x 8.484
38 ID #
2-268
4. 2 EA
Stat-O-Seal 5/16D 44
5. 2 EA
Seal-Shaft 1-1/2 Type-21 46 CE
6. 2 EA
O-Ring 1/8 x 6.734
66 ID
#2-261
7. 2 EA
001500211 O-Ring 1/8 x 7.734
39 ID
#2-265
8. 2 EA
Gasket-Seal Plate Vellumoid 42
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.
SHIP: APL 67 (APL 67) ITEM NO: 634-11-001
COAR: 18 PCN: AP67-L186
CSWT FILE NO: 634-003 (LCU 1646) CMP: NONE
REVISED: 30 SEP 2024 PLANNER: LOFTIS, OLEN
SSP: YOKO-701-26 1 of 1 ITEM NO: 634-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Cosmetic Polymeric Deck Covering (PRC) System Resurfacing;
accomplish
1.2 Location of Work:
1.2.1 Main Quarterdeck (1-20-3-C)
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 NAVSEA Standard Items, FY26, Basic
2.2 8816423, General Arrangement Drawings
3. REQUIREMENTS:
3.1 Accomplish the requirements of 009-026 of 2.1, including Attachment C for TOP COAT replacement of cosmetic polymeric deck covering system conforming to MIL-D-24613 Type I Class 2, at location listed in 1.2.
3.2 Design, Fabricate, and Install a COMPACFLT Command Seal at location on Quarterdeck as directed by SUPERVISOR.
3.3 Accomplish the requirements of 009-032 of 2.1 for each new and disturbed surface.
4. NOTES:
4.1 Sample of Seal listed in 3.2 is available to view at YRBM-57 Berthing Barge.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.