Attachment I - Statement of Work.pdf
PDF 226 KB Posted
- Solicitation number
- 70Z02726RFQ001273
About this file
This is a Statement of Work (SOW) for C5 Training Trailer Roof replacement at the United States Coast Guard Base Portsmouth, located at 4000 Coast Guard Boulevard, Portsmouth, VA 23703 (PR #: 31040PR260001206).
The contractor shall provide complete labor, materials, tools, equipment, and supervision for the removal of an existing TPO roof membrane on a 5,000 square foot flat roof, inspection and conditional replacement of wood underlayment (up to 10% allowance of approximately 500 square feet), and installation of a new TPO roof membrane system. Work is organized into three primary tasks: (1) Tear-Off and Removal, which includes protecting surrounding areas, removing the existing TPO membrane and flashings, disposing of debris at an approved facility, and clearing the roof deck for inspection; (2) Deck Inspection and Underlayment Replacement, requiring thorough inspection of the plywood deck and replacement of deteriorated materials up to the 10% allowance, with any excess replacement subject to contract modification as additional work; and (3) New TPO Membrane Installation, which includes supplying and installing the new TPO membrane according to manufacturer specifications, mechanically fastening or fully adhering the membrane, heat-welding all seams for a watertight seal, installing new TPO flashings and metal drip edge around roof perimeter, and removal of tools and surplus materials.
The period of performance shall not exceed 10 working days after contract award or as negotiated with the Contracting Officer and Facilities Engineering. Work shall generally be performed between 0700 and 1530 EST, Monday through Friday (except Federal holidays), though weekend and holiday work may be required with written approval from the QAE Representative. The contractor must furnish all facilities, materials, equipment, and services; travel costs are included in the overall contract price and not billed separately. The designated QAE Representative is Nathan Chappell, (206) 815-2176, Nathan.C.Chappell@uscg.mil. The contractor must comply with all federal safety regulations (29 CFR 1910 and 1926), environmental protection requirements (40 CFR), and obtain all necessary permits at no additional expense to the government. All contractor employees require base access clearance and must submit a Base Access form with employee lists five days prior to commencing work. Security credentials acceptable for base entry include Real ID driver's license or alternative credentials such as U.S. passport, DoD ID, HSPD-12 PIV card, or other qualifying federal/state-issued identification. The QAE will inspect completed work and has the right to reject deliverables or require correction of deficiencies; rejected work may be corrected and returned per delivery instructions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PR #: 31040PR260001206
STATEMENT OF WORK
PAGE 1/6
STATEMENT OF WORK (SOW)
FOR
C5 Training Trailer Roof replacement
1.0 GENERAL
1.1 SCOPE
The contractor shall provide all labor, materials, tools, equipment, and supervision required for the removal of the existing TPO roof membrane on a roughly 5,000 square foot flat roof, inspection and conditional replacement of the wood underlayment (up to a 10% allowance), and the installation of a new TPO roof membrane system.
Location: 4000 Coast Guard BLVD Portsmouth, VA 23703
2.0 TASK ONE. Tear-Off and Removal
2.0.1 Protect surrounding landscaping, siding, and walkways from falling debris during the tear-off process. Set up waste disposal containers (e.g., dumpsters or debris trailers) in an approved staging area.
2.0.1 Carefully detach and remove the existing TPO roof membrane from the 5,000 SQFT roof area.
2.0.2 Remove all existing flashings, edge metals, and associated roofing debris.
2.0.3 Dispose of all removed TPO materials and roofing debris off-site at an approved waste facility.
2.0.4 Sweep and clear the exposed roof deck/underlayment to prepare for inspection.
2.1 TASK TWO. Deck Inspection and Underlayment Replacement
2.1.1 Perform a thorough inspection of the exposed plywood roof deck to identify any rotted, water-damaged, or compromised wood.
2.1.2 Wood Replacement Allowance: Remove and replace up to 10% (approximately 500 square feet) of deteriorated plywood underlayment.
2.1.3 Fasten all new plywood deck materials securely to the structural framing to ensure a flush, even surface for the new roofing system. (Note: The contractor shall assume that 10% of the wood needs to be replaced. Any required wood replacement exceeding the 10% allowance will be subject to a modification to the contract and negotiated as additional work if determined necessary by the government.)
../SCOPE%20PARAGRAPHS.doc
PAGE 2/6
2.2 TASK THREE. New TPO Membrane Installation
2.2.1 Supply and install new TPO roofing membrane over the 5,000 SQFT roof deck in accordance with the manufacturer's specifications.
2.2.2 Properly secure the membrane (mechanically fastened or fully adhered, depending on building requirements).
2.2.3 Heat-weld all TPO seams to ensure a completely watertight seal. According to manufacturer’s instruction.
2.2.4 Install new TPO flashings around all edge. Install new metal drip edge/fascia metal as required to seal the roof perimeter.
2.2.5 Remove all tools, staging equipment, and surplus materials from the job site.
3.0KEY PERSONNEL
Project Manager
3.1 PROJECT MANAGER
3.1.1 The Project Manager must be available to the QAE via telephone between the hours of 0700 and 1530 EST, Monday through Friday, and must respond to a request for discussion or resolution of technical problems within 24 hours of notification.
3.2 EMPLOYEE IDENTIFICATION
3.2.1 The QAE will provide a Base Access request form. The Contractor will need to return the Base Access form with list of all employees to the QAE Representative five (5) days prior to commencing work. The USCG Base Portsmouth Security Office will be given a copy of the employee list, and a pass will be issued for entry. A valid state license plate and safety inspection sticker is required. All vehicles operated on government property shall be maintained in a good state of repair.
3.3 EMPLOYEE CONDUCT
Contractor’s employees must comply with all applicable Government regulations, policies and procedures (e.g., fire, safety, sanitation, environmental protection, security, and possession of weapons) when visiting or working at Government facilities. The Contractor must ensure Contractor employees present a professional appearance at all times and that their conduct must not reflect discredit on the United States or the Department of Homeland Security. The Project Manager must ensure Contractor employees understand and abide by Department of Homeland Security established rules, regulations and policies concerning safety and security.
3.4 REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS
PAGE 3/6
The Government may, at its sole discretion (via the Contracting Officer), direct the Contractor to remove any Contractor employee from DHS facilities for misconduct or security reasons.
Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.
3.5 DESIGNATED CONTRACTING OFFICER’S QA EVALUATOR (QAE) REPRESENTATIVE
Nathan Chappell. (206) 815-2176 Nathan.C.Chappell@uscg.mil.
3.5.1 CONDITIONS AFFECTING THE WORK
The Offeror should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, the general and local conditions which can affect the cost of the work thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The government will assume no responsibility for any understanding or misrepresentations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for quotes, the specification or related documents. All contractors that require Base access will have to be pre-vetted for entry prior to commencement of work.
3.6 SECURITY
Each contractor that does not have Real ID on their Driver licenses will need to present one of the following credentials:
. U.S. Department of Defense ID, including IDs issued to Active Duty, Reserve, National Guard, retirees and dependents.
. RAPIDGate Credential . HSPD-12 PIV card . State-issued Enhanced Driver's License . U.S. passport . U.S. passport card . DHS trusted traveler cards (Global Entry, NEXUS, SENTRI, FAST) . Permanent resident card . Border crossing card . Federally recognized Tribal Nation/Indian Tribe, including Enhanced Tribal Cards (ETCs) . Foreign government-issued passport . Canadian provincial driver's license or Indian and Northern Affairs Canada card . Transportation worker identification credential . U.S. Citizenship and Immigration Services Employment Authorization Card (I-766) . U.S. Merchant Mariner Credential . Veteran Health Identification Card (VHIC)
3.7 AWARD OF THE CONTRACT: The contractor must immediately notify the contracting officer’s QAE representative of his intended start date. The work shall be done in accordance with the specification.
4.0 PERIOD OF PERFORMANCE
mailto:Nathan.C.Chappell@uscg.mil
PAGE 4/6
The period of performance for this contract must not exceed 10 working days after contract award or as negotiated with Contracting Officer and Facilities Engineering.
4.1 PLACE OF PERFORMANCE
The primary place of performance will be at 4000 Coast Guard Blvd, Portsmouth, VA 23703.
Custom manufacturing will be conducted at Contractor’s facility and installation will be conducted at the USCG Base Portsmouth.
4.2 HOURS OF OPERATION
Contractor employees must generally perform all work between the hours of 0700 and 1530 EST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees must be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW. If the contractor desires to carry on work on Saturday, Sunday, holidays or outside the station’s regular hours, he may submit his request in writing to the Contracting Officer’s QAE Representative for approval consideration. The contractor shall allow ample time to enable satisfactory arrangements to be made by the government to inspect the work in progress.
4.3 TRAVEL
Travel shall not be included as an additional/separate line item. Travel is required for delivery and installation purposes and shall be included as part of the overall cost.
4.4 GENERAL REPORT REQUIREMENTS
The Contractor must provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Microsoft Office Applications).
1.0 4.5 CONTRACTOR FURNISHED PROPERTY
The Contractor must furnish all facilities, materials, equipment and services necessary to fulfill the requirements of this contract.
4.6 GOVERNMENT ACCEPTANCE PERIOD
Upon completion of work, contact the Contracting Officer QAE Representative to arrange for inspection/acceptance of work.
4.6.1 The QAE will conduct an inspection of the work conducted by the Contractor and will have the right to reject or require correction of any deficiencies found that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the QAE of the specific reasons for rejection. The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions.
5.0 OTHER APPLICABLE CONDITIONS
5.1 SECURITY/SAFETY
PAGE 5/6
All contractors working on CG Base Portsmouth shall abide by all federal safety regulations as published by the Occupational Health and Safety Administration, 29 CFR 1910 (series) and 29 CFR 1926 (series). Contractor written safety programs shall be reviewed by the Base Safety Officer prior to starting work.
Written notification must be provided to the Base Safety Officer; in their capacity as Base Fire Marshal of any activity that could potentially cause fire or explosion or that changes or reduces the capability of fighting a fire or explosion. Some examples of qualifying activities are: a fire hydrant or fire suppression system that must be taken out of service for any reason, electrical work that affects fire alarm systems, introduction of hazardous or flammable material onto the Base, and blocking of any egress routes or emergency vehicle routes. Inclusion of this information in the contract constitutes written notification as long as the outsource review sheet is signed by Base Safety Officer.
Lock Out/Tag Out requires notification and coordination with facilities and will not be conducted by a contractor on Base Portsmouth. A Facilities Division representative is required for all contractors Lock Out/Tag Out needs.
Every employee working on Base Portsmouth has the right to a safe and healthy work place.
The contractor has the responsibility and right to stop unsafe work. QAE’s and the Safety Officer may also institute a work stoppage relating to unsafe practices or immediate danger to life and health situations.
5.2 ENVIRONMENTAL PROTECTION REQUIREMENTS:
All contractors working on CG Base Portsmouth shall abide by all federal environmental regulations as published by the Environmental Protection Agency, 40 CFR (series). Contractors written environmental management and pollution prevention programs shall be reviewed by the Environmental Protection Specialist prior to starting work and must be in accordance with ICSPORTSVA INSTM5090.2, the Unit Environmental Guide.
Written notification must be provided to the Environmental Protection Specialist of any activity that could potentially cause a permit violation on Base Portsmouth. Some examples of qualifying activities are: any activity that could result in a spill or discharge into a waterway or introducing a hazardous material into the environment.
Copies of the following must be provided to the Environmental Protection Specialist prior to starting work in affected areas: Material Safety Data Sheets, permits, and notices of intent.
Hazardous materials used by a contractor are required to be disposed of by that contractor.
Disposal must be in accordance with federal, state, and local guidelines.
5.3 PERMITS: The contractor shall, without additional expense to the government, obtain all appointments, licenses, and permits required for the prosecution of the work. The contractor shall comply with all applicable federal, state and local laws.
5.4 WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory for the Contracting Officer.
PAGE 6/6
5.5 ORAL MODIFICATION: No oral statement of any person other than the contracting officer shall in any manner or degree, modify or otherwise affect the terms of this contract.