Attachment H Revised version 2- Price Proposal form.pdf
PDF 132 KB Posted
- Attached to
- LP-37 FUEL FARM SECONDARY TRUCK RECEIPT
- Solicitation number
- Not on record
About this file
This is a price proposal form template for solicitation N4008525R2547 related to a fuel pump skid project at an LP-Fuel Farm facility. The form requires bidders to provide pricing for two Contract Line Items (CLINs).
CLIN 0001AA requires pricing for installing a secondary receipt fuel pump skid, which includes a pre-manufactured pump skid assembly, electrical service from Building LP-18, MCC panel, 8-inch steel piping with valves, concrete pedestal supports, and pavement repairs. CLIN 0001AB requires unit pricing for testing and disposal of 50 tons of hazardous/unsuitable soil at a rate per ton (truck scale measure). The award will be made on the total sum of both CLINs as a firm fixed price with no economic price adjustments. All costs for labor, materials, equipment, management, supervision, and disposal must be included in the lump sum pricing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0004.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No.: N4008525R2547 eProjects Work Order No.: 1692910
PRICE PROPOSAL FORM
PART 1. GENERAL
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.
Provide the Contract Line Item (CLIN) lump sum price for the following items:
CLIN 0001 - BASE PRICE. Price includes the following:
CLIN 0001AA. Price for the entire work in accordance with the drawings and specifications, but excluding work described in Contract Line Item (CLIN) 0001AB.
CLIN DESCRIPTION TOTAL PRICE FOR CLIN
0001AA
0001AA Provide secondary receipt fuel pump skid at the LP-Fuel
Farm. (1) Requires pre-manufactured pump skid assembly
(2) Electrical service from Building LP-18 (3) MCC panel at Building LP-18 (4) Aboveground 8-inch steel piping with valves (5) Concrete pedestal supports for new piping (6) Incidental pavement repairs due to electrical trenching
The quantities in CLIN 0001AB are above and beyond those indicated in the drawings and specifications. This item will only be performed at the direction of the Contracting Officer.
CLIN 0001AB. Price for testing and disposal of 50 tons of unsuitable soil.
CLIN DESCRIPTION QUANITITY UNIT Total PRICE FOR CLIN
0001AB
0001AB Price for disposal of 50 tons of unsatisfactory soil that is classified as hazardous waste that is encountered within planned excavations (i.e.
utilities, foundations) necessary to complete the work. Satisfactory Materials: Any materials classified by ASTM D2487 as GW, GP, GM, GP-GM, GW-GM, GC, GP-GC, GM-GC, SW, SP, SM, SW-SM, SC, SW-SC, SP-SM, SP-SC, free of debris, roots, wood, scrap material, vegetation, refuse, soft unsound particles, and frozen, deleterious, or
50 TONS
(Truck Scale Measure) objectionable materials.
Unless specified otherwise, the maximum particle diameter shall be one-half the lift thickness at the intended location.
Unsatisfactory Materials is materials which do not comply with the requirements for satisfactory materials.
Unsatisfactory materials also include man-made fills, trash, refuse, or backfills from previous satisfactory which contains root and other organic matter, frozen material, and stones larger than 3 inches. The Contracting Officer shall be notified of any contaminated materials.
The unit price shall only include additional costs above and beyond the costs for removal, handling, stockpiling, testing and disposal of uncontaminated soils included in CLIN 0001AB. The quantity of material removed shall be determined based on certified truck measurements scale measurements and the quantity will be approved by the Contracting Officer.
GENERAL BID NOTES
1. Award will be made on the total sum of Contract Line Item CLIN 0001 (0001AA & 0001AB). A firm fixed proposed price is required for CLIN 0001. No provision is made for economic price adjustment.
2. The lump sum price above shall be deemed to include all costs required for the specified work, completed in accordance with the drawings and specifications, including all labor, materials, equipment, tools, management, supervision, disposal and related items.
PART 2. PRODUCTS
Not Used
PART 3. EXECUTION
Not Used
END