Attachment H - Project Manual - Volume 2.pdf
PDF 9 MB Posted
- Attached to
- Beverly Cleary Fernwood Seismic Rehabilitation
- Solicitation number
- 148045
- Issued by
- Multnomah County, Oregon
About this file
This file comprises Volume 2 of the Project Manual for the Beverly Cleary Seismic Upgrade project in Portland, Oregon, prepared for Portland Public Schools by Arcadis Architects, Engineers and Landscape Architects. The project manual serves as the design-build basis for bidders to prepare proposals for a complete seismic upgrade of the Beverly Cleary Elementary School located at 501 N Dixon Street, Portland, Oregon 97227. The document includes detailed specifications for Divisions 21 through 33, covering fire suppression systems, plumbing, HVAC, electrical, communications, electronic safety and security, earthwork, exterior improvements, and utilities. Bidders are required to visit the project site to verify existing conditions and investigate applicable codes and regulations as enforced by the Authority Having Jurisdiction (AHJ). The specification emphasizes design-build methodology throughout the construction phase, with contractors responsible for complete system design and installation. Submittals must be provided in electronic format via bookmarked PDF files organized by specification section, with a maximum of two reviews included before additional reviews incur hourly engineering charges. The document is dated November 5, 2026, establishing this as the bid set for the project.
The specifications establish comprehensive quality assurance, materials, and workmanship requirements aligned with state of Oregon codes, national standards including NFPA, ASTM, and ICC guidelines, and local jurisdiction requirements. Contractors must provide UL-listed, FM-approved, or ICC-ESR-evaluated materials and equipment, with detailed submittals including shop drawings, calculations, product data, seismic restraint designs, and coordination drawings to ensure integration with structural, electrical, plumbing, and HVAC systems. The project mandates seismic control measures per ASCE 7 and NFPA 13 requirements, with stamped engineering drawings from licensed Oregon engineers required for bracing and restraint assemblies. A one-year warranty from substantial completion is required, along with comprehensive operation and maintenance manuals, record drawings, training of owner personnel, and demonstration of all systems. The contractor bears responsibility for all cutting, patching, coordination with other trades, and remediation of any installation errors or improper coordination at no additional cost to the owner.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL
FOR
Beverly Cleary
Seismic Upgrade
Portland Public Schools
501 N Dixon Street
Portland, Oregon 97227
Project No. 30317632
VOLUME 2
Divisions 21 - 33
Bid Set November 5, 2026
PROJECT MANUAL
FOR:
Bid Set
Beverly Cleary
Seismic Upgrade for
Portland Public Schools
501 N Dixon Street
Portland, Oregon 97227
(ARCHITECT)
Arcadis Architects, Engineers and Landscape Architects, A New York
General Partnership 805 SW Broadway | Suite 700
Portland, Oregon 97205
PH: 503 226-6950
November 5, 2026
SECTION 00 01 10
TABLE OF CONTENTS
BID SET Portland Public Schools 00 01 10 - 1
ISSUE: 11/05/2026 Beverly Cleary - Seismic Upgrade
ARCADIS #30317632
TABLE OF CONTENTS
DIVISION 00 — PROCUREMENT AND CONTRACTING REQUIREMENTS
00 00 00 - COVER
00 01 01 - TITLE
00 01 10 - TABLE OF CONTENTS
00 31 00 - AVAILABLE PROJECT INFORMATION
00 31 00a - PRE-RENOVATION HAZARDOUS MATERIALS SURVEY REPORT
DIVISION 01 — GENERAL REQUIREMENTS
01 10 00 - SUMMARY
01 13 31 - CERTIFICATE OF COMPLIANCE
01 13 32 - CERTIFICATE OF NO HAZARDOUS MATERIALS
01 14 00 - WORK RESTRICTIONS
01 20 00 - PRICE AND PAYMENT PROCEDURES
01 21 00 - ALLOWANCES
01 22 00 - UNIT PRICES
01 26 00 - CONTRACT MODIFICATION PROCEDURES
01 30 00 - ADMINISTRATIVE REQUIREMENTS
01 31 23 - PROJECT MANAGEMENT DATABASE (PMD)
01 32 00 - CONSTRUCTION PROGRESS DOCUMENTATION
01 32 33 - PHOTOGRAPHIC DOCUMENTATION
01 40 00 - QUALITY REQUIREMENTS
01 40 05 - CUTTING AND PATCHING
01 42 16 - DEFINITIONS
01 45 05 - FIELD ENGINEERING
01 45 23 - ASBESTOS AIR MONITORING REQUIREMENTS
01 50 00 - TEMPORARY FACILITIES AND CONTROLS
BID SET Portland Public Schools 00 01 10 - 2
ISSUE: 11/05/2026 Beverly Cleary - Seismic Upgrade
ARCADIS #30317632
01 57 16 - TEMPORARY PEST CONTROL
01 57 21 - INDOOR AIR QUALITY CONTROLS
01 60 00 - PRODUCT REQUIREMENTS
01 60 00a - SUBSTITUTION REQUEST FORM
01 60 00b - AFTER BID SUBSTITUTION FORM
01 61 16 - VOLATILE ORGANIC COMPOUND (VOC) RESTRICTIONS
01 61 16.01 - ACCESSORY MATERIAL VOC CERTIFICATION FORM
01 70 00 - EXECUTION
01 74 19 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 77 00 - CLOSEOUT PROCEDURES
01 78 00 - CLOSEOUT SUBMITTALS
01 79 00 - DEMONSTRATION AND TRAINING
DIVISION 02 — EXISTING CONDITIONS
02 41 19 - SELECTIVE STRUCTURE DEMOLITION
02 82 13 - ASBESTOS ABATEMENTS
02 82 21 - OSHA REQUIREMENTS FOR REMOVAL OF MATERIALS WITH LESS THAN
1% ASBESTOS
02 83 14 - LEAD RENOVATION, REPAIR, AND PAINTING FOR CHILD-OCCUPIED
FACILITIES
DIVISION 03 — CONCRETE
03 01 50 - FRP COMPOSITE STRENGTHENING SYSTEM
03 10 00 - CONCRETE FORMING AND ACCESSORIES
03 20 00 - CONCRETE REINFORCING
03 30 00 - CAST-IN-PLACE CONCRETE
03 37 13 - SHOTCRETE
03 54 00 - CAST UNDERLAYMENT
DIVISION 04 — MASONRY
BID SET Portland Public Schools 00 01 10 - 3
ISSUE: 11/05/2026 Beverly Cleary - Seismic Upgrade
ARCADIS #30317632
04 05 11 - MASONRY MORTARING AND GROUTING
04 20 00 - UNIT MASONRY
04 26 13 - MASONRY VENEER
DIVISION 05 — METALS
05 12 00 - STRUCTURAL STEEL FRAMING
05 40 00 - COLD-FORMED METAL FRAMING
05 50 00 - METAL FABRICATIONS
05 52 13 - PIPE AND TUBE RAILINGS
DIVISION 06 — WOOD, PLASTICS, AND COMPOSITES
06 10 00 - ROUGH CARPENTRY
06 20 00 - FINISH CARPENTRY
06 41 00 - ARCHITECTURAL WOOD CASEWORK
DIVISION 07 — THERMAL AND MOISTURE PROTECTION
07 01 50.19 - PREPARATION FOR REROOFING
07 14 16 - COLD FLUID-APPLIED WATERPROOFING
07 14 18 - COLD FLUID-APPLIED WATERPROOF FLASHING
07 19 00 - WATER REPELLENTS
07 21 00 - THERMAL INSULATION
07 25 00 - WATER RESISTIVE BARRIER
07 52 16 - SBS MODIFIED BITUMINOUS MEMBRANE ROOFING
07 62 00 - SHEET METAL FLASHING AND TRIM
07 84 00 - FIRESTOPPING
07 92 00 - JOINT SEALANTS
DIVISION 08 — OPENINGS
08 12 13 - HOLLOW METAL FRAMES
08 14 16 - FLUSH WOOD DOORS
BID SET Portland Public Schools 00 01 10 - 4
ISSUE: 11/05/2026 Beverly Cleary - Seismic Upgrade
ARCADIS #30317632
08 31 00 - ACCESS DOORS AND PANELS
08 71 00 - DOOR HARDWARE
08 80 00 - GLAZING
DIVISION 09 — FINISHES
09 00 01 - FINISH LEGEND
09 21 16 - GYPSUM BOARD ASSEMBLIES
09 30 00 - TILING
09 51 00 - ACOUSTICAL CEILINGS
09 51 53 - DIRECT-APPLIED ACOUSTICAL CEILINGS
09 65 00 - RESILIENT FLOORING
09 68 13 - TILE CARPETING
09 68 16 - SHEET CARPETING
09 84 30 - SOUND-ABSORBING WALL AND CEILING UNITS
09 91 23 - INTERIOR PAINTING
09 96 00 - HIGH-PERFORMANCE COATINGS
DIVISION 10 — SPECIALTIES
10 14 00 - SIGNAGE
10 21 13.19 - PLASTIC TOILET COMPARTMENTS
10 26 00 - WALL AND DOOR PROTECTION
10 28 00 - TOILET, BATH, AND LAUNDRY ACCESSORIES
DIVISION 11 — EQUIPMENT
NOT USED
DIVISION 12 — FURNISHINGS
NOT USED
DIVISION 13 — SPECIAL CONSTRUCTION
13 48 53 - SEISMIC ANCHORAGE REQUIREMENTS
BID SET Portland Public Schools 00 01 10 - 5
ISSUE: 11/05/2026 Beverly Cleary - Seismic Upgrade
ARCADIS #30317632
DIVISION 14 — CONVEYING EQUIPMENT
NOT USED
DIVISION 20 — MECHANICAL SUPPORT
NOT USED
DIVISION 21 — FIRE SUPPRESSION
21 00 00 - FIRE SUPPRESSION BASIC REQUIREMENTS
21 05 00 - COMMON WORK RESULTS FOR FIRE SUPPRESSION
21 13 00 - FIRE SUPPRESSION SPRINKLER SYSTEM
DIVISION 22 — PLUMBING
22 00 00 - PLUMBING BASIC REQUIREMENTS
22 05 16 - EXPANSION FITTINGS AND LOOPS FOR PLUMBING PIPING
22 05 19 - PLUMBING DEVICES
22 05 23 - GENERAL-DUTY VALVES FOR PLUMBING PIPING
22 05 29 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
22 05 48 - VIBRATION AND SEISMIC CONTROLS FOR PLUMBING PIPING AND
EQUIPMENT
22 05 53 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
22 07 00 - PLUMBING INSULATION
22 10 00 - PLUMBING PIPING
22 40 00 - PLUMBING FIXTURES
DIVISION 23 — HEATING VENTILATING AND AIR CONDITIONING
23 00 00 - HEATING, VENTILATING AND AIR CONDITIONING (HVAC) BASIC
REQUIREMENTS
23 05 29 - HANGERS AND SUPPORTS FOR HVAC PIPING, DUCTWORK AND
EQUIPMENT
23 05 48 - VIBRATION AND SEISMIC CONTROLS FOR HVAC EQUIPMENT
23 05 53 - IDENTIFICATION FOR HVAC PIPING DUCTWORK AND EQUIPMENT
23 05 93 - TESTING, ADJUSTING, AND BALANCING FOR HVAC
BID SET Portland Public Schools 00 01 10 - 6
ISSUE: 11/05/2026 Beverly Cleary - Seismic Upgrade
ARCADIS #30317632
23 07 00 - HVAC INSULATION
23 09 00 - INSTRUMENTATION AND CONTROL PERFORMANCE SPECIFICATIONS
23 11 23 - FACILITY FUEL - NATURAL GAS PIPING AND SYSTEMS
23 21 13 - HVAC PIPING
23 31 00 - HVAC DUCTS AND CASINGS
23 33 00 - AIR DUCT ACCESSORIES
23 37 00 - AIR OUTLETS AND INLETS
23 82 00 - TERMINAL HEAT TRANSFER EQUIPMENT
DIVISION 25 — INTEGRATED AUTOMATION
NOT USED
DIVISION 26 — ELECTRICAL
26 00 00 - GENERAL ELECTRICAL REQUIREMENTS
26 05 02 - MINOR ELECTRICAL DEMOLITION
26 05 19 - LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
26 05 26 - GROUNDING AND BONDING
26 05 29 - HANGERS AND SUPPORTS
26 05 33 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
26 05 48 - SEISMIC RESTRAINTS FOR ELECTRICAL SYSTEMS
26 05 53 - ELECTRICAL AND CONTROL IDENTIFICATION
26 05 83 - WIRING CONNECTIONS
26 09 23 - LIGHTING CONTROL DEVICES
26 09 33 - WIRELESS LIGHTING CONTROL SYSTEM
26 27 26 - WIRING DEVICES
26 28 23 - ENCLOSED SWITCHES AND CIRCUIT BREAKERS
26 51 00 - INTERIOR LIGHTING
DIVISION 27 — COMMUNICATIONS
BID SET Portland Public Schools 00 01 10 - 7
ISSUE: 11/05/2026 Beverly Cleary - Seismic Upgrade
ARCADIS #30317632
27 00 00 - GENERAL COMMUNICATIONS SYSTEMS REQUIREMENTS
27 05 29 - HANGERS AND SUPPORTS FOR COMMUNICATION SYSTEMS
27 05 33 - CONDUITS AND BOXES FOR COMMUNICATION SYSTEMS
27 11 00 - COMMUNICATIONS EQUIPMENT ROOM FITTINGS
27 15 00 - COMMUNICATION HORIZONTAL CABLING
DIVISION 28 — ELECTRONIC SAFETY AND SECURITY
28 30 00 - FIRE DETECTION AND ALARM
DIVISION 31 — EARTHWORK
31 20 00 - EARTH MOVING
DIVISION 32 — EXTERIOR IMPROVEMENTS
32 11 23 - AGGREGATE BASE COURSES
32 12 16 - ASPHALT PAVING
32 13 13 - CONCRETE PAVING
32 17 23 - PAVEMENT MARKINGS
32 91 13 - SOIL PREPARATION
32 92 00 - SEEDING
32 93 00 - PLANTS AND PLANTING
32 97 00 - LANDSCAPE WARRANTY AND MAINTENANCE
DIVISION 33 — UTILITIES
33 05 00 - COMMON WORK RESULTS FOR UTILITIES
33 42 00 - STORMWATER CONVEYANCE
33 46 00 - SUBDRAINAGE
DIVISION 34 — TRANSPORTATION
NOT USED
BID SET Portland Public Schools 00 01 10 - 8
ISSUE: 11/05/2026 Beverly Cleary - Seismic Upgrade
ARCADIS #30317632
SECTION 21 00 00
FIRE SUPPRESSION BASIC REQUIREMENTS
BID SET
ISSUE: 11/05/2026
Portland Public Schools Beverly Cleary - Seismic Upgrade
21 00 00 - 1
FIRE SUPPRESSION BASIC REQUIREMENTS
PART 1 - GENERAL
1.01 DESIGN-BUILD SUMMARY
A. Work included in this Section applies to Division 21, Fire Suppression work to provide materials, labor, tools, permits and incidentals to make fire suppression systems ready for
Owner's use for proposed project.
1.02 DESIGN-BUILD INSTRUCTIONS
A. This document is issued to give Bidders a basis for preparing a proposal to design and install a complete Fire Suppression system for this project.
B. Alternates to this Document may be offered as a separate proposal.
1.03 DESIGN-BUILD APPROACH
A. Use this Specification for design/engineering requirements, workmanship and materials or construction. Utilize design-build concept throughout construction phase of project.
B. Investigate and be apprised of applicable codes, rules, and regulations as enforced by AHJ.
C. Visit the Site of the proposed construction. Verify and inspect the existing site to determine conditions that affect this work.
1.04 DESIGN-BUILD CRITERIA
A. Related Work Specified Elsewhere: Contents of Section apply to Division 21, Fire Suppression
Specifications. Requirements of Section are a minimum for Division 21, Fire Suppression
Sections, unless otherwise stated in each Section, in which case that Section's requirements take precedence.
B. Reference Basis of Design narrative document.
C. Fire Suppression Design Criteria: Refer to individual Division 21, Fire Suppression Sections for fire suppression system design criteria.
D. Fire Suppression Equipment: Refer to individual Division 21, Fire Suppression Sections for fire suppression equipment requirements.
1.05 SECTION INCLUDES
A. Work included in this Section iapplies to Division 21, Fire Suppression work to provide materials, labor, tools, permits, incidentals, and other services to provide and make ready for
Owner's use of fire protection systems for proposed project.
B. Contract Documents include, but are not limited to, Specifications including Division 00, Procurement and Contracting Requirements and Division 01, General Requirements, Drawings, Addenda, Owner/Architect Agreement, and Owner/Contractor Agreement. Confirm requirements before commencement of work.
C. Definitions:
1. Provide: To furnish and install, complete and ready for intended use.
2. Furnish: Supply and deliver to project site, ready for unpacking, assembly and installation.
3. Install: Includes unloading, unpacking, assembling, erecting, installation, applying, finishing, protecting, cleaning and similar operations at project site as required to complete Item of work furnished.
Portland Public Schools
21 00 00 - 2
4. Approved or Approved Equivalent: To possess the same performance qualities and characteristics and fulfill the utilitarian function without any decrease in quality, durability or longevity. For equipment/products defined by the Contractor as "equivalent," substitution requests must be submitted to Engineer for consideration, in accordance with Division 01, General Requirements, and approved by the Engineer prior to submitting bids for substituted Item.
5. Authority Having Jurisdiction (AHJ): Indicates reviewing authorities, including local fire marshal, Owner's insurance underwriter, Owner's Authorized Representative, and other reviewing entity whose approval is required to obtain systems acceptance.
1.06 RELATED SECTIONS
A. Content of Section applies to Division 21, Fire Suppression Contract Documents.
B. Related Work:
1. Additional conditions apply to this Division including, but not limited to:
a. Specifications including Division 00, Procurement and Contracting Requirements and Division 01, General Requirements.
b. Drawings
c. Addenda
d. Owner/Architect Agreement
e. Owner/Contractor Agreement
f. Codes, Standards, Public Ordinances and Permits
1.07 REFERENCES AND STANDARDS
A. References and Standards per Division 00, Procurement and Contracting Requirements and
Division 01, General Requirements, individual Division 21, Fire Suppression Sections and those listed in this Section.
B. Codes to include latest adopted editions, including current amendments, supplements and local jurisdiction requirements in effect as of the date of the Contract Documents, of/from:
1. State of Oregon:
a. OAR - Oregon Administrative Rules
b. OESC - Oregon Electrical Specialty Code
c. OFC - Oregon Fire Code
d. OMSC - Oregon Mechanical Specialty Code
e. OPSC - Oregon Plumbing Specialty Code
f. OSSC - Oregon Structural Specialty Code
g. OEESC - Oregon Energy Efficiency Specialty Code
h. Oregon Elevator Specialty Code
C. Reference standards and guidelines include but are not limited to the latest adopted editions from:
1. ADA - Americans with Disabilities Act
2. AHRI - Air-Conditioning Heating & Refrigeration Institute
3. ANSI - American National Standards Institute
4. ASCE - American Society of Civil Engineers
5. ASCE-7 Minimum Design Loads for Buildings and Other Structures
6. ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers
7. ASHRAE Guideline 0, the Commissioning Process
8. ASME - American Society of Mechanical Engineers
9. ASPE - American Society of Plumbing Engineers
10. ASSE - American Society of Sanitary Engineering
11. ASTM - ASTM International
Portland Public Schools
21 00 00 - 3
12. AWWA - American Water Works Association
13. FM - FM Global
14. FM Global - FM Global Approval Guide
15. IAPMO - International Association of Plumbing and Mechanical Official
16. ICC - International Code Council
17. IEC - International Electrotechnical Commission
18. ICC-ESR - International Code Council Evaluation Service Reports
19. ISO - International Organization for Standardization
20. MSS - Manufacturers Standardization Society
21. NEC - National Electric Code
22. NEMA - National Electrical Manufacturers Association
23. NFPA - National Fire Protection Association:
a. NFPA 13 - Standard for the Installation of Sprinkler Systems
b. NFPA 24 - Standard for Installation of Private Fire Service Mains and Their Appurtenances
c. NFPA 25 - Standard for Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems
d. NFPA 70 - National Electrical Code
e. NFPA 72 - National Fire Alarm and Signaling Code
24. OSHA - Occupational Safety and Health Administration
25. UL - Underwriters Laboratories Inc.
D. See Division 21, Fire Suppression individual Sections for additional references.
1.08 SUBMITTALS
A. See Division 01, General Requirements for Submittal Procedures as well as specific individual
Division 21, Fire Suppression sections.
B. Provide drawings in format and software release equal to the design documents. Drawings to be the same sheet size and scale as the Contract Documents.
C. "No Exception Taken" constitutes that review is for general conformance with the design concept expressed in the Contract Documents for the limited purpose of checking for conformance with information given. Any action is subject to the requirements of the Contract
Documents. Contractor is responsible for the dimensions and quantity and will confirm and correlate at the job site, fabrication processes and techniques of construction, coordination of the work with that of all other trades, and the satisfactory performance of the work.
D. Provide product submittals and shop drawings in electronic format only. Electronic format must be submitted via zip file via e-mail. For electronic format, provide one file per division containing one bookmarked PDF file with each bookmark corresponding to each Specification Section.
Arrange bookmarks in ascending order of Specification Section number. Individual submittals sent piecemeal in a per Specification Section method will be returned without review or comment. Copy Architect on all transmissions/submissions.
E. Submit shop drawings, calculations and product data sheets as one complete stand-alone package to AHJ, Owner's insurance underwriter and Engineer.
F. Product Data: Provide Manufacturer's descriptive literature for products specified in Division 21, Fire Suppression Sections.
Portland Public Schools
21 00 00 - 4
G. Identify/mark each submittal in detail. Note what differences, if any, exist between the submitted item and the specified item. Failure to identify the differences will be considered cause for disapproval. If differences are not identified and/or not discovered during the submittal review process, Contractor remains responsible for providing equipment and materials that meet the
Specifications and Drawings.
1. Label submittal to match numbering/references as shown in Contract Documents.
Highlight and label applicable information to individual equipment or cross out/remove extraneous data not applicable to submitted model. Clearly note options and accessories to be provided, including field installed Item. Highlight connections by/to other trades.
2. Include technical data, installation instructions and dimensioned drawings for products, equipment and devices installed, furnished or provided. Reference Division 21, Fire Suppression specification Sections for specific Item required in product data submittal outside of these requirements.
3. Provide pump curves, operation characteristics, capacities, ambient noise criteria, etc. for equipment.
4. For vibration isolation of equipment, list make and model selected with operating load and deflection. Indicate frame type where required. Submit manufacturer's product data.
5. See Division 21, Fire Suppression Sections for additional submittal requirements outside of these requirements.
H. Maximum of two reviews provided of complete submittal package. Arrange for additional reviews and/or early review of long-lead items; bear costs of additional reviews at Engineer's hourly rates. Incomplete submittal packages/submittals will be returned to Contractor without review.
I. Resubmission Requirements: Make corrections or changes in submittals as required, and in consideration of Engineer’s comments. Identify Engineer’s comments and provide an individual response to each of the Engineer’s comments. Cloud changes in the submittals and further identify changes which are in response to Engineer’s comments.
J. Structural/Seismic: Provide weights, dimensions, mounting requirements and like information required for mounting, seismic bracing, and support. Indicate manufacturer's installation and support requirements to meet ASCE 7-16 requirements for non-structural components. Provide engineered seismic drawings and equipment seismic certification. Equipment Importance
Factor as specified in Division 01 and in Structural documents.
K. Trade Coordination: Include physical characteristics, electrical characteristics, device layout plans, wiring diagrams, and connections as required per Division 21, Fire Suppression coordination documents. For equipment with electrical connections, furnish copy of approved submittal for inclusion in Division 26, Electrical and Division 28, Electronic Safety and Security submittals.
L. Make provisions for openings in building for admittance of equipment prior to start of construction or ordering of equipment.
M. Substitutions and Variation from Basis of Design:
1. The Basis of Design designated product establishes the qualities and characteristics for the evaluation of any comparable products by other listed acceptable manufacturers if included in this Specification or included in an approved Substitution Request as judged by the Design Professional.
Portland Public Schools
21 00 00 - 5
2. If substitutions and/or equivalent equipment/products are being proposed, it is the responsibility of parties concerned, involved in, and furnishing the substitute and/or equivalent equipment to verify and compare the characteristics and requirements of that furnished to that specified and/or shown. If greater capacity and/or more materials and/or more labor is required for the rough-in, circuitry or connections than for the item specified and provided for, then provide compensation for additional charges required for the proper rough-in, circuitry and connections for the equipment being furnished. No additional charges above the Base Bid, including resulting charges for work performed under other Divisions, will be allowed for such revisions. Coordinate with the requirements of "Submittals". For any product marked "or approved equivalent", a substitution request must be submitted to Engineer for approval prior to purchase, delivery or installation.
N. Shop Drawings:
1. Provide coordinated Shop Drawings which include physical characteristics of all systems, equipment and piping layout, pipe layout, hanger layout, sway brace layout, seismic restraints, sway brace calculations, drains, location of drain discharge, risers, valves, details, water test information, physical device layout plans, and control wiring diagrams.
Reference individual Division 21, Fire Suppression Sections for additional requirements for shop drawings outside of these requirements.
2. Shop Drawings, sway brace calculations, trapeze hanger calculations, and the like, to be prepared under the direct supervision and control of a Professional Engineer competent to do such work and licensed in the state of Oregon. Drawings and calculations to bear the seal and wet signature of the Professional Engineer.
3. When required, provide Coordination Drawings.
4. Provide sway bracing calculations on drawings showing horizontal seismic design load and requirements, with indication of zone of influence for each bracing location.
5. Provide a schedule of sway bracing type, size, and design criteria, including length, angle from vertical, and load capacities.
O. Resubmission Requirements:
1. Make any corrections or change in submittals when required. Provide submittals as specified. The Engineer will not be required to edit and/or interpret the Contractor's submittals. Indicate changes for the resubmittal in a cover letter with reference to page(s) changed and reference response to comment. Clearly indicate changes on Drawings and cloud changes in the submittals.
2. Resubmit for review until review indicates no exceptions taken or make "corrections as noted".
P. Operation and Maintenance Manuals/Owner's Instructions:
1. Submit, at one time, electronic files (PDF format) of manufacturer's operation and maintenance instruction manuals and parts lists for equipment or Item requiring servicing.
Include valve charts. Submit data when work is substantially complete and in same order format as submittals. Include name and location of source parts and service for each piece of equipment.
a. Include copies of certificates of code authority acceptance, code-required acceptance tests; test reports and certificates.
b. Include Warranty per Division 00, Procurement and Contracting Requirements and Division 01, General Requirements, and individual Division 21, Fire Suppression Sections.
c. Catalog description of each Item of equipment actually installed on job.
d. Instructions for operation and maintenance of fire suppression systems composed of operating instructions, maintenance instructions and manufacturer's literature as follows:
Portland Public Schools
21 00 00 - 6
1) Testing and Maintenance Schedule Chart: Provide an 8-1/2- by 11-inch typewritten list of each item of installed equipment requiring testing inspection, lubrication or service, describing and scheduling performance of maintenance.
2) Manufacturer's Literature: Provide copies of manufacturer's instructions for operation and maintenance of fire suppression equipment, including replacement parts list with name and address of nearest distributor. Mark each copy with equipment identification label as listed in equipment schedule, i.e. F-5 etc.
e. Include product certificates of warranties and guarantees.
f. Include Record Drawings.
g. Include Contractor’s Material and Test Certificates for Aboveground Piping.
h. Include a copy of NFPA 25.
i. Include a copy of valve charts and whether normally open or normally closed.
j. Include a copy of drain, auxiliary, and low point drains charts.
k. Include a copy of the list to be included in the spare sprinkler head box.
l. Include copy of approved submittal data along with submittal review letters received from Engineer. Data to clearly indicate installed equipment model numbers. Delete or cross out data pertaining to other equipment not specific to this project.
m. Include copy of manufacturer's standard Operations and Maintenance for equipment.
At front of each tab, provide routine maintenance documentation for scheduled equipment. Include manufacturer's recommended maintenance schedule and highlight maintenance required to maintain warranty. Furnish list of routine maintenance parts, including part numbers, sizes, and quantities relevant to each piece of equipment: i.e. belts, motors, lubricants, and filters.
n. Include copy of complete parts list for equipment. Include available exploded views of assemblies and sub-assemblies.
o. Engineer will return incomplete documentation without review. Engineer will provide one set of review comments in Submittal Review format. Contractor must arrange for additional reviews; Contractor to bear costs for additional reviews at Engineer's hourly rates.
2. Thoroughly instruct Owner in proper operation of equipment and systems. Where noted in individual Sections, training will include classroom instruction with applicable training aids and systems demonstrations. Field instruction per Section 21 00 00, Fire Suppression Basic Requirements, Article titled "Demonstration".
3. Copies of certificates of code authority inspections, acceptance, code required acceptance tests, letter of conformance and other special guarantees, certificates of warranties, specified elsewhere or indicated on Drawings.
Q. Record Drawings:
1. Maintain at site at least one set of Drawings for recording “As-constructed” conditions.
Indicate on Drawings changes to original documents by referencing revision document, and include buried elements, location of cleanouts, and location of concealed mechanical Item. Include items changed by field orders, supplemental instructions, and constructed conditions.
2. Record Drawings are to include equipment and fixture/connection schedules that accurately reflect "as constructed or installed" for project.
3. At completion of project, input changes to original project Revit Model and make one set of black-line drawings created from Revit model in version/release equal to contract drawings. Submit Revit model and drawings upon substantial completion.
4. Invert elevations and dimensioned locations for water services and drainage piping below grade extending to 5-feet outside building line.
Portland Public Schools
21 00 00 - 7
5. Record Drawings to include site information or reference site information for complete understanding of the fire protection system between the building and the point of connection to the water supply and location of flow test pressure hydrants.
6. See Division 21, Fire Suppression individual Sections for additional items to include in Record Drawings.
R. Submit Sway Brace Calculations:
1. Sway brace calculations utilizing a proprietary computer calculation program only used for the sway brace components supported by that manufacturer. For example, only “manufacturer X” sway brace components, and not those of another manufacturer, may be calculated on a "manufacturer X” sway brace computer calculation program.
2. Provide seismic calculations for any sway brace to be attached to any I-joist, structural insulated panels (SIPs), cross laminated timber, and similar engineered structural products according to the specifications of the I-joist manufacturer.
1.09 QUALITY ASSURANCE
A. Regulatory Requirements: Work and materials installed to conform with all local, State and
Federal codes, and other applicable laws and regulations. Where code requirements are at variance with Contract Documents, meet code requirements as a minimum requirement and include costs necessary to meet these in Contract. Machinery and equipment are to comply with OSHA requirements, as currently revised and interpreted for equipment manufacturer requirements. Install equipment provided per manufacturer recommendations.
B. Whenever this Specification calls for material, workmanship, arrangement or construction of higher quality and/or capacity than that required by governing codes, higher quality and/or capacity take precedence.
C. Drawings are intended to be diagrammatic and reflect the Basis of Design manufacturer's equipment. They are not intended to show every Item in its exact dimensions, or details of equipment or proposed systems layout. Verify actual dimensions of systems (i.e., piping) and equipment proposed to assure that systems and equipment will fit in available space.
Contractor is responsible for design and construction costs incurred for equipment other than
Basis of Design, including, but not limited to, architectural, structural, electrical, HVAC, fire sprinkler, and plumbing systems.
D. Manufacturer's Instructions: Follow manufacturer's written instructions. If in conflict with
Contract Documents, obtain clarification. Notify Engineer/Architect in writing before starting work.
E. Items shown on Drawings are not necessarily included in Specifications or vice versa. Confirm requirements in all Contract Documents.
F. Provide products that are UL listed.
G. Piping Insulation products to contain less than 0.1 percent by weight PBDE in all insulating materials.
1.10 WARRANTY
A. Provide written warranty covering the work for a period of one year from date of Substantial
Completion in accordance with Division 00, Procurement and Contracting Requirements and
Division 01, General Requirements, and individual Division 21, Fire Suppression Sections.
B. Sections under this Division can require additional and/or extended warranties that apply beyond basic warranty under Division 01, General Requirements and the General Conditions.
Confirm requirements in all Contract Documents.
Portland Public Schools
21 00 00 - 8
1.11 COORDINATION DOCUMENTS
A. Prior to construction, prepare and submit coordinated layout drawings (composite drawings), to coordinate installation and location of ductwork, grilles, diffusers, piping, fire sprinklers, fire alarm, plumbing, cable trays, lights, and electrical services. Composite Drawings show services on single sheet. Key Drawings to structural column identification system. Prior to completion of
Drawings, coordinate proposed installation with architectural and structural requirements, and other trades (including plumbing, HVAC, electrical, fire alarm ceiling suspension and tile systems, etc.), and provide maintenance access requirements. Coordinate with submitted architectural systems (i.e. roofing, ceiling and finishes) and structural systems as submitted, including footings and foundation. Identify zone of influence from footings and ensure systems are not routed within the zone of influence.
B. Prepare Drawings as follows:
1. Provide drawings in Revit model. Revit model release equal to design documents.
Drawings to be same sheet size and scale as Contract Drawings and indicate location, size and elevation above finished floor of equipment and distribution systems.
2. Review and revise, as necessary, section cuts in Contract Drawings after verification of field conditions.
3. Indicate fire protection system piping including fittings, hangers, access panels, valves, and bottom of pipe elevations above finished floor.
4. Indicate inverts and provision for piping that must be graded to have right-of-way over more flexible Item. Drawings also to indicate proposed ceiling grid and lighting layout as shown on electrical drawings, architectural reflected ceiling drawings and HVAC equipment, ductwork and piping. Drawings to indicate proposed and identified structural members to which hangers and sway braces will be attached as shown on structural drawings.
5. Incorporate Addenda Item and change orders.
6. Provide additional coordination as requested by other trades.
C. Advise Architect in event conflict occurs in location or connection of equipment. Bear costs resulting from failure to properly coordinate installation or failure to advise Architect of conflict.
D. Verify in field exact size, location, invert, and clearances regarding existing material, equipment and apparatus, and advise Architect of discrepancies between that indicated on Drawings and that existing in field prior to installation related thereto.
E. Submit final Coordination Drawings with changes as Record Drawings at completion of project.
PART 2 - PRODUCTS
2.01 MANUFACTURERS
A. Articles, fixtures, and equipment of a kind to be standard product of one manufacturer, including but not limited to sprinkler heads, pipe, fittings, hangers and bracing materials.
2.02 STANDARDS OF MATERIALS AND WORKMANSHIP
A. Base contract upon furnishing materials as specified. Materials, equipment, and fixtures used for construction are to be new, latest products as listed in manufacturer's printed catalog data and are to be UL, ETL, FM, and ICC-ES listed and labeled for their intended fire protection function or be approved by State, County, and City authorities prior to procurement and installation.
B. Names and manufacturer's names denote character and quality of equipment desired and are not to be construed as limiting competition.
C. Hazardous Materials:
Portland Public Schools
21 00 00 - 9
1. Comply with local, State of Oregon, and Federal regulations relating to hazardous materials.
2. Comply with Division 00, Procurement and Contracting Requirements and Division 01, General Requirements for this project relating to hazardous materials.
3. Do not use any materials containing a hazardous substance. If hazardous materials are encountered, do not disturb; immediately notify Owner and Architect. Hazardous materials will be removed by Owner under separate contract.
PART 3 - EXECUTION
3.01 ACCESSIBILITY AND INSTALLATION
A. Confirm Accessibility and Installation requirements in Division 00, Procurement and Contracting
Requirements, Division 01, General Requirements, and individual Division 21, Fire Suppression
Sections.
B. Install equipment requiring access (i.e. drains, control operators, valves, motors, engines, pumps, controllers, air compressors, gauges, fill cups, tanks, cleanouts and the like) so that they may be serviced, reset, replaced or recalibrated by service people with normal service tools and equipment. Do not install equipment in obvious passageways, doorways, scuttles or crawlspaces which would impede or block intended usage.
C. Install equipment and products complete as directed by manufacturer's installation instructions.
Obtain installation instructions from manufacturer prior to rough-in of equipment and examine instructions thoroughly. When requirements of installation instructions conflict with Contract
Documents, request clarification from Architect prior to proceeding with installation. This includes proper installation methods, sequencing, and coordination with other trades and disciplines.
D. Firestopping:
1. Confirm Firestopping requirements in Division 07, Thermal and Moisture Protection.
2. In absence of specific requirements, comply with individual Division 21, Fire Suppression Sections and coordinate location and protection level of fire and/or smoke rated walls, ceilings, and floors. When these assemblies are penetrated, seal around piping, ductwork and equipment with approved firestopping material. Install firestopping material complete as directed by manufacturer's installation instructions. Meet requirements of ASTM International E814, Standard Test Method for Fire Tests of Through-Penetration Fire Stops.
E. Pipe Installation:
1. Provide installation of piping systems coordinated to account for expansion and contraction of piping materials and building as well as anticipated settlement or shrinkage of building. Install work to prevent damage to piping, equipment, and building and its contents. Provide piping offsets, loops, expansion joints, sleeves, anchors or other means to control pipe movement and minimize forces on piping. Verify anticipated settlement and/or shrinkage of building with Project Structural Engineer. Verify construction phasing, type of building construction products and rating coordinating installation of piping systems.
2. Include provisions for servicing and removal of equipment without dismantling piping.
F. Plenums: Provide plenum rated materials that meet the requirements to be installed in plenums. Immediately notify Architect/Engineer of discrepancy.
3.02 SEISMIC CONTROL
A. Confirm Seismic Control requirements in Division 01, General Requirements, Structural documents, and individual Division 21, Fire Suppression Sections.
Portland Public Schools
21 00 00 - 10
B. Provide fire suppression equipment and piping, both hanging and base mounted, with mounting connection points of sufficient strength to resist lateral seismic forces equal to lateral seismic forces as determined by building code and NFPA 13 calculations, whichever is more demanding.
C. See Structural Drawings for seismic design criteria for sway bracing and seismic restraint.
D. Earthquake resistant designs for Division 21, Fire Protection equipment and distribution, i.e. fire sprinkler systems, fire standpipe systems, fire pumps, fire pump controllers, fire tanks, clean agent fire suppression systems, etc. to conform to regulations of AHJ.
E. Restraints which are used to prevent disruption of function of piece of equipment because of application of horizontal force to be such that forces are carried to frame of structure in such a way that frame will not be deflected when apparatus is attached to a mounting base and equipment pad, or to structure in normal way, utilizing attachments provided. Secure equipment and distribution systems to withstand a force in direction equal to value defined by jurisdiction having authority.
F. Provide stamped Shop Drawings from licensed Engineer of seismic bracing and seismic movement assemblies for piping, equipment, tanks, pumps controllers and the like. Submit shop drawings along with equipment submittals.
G. Provide stamped Shop Drawings from licensed Engineer of seismic flexible joints for piping and crossing building expansion or seismic joints. Submit Shop Drawings along with seismic bracing details.
H. Provide details of flexible drops for sprinklers in conformance with Building Code and ASCE-7 requirements of ceilings. Coordinate with Architectural and Structural Drawings and
Specifications.
I. Piping: Per NFPA 13, ASCE-7 and local requirements.
J. Equipment:
1. Per "Seismic Restraints Manual Guidelines for Mechanical Systems" latest edition published by SMACNA, ASCE 7 and local requirements.
2. Provide means to prohibit excessive motion of fire protection equipment during an earthquake.
3.03 REVIEW AND OBSERVATION
A. Confirm Review and Observation requirements in Division 00, Procurement and Contracting
Requirements and Division 01, General Requirements, and individual Division 21, Fire
Suppression Sections.
B. Notify Architect in writing at following stages of construction so that they may, at their option, visit site for review and construction observation:
1. Prior to covering walls.
2. Prior to ceiling cover/installation.
3. When main systems, or portions of, are being tested and ready for inspection by AHJ.
4. When mains or branchlines are to be permanently concealed by construction or insulation systems.
5. When fire suppression systems, or portions of, are being tested and ready for inspection by AHJ.
C. Bear responsibility and cost to make piping accessible, to expose concealed lines, or to demonstrate acceptability of the system. If Contractor fails to notify Architect at times prescribed above, costs incurred by removal of such work are the responsibility of the
Contractor.
Portland Public Schools
21 00 00 - 11
D. Final Punch: Costs incurred by additional trips required due to incomplete systems will be the responsibility of the Contractor.
3.04 CONTINUITY OF SERVICE
A. Confirm requirements in Division 00, Procurement and Contracting Requirements and Division
01, General Requirements.
B. In absence of specific requirements, comply with individual Division 21, Fire Suppression
Sections and the following:
1. During remodeling or addition to existing structures, while existing structure is occupied, current services to remain intact until new construction, facilities or equipment is installed.
2. Prior to changing over to new service, verify that every Item is thoroughly prepared. Install new piping, and wiring to point of connection.
3. Coordinate transfer time to new service with Owner. If required, perform transfer during off peak hours. Once changeover is started, pursue to its completion to keep interference at a minimum. If overtime is required, there will be no allowance made by Owner for extra expense for such overtime or shift work.
4. During entire time system, or part thereof, is not operational, provide a firewatch per Fire Code, including a watchperson whose sole duty is to watch for and report fires.
5. Organize work to minimize duration of power interruption.
3.05 CUTTING AND PATCHING
A. Confirm Cutting and Patching requirements in Division 01, General Requirements.
B. In absence of specific requirements, comply with individual Division 21, Fire Suppression
Sections and the following:
1. Cutting and patching performed under Division 21, Fire Suppression includes, but is not limited to:
a. Cutting and patching of plaster or partitions.
b. Cutting and patching of finished ceilings.
2. Perform cutting and patching by skilled craftsmen in trade of work to be performed. Fill holes which are cut oversized for completed work. Match refinished areas with existing adjacent finish in a manner acceptable to Architect.
3. When masonry to concrete construction must be penetrated, provide a steel pipe sleeve in opening and grout in place in a neat manner. Leave grout surface to match existing finish. Provide escutcheons. If sleeves are not provided, core drill penetrations.
4. Locate concealed utilities to eliminate possible service interruption or damage.
5. Additional work required by lack of proper coordination will be provided at no additional cost to the Owner.
6. Proposed floor cutting/core drilling/sleeve locations to be approved by Project Structural Engineer. Submit proposed locations to Architect/Project Structural Engineer. Where slabs are of post tension construction, perform x-ray scan of proposed penetration locations and submit scan results including proposed penetration locations to Project Structural Engineer/Architect for approval. Where slabs are of waffle type construction, show column cap extent and cell locations relative to proposed penetration(s).
7. Cutting, patching and repairing for work specified in this Division including plastering, masonry work, concrete work, carpentry work, and painting included under this Section will be performed by skilled craftspeople of each respective trade in conformance with appropriate Division of Work.
8. Additional openings required in building construction to be made by drilling or cutting. Use of jack hammer is specifically prohibited. Patch openings in and through concrete and masonry with grout.
Portland Public Schools
21 00 00 - 12
9. Restore new or existing work that is cut and/or damaged to original condition. Patch and repair specifically where existing items have been removed. This includes repairing and painting walls, ceilings, etc. where existing conduit and devices are removed as part of this project. Where alterations disturb lawns, landscaping, paving, and walks, surfaces to be repaired, refinished and left in condition matching existing prior to commencement of work.
10. Repair mutilation of building around pipes, equipment, hangers, and braces.
3.06 EQUIPMENT SELECTION AND SERVICEABILITY
A. Replace or reposition equipment which is too large or located incorrectly to permit servicing at no additional cost to Owner.
3.07 DELIVERY, STORAGE AND HANDLING
A. Confirm requirements in Division 00, Procurement and Contracting Requirements and Division
01, General Requirements.
B. In absence of specific requirements, comply with individual Division 21, Fire Suppression
Sections and the following:
1. Handle materials delivered to project site with care to avoid damage and deterioration.
Store materials in original containers which identify manufacturer, name, brand and model numbers on site inside building or protected from weather, sun, dirt and construction dust.
Insulation and lining that becomes wet from improper storage and handling to be replaced before installation. Products and/or materials that become damaged due to water, dirt and/or dust as a result of improper storage to be replaced before installation.
2. Protect equipment and pipe to avoid damage. Close pipe openings with caps or plugs.
Keep motors and bearings in watertight and dustproof covers during entire course of installation.
3. Protect bright finished shafts, bearing housings and similar items until in service.
3.08 DEMONSTRATION
A. Confirm Demonstration requirements in Division 00, Procurement and Contracting
Requirements and Division 01, General Requirements, and individual Division 21, Fire
Suppression Sections.
B. Upon completion of work and adjustment of equipment and test systems, demonstrate to
Owner's Authorized Representative, Architect and Engineer that equipment furnished and installed or connected under provisions of these Specifications functions in manner required.
Provide field instruction to Owner's Maintenance Staff as specified in Division 01, General
Requirements, and individual Division 21, Fire Suppression Sections.
C. Manufacturer's Field Services: Furnish services of a qualified person at time approved by
Owner to instruct maintenance personnel, correct defects or deficiencies, and demonstrate to satisfaction of Owner that entire system is operating in satisfactory manner and complies with requirements of other trades that may be required to complete work. Complete instruction and demonstration prior to final job site observations.
D. Prior to acceptance of work and during time designated by Architect, provide necessary qualified personnel to operate system for a period of two hours.
E. Instruct the Owner in the operation of the sprinkler system, including main valve position (open or closed) recognition, system drainage, system testing, dry pipe valve reset and the relation to the fire alarm system.
F. Upon completion of work and adjustment of equipment, test systems to demonstrate to Owner's
Authorized Representative and Architect that equipment is furnished and installed or connected under provisions of these Specifications.
Portland Public Schools
21 00 00 - 13
3.09 CLEANING
A. Confirm Cleaning requirements in Division 00, Procurement and Contracting Requirements, Division 01, General Requirements, and individual Division 21, Fire Suppression Sections.
B. Upon completion of installation, except for sprinklers, thoroughly clean exposed portions of equipment, removing temporary labels and traces of foreign substances. Throughout work, remove construction debris and surplus materials accumulated during work.
C. Sprinklers may not be cleaned except for vacuuming in a manner in which no part of the sprinkler is touched by the vacuuming equipment. Replace sprinklers which bear traces of foreign substances with sprinklers of same model, temperature, K-factor, orifice, finish, style, orientation, and the like.
3.10 INSTALLATION
A. Confirm Installation requirements in Division 00, Procurement and Contracting Requirements, Division 01, General Requirements, and individual Division 21, Fire Suppression Sections.
B. Install equipment in accordance with manufacturer's installation instructions, plumb and level and firmly anchored to vibration isolators. Maintain manufacturer's recommended clearances.
C. Start-up equipment, in accordance with manufacturer's start-up instructions, in the presence of manufacturer's representative. Test controls and demonstrate compliance with requirements.
Replace damaged or malfunctioning controls and equipment. Provide pump impellers to obtain
Basis of Design design capacities.
D. Provide miscellaneous supports/metals required for installation of equipment and piping.
3.11 PAINTING
A. Confirm requirements in Division 01, General Requirements and Division 09, Finishes.
3.12 DEMOLITION
A. Confirm Demolition requirements in Division 01, General Requirements and Division 02, Existing Conditions.
B. In absence of specific requirements, comply with individual Sections in Division 21, Fire
Suppression and the following:
1. It is the intent of these documents to provide necessary information and adjustments to fire protection system required to meet code, and accommodate installation of new work.
2. Coordinate with Owner so that work can be scheduled not to interrupt operations, normal activities, building access or access to different areas.
3. Existing Conditions: Determine exact location of existing utilities and equipment before commencing work, compensate Owner for damages caused by failure to exactly locate and preserve underground utilities. Replace damaged Item with new material to match existing. Promptly notify Owner if utilities are found which are not shown on Drawings.
4. Equipment and Piping: Unless otherwise directed, equipment, piping, or fittings being removed as part of demolition process are Owner's property. Remove other Item not scheduled to be reused or relocated from job site as directed by Owner.
5. Unless specifically indicated on Drawings, remove exposed, unused piping to behind finished surfaces (floor, walls, ceilings, etc.). Cap piping and patch surfaces to match surrounding finish.
6. Unless specifically indicated on Drawings, remove unused equipment, fittings, rough-ins, and connectors. Removal is to be to a point behind finished surfaces (floors, walls, and ceilings).
Portland Public Schools
21 00 00 - 14
7. Coordinate demolition of existing fire suppression systems with Contractor. Where applicable or possible, portions of fire suppression demolition work may be performed by Contractor.
This is the start of the file's text. The full file is on GovTribe.