This is a Price Proposal Form for the Beverly Cleary Fernwood Seismic Rehabilitation project issued by School District No. 1J, Multnomah County, Oregon (Portland Public Schools). The form requests a Base Price Proposal that encompasses all work described in the RFP and Contract Documents, including Drawings and Specifications. The Base Price Proposal includes two allowances: $100,000 for Plan Check Corrections and $100,000 for PBOT Requirements. Additionally, the form provides nine unit pricing options for potential change order work, covering items such as acoustical ceiling tile removal and replacement, wood trim replacement, suspended and lay-in light fixture replacement, and various casework and countertop replacements where existing materials are damaged during demolition. All unit pricing is referenced to specification section 01 22 00.
The proposal requires bidders to submit the Total Base Price Proposal including allowances expressed in both written words and numerals, with written words taking precedence in case of discrepancies, though the District reserves the right to correct mathematical errors. Unit prices for Change Order work will be either as stated on the bid submittal form or negotiated at fair and reasonable rates at the District's discretion. The Total Price Proposal will be calculated by adding to or deducting from the Base Price Proposal any alternates selected by the District at the time of award, with proposals evaluated according to Section 3.3.1 of the RFP.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT F: PRICE PROPOSAL FORM
SCHOOL DISTRICT NO. 1J,
MULTNOMAH COUNTY, OREGON
PORTLAND PUBLIC SCHOOLS
The Base Price Proposal will be the sum of the following items and represents all work set forth in this RFP, the Contract Documents (including without limitation the Drawings and Specifications):
BASE PRICE PROPOSAL
Base Price Proposal $ Allowance: Plan Check Corrections $100,000 Allowance: PBOT Requirements $100,000
TOTAL BASE PRICE PROPOSAL INCLUDING ALLOWANCES (sum of three lines above)
UNIT PRICING (Delete if inapplicable) Unit Cost 1: Removal of unsatisfactory acoustical ceiling tile and replacement or installation of additional, new acoustical ceiling tile. See 01 22 00 3.1A
Unit Cost 2: Replacement of wood trim where existing wood trim intended to be reinstalled is damaged during demolition. See 01 22 00 3.1B
Unit Cost 3: Replacement of suspended light fixtures where existing lighting intended to be reinstalled is damaged during demolition. See 01 22 00 3.1C
Unit Cost 4: Replacement of lay-in light fixtures where existing lighting intended to be reinstalled is damaged during demolition.
See 01 22 00 3.1D
Unit Cost 5: Replacement of lower casework and countertop (doors and drawers) where existing casework intended to be reinstalled is damaged during demolition. See 01 22 00 3.1E
Unit Cost 6: Replacement of lower casework and countertop (drawers only) where existing casework intended to be reinstalled is damaged during demolition. See 01 22 00 3.1F
Unit Cost 7: Replacement of upper casework (shelves only) where existing casework intended to be reinstalled is damaged during demolition. See 01 22 00 3.1G
Unit Cost 8: Replacement of upper casework (doors and shelves) where existing casework intended to be reinstalled is damaged during demolition. See 01 22 00 3.1H
Unit Cost 9: Replacement of lower casework and solid surface countertop where sink exists and where existing casework intended to be reinstalled is damaged during demolition. Assume existing plumbing sink and faucet to be reused. See 01 22 00 3.1I
Total Base Price Proposal Including Allowances
(Expressed in written words and numerals. Written words shall supercede numerals. The District reserves the right to correct mathematical errors whereupon the corrected Total Base Bid takes precedence over written words and numerals.)
UNIT PRICING:
Unit Pricing for Change Order Work: Unit prices for Change Order work will be as stated on the bid submittal form or, at the sole discretion of District, negotiated at a fair and reasonable unit price as Change Orders are requested.
ALTERNATES:
The Total Price Proposal will be calculated by adding to or deducting from the Base Price Proposal those alternates selected by District at the time of award.
Proposals will be evaluated as outlined in Section 3.3.1 of the RFP.