This document is Attachment H from the Orange County Utilities Department, providing detailed maintenance recommendations for Private Pump Stations (PPS) and Private Collection Systems (PCS). The attachment includes a comprehensive maintenance recommendations checklist that outlines specific monthly, quarterly, semi-annual, and annual maintenance tasks for utility infrastructure. Key maintenance activities include securing the pump station during visits, maintaining audible and visual alarm systems, inspecting pumps and electrical components, verifying pump operations, recording motor run times, and performing thorough cleaning of wet wells and sewer lines.
The maintenance checklist provides granular guidance for utility maintenance personnel, with tasks ranging from securing facility keys and locks to inspecting electrical connections, checking float devices, and ensuring proper pump cycling. The document notes that maintenance frequency may vary depending on the specific operating conditions of each pump station, with more frequent inspections recommended for facilities receiving higher quantities of waste or experiencing more challenging operating environments. The recommendations are designed to reduce system failures and associated repair costs by establishing a structured, proactive maintenance approach for critical utility infrastructure.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT H
ORANGE COUNTY UTILITIES
STANDARDS AND CONSTRUCTION SPECIFICATIONS MANUAL
APPENDIX A STANDARD DRAWINGS GENERAL
DATE: February 11, 2011 PUMP STATION CONTROL PANEL (240V) FIGURE A413-1
FRONT & PLAN VIEW
CONTROL PANEL-----
S.S. PIPE CAP
(TYP)
SS BOLTS
(TYP) ----------
316 S.S. METER BASE
WITH BY-PASS ____ ___,___"'�cl=.lfr""i;g-Tgf-i=='i#� 2" SCH 80 PVC ------�_us;;.d.j
SEAL OFF-TYPE ESYR c/=1.........-lil.J.Sl.==:!5� MOTOR CONDUCTOR FROM CONDUIT 2" SCH 80 CONTROL PVC (SEE NOTE #1) --4=l-lH-1
SCADA PANEL
(FUTURE)
ICONTROL PANEL g
SCADA PANEL
(FUTURE) VIEW A-A
1-1/2" MIN MOUNTING BRACKET
WITH PROTECTIVE CAP
SEE NOTE#4
RIGID ALUMINUM
PANEL
i--=--,i}c-,11-,-,1 \---�- PIPE (SCH 40)
CONTROL CONDUIT
2" SCH 80 PVC FINISHED
:::::::::::::;;;;:;=.:;:1 ���������N�I �
GRADE
2" SCH 80 PVC
SWEEP ELBOWS MINIMUM 2"
SCH80PVC--------'
INCOMING POWER FROM UTILITY POINT
OF SERVICE (MINIMUM 2" SCH 80 PVC)
5 OHM MAX. GROUND RODS
(10' LONG MINIMUM, 2 EACH, 10' APART)
FRONT VIEW
PANEL INSTALLATION NOTES:
ENCASED IN CONCRETE
(12 0 TYP)
1" SCH 80 PVC TO ANTENNA POLE
1. PUMP MOTOR CONDUIT SHALL BE SIZE TO ACCOMODATE 40% CONDUIT FILL. MINIMUM CONDUIT SIZE TO
BE 2" SCH 80 PVC.
2. POWER SUPPLY SHALL BE UNDERGROUND ON THE LIFT STATION SITE AND SHALL BE 3-PHASE, FROM A
3-PHASE SOURCE ONLY. 100 AMP SERVICE MINIMUM.
3. AN ELECTRICAL GROUNDING SYSTEM SHALL BE INSTALLED AS PER THE NATIONAL ELECTRICAL CODE, LOCAL CODES AND ORDINANCES. AN UNDERGROUND PERIMETER CABLE GROUNDING SYSTEM SHALL BE INSTALLED WITH CONNECTIONS TO AT LEAST WET WELL COVER, VALVE VAULT COVER, CONTROL PANELS, GENERATOR, UTILITY COMPANY TRANSFORMER, MANUAL DISCONNECT SWITCH AND METAL
FENCE. REFER TO GROUNDING DETAILS.
4. THE STATION NAME, UTILITIES I.D. NUMBER AND ADDRESS SHALL BE AFFIXED TO THE FRONT OF THE
· METERGABINET:
5. ALL MOUNTING HARDWARE & BRACKETS AND ELECTRICAL ENCLOSURES SHALL BE 316 STAINLESS
STEEL.
6. ON A 4-WIRE, DELTA SYSTEM, THE HIGH-LEG SHALL BE IDENTIFIED WITH ORANGE COLOR TAPE AT ALL CONNECTION POINTS AND SHALL BE LOCATED ON THE "B" PHASE AT THE LINE SIDE OF THE MAIN
DISCONNECT.
7. THE SCADA PANEL IS TO SHOWN FOR INFORMATION ONLY AND WILL BE INSTALLED IN THE FUTURE (BY
OTHERS).