01-01-16
27 15 00 - 1
SECTION 27 15 00
COMMUNICATIONS STRUCTURED CABLING
PART 1 - GENERAL
1.1 DESCRIPTION
A. This section specifies a complete and operating voice and digital structured cabling distribution system and associated equipment and hardware to be installed in VA Medical Center here-in-after referred to as the “facility”.
1.2 RELATED WORK
A. Wiring devices: Section 26 27 26, WIRING DEVICES.
B. Lightning protection system: Section 26 41 00, FACILITY LIGHTNING
PROTECTION.
C. General electrical requirements that are common to more than one section in Division 27: Section 27 05 11, REQUIREMENTS FOR
COMMUNICATIONS INSTALLATIONS.
D. Requirements for personnel safety and to provide a low impedance path for possible ground fault currents: Section 27 05 26, GROUNDING AND
BONDING FOR COMMUNICATIONS SYSTEMS.
E. Conduits for cables and wiring: Section 27 05 33, RACEWAYS AND BOXES
FOR COMMUNICATIONS SYSTEMS.
F. Low voltage cabling system infrastructure: Section 27 10 00, CONTROL, COMMUNICATION AND SIGNAL WIRING.
G. Voice communication switching and routing equipment: Section 27 31 00, VOICE COMMUNICATIONS SWITCHING AND ROUTING EQUIPMENT.
H. Extension of a voice communication switching and routing system:
Section 27 31 31, VOICE COMMUNICATIONS SWITCHING AND ROUTING EQUIPMENT
EXTENSION.
I. Emergency radio equipment: Section 27 32 41, TWO-WAY RADIO EQUIPMENT
AND SYSTEMS.
J. High Definition (HDTV) Master Antenna Television (MATV) system and associated equipment: Section 27 41 31, MASTER ANTENNA TELEVISION
EQUIPMENT AND SYSTEMS.
K. Emergency Service Public Address System (PAS) and associated equipment:
Section 27 51 16, PUBLIC ADDRESS AND MASS NOTIFICATION SYSTEMS.
1.3 SUBMITTALS
A. In addition to requirements of Section 27 05 11, REQUIREMENTS FOR
COMMUNICATIONS INSTALLATIONS provide:
1. N/A
27 15 00 - 2
2. List of test equipment as per 27 05 11, REQUIREMENTS FOR
COMMUNICATIONS INSTALLATIONS.
B. Certifications:
1. Submit written certification from OEM indicating that proposed supervisor of installation and proposed provider of contract maintenance are authorized representatives of OEM. Include individual's legal name and address and OEM warranty credentials in the certification.
2. Pre-acceptance Certification: Submit in accordance with test procedures.
3. Test system cables and certify to COR before proof of performance testing can be conducted. Identify each cable as labeled on as-installed drawings.
4. Provide current and qualified test equipment OEM training certificates and product OEM installation certification for contractor installation, maintenance, and supervisory personnel.
C. Closeout Submittal: Provide document from OEM certifying that each item of equipment installed conforms to OEM published specifications.
1.4 WARRANTY
A. Work subject to terms of Article "Warranty of Construction," FAR clause
52.246-21.
PART 2 - PRODUCTS
2.1 PERFORMANCE AND DESIGN CRITERIA
A. N/A
B. Industry Standards:
1. N/A
2. Conform to National and Local Life Safety Codes (whichever are more stringent), NFPA, NEC, this section, Joint Commission Life Safety
Accreditation requirements, and OEM recommendations, instructions, and guidelines.
3. Provide supplies and materials listed by a nationally recognized testing laboratory where such standards are established for supplies, materials or equipment.
4. Refer to industry standards and minimum requirements of Section 27
05 11, REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS and guidelines listed.
5. Active and passive equipment required by system design and approved technical submittal; must conform to each UL standard in effect for
27 15 00 - 3 equipment, when technical submittal was reviewed and approved by
Government or date when COR accepted system equipment to be replaced. Where a UL standard is in existence for equipment to be used in completion of this contract, equipment must bear approved
NRTL label.
C. N/A
D. N/A
E. N/A
F. Coordinate size and type of conduit, pathways and firestopping for maximum 40 percent cable fill with subcontractors.
G. Terminate all interconnecting twisted pair, fiber-optic or coaxial cables on patch panels or punch blocks. Terminate unused or spare conductors and fiber strands. Do not leave unused or spare twisted pair wire, fiber-optic or coaxial cable unterminated, unconnected, loose or unsecured.
H. Color code distribution wiring to conform to ANSI/TIA 606-B and construction documents, whichever is more stringent. Label all equipment, conduit, enclosures, jacks, and cables on record drawings, to facilitate installation and maintenance.
I. In addition to requirements in Section 27 05 11, REQUIREMENTS FOR
COMMUNICATION INSTALLATIONS, provide stainless steel faceplates with plastic covers over labels.
2.2 EQUIPMENT AND MATERIALS
A. N/A
B. Cable Systems - Twisted Pair, Fiber optic, Coaxial and Analog:
1. General:
a. Provide cable (i.e. backbone, outside plant, and horizontal cabling) conforming to accepted industry standards with regards to size, color code, and insulation.
b. Some areas can be considered “plenum”. Comply with all codes pertaining to plenum environments. It is contractor’s responsibility to review the VA’s cable requirements with COR and
OI&T Service prior to installation to confirm type of environment present at each location.
c. Provide proper test equipment to confirm that cable pairs meet each OEM’s standard transmission requirements, and ensure cable carries data transmissions at required speeds, frequencies, and fully loaded bandwidth.
27 15 00 - 4
2. N/A
3. N/A
4. N/A
5. N/A
6. Fiber Optics Backbone Cable:
a. Provide 50/125 (for Bell System Interconnection Compatibility OM3 multi-mode cable, containing at minimum 6 strands of fiber, unless otherwise specified.
b. N/A
c. Provide tight buffered fiber cable for indoor runs.
d. Terminate multimode fibers at both ends with LC type female connectors installed in an appropriate patch or breakout panel and secured with a cable management system. Provide minimum 610 mm (2 ft.) cable loop at each end.
e. N/A
f. Install fiber optic cables in TR’s, Voice (Telephone) Switch
Room, and Main Computer Room, in rack mounted fiber optic patch panels. Provide female LC couplers in appropriate panel for termination of each strand.
g. Test all fiber optic strands' cable transmission performance in accordance with TIA standards. Measure attenuation in accordance with fiber optic test procedures TIA-455-C ('-61', or -53).
Provide written results to COR for review and approval.
C. N/A
D. N/A
E. N/A
F. N/A
G. N/A
H. N/A
I. N/A
J. N/A
K. N/A
2.3 DISTRIBUTION EQUIPMENT AND SYSTEMS
A. N/A
B. Backbone Distribution Cables:
1. N/A
2. N/A
3. N/A:
27 15 00 - 5
4. N/A
5. Fiber Optic:
a. Multimode Fiber:
1) Provide OM3 Type general purpose multimode fiber optic cable installed in conduit for system locations with load-bearing support braid surrounding inner tube for strength during cable installation.
2) Technical Characteristics:
a) Bend Radius: Minimum 152 mm (6 inches); outer jacket as required.
b) Fiber Diameter: 50 for Bell System Interconnection Standard requirements microns.
c) Cladding: 125 microns.
d) Attenuation:
1) 850 nanometer: Maximum 4.0 dB per kilometer.
2) 1,300 nanometer: Maximum 2.0 dB per kilometer.
e) Bandwidth:
1) 850 nanometer: Minimum 160 MHz.
2) 1,300 nanometer: Minimum 500 MHz.
f) Connectors: Stainless steel.
b. N/A
C. N/A
D. N/A
E. Fiber Optic Terminators:
1. Pre-polished crimp on type that has proper ferrule to terminate fiber optic cable.
2. Technical Characteristics:
a. Frequency: Light wave.
b. Power Blocking: As required.
c. Return Loss: 25 dB.
d. Connectors: LC
e. Construction: Ceramic.
F. Conduit and Signal Ducts:
1. Conduit:
a. Provide conduit or sleeves for cables penetrating walls, ceilings, floors, interstitial space, fire barriers, etc.
b. Minimum Conduit Size: 19 mm (3/4 inch).
27 15 00 - 6
c. Provide separate conduit and signal ducts for each cable type installation.
d. When metal (plastic covered, flexible cable protective armor, etc.) systems are authorized to be provided for use in system, follow installation guidelines and standard specified in Section
27 05 33, RACEWAYS AND BOXES FOR COMMUNICATIONS SYSTEMS and NEC.
e. Maximum 40 percent conduit fill for cable installation.
2. Signal Duct, Cable Duct, or Cable Tray: Use existing signal duct, cable duct, and cable tray, when identified and accepted by COR.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Install for ease of operation, maintenance, and testing.
B. Install system to comply with NFPA 70 National Electrical Code, NFPA 99
Health Care Facilities, NFPA 101 Life Safety Code, Joint Commission
Manual for Health Care Facilities, and original equipment manufacturers' (OEM) installation instructions.
C. Cable Systems Installation:
1. Install system cables in cable duct, cable tray, cable runway, conduit or when specifically approved, flexible NEC Article 800 communications raceway. Confirm drawings show sufficient quantity and size of cable pathways. If flexible communications raceway is used, install in same manner as conduit.
2. Coordinate outside plant and backbone cables to furnish number of cable pairs for system requirements and obtain approval of COR and
IT Service prior to installation.
3. Bond to ground metallic cable sheaths, etc. (i.e. risers, underground, horizontal, etc.).
4. Install temporary cable to not present a pedestrian safety hazard and be responsible for all work associated with removal. Temporary cable installations are not required to meet Industry Standards;
but, must be reviewed and accepted by COR, IT Service, FMS and SMCS
005OP2H3 (202-461-5310) prior to installation.
D. N/A
E. Labeling:
1. Industry Standard: Provide labeling in accordance with ANSI/TIA-606-
B.
2. Print lettering of labels with laser printers transfer process;
handwritten labels are not acceptable.
27 15 00 - 7
3. Label both ends of all cables in accordance with industry standard.
Provide permanent Labels in contrasting colors and identify according to system “Record Wiring Diagrams”.
4. Termination Hardware: Label workstation outlets and patch panel connections using color coded labels with identifiers in accordance with industry standard and record on “Record Wiring Diagrams”.
3.2 FIELD QUALITY CONTROL
A. Interim Inspection:
1. Verify that equipment provided adheres to installation requirements of this section. Interim inspection must be conducted by a factory-certified representative and witnessed by COR.
2. Check each item of installed equipment to ensure appropriate NRTL label.
3. N/A
4. Visually confirm marking of cables, faceplates, patch panel connectors and patch cords.
5. Perform fiber optical field inspection tests via attenuation measurements on factory reels and provide results along with manufacturer certification for factory reel tests. Remove failed cable reels from project site upon attenuation test failure.
6. Notify COR of the estimated date the contractor expects to be ready for interim inspection, at least 20 working days before requested inspection date, so interim inspection does not affect systems’ completion date.
7. Provide results of interim inspection to COR. If major or multiple deficiencies are discovered, COR can require a second interim inspection before permitting contractor to continue with system installation.
8. Do not proceed with installation until COR determines if an additional inspection is required. In either case, re-inspection of deficiencies noted during interim inspections must be part of the proof of performance test.
B. Pretesting:
1. Pretest entire system upon completion of system installation.
2. Verify during system pretest, utilizing the accepted equipment, that system is fully operational and meets system performance requirements of this section.
27 15 00 - 8
3. Provide COR two (2) copies of recorded system pretest measurements and the written certification that system is ready for formal acceptance test.
C. N/A
D. Acceptance Test:
1. After system has been pretested and the contractor has submitted pretest results and certification to COR, then schedule an acceptance test date and give COR 30 days' written notice prior to date acceptance test is expected to begin.
2. Test only in presence of a COR.
3. Test utilizing approved test equipment to certify proof of performance.
4. Verify that total system meets the requirements of this section.
5. Include expected duration of test time, with notification of the acceptance test.
E. Verification Tests:
1. N/A
2. Multi-mode Fiber Optic Cable: Perform end-to-end attenuation tests in accordance with TIA-568-B.3 and TIA-526-14A using Method B, OTDR.
Perform verification acceptance test.
3. N/A
F. Performance Testing:
1. N/A
2. Fiber Optic Links: Perform end-to-end fiber optic cable link tests in accordance with TIA-568-B.3.
G. Total System Acceptance Test: Perform verification tests for multi-mode fiber optic cabling systems after complete telecommunication distribution system and workstation outlet are installed.
3.3 MAINTENANCE
A. Accomplish the following minimum requirements during one year warranty period:
1. Respond and correct on-site trouble calls, during standard work week:
a. A routine trouble call within one working day of its report. A routine trouble is considered a trouble which causes a system outlet, station, or patch cord to be inoperable.
b. Standard work week is considered 8:00 A.M. to 5:00 P.M., Monday through Friday exclusive of Federal holidays.
27 15 00 - 9
2. Respond to an emergency trouble call within six hours of its report.
An emergency trouble is considered a trouble which causes a subsystem or distribution point to be inoperable at any time.
3. Respond on-site to a catastrophic trouble call within four hours of its report. A catastrophic trouble call is considered total system failure.
a. If a system failure cannot be corrected within four hours
(exclusive of standard work time limits), provide alternate equipment, or cables within four hours after four hour trouble shooting time.
b. Routine or emergency trouble calls in critical emergency health care facilities (i.e., cardiac arrest, intensive care units, etc.) are also be deemed as a catastrophic trouble.
4. Provide COR written report itemizing each deficiency found and the corrective action performed during each official reported trouble call. Provide COR with sample copies of reports for review and approval at beginning of total system acceptance test.
- - - E N D - - -