ATTACHMENT G - Price Matrix.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
Y1DA--FY23: NRM-Tier 1 (PROJ: 548-20-106) BB - Replace Emergency Generators and Paralleling Gear
Solicitation number
36C24823R0005
Issued by

About this file

This document contains an attachment price matrix and details of a related federal contract opportunity from the Department of Veterans Affairs. The price matrix lists line item descriptions for various construction divisions with columns for labor costs, material costs, and total costs. However, all costs are listed as $0.00.

The federal contract opportunity is solicitation number 36C24823R0005 to replace emergency generators and paralleling gear at the West Palm Beach VA Medical Center in West Palm Beach, Florida. The contractor shall completely prepare the site for building operations, including demolition and removal of existing structures, and furnish all labor, materials, and work to replace the emergency generators and paralleling gear as required by the drawings and specifications in Attachment A.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Base Offer Cost Breakdown

Project Number:Date:
Project Title
Project Location
Offeror Name
Offeror Street
Offeror CityStateZip
ItemDescriptionLabor CostMaterial CostTotal Cost
Division 1General Requirements$-$-$-
Division 2Existing Conditions---
Division 3Concrete---
Division 4Masonry---
Division 5Metals---
Division 6Wood and Plastic---
Division 7Thermal & Moisture Protect---
Division 8Doors and Windows---
Division 9Finishes---
Division 10Specialties---
Division 11Equipment---
Division 12Furnishings---
Division 13Special Construction---
Division 14Conveying Equipment---
Division 21Fire Suppression---
Division 22Plumbing---
Division 23HVAC---
Division 26Electrical---
Division 27Communications---
Division 28Electronic Safety & Security---
Division 31Earthwork---
Division 32Exterior Improvements---
Division 33Utilities---
Division 34Transportation Subtotal---
Division Subtotals :$-$-$-
Overhead %0.00%-
Profit %0.00%-
Bond %0.00%-
Overhead/Profit Subtotals :$-

Total Price $- $- $-

File details come from the government source that posted it. Updated .