Contractors Inquiry - Questions and Answers - Follow Up Questions.docx
DOCX document 18 KB Posted
- Attached to
- Y1DA--FY23: NRM-Tier 1 (PROJ: 548-20-106) BB - Replace Emergency Generators and Paralleling Gear
- Solicitation number
- 36C24823R0005
About this file
This document contains questions and answers regarding solicitation number 36C24823R0005 to replace emergency generators and paralleling gear at the West Palm Beach VA Medical Center. The contractor shall completely prepare the site, including demolishing existing structures, and furnish all labor, materials, and work to replace the generators and gear per the drawings and specifications. Exhaust pipes for the new generators must be double-wall insulated and engineered for exterior use, though black steel pipe may be part of the system. Information on the existing Siemens fire alarm system, including a point of contact, will be provided to the awardee. The solicitation also requires furnishing all new ductwork and accessories to connect the generators to building ventilation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Award Notice for SAM 36C24824C0014_1.pdf | ||
| 36C24823R0005 0002.docx | DOCX document | |
| 36C24823R0005 0001.docx | DOCX document | |
| Contractors Inquiry Questions with Answers.pdf | ||
| 36C24823R0005_1.docx | DOCX document | |
| ATTACHMENT C - Submittal Register.xlsx | XLSX spreadsheet | |
| ATTACHMENT F - Contractors Inquiry.pdf | ||
| ATTACHMENT A - Combined Specs.pdf | ||
| ATTACHMENT G - Price Matrix.xlsx | XLSX spreadsheet | |
| ATTACHMENT D - Past Performance Questionnaire.pdf | ||
| ATTACHMENT E - EMR.pdf | ||
| ATTACHMENT B - Drawings.pdf | ||
| ATTACHMENT H - Experience Information Sheet.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor’s Inquiry RFQ No. 36C24823R0005
| No. |
| REFERENCE |
(PWS, SOW,
CLIN Structure, etc.)
| COMMENT(s)/QUESTION(s) |
| GOVERNMENT’S RESPONSE |
The following questions were asked regarding the provision of temporary generators for the project. Responses to questions 8, 27, 28 and 29 = “see Keynote #11 on sheet E-101 for what should be included in bid.” This keynote reads: ”PROJECT BID SHALL INCLUDE THE RENTAL FEES OF THE GENERATOR FOR THE PERIOD OF PERFORMANCE.PROJECT BID SHALL ALSO INCLUDE TRANSPORTATION OF THE TEMPORARY GENERATORS, SETTING UP, TEMPORARY WIRES, FUEL AND MAINTENANCE OF THE COMPLETE UNIT AND TEMPORARY CONNECTIONS.” . Responses to questions 19, 31 and 64 = “The VA is providing the temporary generators and the fuel.”
The VA is providing the generator and fuel.
Drawing M-102, GENERAL NOTE B: “EXHAUST PIPES SHALL BE DOUBLE WALL INSULATED W/JACKETING ENGINEERED FOR EXTERIOR INSTALLATION.”KEYNOTE 3: “NEW 16” GENERATOR EXHAUST PIPE . REFER TO SPECIFICATION SECTION 26 32 13.” SPECIFICATION 263213.2.7.D “Exhaust Piping and supports : Black steel pipe, ASTM A-53 standard weight with welded fittings.” Please indicate if the exhaust piping is to be DOUBLE WALL INSULATED ENGINEERED ASSEMBLY FOR EXTERIOR INSTALLATION or BLACK STEEL PIPE.
Exhaust pipes shall be double wall insulated with jacketing engineered for exterior installation. The caveat to this is that black steel pipe can be part of a double wall system.
| Question 1 and 63 asked for information regarding the FIRE ALARM SYSTEM in order to acquire cost estimate for the modifications to the FIRE ALARM system as shown on the drawings.(manufacturer, installer, system contact). This information was not provided in either response. |
| It is a Siemens fire alarm system and point of contact will be provided upon award. |
| Drawing M- 101 KEYNOTE 4 “ PROVIDE NEW DUCTWORK, FITTINGS, TRANSITIONS, ACCESSORIES ETC. FROM LOUVER TO GENERATOR.” The existing generator ductwork has motorized dampers which are not shown on the drawings. Will these existing motorized dampers be re-installed, replaced or removed? |
| This shall all be new to go along with the new ductwork. The idea is to have a new system with all new Accessories. |