Attachment G - Cost Schedule.doc

DOC document 82 KB Posted

Attached to
Anaconda Copper Mine Reclamation
Solicitation number
70CNR-S1771
Issued by
Lyon County, Nevada

About this file

This document is the Cost Schedule attachment (Attachment G) for the Request for Proposal (RFP) for the Anaconda Copper Mine Site Reclamation and Environmental Cleanup project, issued by the Nevada Department of Environmental Protection (DEP) under RFP# 70CNR-S1771 and DEP # 22-022. The RFP seeks proposals from qualified vendors to provide professional services for the ongoing Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) related regulatory oversight support of remedial investigation, risk assessment, and feasibility study at the Anaconda Copper Mine site located in Carson City, Nevada.

The Cost Schedule attachment outlines the required personnel direct costs per hour, proposed billing rates, and indirect costs, including travel reimbursement, management mark-up on sub-contractor invoices, and equipment costs. Vendors are required to provide a cost breakdown for these items as part of their proposal submission.

View the file

Other files

File Type Posted
ATTACHMENT I - Agency Terms and Condidtions.doc DOC document
Letter Of Intent - RFP 70CNR-S1771.pdf PDF
ATTACHMENT D.docx DOCX document
Proposed Staff Resume - 04-05-17~10.doc DOC document
ATTACHMENT A~4.docx DOCX document
ATTACHMENT B~4.docx DOCX document
ATTACHMENT C - CONTRACT FOR SERVICES OF INDEPENDENT CONTRACTO1~1.docx DOCX document
Attachment H - Addtional Agency Terms and Conditons.docx DOCX document
Quote Instructions.pdf PDF
RFP 70CNR-S1771 Final~1.docx DOCX document
Reference Questionnaire - 01-24-20~14.doc DOC document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment G Cost Schedule Anaconda Copper Mine Site Reclamation and Environmental Cleanup

RFP# 70CNR-S1771 DEP # 22-022

Vendor Name__________________________________________________________________

A. Personnel Direct Costs Per hour direct staffing cost excluding overhead, general and administrative expenses, or profit. Rates to remain in effect for the life of the contract for positions noted below:

1. Program Director/Principal

2. Associate or Project Manager

3. Senior Engineer

4. Senior Hydrogeologist

5. Project Geologist

6. Project Engineering

7. Project Draftsperson

8. Field Technician

9. Administrative/Billing

10. (Other Job Title)

11. (Other Job Title)

Attachment G - Cost Schedule Cont.

RFP# 70CNR-S1771 DEP # 22-022

B. Proposed Billing Rates Total billing rate, with direct labor overhead multiplier built in. Rates to remain in effect for the life of the contract for positions noted below:

1. Program Director/Principal

2. Associate or Project Manager

3. Senior Engineer

4. Senior Hydrogeologist

5. Project Geologist

6. Project Engineering

7. Project Draftsperson

8. Field Technician

9. Administrative/Billing

10. (Other Job Title)

11. (Other Job Title)

C. Indirect Costs – To include but not be limited to the following:

1. Travel: Reimbursement for travel, including vehicle use /mileage, reimbursed per current FY State and GSA guidelines only.
Accept:

Yes No

2. Main Contractor Only: Management mark-up of 5% requested on partnering sub-contractor invoices.
Accept:
3. Main Contractor Only: Management mark-up of 5% requested on outside service sub-contractor invoices.
Accept:
4. Equipment: Provide a list of in-house or rented equipment cost per day or unit, excluding all vehicle usage.
Cost sheet included:

5. Other Indirect Cost Request: Provide specific details as attachment including a cost breakdown per day or unit.

Cost sheet included

DEP #22-022 Anaconda Copper Mine Site Reclamation and Environmental Cleanup pg. 2 of 2

File details come from the government source that posted it. Updated .