This is an arc flash study document prepared for the NIST Gaithersburg, Maryland campus in support of an electrical maintenance services solicitation. The document provides technical analysis and safety assessment of electrical systems at the facility to establish baseline conditions for maintenance requirements and hazard mitigation. Arc flash studies are critical safety assessments that identify potential electrical hazards, calculate incident energy levels, and recommend protective measures for personnel working on or near electrical equipment. This attachment serves as a reference document for vendors responding to the RFQ to understand the electrical infrastructure, current system conditions, and safety requirements they must address in their maintenance service proposals. The arc flash study enables prospective contractors to accurately scope work, identify necessary safety protocols and personal protective equipment (PPE) requirements, and develop comprehensive maintenance plans that comply with NFPA 70E electrical safety standards and other applicable federal safety regulations for work performed at the NIST facility.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Transmittal Transmittal Number: 44690010-1305

TO: Mike Boisclair

Building 301 Rm B168 Date: June 1, 2018

100 Bureau Drive Job Name: ESPC NIST ECM 10.1

Gaithersburg, MD 20899 Location: NIST Gaithersburg, MD

Customer PO#:

Subj. Transmittal: ESPC-NIST ECM 10.1 Arc Flash Study Final Report – Revision 4.2

Contract #:

YB1323-15-CN-0018

We are sending you herewith the following drawings, documents or instructions for:

For Submittal Destroy Previous Prints As Requested

Preliminary Final Distribution Record and File

For Information Only

Approval

Return 1 Item

Fabrication Held for Approval & Written Release

Equipment is being fabricated and any changes may create a delay in shipment and a possible increase in price.

Note: For Information Only.

Item Description / Comments Document # / Ref Rev

# of

Sets

1 ESPC-NIST ECM 10.1 Arc Flash Study Final Report – Revision 4.2 44690010-1306 NA 1

Comments:

CC to:

# of Copies

TRANSMITTED BY:

David Cheek 1

Marcellia Kemp 1 ________________________

COMMBINED HEAT AND POWER

ARC-FLASH STUDY

NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY

GAITHERSBURG, MD

PREPARED FOR:

LIMBACH INC.

May 2018

Revision 4.2

Table of Contents

1. INTRODUCTION 3

1.1 About the Study

1.2 Arc Flash Hazard Analysis

1.3 Single Line Diagram

2. SHORT-CIRCUIT ANALYSIS 4

2.1 Fault Current Considerations

2.2 Available Fault Current

3. ARC FLASH SUMMARY 20

4. SUMMARY AND RECOMMENDATIONS 24

APPENDICES

APPENDIX A Arc Flash Analysis 27

APPENDIX B PPE Guidance Table 60

APPENDIX C Arc Flash Labels 62

APPENDIX D System One-Line Diagram 70

ELECTRICAL ASSET MANAGEMENT PROGRAM

©2013 ABM Industries Inc. Confidential and Proprietary

1. INTRODUCTION

1.1 About the Study

ABM Electrical Power Solutions (ABMEPS) performs Arc-Flash Hazard studies to ensure safe, reliable and dependable electrical power. ABMEPS accomplishes this by assuring that the system properly provides continuous electrical power during normal operating conditions, and safely minimizes the extent of outages during short-circuits (faults) or overload conditions.

The basis of this analysis is that an arc-flash can occur at anytime, anywhere on the system.

ABMEPS analyses the protective devices within the scope of the project for proper interrupting capability by comparing the manufacturer's published interrupting ratings with the calculated available fault levels.

1.2 Arc Flash Hazard Analysis

Arc Flash Evaluation analysis has been performed using the ETAP Power System Analysis

Software which is based on the NFPA 70E-2015 and IEEE Standard 1584 -

2002/2004a/2011b, IEEE Guide for Performing Arc-Flash Hazard Calculations.

1.3 System One -Line Diagram

The one-line diagram in Appendix D represents the electrical distribution system within the scope of the existing electrical systems.

2. SHORT-CIRCUIT ANALYSIS

2.1 Fault Current Considerations

This study summarizes the computer calculations of the most significant electrical distribution system three-phase and phase-to-ground short circuit currents for the National Institutes of

Standards and Technology, Combined Heat and Power Plant, Gaithersburg, Md.

Unless otherwise noted, calculations comply with IEEE Standard 141-1993(R1999) Red-Book, IEEE Recommended Practices For Electric Power Distribution For Industrial Plants;

ANSI/IEEE Standard 242-2004 Buff-Book, IEEE Recommended Practices For Protection and Coordination of Industrial and Commercial Power Systems, the IEEE Standard 399-

1997 Brown-Book, IEEE Recommended Practices For Power Systems Analysis, and ANSI

C37.010-1999, IEEE Application Guide for AC High-Voltage Circuit Breakers Rated on a

Symmetrical Current Basis.

2.2 Available Fault Currents

The available fault currents on the PEPCO Bus 224485, Sub 160, Feeders A, B, and C was referenced from the Concord Engineering Short Circuit / Coordination Study.

The following Time Current Curves and Protection Device tables study excerpts are from

Concord Engineering Short-Circuit / Coordination study.

TCC & PROTECTIVE DEVICE

CONCORD ENGINEERING

STUDY EXCERPT

Location: Gaithersburg, MD

Engineer:

Study Case: SC

16.2.0C Page: 1

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

Electrical Transient Analyzer Program

Short-Circuit Analysis

ANSI Standard

3-Phase Fault Currents

Number of Buses:

Number of Branches:

Number of Machines:

Total

Tie PD

Total

Impedance

Lumped

Load

Total

Induction

Machines

Line/Cable

Load

Synchronous

Motor

Reactor

V-Control

Power

Grid

XFMR3

Swing

Synchronous

Generator

XFMR2

Unit System:

Project Filename:

Output Filename:

System Frequency: 60.00

English

NIST CHP FINAL

C:\Users\vcarbone\Desktop\NIST CHP ETAP - Working\SC.SA1S

NIST CHP ETAP SHORT-CIRCUIT ANALYSIS

3-PHASE FAULT CURRENTS

Study Case: SC

16.2.0C Page: 2

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

Adjustments

Transformer Impedance:

Reactor Impedance:

Tolerance

Overload Heater Resistance:

Transmission Line Length:

Cable Length:

Temperature Correction

Transmission Line Resistance:

Cable Resistance:

Percent

Degree C

Individual

/Global

Individual

/Global

Individual

Individual

Individual

Individual

Apply

Adjustments

Apply

Adjustments

Yes

Yes

No

No

No

Yes

Yes

Study Case: SC

16.2.0C Page: 3

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

Bus Input Data

ID Type

Bus Initial Voltage

%Mag. Ang.Sub-sysBase kVNom. kV

0.4800.480Load1O_BUS 1 100.00 0.00

0.4800.480Load2C_BUS 1 100.00 0.00

0.4800.480Load2I_BUS 1 100.00 0.00

0.4800.480Load2O_BUS 1 100.00 0.00

0.4800.480Load3A_BUS 1 100.00 0.00

0.4800.480Load3E_BUS 1 100.00 0.00

0.4800.480Load4A_BUS 1 100.00 0.00

0.4800.480Load4G_BUS 1 100.00 0.00

0.4800.480LoadAC-6 VFD_BUS 1 100.00 0.00

0.4800.480LoadAC-7 VFD_BUS 1 100.00 0.00

13.80013.800LoadBUS B 1 100.00 0.00

13.80013.800LoadBUS D 1 100.00 0.00

13.80013.800SWNGBusC 1 100.00 0.00

4.1604.160Gen.CTG-1_BUS 1 100.00 0.00

0.4800.480LoadEF-25_BUS 1 100.00 0.00

0.4800.480LoadEF-26_BUS 1 100.00 0.00

4.1604.160LoadFGC-1 Starter 1 100.00 0.00

4.1604.160LoadFGC-01_BUS 1 100.00 0.00

0.4800.480LoadFGC-PP 1 100.00 0.00

0.4800.480LoadH3103_BUS 1 100.00 0.00

0.4800.480LoadM1300 VFD_BUS 1 100.00 0.00

0.4800.480LoadM1300-HTR_BUS 1 100.00 0.00

0.4800.480LoadM1330_BUS 1 100.00 0.00

0.4800.480LoadM3150-HTR_BUS 1 100.00 0.00

0.4800.480LoadM3150_BUS 1 100.00 0.00

0.4800.480LoadM-3220_BUS 1 100.00 0.00

0.4800.480LoadM-3320-HTR_BUS 1 100.00 0.00

0.4800.480LoadM6211-HTR_BUS 1 100.00 0.00

0.4800.480LoadM6211_BUS 1 100.00 0.00

0.4800.480LoadM6221-HTR_BUS 1 100.00 0.00

0.4800.480LoadM6221_BUS 1 100.00 0.00

0.4800.480LoadMCC-7 1 100.00 0.00

0.4800.480LoadP-CHWP-9-HTR_BUS 1 100.00 0.00

0.4800.480LoadP-CHWP-9_BUS 1 100.00 0.00

0.4800.480LoadP-CHWP-10-HTR_BUS4 1 100.00 0.00

0.4800.480LoadP-CHWP-10_BUS 1 100.00 0.00

0.4800.480LoadPA-2-A 1 100.00 0.00

0.1200.120LoadPB-2-A 1 100.00 0.00

13.80013.800LoadPoint of Connection 1 100.00 0.00

0.4800.480LoadRC1-VFD 1 100.00 0.00

0.4800.480LoadRC-1_BUS 1 100.00 0.00

Study Case: SC

16.2.0C Page: 4

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

ID Type

Bus Initial Voltage

%Mag. Ang.Sub-sysBase kVNom. kV

0.4800.480LoadSCB-1_BUS 1 100.00 0.00

0.4800.480LoadSCB-2_BUS 1 100.00 0.00

4.1604.160LoadSG-4001 1 100.00 0.00

0.4800.480LoadT-CP-4 1 100.00 0.00

0.4800.480LoadTD-2-A PRI 1 100.00 0.00

0.1200.120LoadTD-2-A SEC 1 100.00 0.00

4.1604.160LoadTD-4001 Pri 1 100.00 0.00

0.4800.480LoadTD-4001 Sec 1 100.00 0.00

13.80013.800LoadTL-1301 Pri 1 100.00 0.00

4.1604.160LoadTL-1301 Sec 1 100.00 0.00

51Buses Total

All voltages reported by ETAP are in % of bus Nominal kV.

Base kV values of buses are calculated and used internally by ETAP.

Study Case: SC

16.2.0C Page: 5

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

Line/Cable Input Data

ID Library Size #/Phase R

Line/Cable ohms or siemens/1000 ft per Conductor (Cable) or per Phase (Line)

Adj. (ft) % Tol.

Length

YXT ( C)

1P001A/B/C 500 25.0 3 0.02900750 0.00000000.048000.6MCUN1

1P002 4/0 15.0 1 0.06300750 0.00000000.051000.6MCUN1

1P003 8 175.0 1 0.77940750 0.00000000.034900.6NCUN3

1P004 1 30.0 1 0.15530750 0.00000000.032310.6NCUN3

1P005 12 165.0 1 1.97044750 0.00000000.035200.6NCUN3

1P006 12 165.0 1 1.97044750 0.00000000.035200.6NCUN3

1P007 10 125.0 1 1.23988750 0.00000000.033220.6NCUN3

1P008 1/0 350.0 1 0.12434750 0.00000000.031090.6NCUN3

1P009 12 125.0 1 1.97044750 0.00000000.035200.6NCUN3

1P010 12 125.0 1 1.97044750 0.00000000.035200.6NCUN3

1P011 4/0 15.0 1 0.06300750 0.00000000.051000.6MCUN1

1P012A/B/C 250 25.0 3 0.05520750 0.00000000.037900.6MCUN3

1P013A/B 350 150.0 2 0.03780750 0.00000000.037300.6MCUN3

1P014 12 150.0 1 1.97044750 0.00000000.035200.6NCUN3

1P015 6 150.0 1 0.49043750 0.00000000.035810.6NCUN3

1P016 12 150.0 1 1.97044750 0.00000000.035200.6NCUN3

1P017 6 140.0 1 0.49043750 0.00000000.035810.6NCUN3

1P018 12 140.0 1 1.97044750 0.00000000.035200.6NCUN3

1P020 8 130.0 1 0.77940750 0.00000000.034900.6NCUN3

1P021 8 130.0 1 0.77940750 0.00000000.034900.6NCUN3

1P042 12 100.0 1 1.97044750 0.00000000.035200.6NCUN3

1P043 4 100.0 1 0.30815750 0.00000000.033680.6NCUN3

1P044 4 100.0 1 0.30815750 0.00000000.033680.6NCUN3

1P046 12 100.0 1 1.97044750 0.00000000.035200.6NCUN3

1P053 6 120.0 1 0.49043750 0.00000000.035810.6NCUN3

1P054 6 35.0 1 0.49043750 0.00000000.035810.6NCUN3

1P065 8 40.0 1 0.77940750 0.00000000.034900.6NCUN3

1P066 8 50.0 1 0.77940750 0.00000000.034900.6NCUN3

1P067 12 50.0 1 1.97044750 0.00000000.035200.6NCUN3

1P073 12 125.0 1 1.97044750 0.00000000.035200.6NCUN3

4P001A/B/C/D 750 270.0 4 0.02230750 0.00000000.049705.0MCUS1

4P002A/B/C/D 750 125.0 4 0.02230750 0.00000000.049705.0MCUS1

4P006 2/0 280.0 1 0.10300750 0.00000000.063005.0MCUS1

4P007 2/0 10.0 1 0.10300750 0.00000000.063005.0MCUS1

4P008 1/0 25.0 1 0.12800750 0.00000000.063505.0MCUS1

13P001 500 1100.0 1 0.03338750 0.00000000.0990015MCUS1

Study Case: SC

16.2.0C Page: 6

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

Line / Cable resistances are listed at the specified temperatures.

Study Case: SC

16.2.0C Page: 7

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

2-Winding Transformer Input Data

ID MVA Prim. kV Sec. kV % Z X/R Prim. Sec.

Transformer % Tap Setting

% Tol.

Rating Z Variation

+ 5% - 5% % Z

Adjusted

TD-2-A 0.075 0.480 0.120 5.83 1.92 0 00 0 0 5.8300

TD-4001 0.750 4.160 0.480 5.75 3.96 0 00 0 0 5.7500

TL-1301 7.500 13.800 4.160 6.50 14.23 0 00 0 0 6.5000

NIST CHP ETAP SHORT-CIRCUIT ANALYSIS

Study Case: SC

16.2.0C Page: 8

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

Branch Connections

ID From Bus To Bus R X ZType

CKT/Branch % Impedance, Pos. Seq., 100 MVAbConnected Bus ID

Y

TD-2-A TD-2-A PRI 3590.77 6894.28 7773.33TD-2-A SEC2W XFMR

TD-4001 TD-4001 Pri 187.71 743.33 766.67TD-4001 Sec2W XFMR

TL-1301 TL-1301 Pri 6.08 86.45 86.67TL-1301 Sec2W XFMR

1P001A/B/C TD-4001 Sec 10.49 17.36 20.28MCC-7Cable

1P002 MCC-7 41.02 33.20 52.77PA-2-ACable

1P003 MCC-7 5919.89 265.08 5925.82H3103_BUSCable

1P004 MCC-7 202.21 42.07 206.54TD-2-A PRICable

1P005 2O_BUS 14111.20 252.11 14113.45M3150_BUSCable

1P006 2O_BUS 14111.20 252.11 14113.45M3150-HTR_BUSCable

1P007 1O_BUS 6726.79 180.25 6729.20M-3220_BUSCable

1P008 MCC-7 1888.80 472.28 1946.95FGC-PPCable

1P009 MCC-7 10690.30 191.00 10692.01SCB-1_BUSCable

1P010 MCC-7 10690.30 191.00 10692.01SCB-2_BUSCable

1P011 TD-2-A SEC 656.25 531.25 844.33PB-2-ACable

1P012A/B/C MCC-7 19.97 13.71 24.22M1300 VFD_BUSCable

1P013A/B M1300 VFD_BUS 123.05 121.42 172.87M1330_BUSCable

1P014 M1300 VFD_BUS 12828.37 229.20 12830.41M1300-HTR_BUSCable

1P015 2C_BUS 3192.90 233.16 3201.40M6211_BUSCable

1P016 2C_BUS 12828.37 229.20 12830.41M6211-HTR_BUSCable

1P017 2I_BUS 2980.04 217.62 2987.97M6221_BUSCable

1P018 2I_BUS 11973.14 213.92 11975.05M6221-HTR_BUSCable

1P020 MCC-7 4397.63 196.92 4402.04AC-6 VFD_BUSCable

1P021 MCC-7 4397.63 196.92 4402.04AC-7 VFD_BUSCable

1P042 4A_BUS 8552.24 152.80 8553.61P-CHWP-9-HTR_BUSCable

1P043 4A_BUS 1337.47 146.18 1345.44P-CHWP-9_BUSCable

1P044 4G_BUS 1337.47 146.18 1345.44P-CHWP-10_BUSCable

1P046 4G_BUS 8552.24 152.80 8553.61P-CHWP-10-HTR_BUS4Cable

1P053 3A_BUS 2554.32 186.53 2561.12EF-25_BUSCable

1P054 3E_BUS 745.01 54.40 746.99EF-26_BUSCable

1P065 FGC-PP 1353.12 60.59 1354.47RC1-VFDCable

1P066 RC1-VFD 1691.40 75.74 1693.09RC-1_BUSCable

1P067 MCC-7 4276.12 76.40 4276.80T-CP-4Cable

1P073 1O_BUS 10690.30 191.00 10692.01M-3320-HTR_BUSCable

4P001A/B/C/D TL-1301 Sec 0.87 1.94 2.12SG-4001Cable

4P002A/B/C/D SG-4001 0.40 0.90 0.98CTG-1_BUSCable

4P006 SG-4001 16.67 10.19 19.54FGC-1 StarterCable

Study Case: SC

16.2.0C Page: 9

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

ID From Bus To Bus R X ZType

CKT/Branch % Impedance, Pos. Seq., 100 MVAbConnected Bus ID

Y

4P007 SG-4001 0.60 0.36 0.70TD-4001 PriCable

4P008 FGC-1 Starter 1.85 0.92 2.06FGC-01_BUSCable

13P001 Point of Connection 1.93 5.72 6.03TL-1301 PriCable

1O MCC-7 1O_BUSTie Breaker

2C MCC-7 2C_BUSTie Breaker

2I MCC-7 2I_BUSTie Breaker

2O MCC-7 2O_BUSTie Breaker

3A MCC-7 3A_BUSTie Breaker

3E MCC-7 3E_BUSTie Breaker

4A MCC-7 4A_BUSTie Breaker

4G MCC-7 4G_BUSTie Breaker

BUS C-B TIE BUS B BusCTie Breaker

BUS C-D TIE BUS D BusCTie Breaker

FC-9 BusC Point of ConnectionTie Breaker

Study Case: SC

16.2.0C Page: 10

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

Power Grid Input Data

ID ID MVASC kV R X

Rating

X/R

100 MVA Base % Impedance

Power Grid Connected Bus

PEPCO CONTRIBUTION 13.800 19.904670.83986501.948BusC 23.70

Total Connected Power Grids (= 1 ): 501.948 MVA

Synchronous Generator Input Data

Xd"

Xd'ID Type ID

Connected Bus

% Impedance in Machine Base

X/R RatioRatingSynchronous Generator

Adj. Tol.RX'/RX"/RRPMkVMVA

0.37949.0549.0518004.1609.375CTG-1 Turbo 28.00CTG-1_BUS 0.018.60

Total Connected Synchronous Generators ( = 1 ): 9.375 MVA

Study Case: SC

16.2.0C Page: 11

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

Induction Machine Input Data kVA kV RPM X"/R X'/R R X'X"

Induction Machine Rating X/R Ratio Machine BaseConnected Bus

IDID

% Impedance

HP/kWQty

Motors

FGC-01 1 FGC-01_BUS 4.160 1.0716.5216.521800 17.65 44.12450.00 396.36

AC-6 1 AC-6 VFD_BUS 0.480 9.233.023.021800 27.83 9999.0015.00 16.73

AC-7 1 AC-7 VFD_BUS 0.480 9.233.023.021800 27.83 9999.0015.00 16.73

EF-25 1 EF-25_BUS 0.480 9.233.023.021800 27.83 9999.0015.00 16.73

EF-26 1 EF-26_BUS 0.480 9.233.023.021800 27.83 9999.0015.00 16.73

M1300 1 M1330_BUS 0.480 2.109.549.541800 20.00 50.00150.00 131.89

M3150 1 M3150_BUS 0.480 20.631.351.351800 27.83 9999.003.00 3.81

M-3220 1 M-3220_BUS 0.480 13.052.132.131800 27.83 9999.007.50 8.76

M6211 1 M6211_BUS 0.480 7.993.483.481800 27.83 9999.0020.00 21.51

M6221 1 M6221_BUS 0.480 7.993.483.481800 27.83 9999.0020.00 21.51

P-CHWP-9 1 P-CHWP-9_BUS 0.480 7.153.893.891800 27.83 9999.0025.00 27.09

P-CHWP-10 1 P-CHWP-10_BUS 0.480 7.153.893.891800 27.83 9999.0025.00 27.09

RC-1 1 RC-1_BUS 0.480 7.993.483.481800 27.83 9999.0020.00 21.51

SCB-1 1 SCB-1_BUS 0.480 17.871.561.561800 27.83 9999.004.00 4.94

SCB-2 1 SCB-2_BUS 0.480 17.871.561.561800 27.83 9999.004.00 4.94

CP-4A 1 T-CP-4 0.480 35.740.780.781800 27.83 9999.001.00 1.42

CP-4B 1 T-CP-4 0.480 35.740.780.781800 27.83 9999.001.00 1.42

Total Connected Induction Motors ( = 17 ): 739.2 kVA

Study Case: SC

16.2.0C Page: 12

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

SHORT-CIRCUIT REPORT

= 100.00 % of nominal bus kV (0.480 kV)

= 100.00 % of base (0.480 kV)

Prefault voltage = 0.480 kV

3-phase fault at bus: 1O_BUS

ID Magnitude/RealRealFrom BusID Imaginary

From Bus To Bus % V kA kA Imag. kA Symm.

Contribution 1/2 Cycle

Total 15.6584.13.6940.001O_BUS -15.216

1O_BUS 0.0342.00.0151.90M-3220_BUS -0.031

1O_BUS 0.000999.90.0000.00M-3320-HTR_BUS 0.000

MCC-7 14.0364.13.3292.37TD-4001 Sec -13.636

MCC-7 0.000999.90.0000.00PA-2-A 0.000

MCC-7 0.000999.90.0000.00H3103_BUS 0.000

MCC-7 0.000999.90.0000.00TD-2-A PRI 0.000

MCC-7 0.0883.10.0271.42FGC-PP -0.084

MCC-7 0.0181.50.0101.58SCB-1_BUS -0.015

MCC-7 0.0181.50.0101.58SCB-2_BUS -0.015

MCC-7 0.7818.80.0880.16M1300 VFD_BUS -0.776

MCC-7 0.0682.80.0232.49AC-6 VFD_BUS -0.064

MCC-7 0.0682.80.0232.49AC-7 VFD_BUS -0.064

MCC-7 0.0080.80.0060.27T-CP-4 -0.005

4G_BUS 0.1133.70.0291.26P-CHWP-10_BUS -0.109

4G_BUS 0.000999.90.0000.00P-CHWP-10-HTR_BUS4 0.000

4A_BUS 0.000999.90.0000.00P-CHWP-9-HTR_BUS 0.000

4A_BUS 0.1133.70.0291.26P-CHWP-9_BUS -0.109

3E_BUS 0.0693.00.0220.43EF-26_BUS -0.065

3A_BUS 0.0682.90.0221.45EF-25_BUS -0.064

2O_BUS 0.0131.30.0081.54M3150_BUS -0.010

2O_BUS 0.000999.90.0000.00M3150-HTR_BUS 0.000

2I_BUS 0.0893.20.0262.20M6221_BUS -0.085

2I_BUS 0.000999.90.0000.00M6221-HTR_BUS 0.000

2C_BUS 0.0893.20.0262.36M6211_BUS -0.085

2C_BUS 0.000999.90.0000.00M6211-HTR_BUS 0.000

1O_BUS 15.6254.13.6790.00MCC-7 -15.185*

MCC-7 0.0893.20.0260.002C_BUS -0.085*

MCC-7 0.0893.20.0260.002I_BUS -0.085*

Study Case: SC

16.2.0C Page: 13

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

= 100.00 % of nominal bus kV (0.480 kV)

= 100.00 % of base (0.480 kV)

Prefault voltage = 0.480 kV

3-phase fault at bus: 1O_BUS

(Cont.)

ID Magnitude/RealRealFrom BusID Imaginary

From Bus To Bus % V kA kA Imag. kA Symm.

Contribution 1/2 Cycle

MCC-7 0.0131.30.0080.002O_BUS -0.010*

MCC-7 0.0682.90.0220.003A_BUS -0.064*

MCC-7 0.0693.00.0220.003E_BUS -0.065*

MCC-7 0.1133.70.0290.004A_BUS -0.109*

MCC-7 0.1133.70.0290.004G_BUS -0.109*

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.

* Indicates a fault current through a tie circuit breaker.

If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

Study Case: SC

16.2.0C Page: 14

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

= 100.00 % of nominal bus kV (0.480 kV)

= 100.00 % of base (0.480 kV)

Prefault voltage = 0.480 kV

3-phase fault at bus: 2C_BUS

ID Magnitude/RealRealFrom BusID Imaginary

From Bus To Bus % V kA kA Imag. kA Symm.

Contribution 1/2 Cycle

Total 15.6584.13.6940.002C_BUS -15.216

2C_BUS 0.0893.20.0262.36M6211_BUS -0.085

2C_BUS 0.000999.90.0000.00M6211-HTR_BUS 0.000

MCC-7 14.0364.13.3292.37TD-4001 Sec -13.636

MCC-7 0.000999.90.0000.00PA-2-A 0.000

MCC-7 0.000999.90.0000.00H3103_BUS 0.000

MCC-7 0.000999.90.0000.00TD-2-A PRI 0.000

MCC-7 0.0883.10.0271.42FGC-PP -0.084

MCC-7 0.0181.50.0101.58SCB-1_BUS -0.015

MCC-7 0.0181.50.0101.58SCB-2_BUS -0.015

MCC-7 0.7818.80.0880.16M1300 VFD_BUS -0.776

MCC-7 0.0682.80.0232.49AC-6 VFD_BUS -0.064

MCC-7 0.0682.80.0232.49AC-7 VFD_BUS -0.064

MCC-7 0.0080.80.0060.27T-CP-4 -0.005

4G_BUS 0.1133.70.0291.26P-CHWP-10_BUS -0.109

4G_BUS 0.000999.90.0000.00P-CHWP-10-HTR_BUS4 0.000

4A_BUS 0.000999.90.0000.00P-CHWP-9-HTR_BUS 0.000

4A_BUS 0.1133.70.0291.26P-CHWP-9_BUS -0.109

3E_BUS 0.0693.00.0220.43EF-26_BUS -0.065

3A_BUS 0.0682.90.0221.45EF-25_BUS -0.064

2O_BUS 0.0131.30.0081.54M3150_BUS -0.010

2O_BUS 0.000999.90.0000.00M3150-HTR_BUS 0.000

2I_BUS 0.0893.20.0262.20M6221_BUS -0.085

2I_BUS 0.000999.90.0000.00M6221-HTR_BUS 0.000

1O_BUS 0.0342.00.0151.90M-3220_BUS -0.031

1O_BUS 0.000999.90.0000.00M-3320-HTR_BUS 0.000

MCC-7 0.0342.00.0150.001O_BUS -0.031*

2C_BUS 15.5694.13.6670.00MCC-7 -15.131*

MCC-7 0.0893.20.0260.002I_BUS -0.085*

MCC-7 0.0131.30.0080.002O_BUS -0.010*

MCC-7 0.0682.90.0220.003A_BUS -0.064*

Study Case: SC

16.2.0C Page: 15

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

= 100.00 % of nominal bus kV (0.480 kV)

= 100.00 % of base (0.480 kV)

Prefault voltage = 0.480 kV

3-phase fault at bus: 2C_BUS

(Cont.)

ID Magnitude/RealRealFrom BusID Imaginary

From Bus To Bus % V kA kA Imag. kA Symm.

Contribution 1/2 Cycle

MCC-7 0.0693.00.0220.003E_BUS -0.065*

MCC-7 0.1133.70.0290.004A_BUS -0.109*

MCC-7 0.1133.70.0290.004G_BUS -0.109*

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.

If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

Study Case: SC

16.2.0C Page: 16

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

= 100.00 % of nominal bus kV (0.480 kV)

= 100.00 % of base (0.480 kV)

Prefault voltage = 0.480 kV

3-phase fault at bus: 2I_BUS

ID Magnitude/RealRealFrom BusID Imaginary

From Bus To Bus % V kA kA Imag. kA Symm.

Contribution 1/2 Cycle

Total 15.6584.13.6940.002I_BUS -15.216

2I_BUS 0.0893.20.0262.20M6221_BUS -0.085

2I_BUS 0.000999.90.0000.00M6221-HTR_BUS 0.000

MCC-7 14.0364.13.3292.37TD-4001 Sec -13.636

MCC-7 0.000999.90.0000.00PA-2-A 0.000

MCC-7 0.000999.90.0000.00H3103_BUS 0.000

MCC-7 0.000999.90.0000.00TD-2-A PRI 0.000

MCC-7 0.0883.10.0271.42FGC-PP -0.084

MCC-7 0.0181.50.0101.58SCB-1_BUS -0.015

MCC-7 0.0181.50.0101.58SCB-2_BUS -0.015

MCC-7 0.7818.80.0880.16M1300 VFD_BUS -0.776

MCC-7 0.0682.80.0232.49AC-6 VFD_BUS -0.064

MCC-7 0.0682.80.0232.49AC-7 VFD_BUS -0.064

MCC-7 0.0080.80.0060.27T-CP-4 -0.005

4G_BUS 0.1133.70.0291.26P-CHWP-10_BUS -0.109

4G_BUS 0.000999.90.0000.00P-CHWP-10-HTR_BUS4 0.000

4A_BUS 0.000999.90.0000.00P-CHWP-9-HTR_BUS 0.000

4A_BUS 0.1133.70.0291.26P-CHWP-9_BUS -0.109

3E_BUS 0.0693.00.0220.43EF-26_BUS -0.065

3A_BUS 0.0682.90.0221.45EF-25_BUS -0.064

2O_BUS 0.0131.30.0081.54M3150_BUS -0.010

2O_BUS 0.000999.90.0000.00M3150-HTR_BUS 0.000

2C_BUS 0.0893.20.0262.36M6211_BUS -0.085

2C_BUS 0.000999.90.0000.00M6211-HTR_BUS 0.000

1O_BUS 0.0342.00.0151.90M-3220_BUS -0.031

1O_BUS 0.000999.90.0000.00M-3320-HTR_BUS 0.000

MCC-7 0.0342.00.0150.001O_BUS -0.031*

MCC-7 0.0893.20.0260.002C_BUS -0.085*

2I_BUS 15.5694.13.6670.00MCC-7 -15.131*

Study Case: SC

16.2.0C Page: 17

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

= 100.00 % of nominal bus kV (0.480 kV)

= 100.00 % of base (0.480 kV)

Prefault voltage = 0.480 kV

3-phase fault at bus: 2I_BUS

(Cont.)

ID Magnitude/RealRealFrom BusID Imaginary

From Bus To Bus % V kA kA Imag. kA Symm.

Contribution 1/2 Cycle

MCC-7 0.0693.00.0220.003E_BUS -0.065*

MCC-7 0.1133.70.0290.004A_BUS -0.109*

MCC-7 0.1133.70.0290.004G_BUS -0.109*

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.

If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

Study Case: SC

16.2.0C Page: 18

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

= 100.00 % of nominal bus kV (0.480 kV)

= 100.00 % of base (0.480 kV)

Prefault voltage = 0.480 kV

3-phase fault at bus: 2O_BUS

ID Magnitude/RealRealFrom BusID Imaginary

From Bus To Bus % V kA kA Imag. kA Symm.

Contribution 1/2 Cycle

Total 15.6584.13.6940.002O_BUS -15.216

2O_BUS 0.0131.30.0081.54M3150_BUS -0.010

2O_BUS 0.000999.90.0000.00M3150-HTR_BUS 0.000

MCC-7 14.0364.13.3292.37TD-4001 Sec -13.636

MCC-7 0.000999.90.0000.00PA-2-A 0.000

MCC-7 0.000999.90.0000.00H3103_BUS 0.000

MCC-7 0.000999.90.0000.00TD-2-A PRI 0.000

MCC-7 0.0883.10.0271.42FGC-PP -0.084

MCC-7 0.0181.50.0101.58SCB-1_BUS -0.015

MCC-7 0.0181.50.0101.58SCB-2_BUS -0.015

MCC-7 0.7818.80.0880.16M1300 VFD_BUS -0.776

MCC-7 0.0682.80.0232.49AC-6 VFD_BUS -0.064

MCC-7 0.0682.80.0232.49AC-7 VFD_BUS -0.064

MCC-7 0.0080.80.0060.27T-CP-4 -0.005

4G_BUS 0.1133.70.0291.26P-CHWP-10_BUS -0.109

4G_BUS 0.000999.90.0000.00P-CHWP-10-HTR_BUS4 0.000

4A_BUS 0.000999.90.0000.00P-CHWP-9-HTR_BUS 0.000

4A_BUS 0.1133.70.0291.26P-CHWP-9_BUS -0.109

3E_BUS 0.0693.00.0220.43EF-26_BUS -0.065

3A_BUS 0.0682.90.0221.45EF-25_BUS -0.064

2I_BUS 0.0893.20.0262.20M6221_BUS -0.085

2I_BUS 0.000999.90.0000.00M6221-HTR_BUS 0.000

2C_BUS 0.0893.20.0262.36M6211_BUS -0.085

2C_BUS 0.000999.90.0000.00M6211-HTR_BUS 0.000

1O_BUS 0.0342.00.0151.90M-3220_BUS -0.031

1O_BUS 0.000999.90.0000.00M-3320-HTR_BUS 0.000

MCC-7 0.0342.00.0150.001O_BUS -0.031*

MCC-7 0.0893.20.0260.002C_BUS -0.085*

MCC-7 0.0893.20.0260.002I_BUS -0.085*

2O_BUS 15.6464.13.6860.00MCC-7 -15.205*

Study Case: SC

16.2.0C Page: 19

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

= 100.00 % of nominal bus kV (0.480 kV)

= 100.00 % of base (0.480 kV)

Prefault voltage = 0.480 kV

3-phase fault at bus: 2O_BUS

(Cont.)

ID Magnitude/RealRealFrom BusID Imaginary

From Bus To Bus % V kA kA Imag. kA Symm.

Contribution 1/2 Cycle

MCC-7 0.0693.00.0220.003E_BUS -0.065*

MCC-7 0.1133.70.0290.004A_BUS -0.109*

MCC-7 0.1133.70.0290.004G_BUS -0.109*

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.

If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

Study Case: SC

16.2.0C Page: 20

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

= 100.00 % of nominal bus kV (0.480 kV)

= 100.00 % of base (0.480 kV)

Prefault voltage = 0.480 kV

3-phase fault at bus: 3A_BUS

ID Magnitude/RealRealFrom BusID Imaginary

From Bus To Bus % V kA kA Imag. kA Symm.

Contribution 1/2 Cycle

Total 15.6584.13.6940.003A_BUS -15.216

3A_BUS 0.0682.90.0221.45EF-25_BUS -0.064

MCC-7 14.0364.13.3292.37TD-4001 Sec -13.636

MCC-7 0.000999.90.0000.00PA-2-A 0.000

MCC-7 0.000999.90.0000.00H3103_BUS 0.000

MCC-7 0.000999.90.0000.00TD-2-A PRI 0.000

MCC-7 0.0883.10.0271.42FGC-PP -0.084

MCC-7 0.0181.50.0101.58SCB-1_BUS -0.015

MCC-7 0.0181.50.0101.58SCB-2_BUS -0.015

MCC-7 0.7818.80.0880.16M1300 VFD_BUS -0.776

MCC-7 0.0682.80.0232.49AC-6 VFD_BUS -0.064

MCC-7 0.0682.80.0232.49AC-7 VFD_BUS -0.064

MCC-7 0.0080.80.0060.27T-CP-4 -0.005

4G_BUS 0.1133.70.0291.26P-CHWP-10_BUS -0.109

4G_BUS 0.000999.90.0000.00P-CHWP-10-HTR_BUS4 0.000

4A_BUS 0.000999.90.0000.00P-CHWP-9-HTR_BUS 0.000

4A_BUS 0.1133.70.0291.26P-CHWP-9_BUS -0.109

3E_BUS 0.0693.00.0220.43EF-26_BUS -0.065

2O_BUS 0.0131.30.0081.54M3150_BUS -0.010

2O_BUS 0.000999.90.0000.00M3150-HTR_BUS 0.000

2I_BUS 0.0893.20.0262.20M6221_BUS -0.085

2I_BUS 0.000999.90.0000.00M6221-HTR_BUS 0.000

2C_BUS 0.0893.20.0262.36M6211_BUS -0.085

2C_BUS 0.000999.90.0000.00M6211-HTR_BUS 0.000

1O_BUS 0.0342.00.0151.90M-3220_BUS -0.031

1O_BUS 0.000999.90.0000.00M-3320-HTR_BUS 0.000

MCC-7 0.0342.00.0150.001O_BUS -0.031*

MCC-7 0.0893.20.0260.002C_BUS -0.085*

MCC-7 0.0893.20.0260.002I_BUS -0.085*

3A_BUS 15.5904.13.6710.00MCC-7 -15.151*

Study Case: SC

16.2.0C Page: 21

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

= 100.00 % of nominal bus kV (0.480 kV)

= 100.00 % of base (0.480 kV)

Prefault voltage = 0.480 kV

3-phase fault at bus: 3A_BUS

(Cont.)

ID Magnitude/RealRealFrom BusID Imaginary

From Bus To Bus % V kA kA Imag. kA Symm.

Contribution 1/2 Cycle

MCC-7 0.0693.00.0220.003E_BUS -0.065*

MCC-7 0.1133.70.0290.004A_BUS -0.109*

MCC-7 0.1133.70.0290.004G_BUS -0.109*

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.

If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

Study Case: SC

16.2.0C Page: 22

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

= 100.00 % of nominal bus kV (0.480 kV)

= 100.00 % of base (0.480 kV)

Prefault voltage = 0.480 kV

3-phase fault at bus: 3E_BUS

ID Magnitude/RealRealFrom BusID Imaginary

From Bus To Bus % V kA kA Imag. kA Symm.

Contribution 1/2 Cycle

Total 15.6584.13.6940.003E_BUS -15.216

3E_BUS 0.0693.00.0220.43EF-26_BUS -0.065

MCC-7 14.0364.13.3292.37TD-4001 Sec -13.636

MCC-7 0.000999.90.0000.00PA-2-A 0.000

MCC-7 0.000999.90.0000.00H3103_BUS 0.000

MCC-7 0.000999.90.0000.00TD-2-A PRI 0.000

MCC-7 0.0883.10.0271.42FGC-PP -0.084

MCC-7 0.0181.50.0101.58SCB-1_BUS -0.015

MCC-7 0.0181.50.0101.58SCB-2_BUS -0.015

MCC-7 0.7818.80.0880.16M1300 VFD_BUS -0.776

MCC-7 0.0682.80.0232.49AC-6 VFD_BUS -0.064

MCC-7 0.0682.80.0232.49AC-7 VFD_BUS -0.064

MCC-7 0.0080.80.0060.27T-CP-4 -0.005

4G_BUS 0.1133.70.0291.26P-CHWP-10_BUS -0.109

4G_BUS 0.000999.90.0000.00P-CHWP-10-HTR_BUS4 0.000

4A_BUS 0.000999.90.0000.00P-CHWP-9-HTR_BUS 0.000

4A_BUS 0.1133.70.0291.26P-CHWP-9_BUS -0.109

3A_BUS 0.0682.90.0221.45EF-25_BUS -0.064

2O_BUS 0.0131.30.0081.54M3150_BUS -0.010

2O_BUS 0.000999.90.0000.00M3150-HTR_BUS 0.000

2I_BUS 0.0893.20.0262.20M6221_BUS -0.085

2I_BUS 0.000999.90.0000.00M6221-HTR_BUS 0.000

2C_BUS 0.0893.20.0262.36M6211_BUS -0.085

2C_BUS 0.000999.90.0000.00M6211-HTR_BUS 0.000

1O_BUS 0.0342.00.0151.90M-3220_BUS -0.031

1O_BUS 0.000999.90.0000.00M-3320-HTR_BUS 0.000

MCC-7 0.0342.00.0150.001O_BUS -0.031*

MCC-7 0.0893.20.0260.002C_BUS -0.085*

MCC-7 0.0893.20.0260.002I_BUS -0.085*

Study Case: SC

16.2.0C Page: 23

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

= 100.00 % of nominal bus kV (0.480 kV)

= 100.00 % of base (0.480 kV)

Prefault voltage = 0.480 kV

3-phase fault at bus: 3E_BUS

(Cont.)

ID Magnitude/RealRealFrom BusID Imaginary

From Bus To Bus % V kA kA Imag. kA Symm.

Contribution 1/2 Cycle

3E_BUS 15.5894.13.6720.00MCC-7 -15.151*

MCC-7 0.1133.70.0290.004A_BUS -0.109*

MCC-7 0.1133.70.0290.004G_BUS -0.109*

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.

If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

Study Case: SC

16.2.0C Page: 24

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

= 100.00 % of nominal bus kV (0.480 kV)

= 100.00 % of base (0.480 kV)

Prefault voltage = 0.480 kV

3-phase fault at bus: 4A_BUS

ID Magnitude/RealRealFrom BusID Imaginary

From Bus To Bus % V kA kA Imag. kA Symm.

Contribution 1/2 Cycle

Total 15.6584.13.6940.004A_BUS -15.216

4A_BUS 0.000999.90.0000.00P-CHWP-9-HTR_BUS 0.000

4A_BUS 0.1133.70.0291.26P-CHWP-9_BUS -0.109

MCC-7 14.0364.13.3292.37TD-4001 Sec -13.636

MCC-7 0.000999.90.0000.00PA-2-A 0.000

MCC-7 0.000999.90.0000.00H3103_BUS 0.000

MCC-7 0.000999.90.0000.00TD-2-A PRI 0.000

MCC-7 0.0883.10.0271.42FGC-PP -0.084

MCC-7 0.0181.50.0101.58SCB-1_BUS -0.015

MCC-7 0.0181.50.0101.58SCB-2_BUS -0.015

MCC-7 0.7818.80.0880.16M1300 VFD_BUS -0.776

MCC-7 0.0682.80.0232.49AC-6 VFD_BUS -0.064

MCC-7 0.0682.80.0232.49AC-7 VFD_BUS -0.064

MCC-7 0.0080.80.0060.27T-CP-4 -0.005

4G_BUS 0.1133.70.0291.26P-CHWP-10_BUS -0.109

4G_BUS 0.000999.90.0000.00P-CHWP-10-HTR_BUS4 0.000

3E_BUS 0.0693.00.0220.43EF-26_BUS -0.065

3A_BUS 0.0682.90.0221.45EF-25_BUS -0.064

2O_BUS 0.0131.30.0081.54M3150_BUS -0.010

2O_BUS 0.000999.90.0000.00M3150-HTR_BUS 0.000

2I_BUS 0.0893.20.0262.20M6221_BUS -0.085

2I_BUS 0.000999.90.0000.00M6221-HTR_BUS 0.000

2C_BUS 0.0893.20.0262.36M6211_BUS -0.085

2C_BUS 0.000999.90.0000.00M6211-HTR_BUS 0.000

1O_BUS 0.0342.00.0151.90M-3220_BUS -0.031

1O_BUS 0.000999.90.0000.00M-3320-HTR_BUS 0.000

MCC-7 0.0342.00.0150.001O_BUS -0.031*

MCC-7 0.0893.20.0260.002C_BUS -0.085*

MCC-7 0.0893.20.0260.002I_BUS -0.085*

Study Case: SC

16.2.0C Page: 25

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

= 100.00 % of nominal bus kV (0.480 kV)

= 100.00 % of base (0.480 kV)

Prefault voltage = 0.480 kV

3-phase fault at bus: 4A_BUS

(Cont.)

ID Magnitude/RealRealFrom BusID Imaginary

From Bus To Bus % V kA kA Imag. kA Symm.

Contribution 1/2 Cycle

MCC-7 0.0693.00.0220.003E_BUS -0.065*

4A_BUS 15.5454.13.6640.00MCC-7 -15.107*

MCC-7 0.1133.70.0290.004G_BUS -0.109*

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.

If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

Study Case: SC

16.2.0C Page: 26

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

= 100.00 % of nominal bus kV (0.480 kV)

= 100.00 % of base (0.480 kV)

Prefault voltage = 0.480 kV

3-phase fault at bus: 4G_BUS

ID Magnitude/RealRealFrom BusID Imaginary

From Bus To Bus % V kA kA Imag. kA Symm.

Contribution 1/2 Cycle

Total 15.6584.13.6940.004G_BUS -15.216

4G_BUS 0.1133.70.0291.26P-CHWP-10_BUS -0.109

4G_BUS 0.000999.90.0000.00P-CHWP-10-HTR_BUS4 0.000

MCC-7 14.0364.13.3292.37TD-4001 Sec -13.636

MCC-7 0.000999.90.0000.00PA-2-A 0.000

MCC-7 0.000999.90.0000.00H3103_BUS 0.000

MCC-7 0.000999.90.0000.00TD-2-A PRI 0.000

MCC-7 0.0883.10.0271.42FGC-PP -0.084

MCC-7 0.0181.50.0101.58SCB-1_BUS -0.015

MCC-7 0.0181.50.0101.58SCB-2_BUS -0.015

MCC-7 0.7818.80.0880.16M1300 VFD_BUS -0.776

MCC-7 0.0682.80.0232.49AC-6 VFD_BUS -0.064

MCC-7 0.0682.80.0232.49AC-7 VFD_BUS -0.064

MCC-7 0.0080.80.0060.27T-CP-4 -0.005

4A_BUS 0.000999.90.0000.00P-CHWP-9-HTR_BUS 0.000

4A_BUS 0.1133.70.0291.26P-CHWP-9_BUS -0.109

3E_BUS 0.0693.00.0220.43EF-26_BUS -0.065

3A_BUS 0.0682.90.0221.45EF-25_BUS -0.064

2O_BUS 0.0131.30.0081.54M3150_BUS -0.010

2O_BUS 0.000999.90.0000.00M3150-HTR_BUS 0.000

2I_BUS 0.0893.20.0262.20M6221_BUS -0.085

2I_BUS 0.000999.90.0000.00M6221-HTR_BUS 0.000

2C_BUS 0.0893.20.0262.36M6211_BUS -0.085

2C_BUS 0.000999.90.0000.00M6211-HTR_BUS 0.000

1O_BUS 0.0342.00.0151.90M-3220_BUS -0.031

1O_BUS 0.000999.90.0000.00M-3320-HTR_BUS 0.000

MCC-7 0.0342.00.0150.001O_BUS -0.031*

MCC-7 0.0893.20.0260.002C_BUS -0.085*

MCC-7 0.0893.20.0260.002I_BUS -0.085*

Study Case: SC

16.2.0C Page: 27

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

= 100.00 % of nominal bus kV (0.480 kV)

= 100.00 % of base (0.480 kV)

Prefault voltage = 0.480 kV

3-phase fault at bus: 4G_BUS

(Cont.)

ID Magnitude/RealRealFrom BusID Imaginary

From Bus To Bus % V kA kA Imag. kA Symm.

Contribution 1/2 Cycle

MCC-7 0.0693.00.0220.003E_BUS -0.065*

MCC-7 0.1133.70.0290.004A_BUS -0.109*

4G_BUS 15.5454.13.6640.00MCC-7 -15.107*

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.

If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

Study Case: SC

16.2.0C Page: 28

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

= 100.00 % of nominal bus kV (0.480 kV)

= 100.00 % of base (0.480 kV)

Prefault voltage = 0.480 kV

3-phase fault at bus: AC-6 VFD_BUS

ID Magnitude/RealRealFrom BusID Imaginary

From Bus To Bus % V kA kA Imag. kA Symm.

Contribution 1/2 Cycle

Total 2.6070.22.5410.00AC-6 VFD_BUS -0.586

AC-6 VFD_BUS 2.5720.22.51994.14MCC-7 -0.521

AC-6 VFD_BUS 0.0693.00.022100.00AC-6 -0.065

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.

If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

Study Case: SC

16.2.0C Page: 29

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

= 100.00 % of nominal bus kV (0.480 kV)

= 100.00 % of base (0.480 kV)

Prefault voltage = 0.480 kV

3-phase fault at bus: AC-7 VFD_BUS

ID Magnitude/RealRealFrom BusID Imaginary

From Bus To Bus % V kA kA Imag. kA Symm.

Contribution 1/2 Cycle

Total 2.6070.22.5410.00AC-7 VFD_BUS -0.586

AC-7 VFD_BUS 2.5720.22.51994.14MCC-7 -0.521

AC-7 VFD_BUS 0.0693.00.022100.00AC-7 -0.065

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.

If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

Study Case: SC

16.2.0C Page: 30

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

= 100.00 % of nominal bus kV (13.800 kV)

= 100.00 % of base (13.800 kV)

Prefault voltage = 13.800 kV

3-phase fault at bus: BUS B

ID Magnitude/RealImaginaryRealFrom BusMagnitude/RealRealFrom BusID Imaginary

From Bus To Bus % V kA kA Imag. kA Symm. % V kA kA Imag. kA Symm.

Contribution 1/2 Cycle 1.5 to 4 Cycle

Total 22.48923.40.9610.00BUS B -22.468 0.00 0.953 -22.426 23.5 22.446

BusC 21.00023.70.885100.00PEPCO CONTRIBUTION -20.981 100.00 0.885 -20.981 23.7 21.000

Point of Connection 1.48919.70.0752.15TL-1301 Pri -1.487 2.09 0.067 -1.445 21.5 1.446

BUS B 22.48923.40.9610.00BusC -22.468* 0.00 0.953 -22.426 23.5 22.446

BusC 0.0009999.00.0000.00BUS D 0.000* 0.00 0.000 0.000 9999.0 0.000

BusC 1.48919.70.0750.00Point of Connection -1.487* 0.00 0.067 -1.445 21.5 1.446

NACD Ratio = 0.94

# Indicates a fault current contribution from a three-winding transformer.

If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

Study Case: SC

16.2.0C Page: 31

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

= 100.00 % of nominal bus kV (13.800 kV)

= 100.00 % of base (13.800 kV)

Prefault voltage = 13.800 kV

3-phase fault at bus: BUS D

ID Magnitude/RealImaginaryRealFrom BusMagnitude/RealRealFrom BusID Imaginary

From Bus To Bus % V kA kA Imag. kA Symm. % V kA kA Imag. kA Symm.

Contribution 1/2 Cycle 1.5 to 4 Cycle

Total 22.48923.40.9610.00BUS D -22.468 0.00 0.953 -22.426 23.5 22.446

BusC 21.00023.70.885100.00PEPCO CONTRIBUTION -20.981 100.00 0.885 -20.981 23.7 21.000

Point of Connection 1.48919.70.0752.15TL-1301 Pri -1.487 2.09 0.067 -1.445 21.5 1.446

BusC 0.0009999.00.0000.00BUS B 0.000* 0.00 0.000 0.000 9999.0 0.000

BUS D 22.48923.40.9610.00BusC -22.468* 0.00 0.953 -22.426 23.5 22.446

BusC 1.48919.70.0750.00Point of Connection -1.487* 0.00 0.067 -1.445 21.5 1.446

NACD Ratio = 0.94

# Indicates a fault current contribution from a three-winding transformer.

* Indicates a fault current through a tie circuit breaker.

If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

NIST CHP ETAP SHORT-CIRCUIT ANALYSIS

Study Case: SC

16.2.0C Page: 32

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

= 100.00 % of nominal bus kV (13.800 kV)

= 100.00 % of base (13.800 kV)

Prefault voltage = 13.800 kV

3-phase fault at bus: BusC

ID Magnitude/RealImaginaryRealFrom BusMagnitude/RealRealFrom BusID Imaginary

From Bus To Bus % V kA kA Imag. kA Symm. % V kA kA Imag. kA Symm.

Contribution 1/2 Cycle 1.5 to 4 Cycle

Total 22.48923.40.9610.00BusC -22.468 0.00 0.953 -22.426 23.5 22.446

BusC 21.00023.70.885100.00PEPCO CONTRIBUTION -20.981 100.00 0.885 -20.981 23.7 21.000

Point of Connection 1.48919.70.0752.15TL-1301 Pri -1.487 2.09 0.067 -1.445 21.5 1.446

BusC 0.0009999.00.0000.00BUS B 0.000* 0.00 0.000 0.000 9999.0 0.000

BusC 0.0009999.00.0000.00BUS D 0.000* 0.00 0.000 0.000 9999.0 0.000

BusC 1.48919.70.0750.00Point of Connection -1.487* 0.00 0.067 -1.445 21.5 1.446

NACD Ratio = 0.94

# Indicates a fault current contribution from a three-winding transformer.

If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

Study Case: SC

16.2.0C Page: 33

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

= 100.00 % of nominal bus kV (4.160 kV)

= 100.00 % of base (4.160 kV)

Prefault voltage = 4.160 kV

3-phase fault at bus: CTG-1_BUS

ID Magnitude/RealImaginaryRealFrom BusMagnitude/RealRealFrom BusID Imaginary

From Bus To Bus % V kA kA Imag. kA Symm. % V kA kA Imag. kA Symm.

Contribution 1/2 Cycle 1.5 to 4 Cycle

Total 19.48415.51.2580.00CTG-1_BUS -19.443 0.00 1.210 -19.134 15.8 19.172

CTG-1_BUS 12.50111.21.1150.89SG-4001 -12.451 0.86 1.067 -12.142 11.4 12.189

CTG-1_BUS 6.99449.00.143100.00CTG-1 -6.992 100.00 0.143 -6.992 49.0 6.994

NACD Ratio = 0.64

# Indicates a fault current contribution from a three-winding transformer.

If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

Study Case: SC

16.2.0C Page: 34

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

= 100.00 % of nominal bus kV (0.480 kV)

= 100.00 % of base (0.480 kV)

Prefault voltage = 0.480 kV

3-phase fault at bus: EF-25_BUS

ID Magnitude/RealRealFrom BusID Imaginary

From Bus To Bus % V kA kA Imag. kA Symm.

Contribution 1/2 Cycle

Total 4.2010.43.9570.00EF-25_BUS -1.412

EF-25_BUS 4.1590.33.93588.563A_BUS -1.347

EF-25_BUS 0.0693.00.022100.00EF-25 -0.065

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.

If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

Study Case: SC

16.2.0C Page: 35

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

= 100.00 % of nominal bus kV (0.480 kV)

= 100.00 % of base (0.480 kV)

Prefault voltage = 0.480 kV

3-phase fault at bus: EF-26_BUS

ID Magnitude/RealRealFrom BusID Imaginary

From Bus To Bus % V kA kA Imag. kA Symm.

Contribution 1/2 Cycle

Total 9.8610.97.4250.00EF-26_BUS -6.490

EF-26_BUS 9.8020.97.40360.883E_BUS -6.425

EF-26_BUS 0.0693.00.022100.00EF-26 -0.065

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.

If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

Study Case: SC

16.2.0C Page: 36

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

= 100.00 % of nominal bus kV (4.160 kV)

= 100.00 % of base (4.160 kV)

Prefault voltage = 4.160 kV

3-phase fault at bus: FGC-1 Starter

ID Magnitude/RealImaginaryRealFrom BusMagnitude/RealRealFrom BusID Imaginary

From Bus To Bus % V kA kA Imag. kA Symm. % V kA kA Imag. kA Symm.

Contribution 1/2 Cycle 1.5 to 4 Cycle

Total 16.6623.94.1150.00FGC-1 Starter -16.146 0.00 4.046 -15.882 3.9 16.389

FGC-1 Starter 16.3563.94.09623.02SG-4001 -15.835 22.90 4.038 -15.758 3.9 16.267

FGC-1 Starter 0.31116.40.0190.05FGC-01_BUS -0.311 0.02 0.008 -0.124 16.5 0.124

NACD Ratio = 0.64

# Indicates a fault current contribution from a three-winding transformer.

* Indicates a fault current through a tie circuit breaker.

If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

NIST CHP ETAP SHORT-CIRCUIT ANALYSIS

Study Case: SC

16.2.0C Page: 37

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

= 100.00 % of nominal bus kV (4.160 kV)

= 100.00 % of base (4.160 kV)

Prefault voltage = 4.160 kV

3-phase fault at bus: FGC-01_BUS

ID Magnitude/RealImaginaryRealFrom BusMagnitude/RealRealFrom BusID Imaginary

From Bus To Bus % V kA kA Imag. kA Symm. % V kA kA Imag. kA Symm.

Contribution 1/2 Cycle 1.5 to 4 Cycle

Total 16.4023.74.3310.00FGC-01_BUS -15.820 0.00 4.261 -15.560 3.7 16.133

FGC-01_BUS 16.0973.64.3122.39FGC-1 Starter -15.509 2.38 4.254 -15.436 3.6 16.011

FGC-01_BUS 0.31116.50.019100.00FGC-01 -0.311 100.00 0.008 -0.124 16.5 0.124

NACD Ratio = 0.64

# Indicates a fault current contribution from a three-winding transformer.

If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

Study Case: SC

16.2.0C Page: 38

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

= 100.00 % of nominal bus kV (0.480 kV)

= 100.00 % of base (0.480 kV)

Prefault voltage = 0.480 kV

3-phase fault at bus: FGC-PP

ID Magnitude/RealRealFrom BusID Imaginary

From Bus To Bus % V kA kA Imag. kA Symm.

Contribution 1/2 Cycle

Total 5.0670.64.3330.00FGC-PP -2.628

FGC-PP 5.0010.64.30680.96MCC-7 -2.544

FGC-PP 0.0893.20.0261.00RC1-VFD -0.085

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.

If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

Study Case: SC

16.2.0C Page: 39

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

= 100.00 % of nominal bus kV (0.480 kV)

= 100.00 % of base (0.480 kV)

Prefault voltage = 0.480 kV

3-phase fault at bus: H3103_BUS

ID Magnitude/RealRealFrom BusID Imaginary

From Bus To Bus % V kA kA Imag. kA Symm.

Contribution 1/2 Cycle

Total 1.9450.21.9190.00H3103_BUS -0.318

H3103_BUS 1.9450.21.91995.82MCC-7 -0.318

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.

If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

Study Case: SC

16.2.0C Page: 40

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2016

Revision: Base

Config.: Normal

= 100.00 % of nominal bus kV (0.480 kV)

= 100.00 % of base (0.480 kV)

Prefault voltage = 0.480 kV

3-phase fault at bus: M1300 VFD_BUS

ID Magnitude/RealRealFrom BusID Imaginary

From Bus To Bus % V kA kA Imag. kA Symm.

Contribution 1/2 Cycle

Total 15.3273.83.8870.00M1300 VFD_BUS -14.826

M1300 VFD_BUS 14.5543.73.8002.93MCC-7 -14.049

M1300 VFD_BUS 0.7828.90.0871.12M1330_BUS -0.777

M1300 VFD_BUS 0.000999.90.0000.00M1300-HTR_BUS 0.000

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.

If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

Study Case: SC

16.2.0C Page: 41

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

= 100.00 % of nominal bus kV (0.480 kV)

= 100.00 % of base (0.480 kV)

Prefault voltage = 0.480 kV

3-phase fault at bus: M1300-HTR_BUS

ID Magnitude/RealRealFrom BusID Imaginary

From Bus To Bus % V kA kA Imag. kA Symm.

Contribution 1/2 Cycle

Total 0.9210.10.9180.00M1300-HTR_BUS -0.070

M1300-HTR_BUS 0.9210.10.91898.21M1300 VFD_BUS -0.070

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.

If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

Study Case: SC

16.2.0C Page: 42

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

= 100.00 % of nominal bus kV (0.480 kV)

= 100.00 % of base (0.480 kV)

Prefault voltage = 0.480 kV

3-phase fault at bus: M1330_BUS

ID Magnitude/RealRealFrom BusID Imaginary

From Bus To Bus % V kA kA Imag. kA Symm.

Contribution 1/2 Cycle

Total 13.0442.84.3280.00M1330_BUS -12.305

M1330_BUS 12.2782.74.24617.65M1300 VFD_BUS -11.520

M1330_BUS 0.7899.50.082100.00M1300 -0.785

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.

If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

Study Case: SC

16.2.0C Page: 43

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

= 100.00 % of nominal bus kV (0.480 kV)

= 100.00 % of base (0.480 kV)

Prefault voltage = 0.480 kV

3-phase fault at bus: M3150-HTR_BUS

ID Magnitude/RealRealFrom BusID Imaginary

From Bus To Bus % V kA kA Imag. kA Symm.

Contribution 1/2 Cycle

Total 0.8400.10.8370.00M3150-HTR_BUS -0.059

M3150-HTR_BUS 0.8400.10.83798.512O_BUS -0.059

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.

If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

Study Case: SC

16.2.0C Page: 44

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

= 100.00 % of nominal bus kV (0.480 kV)

= 100.00 % of base (0.480 kV)

Prefault voltage = 0.480 kV

3-phase fault at bus: M3150_BUS

ID Magnitude/RealRealFrom BusID Imaginary

From Bus To Bus % V kA kA Imag. kA Symm.

Contribution 1/2 Cycle

Total 0.8480.10.8450.00M3150_BUS -0.069

M3150_BUS 0.8400.10.83798.512O_BUS -0.059

M3150_BUS 0.0131.30.008100.00M3150 -0.011

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.

If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

Study Case: SC

16.2.0C Page: 45

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

= 100.00 % of nominal bus kV (0.480 kV)

= 100.00 % of base (0.480 kV)

Prefault voltage = 0.480 kV

3-phase fault at bus: M-3220_BUS

ID Magnitude/RealRealFrom BusID Imaginary

From Bus To Bus % V kA kA Imag. kA Symm.

Contribution 1/2 Cycle

Total 1.7440.21.7250.00M-3220_BUS -0.261

M-3220_BUS 1.7260.11.71096.541O_BUS -0.230

M-3220_BUS 0.0342.10.015100.00M-3220 -0.031

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.

* Indicates a fault current through a tie circuit breaker.

If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

NIST CHP ETAP SHORT-CIRCUIT ANALYSIS

Study Case: SC

16.2.0C Page: 46

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

= 100.00 % of nominal bus kV (0.480 kV)

= 100.00 % of base (0.480 kV)

Prefault voltage = 0.480 kV

3-phase fault at bus: M-3320-HTR_BUS

ID Magnitude/RealRealFrom BusID Imaginary

From Bus To Bus % V kA kA Imag. kA Symm.

Contribution 1/2 Cycle

Total 1.1020.11.0980.00M-3320-HTR_BUS -0.095

M-3320-HTR_BUS 1.1020.11.09897.991O_BUS -0.095

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.

If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

Study Case: SC

16.2.0C Page: 47

SN:

Filename: NIST CHP FINAL

Project: NIST CHP ETAP

Contract:

Date: 04-25-2018

Revision: Base

Config.: Normal

= 100.00 % of nominal bus kV (0.480 kV)

= 100.00 % of base (0.480 kV)

Prefault voltage = 0.480 kV

3-phase fault at bus: M6211-HTR_BUS

ID Magnitude/RealRealFrom BusID Imaginary

From Bus To Bus % V kA kA Imag. kA Symm.

Contribution 1/2 Cycle

Total 0.9220.10.9190.00M6211-HTR_BUS -0.069

M6211-…