Attachment F Project Price Breakdown.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
FY22-Tier 1: STA (PROJ: 673-21-122) D/B Install Police Evidence Secured Storage
Solicitation number
36C24822R0319
Issued by

View the file

Other files

File Type Posted
Award Notice FBO.pdf PDF
36C24822R0319 0004.pdf PDF
36C24822R0319 0003.pdf PDF
Attachments 36C24822R0319 0002.pdf PDF
36C24822R0319 0002.docx DOCX document
673-21-122 Site Visit Sign in Sheet.pdf PDF
36C24822R0319 0001.docx DOCX document
VA 01 00 00 General Requirements - Attachment 3.pdf PDF
VA 01 00 00 General Requirements - Attachment 6.pdf PDF
Attachment G Site Map.pdf PDF
Attachment H 010000 General Requirements 673 21 122.pdf PDF
36C24822R0319 RFP.pdf PDF
Attachment I 013526 Safety Requirements - 01-May-2020.pdf PDF
List of Attachments.docx DOCX document
VA 01 00 00 General Requirements - Appendix B.pdf PDF
VA 01 00 00 General Requirements - Attachment 1a and 1b.pdf PDF
VA 01 00 00 General Requirements - Appendix D.pdf PDF
VA 01 00 00 General Requirements - Appendix A.pdf PDF
Attachment B FL20210208 dtd 10.01.21 Hillsborough County.pdf PDF
Attachment A Mask Specification (PPE).pdf PDF
VA 01 00 00 General Requirements - Attachment 5a and 5b.pdf PDF
Attachment C Contractor Safety and Environmental Record Form.pdf PDF
VA 01 00 00 General Requirements - Attachment 4.pdf PDF
Attachment E Past Performance Questionnaire.pdf PDF
VA 01 00 00 General Requirements - Attachment 2.pdf PDF
Attachment D Experience Information Sheet.pdf PDF
VA 01 00 00 General Requirements - Appendix C.pdf PDF
Attachment J 014219 Reference Standards.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer Attachment F

Project Price Breakdown

Project Number:Date:
Project Title
Project Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Edward L Roy: VA assigned project #

Edward L Roy: VA assigned Project TitleDivision 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Total Base Offer Cost $ - 0 $ - 0 $ - 0