36C24822R0319 0003.pdf

PDF 491 KB Posted

Attached to
FY22-Tier 1: STA (PROJ: 673-21-122) D/B Install Police Evidence Secured Storage
Solicitation number
36C24822R0319
Issued by

View the file

Other files

File Type Posted
Award Notice FBO.pdf PDF
36C24822R0319 0004.pdf PDF
Attachments 36C24822R0319 0002.pdf PDF
36C24822R0319 0002.docx DOCX document
673-21-122 Site Visit Sign in Sheet.pdf PDF
36C24822R0319 0001.docx DOCX document
VA 01 00 00 General Requirements - Attachment 3.pdf PDF
VA 01 00 00 General Requirements - Attachment 6.pdf PDF
Attachment G Site Map.pdf PDF
Attachment F Project Price Breakdown.xlsx XLSX spreadsheet
Attachment H 010000 General Requirements 673 21 122.pdf PDF
36C24822R0319 RFP.pdf PDF
Attachment I 013526 Safety Requirements - 01-May-2020.pdf PDF
List of Attachments.docx DOCX document
VA 01 00 00 General Requirements - Appendix B.pdf PDF
VA 01 00 00 General Requirements - Attachment 1a and 1b.pdf PDF
VA 01 00 00 General Requirements - Appendix D.pdf PDF
VA 01 00 00 General Requirements - Appendix A.pdf PDF
Attachment B FL20210208 dtd 10.01.21 Hillsborough County.pdf PDF
Attachment A Mask Specification (PPE).pdf PDF
VA 01 00 00 General Requirements - Attachment 5a and 5b.pdf PDF
Attachment C Contractor Safety and Environmental Record Form.pdf PDF
VA 01 00 00 General Requirements - Attachment 4.pdf PDF
Attachment E Past Performance Questionnaire.pdf PDF
VA 01 00 00 General Requirements - Attachment 2.pdf PDF
Attachment D Experience Information Sheet.pdf PDF
VA 01 00 00 General Requirements - Appendix C.pdf PDF
Attachment J 014219 Reference Standards.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 3

01-12-2022

673-21-122

36C248

Department of Veterans Affairs Network Contracting Office 8 (NCO 8)

8875 Hidden River Pkwy Suite 525 Tampa FL 33637

36C248

Department of Veterans Affairs Network Contracting Office 8 (NCO 8)

8875 Hidden River Pkwy Tampa FL 33637

To all Offerors/Bidders

36C24822R0319

12-22-2021

X

X X

See CONTINUATION Page

X 1

The purpose of this amendment is to provide additional RFI Questions and Responses.

Stacy Figlinski Contracting Officer

CONTINUATION PAGE

Requests for Information (RFI) Project: 673-21-122, Install Police Evidence Secured Storage RFP Number 36C24822R0319 Amendment 3

Question 1. For the design, please confirm a licensed engineer may complete the documents – an architect is not required.

A licensed engineer will suffice.

Question 2. Please provide a set of drawings as-built for the area, and adjacent spaces.

There are no actual “as-builts” I have provided all the prints for this building.

Question 3. On the drawings, please indicate the existing electrical panel to be relocated.

The VA recommends that it be installed in the wall that the contractor will build. That is the best place in the immediate area fir it to be placed. Due to the adjacent interior wall being of masonry construction.

Question 4. On the drawings, please indicate existing wall types and construction.

North wall is masonry with a 3 ½” metal frame w/drywall fur. East wall is masonry with a 1” fur strip drywall. West wall is a 3 ½” metal framed w/drywall fur.

Question 5. Please note the Physical security guidelines/specifications to govern design.

PHYSICAL SECURITY & RESILIENCY DESIGN MANUAL October 1, 2020.

Question 6. Please note the MEP specifications to govern design.

MEP shall follow the TIL.

Question 7. Please note the electronic security specifications for the project.

This information is within the TIL and PSDM 2020.

Question 8. Please confirm bandwidth, existing pathway, and capacity for any new security cameras or security devices.

No Camera in this project and It has been confirmed with Electronics shop that there is an open reader and lock port.

Question 9. Please provide contact info for the incumbent electronics contractor managing the existing security /camera systems the new project will join.

American Dynamic system.

Question 10. Please specify make and model of door hardware preferred site wide.

There are different makes and models in the facility please ensure that it follows specifications on the TIL and PDSM 2020 or field verify.

Question 11. Please specify make and model of security cameras preferred site wide.

N/A

Question 12. At the site visit it was noted by the tenants that existing cabinets would be relocated to the new space, open shelving was requested to complete the new space, please confirm.

No shelving is requested for the project

Question 13. The RFP calls out a non-pass-through evidence locker with a minimum of 12 compartments – from the site visit please confirm this is not required.

Not required

File details come from the government source that posted it. Updated .