Attachment F - Price Schedule 1905345.pdf

PDF 87 KB Posted

Attached to
NSA Portsmouth Pierside Defueling ESS Cable
Solicitation number
N4008526R0210
Issued by

About this file

This is a Price Schedule template for eProject #1905345 "Wharf Three Pierside Defueling ESS," a fiber optic installation project. The schedule presents three mutually exclusive contract line items, with award to be made on only one of the three options based on total price.

Line Item 1 represents the complete project scope, including installation of fiber between building 1539 and new service rack #1, and fiber between building 9251 and new service rack #2, with all work performed through new and existing conduit and duct bank in accordance with provided drawings and specifications. Line Item 2 (Bid Option A) covers only the fiber installation between building 1539 and new wharf three service rack #1, while Line Item 3 (Bid Option B) covers only the fiber installation between building 9251 and new wharf three service rack #2. All line items are priced on a lump sum (LS) basis with a quantity of 1. Bidders must provide total price entries in the designated spaces for each contract line item; the contracting officer will award to the single lowest-priced option among the three alternatives submitted.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE SCHEDULE

(08/24)

1.1 CONTRACT LINE ITEMS

Provide line item prices, where indicated by blank underlines, for the following items:

Line Item

Description Quantity Unit Unit Price

Sub- Total

Total Price

1 Total price for the entire work on eProject #1905345 “Wharf Three Pierside Defueling ESS.”

This includes the installation of fiber between building 1539 and new service rack #1 and fiber between building 9251 and new service rack #2 through new/existing conduit and duct bank in accordance with the drawings and specifications complete.

1 LS $_____

2 Total price on bid option A on eProject #1905345 “Wharf Three Pierside Defueling ESS.”

This involves the installation of fiber between building 1539 and a new wharf three service rack (#1) through new/existing conduit and duct bank in accordance with the drawings and specifications.

1 LS $_____

3 Total price on bid option B on eProject #1905345 “Wharf Three Pierside Defueling ESS.”

This involves the installation of fiber between building 9251 and a new wharf three service rack (#2) through new/existing conduit and duct bank in accordance with the drawings and specifications.

1 LS $_____

1.2 GENERAL NOTES

a. Award will be made on the total sum of Contract Line Item 1, 2, or 3. Multiple contract line items will not be awarded. Enter price totals in spaces provided.