| Attachment F - JOFI Exhibit: Fabrication Estimate Form | | | | | |
| | | Labor | Materials | Totals |
| PROJECT MANAGEMENT | | $0.00 | | $0.00 |
| FABRICATION DRAWINGS | | $0.00 | $0.00 | $0.00 |
| SAMPLES | | $0.00 | $0.00 | $0.00 |
| LIGHTING | | $0.00 | $0.00 | $0.00 |
| EXHIBIT STRUCTURES | | $0.00 | $0.00 | $0.00 |
| CUSTOM ELEMENTS | | $0.00 | $0.00 | $0.00 |
| ELECTRICAL/ ELECTRONIC | | $0.00 | $0.00 | $0.00 |
| GRAPHICS | | $0.00 | $0.00 | $0.00 |
| CONSERVATION | | $0.00 | $0.00 | $0.00 |
| PROJECT CLOSEOUT | | $0.00 | $0.00 | $0.00 |
| SHIPPING | | $0.00 | $0.00 | $0.00 |
| INSTALLATION | | $0.00 | $0.00 | $0.00 |
| TRAVEL | | $0.00 | $0.00 | $0.00 |
| | | $0.00 | $0.00 | |
| | Grand Total | | | $0 |
| PROJECT MANAGEMENT (excluding travel) | | | | | |
| LABOR | | hours | x | rate | amount |
| Project Manager | | hours @ | | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Project Management $0.00
| Fabrication Drawings | | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| Miscellaneous | | job | | $0.00 |
| SUBTOTAL MATERIALS | | $0.00 |
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | | | | $0.00 |
| LABOR | | hours | x | rate | amount |
| Detailling | | hours @ | | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Fabrication Drawings $0.00
| Samples/Mock-ups/Prototypes | | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| graphic samples | | job | | $0.00 |
| graphic samples-color proofs | | job | | $0.00 |
| custom elements samples | | job | | $0.00 |
| prototypes | | job | | $0.00 |
| SUBTOTAL MATERIALS | | $0.00 |
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | | | | $0.00 |
| LABOR | | hours | x | rate | amount |
| exhibit spec-fabrication | | hours @ | | $0.00 |
| model maker | | hours @ | | $0.00 |
| TOTAL ALL LABOR | | | | $0.00 |
TOTAL Samples $0.00
| Lighting | | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| Lighting Type: | | Each | | $0.00 |
| Lighting Type: | | Each | | $0.00 |
| Lighting Type: | | Each | | $0.00 |
| Lighting Type: | | per foot | | $0.00 |
| Lighting Type: | | per foot | | $0.00 |
| Lighting Type: | | per foot | | $0.00 |
| Lighting Type: | | per foot | | $0.00 |
| Lighting Type: | | each | | $0.00 |
| Lighting Type: | | each | | $0.00 |
| Lighting Type: | | each | | $0.00 |
| Scissor Lift rental | | Week | | $0.00 |
| Scissor Lift Delivery | | PU/Ret | | $0.00 |
| SUBTOTAL, AV EQUIPMENT | | $0.00 |
| MARK-UP on materials | percent | $0.00 |
TOTAL ALL MATERIALS $0.00
| LABOR | | hours | x | rate | amount |
| Lighting Technician | | hours @ | | $0.00 |
| TOTAL ALL LABOR | | | | $0.00 |
TOTAL Lighting $0.00
| Exhibit Structures | | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000. CE-01-02-250 Reading Rail Structure | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| 2 | ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| 3 | ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| 4 | ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| 5 | ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| 6 | ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| 7 | ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| 8 | ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| 9 | ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| SUBTOTAL MATERIALS | | | | $0.00 |
| MARK-UP on materials | | percent | | $0.00 |
TOTAL ALL MATERIALS $0.00
| LABOR | | hours | x | rate | amount |
| Fabrication Shop Supervisor | | hours @ | | $0.00 |
| Exhibit Specialist (Fabrication) | | hours @ | | $0.00 |
| TOTAL ALL LABOR | | | | $0.00 |
TOTAL Exhibit Structures $0.00
| Custom Elements | | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| CE-01-01-025 NPS Arrowhead | | Job | | $0.00 |
| CE-01-02-300 Reproduction Card File Box with lifting cards | | Job | | $0.00 |
| CE-01-02-400 Telephone Reproduction | | Job | | $0.00 |
| CE-01-03-400 Frame for Photo 1 | | Job | | $0.00 |
| CE-01-03-450 Frame for Photo 2 | | Job | | $0.00 |
| CE-01-03-475 Frame for Photo 3 | | Job | | $0.00 |
| CE-00.00-000 | | Job | | $0.00 |
| CE-00.00-000 | | Job | | $0.00 |
| CE-00.00-000 | | Job | | $0.00 |
| CE-00.00-000 | | Job | | $0.00 |
| CE-00.00-000 | | Job | | $0.00 |
| CE-00.00-000 | | Job | | $0.00 |
| CE-00.00-000 | | Job | | $0.00 |
| CE-00.00-000 | | Job | | $0.00 |
| CE-00.00-000 | | Job | | $0.00 |
| CE-00.00-000 | | Job | | $0.00 |
| CE-00.00-000 | | Job | | $0.00 |
| CE-00.00-000 | | Job | | $0.00 |
| CE-00.00-000 | | Job | | $0.00 |
| CE-00.00-000 | | Job | | $0.00 |
| CE-00.00-000 | | Job | | $0.00 |
| CE-00.00-000 | | Job | | $0.00 |
| SUBTOTAL MATERIALS | | $0.00 |
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | | | | $0.00 |
| LABOR | | hours | x | rate | amount |
| Map model maker | | hours @ | | $0.00 |
| Model maker | | hours @ | | $0.00 |
| Illustrator | | hours @ | | $0.00 |
| TOTAL ALL LABOR | | | | $0.00 |
| TOTAL CE | | | | | $0.00 |
| Electrical/Electronic | | | | | |
| MATERIALS - AV EQUIPMENT: | | qty. | unit | unit cost | amount |
| EP-00.00-000 Audio Description | | | | | |
| Beacons | | each | | $0.00 |
| Headphone cushion sanitary cover, black, 50 pair | | each | | $0.00 |
| Headphone cushion sanitary cover, black, Master carton of (12) 50 pair | | each | | $0.00 |
| Headphones | | each | | $0.00 |
| Induction neckloop | | each | | $0.00 |
| iPhone XR, black, 128GB, unlocked sim-free | | each | | $0.00 |
| Lanyard, 5/8", breakaway, cell phone loop / keyring, dark forest green, NPS text | | each | | $0.00 |
| Lightning to 3.5 mm Headphone Jack Adapter, 2 pack | | each | | $0.00 |
| Refresh Kit, replacement cushion and bag | | each | | $0.00 |
| Ruggedized case for media player | | each | | $0.00 |
| Sreen Protector for media player | | each | | $0.00 |
| USB charging station, 6 ports, 6 Apple cables, white | | each | | $0.00 |
| EP-01-02-425 Sound Equipment in Telephone | | | job | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| EP-01-02-425 Telephone Audio Program | | | job | | |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| EP-00.00-000 | | | | | |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| EP-00.00-000 | | | | | |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| EP-00.00-000 | | | | | |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| EP-00.00-000 | | | | | |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| EP-00.00-000 | | | | | |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| EP-00.00-000 | | | | | |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| EP-00.00-000 | | | | | |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| EP-00.00-000 | | | | | |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| EP-00.00-000 | | | | | |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| SUBTOTAL, AV EQUIPMENT | | | | $0.00 |
| MARK-UP on materials | | percent | | $0.00 |
| TOTAL ALL MATERIALS | | | | $0.00 |
| LABOR (Production) | | hours | x | rate | amount |
| Audio Describer | | Hours | | $0.00 |
| AV Producer | | Hours | | $0.00 |
| AV Technician | | Hours | | $0.00 |
| Electrical Technician | | Hours | | $0.00 |
| Videographer | | Hours | | $0.00 |
| EP-01-02-425 Telephone Audio Program | | job | | $0.00 |
TOTAL ALL LABOR (see AV Estimate for Detail) $0.00
TOTAL Electrical/Mechanical/AV $0.00
| Graphics | | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| 0 | GL-00.00-00 | | Job | | $0.00 |
| GL-00.00-00 | | Job | | $0.00 |
| 1 | GL-01-01-050 Site ID | | Job | | $0.00 |
| GL-01-01-100 Enlarged Quote by Door | | Job | | $0.00 |
| GL-01-01-200 Welcome Panel | | Job | | $0.00 |
| GL-01-01-250 History and Memory Panel | | Job | | $0.00 |
| GL-01-01-300 Logistics Signage | | Job | | $0.00 |
| GL-01-01-400 Enlarged Quote behind Desk | | Job | | $0.00 |
| 2 | GL-01-02-100 Primary Panel | | Job | | $0.00 |
| GL-01-02-150 Callout Panel | | Job | | $0.00 |
| GL-01-02-200 Reading Rail Graphic Panel | | Job | | $0.00 |
| GL-01-02-310 thru GL-01-02 Card Graphics | | Job | | $0.00 |
| 3 | GL-01-03-100 Applied Mural on Cabinet Doors | | Job | | $0.00 |
| GL-01-03-110 Mural Caption | | Job | | $0.00 |
| GL-01-03-120 Mural Quote 1 | | Job | | $0.00 |
| GL-01-03-130 Mural Quote 2 | | Job | | $0.00 |
| GL-01-03-300 Family Photo 1 | | Job | | $0.00 |
| GL-01-03-350 Family Photo 2 | | Job | | $0.00 |
| GL-01-03-375 Family Photo 3 | | Job | | $0.00 |
| GL-00.00-00 | | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| 4 | GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| 5 | GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| 6 | GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| GL-00.00-00 | 1 | Job | | $0.00 |
| SUBTOTAL MATERIALS | | | | $0.00 |
| MARK-UP on materials | | percent | | $0.00 |
| TOTAL ALL MATERIALS | | | | $0.00 |
| LABOR | | hours | x | rate | amount |
| Graphics Shop Supervisor | | hours @ | | $0.00 |
| Exhibit Specialist (Graphics) | | hours @ | | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Graphics $0.00
| Conservation (Artifact/Prop Mounting) | | | | |
| MATERIALS: | qty. | unit | unit cost | amount |
| | job | | $0.00 |
| | job | | $0.00 |
| | job | | $0.00 |
| SUBTOTAL MATERIALS | | $0.00 |
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | | | | $0.00 |
| LABOR | | hours | x | rate | amount |
| Mount maker | | hours @ | | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Conservation $0.00
| PROJECT CLOSEOUT | | | | |
| MATERIALS: | qty. | unit | unit cost | amount |
| | job | | $0.00 |
| SUBTOTAL MATERIALS | | $0.00 |
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | | | | $0.00 |
| LABOR | | hours | x | rate | amount |
| Project Manager | | hours @ | | $0.00 |
| TOTAL ALL LABOR | | | | $0.00 |
TOTAL Project Closeout $0.00
| SHIPPING | | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| Packing | | job @ | | $0.00 |
| Shipping | | job @ | | $0.00 |
TOTAL MATERIALS $0.00
| LABOR | | hours | x | rate | amount |
| Exhibit Spec - Fabrication | | hours @ | | $0.00 |
TOTAL ALL LABOR $0.00
Total Shipping $0.00
| INSTALLATION | | | | | |
| Project Manager | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| air fare | | job @ | | $0.00 |
| per diem | | days @ | | $0.00 |
| Rental Van and Gas | | days @ | | $0.00 |
| Lodging | | days @ | | $0.00 |
| Total | | | | $0.00 |
| LABOR | | hours | x | rate | amount |
| Project Manager (1 Person) | | hours @ | | $0.00 |
| Total Travel and Accomodation for: Project Manager | | | | $0.00 |
| Fabrication Installers | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| air fare | | job @ | | $0.00 |
| per diem | | days @ | | $0.00 |
| Lodging | | days @ | | $0.00 |
| | | | | $0.00 |
| LABOR | | | | | |
| Exhibit Spec - Fabricator | | hours @ | | $0.00 |
| Exhibit Spec - Fabricator | | hours @ | | $0.00 |
| Exhibit Spec - Fabricator | | hours @ | | $0.00 |
| Exhibit Spec - Fabricator | | hours @ | | $0.00 |
| Total | | | | $0.00 |
Total Travel and Accomodation for: Installer $0.00
| Lighting Specialists | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| air fare | | Each | | $0.00 |
| Rental Car and Gas | | days @ | | $0.00 |
| per diem | | days @ | | $0.00 |
| Lodging | | days @ | | $0.00 |
| | | | | $0.00 |
| LABOR | | | | | |
| Lighting Designer | | hours @ | | $0.00 |
| Lighting Technician | | hours @ | | $0.00 |
| Total | | | | $0.00 |
Total Travel and Accomodation for: Lighting $0.00
| Exhibit AV Specialist | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| air fare | | Each | | $0.00 |
| Rental Car and Gas | | days@ | | $0.00 |
| per diem | | days @ | | $0.00 |
| Lodging | | days @ | | $0.00 |
| | | | | $0.00 |
| LABOR | | | | | |
| AV Technician | | hours @ | | $0.00 |
| Total | | | | $0.00 |
Total Travel and Accomodation for: AV Specialist $0.00
| Object Mounter and Installer | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| air fare | | Each | | $0.00 |
| Rental Car and gas | | days @ | | $0.00 |
| per diem | | days @ | | $0.00 |
| Lodging | | days @ | | $0.00 |
| | | | | $0.00 |
| LABOR | | | | | |
| Object Installer and Mount Maker | | hours @ | | $0.00 |
| Object Installer and Mount Maker | | hours @ | | $0.00 |
| | | | | $0.00 |
Total Travel and Accomodation for: Object Installer $0.00
TOTAL ALL MATERIALS: INSTALLATION $0.00
TOTAL ALL LABOR: INSTALLATION $0.00
Total Installation $0.00
| OTHER TRAVEL | | | | | |
| Postaward meeting | | | | | |
| MATERIALS: | | | | | |
| | qty. | unit | unit cost | amount |
| air fare | | job @ | | $0.00 |
| per diem | | days @ | | $0.00 |
| lodging | | days @ | | $0.00 |
| Rental car and gas | | days @ | | $0.00 |
| Misc. | | job @ | | $0.00 |
TOTAL MATERIALS 1 PM $0.00
| Building Prep Site Visit | | | | | |
| MATERIALS: | | | | | |
| | qty. | unit | unit cost | amount |
| air fare | | job @ | | $0.00 |
| per diem | | days @ | | $0.00 |
| lodging | | days @ | | $0.00 |
| Rental car and gas | | days @ | | $0.00 |
| Misc. | | job @ | | $0.00 |
TOTAL MATERIALS 1 PM $0.00
| LABOR | | hours | x | rate | amount |
| Project Manager | | hours @ | | $0.00 |
TOTAL ALL LABOR $0.00
Total Travel $0.00