Attachment F - Bid Alternate No. 1 - Elevator No. 3 - Invitation for Bids - HECO-12.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Enterprise Hall Elevator Modernization
Solicitation number
IFB-127890
Issued by
Fairfax County, Virginia

About this file

This is a bid alternate form for George Mason University's Enterprise Hall Elevator Modernization project (HECO-12) in Virginia, specifically addressing Bid Alternate No. 1 for Elevator No. 3. The form requires contractors to submit detailed pricing broken down by specification sections and sub-categories, with all line items and calculations required to correspond with the total base bid amount submitted through Mason's e-Builder System.

Contractors must provide itemized pricing that includes separate entries for taxes and insurance (listed as a percentage with corresponding dollar value) and contractor's fee (listed as a percentage with corresponding dollar value). The total base bid amount must precisely match the amount entered into Mason's e-Builder System. The form template shows a current total base bid amount of $0.00, indicating this is a blank template awaiting contractor completion. Bidders are explicitly instructed not to alter the format of the form, ensuring standardized submission and evaluation across all bids received for this elevator modernization alternate.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

GEORGE MASON UNIVERSITY
INVITATION FOR BID - HECO-12 FORM
Project No:Date Submitted
Project Name:Submitted By
Submitted By:
BIDDERS DO NOT MAKE ANY CHANGES TO THE FORMAT OF THIS FORM
SPEC SECTIONDESCRIPTION - BID ALTERNATE NO. 1 - ELEVATOR NO. 3 - Contractor is required to submit a detailed pricing broken down by each category including sub-categories utilizing the Invitation for Bid - HECO-12 Form that is required to match the Total Base Bid Amount as entered into Mason’s Trimble System for Bid Alternate No. 1TOTAL VALUE

Specification Section Description Sub-Section Description

Taxes & Insurance(enter percentage here = %; total dollar value in total value column
Contractor's Fee(enter percentage here = %; total dollar value in total value column
TOTAL BASE BID AMOUNT (must match total base bid amount as entered into Mason's e-Builder System)$0.00

File details come from the government source that posted it. Updated .