Attachment B - Approved for Const Project Drawings - 03.17.26.pdf
PDF 31 MB Posted
- Attached to
- Enterprise Hall Elevator Modernization
- Solicitation number
- IFB-127890
- Issued by
- Fairfax County, Virginia
About this file
This is a set of approved construction project drawings for the Enterprise Hall Elevator Modernization project at George Mason University in Fairfax, Virginia, involving the Office of the University Building Official (OUBO). The project consists of the modernization of three hydraulic elevators in the Enterprise Hall classroom and office building, with Elevators #1 and #2 comprising a 5-stop elevator bank and Elevator #3 a 3-stop elevator. Modernization work includes renovations of the elevator pit, replacement of elevator doors, upgrades to new interior stainless steel panels, lighting, and call buttons, and all necessary modifications to bring the elevators into compliance with current code requirements. The project is classified as a Level II Alteration per the Virginia Uniform Statewide Building Code (VUSBC) 2021 Edition, and work will be conducted in two phases to maintain building occupancy and elevator access to all floors during construction. The drawing set includes comprehensive plans and details across multiple disciplines: general, architectural, mechanical, plumbing, electrical, telecom, fire alarm, and sprinkler systems, with sheets indexed for floor plans at various elevator locations and levels, reflected ceiling plans, interior elevations, sections, details, and schedules.
The project is governed by the VUSBC 2021 Edition, Virginia State Fire Prevention Code 2021 Edition, Higher Education Capital Outlay (HECO) 2023 Edition, and the George Mason University Design Manual 2013 Edition. The compliance path for accessibility follows ADA-SO-Title II with technical standards per the 2010 ADA Standards for Accessible Design and AI 17.1-2017. The building is exempt from the High Performance Building Act compliance because renovation costs do not exceed 50% of the building's value, and must comply with Virginia Energy Conservation Code (VECC) Sections C402 through C405 and C408. The drawings were approved for construction on March 11, 2026, with an electronic approval stamp from the same date. The existing structure is a sprinklered, non-high-rise building originally constructed under the VUSBC 2021 Use & Occupancy Classification with a sprinklered construction type.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONCRETE
BRICK
CMU
GROUT
STEEL
WOOD LUMBER
FINISH LUMBER
PLYWOOD
GYPSUM WALLBOARD
BATT INSULATION
RIGID INSULATION
AREAS
OF WORK
ROOM NAME &
NUMBER
PARTITION TYPEDOOR TYPE
# WINDOW TYPE
LEVEL MARKER
KEYNOTE
SECTION REFERENCE
SECTION NUMBER
SHEET NUMBER WHERE
DETAIL IS LOCATED
SHEET NUMBER WHERE
DETAIL IS REFERENCED
FROM
DETAIL REFERENCE
DETAIL NUMBER
SHEET NUMBER
WHERE SECTION IS
REFERENCED FROM
SHEET NUMBER WHERE
SECTION IS LOCATED
ELEVATION REFERENCE
ELEVATION NUMBER
SHEET NUMBER WHERE
ELEVATION IS REFERENCED
FROM SHEET NUMBER WHERE
ELEVATION IS LOCATED
INTERIOR ELEVATION
ELEVATION NUMBER
SHEET NUMBER WHERE
ELEVATION IS LOCATED
SECTION NUMBER
SHEET NUMBER WHERE
SECTION IS LOCATED
Name
NAME
PROJECT LOCATION
O
X R D
EXISTING TO REMAIN
EXISTING TO BE DEMOLISHED
NEW CONSTRUCTION
I-
236 / MAIN ST
US 50
I-66
O
X R D
PROJECT LOCATION
US 29
BRIDGE RD
CH
AI
N
General
G0.01 Cover Sheet
G1.01 Egress, Occupancy & Fire Resistance Rating Plan
PH1.01 Phasing Plan
Architectural
AD1.01 Partial Demolition Floor Plan - Elev #1 & #2
AD1.02 Partial Demolition Floor Plan - Elevator #3
AD1.03 Partial Demo RCP - Elev #1 & #2
AD1.04 Partial Demo RCP - Elevator #3
AD4.01 Demo Int Elevations, Sections, and Details - Elevator #1 & #2
AD4.02 Demo Int Elevations, Sections, and Details - Elevator #3
A1.01 Partial Floor Plans - Elev #1 & #2
A1.02 Partial Floor Plans - Elevator #3
A1.03 Partial RCP - Elevator #1 & #2
A1.04 Partial RCP - Elevator #3
A4.01 Interior Elevations, Wall Sections, and Details - Elevator #1 & #2
A4.02 Interior Elevations, Wall Sections, and Details - Elevator #3
A5.01 Partition Type and Rath Wiring Diagram
A5.02 UL Details
Mechanical
M-001 Cover Sheet - Mechanical
M-101 Partial Demolition Floor Plans Elevator #1 & #2 - Mechanical
M-102 Partial Demolition Floor Plans Elevator #3 - Mechanical
M-201 Partial New Work Floor Plans Elevator #1 & #2 - Mechanical
M-202 Partial Demolition Floor Plan Elevator #3 - Mechanical
M-203 Site Plan New Work, Mechanical
M-301 Details - Mechanical
M-401 Schedules - Mechanical
Plumbing
P-001 Cover Sheet - Plumbing
P-201 Partial New Work Floor Plans - Elevator #1 & #2
P-202 Partial New Work Floor Plans - Elevator #3
Electrical
E-001 Cover Sheet - Electrical
E-101 Partial Demolition Floor Plans - Elevator #1 & #2
E-102 Partial Demolition Floor Plans - Elevator #3
E-201 Partial Lighiting Floor Plans - Elevator #1 & #2
E-202 Partial Power Floor Plans - Elevator #1 & #2
E-203 Partial Lighiting Floor Plans - Elevator #3
E-204 Partial Power Floor Plans - Elevator #3
E-205 Site Plan - Electrical
E-401 Power Riser Diagram
E-501 Panel Schedules - Electrical
Telecom
T-001 Cover Sheet - Telecom
T-201 Partial New Work Floor Plans - Elevator #1 & #2
T-202 Partial New Work Floor Plans - Elevator #3
Fire Alarm
FA0.01 Reference Sheet - Fire Alarm
FA1.00 Elev #1 & #2 Lower Floor Plans - Fire Alarm
FA1.01 Elev & #2 Level 1-4 Floor Plans - Fire Alarm
FA1.02 Elev #3 Lower Level Floor Plans - Fire Alarm
FA1.03 Elev #3 First Floor Plans - Fire Alarm
FA1.04 Elev #3 Second Floor Plans - Fire Alarm
FA5.01 Detail Sheet - Fire Alarm
Sprinkler
FX0.01 Reference Sheet - Sprinkler
FX1.00 Elev #1 & #2 Lower Floor Plans - Sprinkler
FX1.01 Elev & #2 Level 1-4 Floor Plans - Sprinkler
FX1.02 Elev #3 Lower Level Floor Plans - Sprinkler
FX1.03 Elev #3 First Floor Plans - Sprinkler
FX1.04 Elev #3 Second Floor Plans - Sprinkler
FX5.01 Detail Sheet - Sprinkler
SHEET INDEX
GMU Enterprise Hall
Elevator Modernization Project Code: 247-242012
4400 University Drive Fairfax, Virginia 22030
LAE
WN
O M
M O
OF
I
NI
G
RI
H V
E C TCRA
MICHAEL DETOMO
Lic. No. 15799
T
C
A
IH T
Consultants
703.684.5994
333 North Fairfax Street
Alexandria, Virginia 22314
Seal
Key Plan
Drawing
Revisions
Date
Project No.
Sheet No.
OUBO Submission 09/26/2025
Submission Set coleanddenny.com
PC No.: 247-242012
Permit Electronic Approval Stamp
03/11/2026
03/11/2026
20011.22
4400 University Drive Fairfax, Virginia 22030
G0.01
Cover Sheet
GMU Enterprise Hall Elevator Modernization
APPLICABLE CODES
MATERIALS
DRAWING SYMBOLS
CODE SUMMARY
LOCATION MAP
ABBREVIATIONS
PHASING
# NUMBER
& AND
@ AT
ACP ACOUSTICAL CEILING PANEL
AFF ABOVE FINISH FLOOR
ALT ALTERNATIVE
ALUM ALUMINUM
ASTM AMERICAN SOCIETY OF TESTING &
MATERIALS
BD BUILDING
BOT BOTTOM
CJ CONTROL JOINT
CLG CEILING
CLOS CLOSET
CMU CONCRETE MASONRY UNIT
CONC CONCRETE
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
DEMO DEMOLITION
DF DRINKING FOUNTAIN
DIA DIAMETER
DN DOWN
DS DOWNSPOUT
EF EXHAUST FAN
EIFS EXTERIOR INSULATION FINISHING SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
EQ EQUAL
EQUIP EQUIPMENT
ETR EXISTING TO REMAIN
EXIST EXISTING
EXT EXTERIOR
FE FIRE EXTINGUISHER
FRT FIRE RETARDANT TREATED
FT FEET/FOOT
GA GAUGE
GALV GALVANIZED
GWB GYPSUM WALL BOARD
HDWR HARDWARE
HM HOLLOW METAL
HR HOUR
IN INCH
INSUL INSULATION
INT INTERIOR
JAN JANITOR'S CLOSET
JT JOINT
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MO MASONRY OPENING
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NO NUMBER
OC ON CENTER
PLAM PLASTIC LAMINATE
PLUMB PLUMBING
PLYWD PLYWOOD
PT PRESSURE TREATED
PTD PAINTED
PVC POLYVINYL CHLORIDE
RB RESILIENT BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RM ROOM
SCW SOLID CORE WOOD
SF SQUARE FOOT/FEET
SIM SIMILAR
SST STAINLESS STEEL
STOR STORAGE
STRUCT STRUCTURAL
THRU THROUGH
TOS TOP OF STEEL
TYP TYPICAL
UL UNDERWRITER'S LABORATORIES
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITE TILE
VEST VESTIBULE
VIF VERIFY IN FIELD
VWC VINYL WALL COVERING
W/ WITH
WD WOOD
THE BUILDING CODE AUTHORITY IS THE OFFICE OF THE UNIVERSITY BUILDING OFFICIAL (OUBO) OF
GEORGE MASON UNIVERSITY (GMU).
THE BUILDING CODE FOR THIS PROJECT IS THE VIRGINIA UNIFORM STATEWIDE BUILDING CODE (VUSBC) 2021 EDITION, EFFECTIVE JANUARY 24, 2024. ALL WORK SHALL CONFORM TO THE BUILDING CODE.
THE PROJECT IS CLASSIFIED AS A LEVEL II ALTERATION PER SECTION 601 OF THE VIRGINIA EXISTING
BUILDING CODE, 2021 EDITION.
THE FIRE CODES FOR THIS PROJECT ARE THE VIRGINIA STATE FIRE PREVENTION CODE, 2021 EDITION.
THE HIGHER EDUCATION CAPITAL OUTLAY (HECO) 2023 EDITION APPLIES TO THIS PROJECT.
GEORGE MASON UNIVERSITY DESIGN MANUAL, 2013 EDITION
THE COMPLIANCE PATH FOR ACCESSIBILITY FOR THIS PROJECT IS ADASO-TITLE II. THE ADA STANDARD FOR SCOPE OF WORK IS CHAPTER 2 OF THE DOJ'S 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN (ASAD) DATED SEPTEMBER 16, 2010. THE ADA STANDARDS FOR TECHNICAL DESIGN ARE CHAPTERS | 8 THRU II OF STANDARDS FOR ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES AI 17.1-2017.
APPROVED MARCH 28, 2017.
THE PROJECT CONSISTS OF THE MODERNIZATION OF THREE HYDRAULIC ELEVATORS IN THE ENTERPRISE HALL CLASSROOM AND OFFICE BUILDING OF THE GEORGE MASON UNIVERSITY. ELEVATORS #1 & #2 IS A 5-STOP ELEVATOR BANK, AND ELEVATOR #3 IS A 3-STOP ELEVATOR. MODERNIZATION CONSISTS OF RENOVATIONS OF THE ELEVATOR PIT AND REPLACING ELEVATOR DOORS. THE ELEVATOR WILL ALSO BE UPGRADED WITH NEW INTERIOR STAINLESS STEEL INTERIOR PANELS, LIGHTING, AND CALL BUTTONS. ALL NECESSARY MODIFICATIONS SHALL BE MADE TO BRING THE ELEVATOR UP TO CURRENT CODE. WORK WILL BE CONDUCTED IN 2 PHASES SUCH THAT THE BUILDING WILL REMAIN OCCUPIED DURING CONSTRUCTION AND ELEVATOR ACCESS TO ALL
FLOORS SHALL BE MAINTAINED. SEE PHASING DIAGRAM AND NARRATIVE ON PH1.01
DESCRIPTION OF WORK
IN ACCORDANCE WITH THE HIGH PERFORMANCE BUILDING ACT, THE BUILDING IS EXEMPT FROM BUILDING IS EXEMPT FROM COMPLIANCE BECAUSE THE COST OF THE RENOVATIONS DOES NOT EXCEED 50% OF THE
VALUE OF THE BUILDING.
HIGH PERFORMANCE BUILDING ACT-
COMPLIANCE STATEMENT
IN ACCORDANCE WITH THE VIRGINIA ENERGY CONSERVATION CODE (VECC), THE BUILDING SHALL COMPLY WITH
VECC SECTIONS C402 THROUGH C405 AND C408.
VECC COMPLIANCE STATEMENT
ORIGINAL CODE BUILT UNDER:
ORIGINAL USE GROUP
ORIGINAL CONSTRUCTION TYPE:
VUSBC 2021 USE & OCC CLASSIFICATION
VUSBC 2021 CONSTRUCTION TYPE:
SPRINKLERED:
EXISTING BUILDING AREA:
EXISTING BUILDING HEIGHT:
NON-HIGH-RISE BUILDING PER <75'-0"
HIGHEST OCCUPIED FLOOR HEIGHT:
PROJECT AREA:
VUSBC 1990
A-3, B & E
IIA
A-3 & B
IIA
YES
101,200 GSF
6 STORIES, 86'-4"
70'-4"
3,250 SF
VICINITY MAP
ADDITIVE ITEM #1
PHASING
ALL WORK RELATED TO THE MODERNIZATION OF ELEVATOR #3 SHALL BE BID AS AN ADDITIVE ITEM.
THE PROJECT WORK WILL BE CONDUCTED IN 3 PHASES SUCH THAT THE BUILDING WILL REMAIN OCCUPIED DURING CONSTRUCTION AND ELEVATOR ACCESS TO ALL FLOORS SHALL BE MAINTAINED. EACH PHASE CONSISTS OF ONE ELEVATOR MODERNIZATION. SEE PH1.01 FOR PHASING PLAN AND NARRATIVE.
THE CONTRACTOR SHALL RETAIN THE NECESSARY DESIGN PROFESSIONALS LICENSED IN THE JURISDICTION OF THE PROJECT TO FULLY DESIGN AND DETAIL THE FOLLOWING DELEGATED DESIGN ITEMS. DELEGATED DESIGN SUBMITTALS SHALL INCLUDE SIGNED AND SEALED DRAWINGS AND CALCULATIONS AS NECESSARY:
1. SYSTEMS WITH SHOP DRAWING REVIEW & APPROVAL BY OUBO AFTER A/E REVIEW AND APPROVAL:
A. FIRE SUPPRESSION SYSTEMS
B. FIRE ALARM SYSTEMS
C. IN-BUILDING EMERGENCY COMMUNICATIONS INFRASTRUCTURE (RATH)
D. ELEVATOR CAB (ENGINEER SEAL NOT REQUIRED)
2. SYSTEMS WITH SHOP DRAWING REVIEW & APPROVAL BY THE A/E:
A. INTERIOR NON-LOAD BEARING METAL STUD WALLS
B. BOLTED AND WELDED STEEL CONNECTIONS
C. DUCTWORK SUPPORT HANGERS
D. PIPING SUPPORT HANGERS
E. ELEVATOR PIT LADDERS
DELEGATED DESIGN ITEMS
No. Revision Date 1 Response to Comments 11/20/2025
2 Response to Comments 02/09/2026
3 Response to Comments 03/11/2026
Revisions
Date
OUBO Submission 09/26/2025
Submission Set
03/11/2026
No. Revision Date 1 Response to Comments 11/20/2025
2 Response to Comments 02/09/2026
3 Response to Comments 03/11/2026
APPROVED FOR
CONSTRUCTION
Date = 03/17/2026
These construction documents have been examined in accordance with the 2021 Virginia Uniform Statewide Building Code (USBC). Submittals and/or shop drawings have not been provided or reviewed as part of this process.
The Registered Design Professional and/or Building/Tradesman Contractor shall be solely responsible for the correct installation and construction of all required systems in compliance with Federal, State, Local codes and manufacturing installation instructions. Request required special inspections and provide to A&E for review. Request inspections required by OUBO in accordance with OUBO policies and procedures. Any revisions that occur during the course of construction shall not be made to this set without the explicit permission of the OUBO in accordance with OUBO policies and procedures.
2-HR FIRE BARRIER
EGRESS STARTING POINT
POINT AT WHICH A CHOICE OF
TWO EXITS BECOMES AVAILABLE
REMAINING TRAVEL DISTANCE
(REMAINING TRAVEL DISTANCE +
COMMON PATH OF TRAVEL <300')
COMMON PATH OF TRAVEL (<100')
TYPE-B EGRESS LEGEND
AREAS
OF WORK
ELEC ROOM
LOBBY
KITCHENETTE
ELEV MACH
ROOM
LOBBY
47'
58'
113'
20'
TEL/
COMM
#1
ELEVATOR
#2
ELEVATOR
ELEV MACH
ROOM
#3
ELEVATOR
121'
66'
JAN CL
JAN CL
2-HR FIRE BARRIER
EGRESS STARTING POINT
POINT AT WHICH A CHOICE OF
TWO EXITS BECOMES AVAILABLE
REMAINING TRAVEL DISTANCE
(REMAINING TRAVEL DISTANCE +
COMMON PATH OF TRAVEL <250')
COMMON PATH OF TRAVEL (<75')
TYPE-A EGRESS LEGEND
LAE
WN
O M
M O
OF
I
NI
G
RI
H V
E C TCRA
MICHAEL DETOMO
Lic. No. 15799
T
C
A
IH T
Consultants
703.684.5994
333 North Fairfax Street
Alexandria, Virginia 22314
Seal
Key Plan
Drawing
Revisions
Date
Project No.
Sheet No.
OUBO Submission 09/26/2025
Submission Set coleanddenny.com
PC No.: 247-242012
Permit Electronic Approval Stamp
03/11/2026
03/11/2026
20011.22
4400 University Drive Fairfax, Virginia 22030
G1.01
Egress, Occupancy & Fire Resistance Rating Plan
GMU Enterprise Hall Elevator Modernization
1" = 10'-0"A1.03 G1.01
1 LOWER LEVEL EGRESS PLAN
0' 5' 10' 20'
SCALE: 1" = 10'
N
No. Revision Date
Revisions
Date
OUBO Submission 09/26/2025
Submission Set
03/11/2026
No. Revision Date 1 Response to Comments 11/20/2025
2 Response to Comments 02/09/2026
3 Response to Comments 03/11/2026
APPROVED FOR
CONSTRUCTION
Date = 03/17/2026
These construction documents have been examined in accordance with the 2021 Virginia Uniform Statewide Building Code (USBC). Submittals and/or shop drawings have not been provided or reviewed as part of this process.
The Registered Design Professional and/or Building/Tradesman Contractor shall be solely responsible for the correct installation and construction of all required systems in compliance with Federal, State, Local codes and manufacturing installation instructions. Request required special inspections and provide to A&E for review. Request inspections required by OUBO in accordance with OUBO policies and procedures. Any revisions that occur during the course of construction shall not be made to this set without the
X XX X X
AREAS
OF WORK
ELEC ROOM
LOBBY
KITCHENETTE
ELEV MACH
ROOM
LOBBY
PROVIDE SAFETY NETTING HOISTWAY
SCREENING SUCH THAT THE PORTION
OF THE ELEVATOR HOISTWAY WHERE
THE WORK IS TO BE PERFORMED
SHALL BE FULLY SEPARATED
PHASE 1 PHASE 2
PHASE 1&2
PHASE 3
ADDITIVE
ITEM #1
PHASE 1, 2, & 3
PROVIDE 4'X3' GCVIF EXTERIOR
CONCRETE PAD FOR NEW CONDENSING
UNIT PER 2/PH1.01. SEE MECH.
PROVIDE 8'X3' GCVIF EXTERIOR
CONCRETE PAD FOR NEW CONDENSING
UNIT PER 2/PH1.01. SEE MECH.
THE PROJECT WORK WILL BE CONDUCTED IN 3 PHASES SUCH THAT THE BUILDING WILL REMAIN OCCUPIED DURING CONSTRUCTION
AND ELEVATOR ACCESS TO ALL FLOORS SHALL BE MAINTAINED.
PHASE 1
1. INSTALL HOISTWAY SAFETY NETTING SUCH THAT ELEVATOR #1 AND ELEVATOR #2 ARE SEPARATED WITHIN SHARED SHAFT
2. REMOVE EXISTING ELEVATOR MACHINE ROOM 033 / KITCHENETTE WALL 031
3. BUILD NEW ELEVATOR MACHINE ROOM 033 / KITCHENETTE WALL 031
4. REMOVE EXISTING ELEVATOR EQUIPMENT ASSOCIATED WITH ELEVATOR #1
5. INSTALL NEW ELEVATOR EQUIPMENT ASSOCIATED WITH ELEVATOR #1
6. PERFORM ALL WORK REQUIRED TO MODERNIZE ELEVATOR #1 SHAFT, CAB, AND LOBBY COMPONENTS
7. PROVIDE EXTERIOR CONCRETE PADS AND INSTALL NEW CONDENSING UNITS TO SERVE ELEV #1 & ELEV #2
8. INSTALL NEW FAN COIL UNITS IN MACHINE ROOM 033 FOR ELEV #1 & #2
9. REMOVE PARTIAL SUPPLY AIR DUCT TO ELEVATOR MACHINE ROOM 033 (SEE MECH)
10. CLOSE IN CEILING IN ELEVATOR MACHINE ROOM 033 AND KITCHENETTE 031 AS REQUIRED FOR ELEVATOR INSPECTION
PHASE 2
1. REMOVE EXISTING ELEVATOR EQUIPMENT ASSOCIATED WITH ELEVATOR #2
2. INSTALL NEW ELEVATOR EQUIPMENT ASSOCIATED WITH ELEVATOR #2
3. PERFORM ALL WORK REQUIRED TO MODERNIZE ELEVATOR #2 SHAFT, CAB, AND LOBBY COMPONENTS
4. CLOSE IN CEILING IN ELEVATOR MACHINE ROOM 033
PHASE 3 (ADDITIVE ITEM #1)
1. REMOVE EXISTING ELEVATOR EQUIPMENT ASSOCIATED WITH ELEVATOR #3
2. INSTALL NEW ELEVATOR EQUIPMENT ASSOCIATED WITH ELEVATOR #3
3. PERFORM ALL WORK REQUIRED TO MODERNIZE ELEVATOR #3 SHAFT, CAB, AND LOBBY COMPONENTS
4. PROVIDE EXTERIOR CONCRETE PAD AND INSTALL NEW CONDENSING UNIT
5. INSTALL NEW FAN COIL UNITS IN ELEVATOR MACHINE ROOM 022
6. CLOSE IN CEILING IN ELEVATOR MACHINE ROOM 022
PHASING NARRATIVE
JAN CL
JAN CL
TEL/
COMM
PHASE 1
PHASE 3
ADDITIVE ITEM #1
ELEV MACH
ROOM
1 1/2"
6"
3"
CAST IN PLACE CONCRETE EQUIPMENT PAD PER ASTM C387:
4,000 PSI @ 28 DAYS, REGULAR WEIGHT AGGREGATE, MAX
WATER TO CEMENT RATIO OF 0.45, 6% AIR-ENTRAINMENT
ADMIXTURE ADDED WITH A TOLERANCE OF ± 1.5%.
2" MIN COMPACTED
#57 BLUESTONE
6 MIL VAPOR
BARRIER
4" X 4" WELDED WIRE MESH
EQUIPMENT BASE
MECHANICALLY FASTEN TO PAD
WITH1/2" SS POST-INSTALLED BOLT AND
WASHER WITH ZINC INSERT AS NEEDED
LAE
WN
O M
M O
OF
I
NI
G
RI
H V
E C TCRA
MICHAEL DETOMO
Lic. No. 15799
T
C
A
IH T
Consultants
703.684.5994
333 North Fairfax Street
Alexandria, Virginia 22314
Seal
Key Plan
Drawing
Revisions
Date
Project No.
Sheet No.
OUBO Submission 09/26/2025
Submission Set coleanddenny.com
PC No.: 247-242012
Permit Electronic Approval Stamp
03/11/2026
03/11/2026
20011.22
4400 University Drive Fairfax, Virginia 22030
PH1.01
Phasing Plan
GMU Enterprise Hall Elevator Modernization
1" = 10'-0"A1.03 PH1.01
1 PHASING PLAN
1" = 1'-0"PH1.01
2 CONC PAD DETAIL
0' 5' 10' 20'
SCALE: 1" = 10'
N
No. Revision Date 1 Response to Comments 11/20/2025
Revisions
Date
OUBO Submission 09/26/2025
Submission Set
03/11/2026
No. Revision Date 1 Response to Comments 11/20/2025
2 Response to Comments 02/09/2026
3 Response to Comments 03/11/2026
APPROVED FOR
CONSTRUCTION
Date = 03/17/2026
These construction documents have been examined in accordance with the 2021 Virginia Uniform Statewide Building Code (USBC). Submittals and/or shop drawings have not been provided or reviewed as part of this process.
The Registered Design Professional and/or Building/Tradesman Contractor shall be solely responsible for the correct installation and construction of all required systems in compliance with Federal, State, Local codes and manufacturing installation instructions. Request required special inspections and provide to A&E for review. Request inspections required by OUBO in accordance with OUBO policies and procedures. Any revisions that occur during the course of construction shall not be made to this set without the
OF WORK
J K
AD4.01AD1.01
AD4.01
AD1.01 ---
MEN'S
TOILET
WOMEN'S
TOILET
#1
ELEVATOR
#2
ELEVATOR
LOBBY
KITCHENETTE
TEL/
COMM
ELEV MACH
ROOM
STAIR #2
AD4.017
S im
Sim
Sim
S im AD4.017
S im
Sim
Sim
S im
D-1
6'-9" D-2
D-1
AD1.01 AD1.01
AD1.03AD1.01
J K
AD4.01AD1.01
AD4.01
HYDRAULIC
PUMP #1
OIL
COOL
#1
ELEVATOR
CONTROLLER #1
STACKED ELEV
DISCONNECTS
- SEE ELEC
STACKED ELEV
CAB LIGHT
DISCONNECTS
- SEE ELEC
D U C
TL
E S
A C -1
A B O
V E
RATH
#1
H Y D R A U
LI
P O
W E R U
N
IT
C O
N
TR
O L
BATTERY
LOWERING
DEVICE #2MAINLINE
DISCS #2
RELOCATED CAB
LIGHT DISC #2
HALL BUTTON
INTERFACE #2
EXIST FA
PANEL ABOVE
STACKED OIL
MINDER AND
SUMP POWER -
SEE ELEC
HYDRAULIC POWER
UNIT #1
H Y D R A U
W E R U
N
IT
CONTROL #1
C O
N
TR
O L
BATTERY
LOWERING
DEVICE #2
STACKED
MAINLINE DISCS
#1TO BE DEMO'D
#2 TO REMAIN CAB LIGHT
DISC #1
RELOCATE
CAB LIGHT
DISC #2
HALL BUTTON
INTERFACE #1
HALL BUTTON
INTERFACE #2
FA PANEL TO REMAIN
CONDUIT CHASE
LAE
WN
O M
M O
OF
I
NI
G
RI
H V
E C TCRA
MICHAEL DETOMO
Lic. No. 15799
T
C
A
IH T
Consultants
703.684.5994
333 North Fairfax Street
Alexandria, Virginia 22314
Seal
Key Plan
Drawing
Revisions
Date
Project No.
Sheet No.
OUBO Submission 09/26/2025
Submission Set coleanddenny.com
PC No.: 247-242012
Permit Electronic Approval Stamp
03/11/2026
03/11/2026
20011.22
4400 University Drive Fairfax, Virginia 22030
AD1.01
Partial Demolition Floor Plan - Elev #1 & #2
GMU Enterprise Hall Elevator Modernization
0' 2' 4' 8'
SCALE: 1/4" = 1'-0"
KEYED DEMO NOTES
1/4" = 1'-0"AD1.01
1 PARTIAL LOWER LEVEL DEMO PLAN - ELEV #1 
1/4" = 1'-0"AD1.01
2 PARTIAL DEMO PLAN LEVEL 1 THRU 4 - ELEV #1 & #2
N
1. REVIEW PHASING PLAN AND NARRATIVE ON PH1.01. DEMOLITION WORK RELATED TO
ELEVATOR #1 TO BE DONE IN A SEPARATE PHASE FROM WORK RELATED TO ELEVATOR #2
SUCH THAT ONE ELEVATOR REMAINS FULLY OPERATIONAL AT ALL TIMES. SEE ADDITIONAL
NOTES ON MEP SHEETS.
A. EXCEPTION: EXIST CAB LIGHT DISCONNECT FOR ELEVATOR #2 SHALL BE TEMPORARILY
RELOCATED LOWER IN PHASE ONE TO ALLOW FOR MOUNTING POSITION OF NEW
ELEVATOR #1 CONTROLLER. RELOCATED CAB LIGHT DISCONNECT FOR ELEVATOR #2
SHALL THEN BE FULLY DEMOLISHED IN PHASE TWO.
2. REMOVE OR REROUTE ALL CONDUIT, PIPES AND DUCTS NOT SERVING THE ELEVATOR
MACHINE ROOM EQUIPMENT.
3. PATCH ALL WALL PENETRATIONS AFTER REMOVAL. TOOTH IN MASONRY USING FULL BLOCKS
WHERE NECESSARY. MACHINE ROOM AND HOISTWAY WALLS ARE 2-HOUR RATED.
4. SEE SHEET A 5.01 FOR APPROVED UL PENETRATION DETAILS
5. RETAIN AND REFURBISH EXIST HYDRAULIC PIPING AS APPROPRIATE.
6. REPLACE ALL EXISTING HYDRAULIC FITTINGS.
7. REMOVE EXISTING ELEVATOR CONTROLLERS AND HYDRAULIC POWER UNITS TO BE REPLACED
WITH NON-PROPRIETARY UNITS - SEE MEP
MACHINE ROOM DEMOLITION NOTES
GENERAL DEMOLITION NOTES
1. ALL EXISTING DIMENSIONS AND CONDITIONS SHALL BE FIELD VERIFIED.
2. REPAIR EXISTING CONSTRUCTION TO REMAIN WHERE MECHANICAL, PLUMBING, FIRE PROTECTION, AND ELECTRICAL
WORK IS REMOVED TO MATCH EXISTING CONSTRUCTION.
3. WHERE MASONRY IS EXPOSED, TOOTH-IN NEW WORK WITH FULL-SIZE MASONRY UNITS.
4. PATCH AS REQUIRED TO ACCOMMODATE NEW MECHANICAL, PLUMBING, AND ELECTRICAL WORK.
REFER TO
ENGINEERING DRAWINGS. ALL NEW WORK SHALL BE CONCEALED UNLESS NOTED OTHERWISE.
5. PROTECT EXIT FLOOR & WALL FINISHES ADJACENT TO THE AREA OF WORK DURING CONSTRUCTION.
6. REQUIRED DEMOLITION SHALL NOT BE LIMITED TO THAT PORTION ON THE PLANS, BUT SHALL
INCLUDE ALL NECESSARY WORK (OR INCIDENTAL THERE TO) TO COMPLETE THE WORK IN
ACCORDANCE WITH THE CONTRACT DOCUMENTS.
D-1 PARTIAL DEMOLITION OF EXIST METAL STUD AND GWB WALL TO EXTENTS SHOWN
D-2 PARTIAL DEMOLITION OF EXIST 2-HR RATED CMU WALL TO EXTENTS SHOWN
1/2" = 1'-0"AD1.01
4 PHASE 2 - ELEV MACH ROOM DEMO PLAN
1/2" = 1'-0"AD1.01 AD1.01
3 PHASE 1 - ELEV MACH ROOM DEMO PLAN
No. Revision Date
Revisions
Date
OUBO Submission 09/26/2025
Submission Set
03/11/2026
No. Revision Date 1 Response to Comments 11/20/2025
2 Response to Comments 02/09/2026
3 Response to Comments 03/11/2026
APPROVED FOR
CONSTRUCTION
Date = 03/17/2026
These construction documents have been examined in accordance with the 2021 Virginia Uniform Statewide Building Code (USBC). Submittals and/or shop drawings have not been provided or reviewed as part of this process.
The Registered Design Professional and/or Building/Tradesman Contractor shall be solely responsible for the correct installation and construction of all required systems in compliance with Federal, State, Local codes and manufacturing installation instructions. Request required special inspections and provide to A&E for review. Request inspections required by OUBO in accordance with OUBO policies and procedures. Any revisions that occur during the course of construction shall not be made to this set without the
E F G
STAIR
#3
CLASSROOM
ELEV MACH
ROOM
#3
ELEVATOR
LOBBY
AD4.02AD1.02
AD4.022
AD1.02 AD1.02
AD4.025
S im 6
S im
Sim
Sim
E F G
WOMEN'S
TOILET
STAIR
#3
#3
ELEVATOR
LOBBY
COMM /
TELL
AD4.02AD1.02
AD4.023
MECH SHAFT
E F G
WOMEN'S
TOILET
#3
ELEVATOR
STIAR #3
COMM /
TEL208
LOBBY
AD4.02AD1.02
AD4.024
MECH SHAFT
H Y D R A U
W E R U
N
IT
C O
N
TR
O L
MAINLINE
DISC #3
CAB LIGHT
DISC #3
HALL BUTTON
INTERFACE #3
FA PANEL
CONDUIT
CHASE
BATTERY
LOWERING
DEVICE #3
AREAS
OF WORK
LAE
WN
O M
M O
OF
I
NI
G
RI
H V
E C TCRA
MICHAEL DETOMO
Lic. No. 15799
T
C
A
IH T
Consultants
703.684.5994
333 North Fairfax Street
Alexandria, Virginia 22314
Seal
Key Plan
Drawing
Revisions
Date
Project No.
Sheet No.
OUBO Submission 09/26/2025
Submission Set coleanddenny.com
PC No.: 247-242012
Permit Electronic Approval Stamp
ADDITIVE ITEM #1
02/09/2026
03/11/2026
20011.22
4400 University Drive Fairfax, Virginia 22030
AD1.02
Partial Demolition Floor Plan - Elevator #3
GMU Enterprise Hall Elevator Modernization
1/4" = 1'-0"AD1.02
1 PARTIAL LOWER LEVEL DEMO PLAN - ELEV #3
1/4" = 1'-0"AD1.02
2 PARTIAL FIRST FLOOR DEMO PLAN - ELEV #3
1/4" = 1'-0"AD1.02
3 PARTIAL SECOND FLOOR DEMO PLAN - ELEV #3
1/2" = 1'-0"AD1.02 AD1.02
4 ELEVATOR MACHINE ROOM DEMO PLAN
0' 2' 4' 8'
SCALE: 1/4" = 1'-0"
N
GENERAL DEMOLITION NOTES
1. ALL EXISTING DIMENSIONS AND CONDITIONS SHALL BE FIELD VERIFIED.
2. REPAIR EXISTING CONSTRUCTION TO REMAIN WHERE MECHANICAL, PLUMBING, FIRE PROTECTION, AND ELECTRICAL
WORK IS REMOVED TO MATCH EXISTING CONSTRUCTION.
3. WHERE MASONRY IS EXPOSED, TOOTH-IN NEW WORK WITH FULL-SIZE MASONRY UNITS.
4. PATCH AS REQUIRED TO ACCOMMODATE NEW MECHANICAL, PLUMBING, AND ELECTRICAL WORK. REFER TO
ENGINEERING DRAWINGS. ALL NEW WORK SHALL BE CONCEALED UNLESS NOTED OTHERWISE.
5. PROTECT EXIT FLOOR & WALL FINISHES ADJACENT TO THE AREA OF WORK DURING CONSTRUCTION.
6. REQUIRED DEMOLITION SHALL NOT BE LIMITED TO THAT PORTION ON THE PLANS, BUT SHALL INCLUDE ALL
NECESSARY WORK (OR INCIDENTAL THERE TO) TO COMPLETE THE WORK IN ACCORDANCE WITH THE CONTRACT
DOCUMENTS.
1. REVIEW PHASING PLAN AND NARRATIVE ON PH1.01. ALL WORK RELATED TO ELEVATOR #3
TO BE COMPLETED IN PHASE #3
2. REMOVE OR REROUTE ALL CONDUIT, PIPES AND DUCTS NOT SERVING THE ELEVATOR
MACHINE ROOM EQUIPMENT.
3. PATCH ALL WALL PENETRATIONS AFTER REMOVAL. TOOTH IN MASONRY USING FULL BLOCKS
WHERE NECESSARY. MACHINE ROOM AND HOISTWAY WALLS ARE 2-HOUR RATED.
4. SEE SHEET A 5.01 FOR APPROVED UL PENETRATION DETAILS
5. RETAIN AND REFURBISH EXIST HYDRAULIC PIPING AS APPROPRIATE.
6. REPLACE ALL EXISTING HYDRAULIC FITTINGS.
7. REMOVE EXISTING ELEVATOR CONTROLLERS AND HYDRAULIC POWER UNITS TO BE
REPLACED WITH NON-PROPRIETARY UNITS - SEE ELEC
MACHINE ROOM DEMOLITION NOTES
No. Revision Date
Revisions
Date
OUBO Submission 09/26/2025
Submission Set
03/11/2026
No. Revision Date 1 Response to Comments 11/20/2025
2 Response to Comments 02/09/2026
3 Response to Comments 03/11/2026
APPROVED FOR
CONSTRUCTION
Date = 03/17/2026
These construction documents have been examined in accordance with the 2021 Virginia Uniform Statewide Building Code (USBC). Submittals and/or shop drawings have not been provided or reviewed as part of this process.
The Registered Design Professional and/or Building/Tradesman Contractor shall be solely responsible for the correct installation and construction of all required systems in compliance with Federal, State, Local codes and manufacturing installation instructions. Request required special inspections and provide to A&E for review. Request inspections required by OUBO in accordance with OUBO policies and procedures. Any revisions that occur during the course of construction shall not be made to this set without the
AD4.01AD1.01
ELEV MACH
ROOM
TEL/
COMM
KITCHENETTE
MEN'S
TOILET
WOMEN'S
TOILET
#1
ELEVATOR
#2
ELEVATOR
LOBBY
STAIR #2
AD1.03AD1.01
AD4.01AD1.01
MEN'S
TOILET
STAIR #2
WOMEN'S
TOILET
LOBBY
#1
ELEVATOR
#2
ELEVATOR
AREAS
OF WORK
Lower Level
421' - 5"
First Floor
435' - 5"
REMOVE EXIST 2HR
RATED CMU WALL
EXIST 2HR RATED
CEILING ASSEMBLY
EXIST 90MIN RATED
ACCESS PANEL
REMOVE EXIST
FIRE DAMPER
REMOVE EXIST CONC LINTEL
EXIST DUCTWORK
REMOVE EXIST ACP
CEILING AND GRID
ELEV MACH
ROOM 031
KITCHENETTE
EXIST ACP TO BE REMOVED
AND REPLACED AS
REQUIRED FOR ACCESS TO
PERFORM THE WORK ABOVE
LAE
WN
O M
M O
OF
I
NI
G
RI
H V
E C TCRA
MICHAEL DETOMO
Lic. No. 15799
T
C
A
IH T
Consultants
703.684.5994
333 North Fairfax Street
Alexandria, Virginia 22314
Seal
Key Plan
Drawing
Revisions
Date
Project No.
Sheet No.
OUBO Submission 09/26/2025
Submission Set coleanddenny.com
PC No.: 247-242012
Permit Electronic Approval Stamp
03/11/2026
03/11/2026
20011.22
4400 University Drive Fairfax, Virginia 22030
AD1.03
Partial Demo RCP - Elev #1 & #2
GMU Enterprise Hall Elevator Modernization
1/4" = 1'-0"AD1.03
1 PARTIAL LOWER LEVEL DEMO RCP - ELEV #1 & #2
1/4" = 1'-0"AD1.03
2 PARTIAL DEMO RCP LEVEL 1 THRU 4 - ELEV #1 & #2
0' 2' 4' 8'
SCALE: 1/4" = 1'-0"
N
GENERAL DEMOLITION NOTES
1. ALL EXISTING DIMENSIONS AND CONDITIONS SHALL BE FIELD VERIFIED.
2. REPAIR EXISTING CONSTRUCTION TO REMAIN WHERE MECHANICAL, PLUMBING, FIRE PROTECTION, AND ELECTRICAL
WORK IS REMOVED TO MATCH EXISTING CONSTRUCTION.
3. WHERE MASONRY IS EXPOSED, TOOTH-IN NEW WORK WITH FULL-SIZE MASONRY UNITS.
4. PATCH AS REQUIRED TO ACCOMMODATE NEW MECHANICAL, PLUMBING, AND ELECTRICAL WORK. REFER TO
ENGINEERING DRAWINGS. ALL NEW WORK SHALL BE CONCEALED UNLESS NOTED OTHERWISE.
5. PROTECT EXIT FLOOR & WALL FINISHES ADJACENT TO THE AREA OF WORK DURING CONSTRUCTION.
6. REQUIRED DEMOLITION SHALL NOT BE LIMITED TO THAT PORTION ON THE PLANS, BUT SHALL INCLUDE ALL
NECESSARY WORK (OR INCIDENTAL THERE TO) TO COMPLETE THE WORK IN ACCORDANCE WITH THE CONTRACT
DOCUMENTS.
3/8" = 1'-0"AD1.01 AD1.03
3 PARTIAL DEMO SECTION ELEV MACH ROOM
No. Revision Date 2 Response to Comments 02/09/2026
Revisions
Date
OUBO Submission 09/26/2025
Submission Set
03/11/2026
No. Revision Date 1 Response to Comments 11/20/2025
2 Response to Comments 02/09/2026
3 Response to Comments 03/11/2026
APPROVED FOR
CONSTRUCTION
Date = 03/17/2026
These construction documents have been examined in accordance with the 2021 Virginia Uniform Statewide Building Code (USBC). Submittals and/or shop drawings have not been provided or reviewed as part of this process.
The Registered Design Professional and/or Building/Tradesman Contractor shall be solely responsible for the correct installation and construction of all required systems in compliance with Federal, State, Local codes and manufacturing installation instructions. Request required special inspections and provide to A&E for review. Request inspections required by OUBO in accordance with OUBO policies and procedures. Any revisions that occur during the course of construction shall not be made to this set without the
AD4.02AD1.02
STAIR
#3
CLASSROOM
ELEV MACH
ROOM
#3
ELEVATOR
LOBBY
WOMEN'S
TOILET
AD4.02AD1.02
WOMEN'S
TOILET
STAIR
#3
#3
ELEVATOR
LOBBY
COMM /
TELL
MECH SHAFT
AD4.02AD1.02
WOMEN'S
TOILET
#3
ELEVATOR
STIAR #3
COMM /
TEL
LOBBY
MECH SHAFT
AREAS
OF WORK
LAE
WN
O M
M O
OF
I
NI
G
RI
H V
E C TCRA
MICHAEL DETOMO
Lic. No. 15799
T
C
A
IH T
Consultants
703.684.5994
333 North Fairfax Street
Alexandria, Virginia 22314
Seal
Key Plan
Drawing
Revisions
Date
Project No.
Sheet No.
OUBO Submission 09/26/2025
Submission Set coleanddenny.com
PC No.: 247-242012
Permit Electronic Approval Stamp
ADDITIVE ITEM #1
02/09/2026
03/11/2026
20011.22
4400 University Drive Fairfax, Virginia 22030
AD1.04
Partial Demo RCP - Elevator #3
GMU Enterprise Hall Elevator Modernization
1/4" = 1'-0"AD1.04
1 PARTIAL LOWER LEVEL DEMO RCP - ELEV #3
1/4" = 1'-0"AD1.04
2 PARTIAL FIRST FLOOR DEMO RCP - ELEV #3
1/4" = 1'-0"AD1.04
3 PARTIAL SECOND FLOOR DEMO RCP - ELEV #3
0' 2' 4' 8'
SCALE: 1/4" = 1'-0"
N
GENERAL DEMOLITION NOTES
1. ALL EXISTING DIMENSIONS AND CONDITIONS SHALL BE FIELD VERIFIED.
2. REPAIR EXISTING CONSTRUCTION TO REMAIN WHERE MECHANICAL, PLUMBING, FIRE PROTECTION, AND ELECTRICAL
WORK IS REMOVED TO MATCH EXISTING CONSTRUCTION.
3. WHERE MASONRY IS EXPOSED, TOOTH-IN NEW WORK WITH FULL-SIZE MASONRY UNITS.
4. PATCH AS REQUIRED TO ACCOMMODATE NEW MECHANICAL, PLUMBING, AND ELECTRICAL WORK. REFER TO
ENGINEERING DRAWINGS. ALL NEW WORK SHALL BE CONCEALED UNLESS NOTED OTHERWISE.
5. PROTECT EXIT FLOOR & WALL FINISHES ADJACENT TO THE AREA OF WORK DURING CONSTRUCTION.
6. REQUIRED DEMOLITION SHALL NOT BE LIMITED TO THAT PORTION ON THE PLANS, BUT SHALL INCLUDE ALL
NECESSARY WORK (OR INCIDENTAL THERE TO) TO COMPLETE THE WORK IN ACCORDANCE WITH THE CONTRACT
DOCUMENTS.
No. Revision Date
Revisions
Date
OUBO Submission 09/26/2025
Submission Set
03/11/2026
No. Revision Date 1 Response to Comments 11/20/2025
2 Response to Comments 02/09/2026
3 Response to Comments 03/11/2026
APPROVED FOR
CONSTRUCTION
Date = 03/17/2026
These construction documents have been examined in accordance with the 2021 Virginia Uniform Statewide Building Code (USBC). Submittals and/or shop drawings have not been provided or reviewed as part of this process.
The Registered Design Professional and/or Building/Tradesman Contractor shall be solely responsible for the correct installation and construction of all required systems in compliance with Federal, State, Local codes and manufacturing installation instructions. Request required special inspections and provide to A&E for review. Request inspections required by OUBO in accordance with OUBO policies and procedures. Any revisions that occur during the course of construction shall not be made to this set without the
D-4
D-3
D-1
REMOVE COP PANEL
D-1
D-3
D-4
D-3
D-6
D-7
D-4
AREAS
OF WORK
Lower Level
421' - 5"
First Floor
435' - 5"
Second Floor
449' - 5"
Third Floor
463' - 5"
Fourth Floor
477' - 5"
Roof
491' - 5"
Pit #1
417' - 0 1/4"
D-1
D-2
D-12
D-8
D-11
TYP
D-10
D-9
D-8
D-11
TYP
D-10
D-9
D-3
D-7
D-4
LAE
WN
O M
M O
OF
I
NI
G
RI
H V
E C TCRA
MICHAEL DETOMO
Lic. No. 15799
T
C
A
IH T
Consultants
703.684.5994
333 North Fairfax Street
Alexandria, Virginia 22314
Seal
Key Plan
Drawing
Revisions
Date
Project No.
Sheet No.
OUBO Submission 09/26/2025
Submission Set coleanddenny.com
PC No.: 247-242012
Permit Electronic Approval Stamp
03/11/2026
03/11/2026
20011.22
4400 University Drive Fairfax, Virginia 22030
AD4.01
Demo Int Elevations, Sections, and Details - Elevator #1 & #2
GMU Enterprise Hall Elevator Modernization
1/4" = 1'-0"AD4.01
5 ELEV CAR 1 - DEMO RCP
1/4" = 1'-0"AD4.01
4 ELEV CAR 1 - DEMO FLOOR PLAN
1/4" = 1'-0"AD1.01 AD4.01
8 ELEV CAR 1 DOOR - DEMO ELEVATION
1/4" = 1'-0"AD1.01 AD4.01
6 ELEV CAR 1 - DEMO ELEVATION
0' 2' 4' 8'
SCALE: 1/4" = 1'-0"1/4" = 1'-0"AD1.01 AD4.01
1 DEMO SECTION - ELEVATOR SHAFT #1 & #2
1/4" = 1'-0"AD1.01 AD4.01
2 LOWER LEVEL LOBBY ELEVATION
1/4" = 1'-0"AD1.01 AD4.01
3 LEVEL 1 THRU 4 LOBBY ELEVATION
1/4" = 1'-0"AD1.01 AD4.01
7 ELEV CAR - DEMO ELEVATION
GENERAL DEMOLITION NOTES
1. ALL EXISTING DIMENSIONS AND CONDITIONS SHALL BE FIELD VERIFIED.
2. REQUIRED DEMOLITION SHALL NOT BE LIMITED TO THAT PORTION ON THE PLANS, BUT SHALL INCLUDE ALL
NECESSARY WORK (OR INCIDENTAL THERE TO) TO COMPLETE THE WORK IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
3. REMOVE FLOOR, AND CEILING FINISHES AND CONSTRUCTION AS INDICATED.
4. REPAIR EXISTING CONSTRUCTION TO REMAIN WHERE MECHANICAL, PLUMBING, FIRE PROTECTION, AND
ELECTRICAL WORK IS REMOVED TO MATCH EXISTING CONSTRUCTION.
D-1 REMOVE EXIST ELEVATOR CAR DOORS
D-2 REMOVE EXIST DOOR OPERATORS
D-3 REMOVE EXIST TILE FLOORING
D-4 REMOVE EXISTING CEILING AND LIGHTS
D-6 REMOVE EXIST HAND RAILS
D-7 REMOVE EXIST PLAM WALL PANELS
D-8 REMOVE EXIST HALL LANTERNS, PATCH AND PAINT EXCESS OPENING TO MATCH EXIST
D-9 REMOVE EXIST EGRESS SIGNAGE AND SAVE FOR REINSTALLATION
D-10 REMOVE EXIST UNUSED JBOX AND COVER PLATE, PATCH AND PAINT TO MATCH EXIST
D-11 REMOVE EXIST ELEVATOR CALL BUTTON, PATCH AND PAINT EXCESS OPENING TO MATCH EXIST
D-12 REMOVE EXIST PITT LADDER
KEYED DEMO NOTES
ELEV CAR DEMOLITION NOTES
1. RETAIN & REFURBISH CAR SLING, SAND AND PAINT
2. RETAIN & REFURBISH CAR SHELL
3. RETAIN & REFURBISH CAR PLATFORM
4. REMOVE AND REPLACE EXISTING ISOLATION PADS
5. REMOVE AND REPLACE EXISTING SUBFLOORING
No. Revision Date 1 Response to Comments 11/20/2025
Revisions
Date
OUBO Submission 09/26/2025
Submission Set
03/11/2026
No. Revision Date 1 Response to Comments 11/20/2025
2 Response to Comments 02/09/2026
3 Response to Comments 03/11/2026
APPROVED FOR
CONSTRUCTION
Date = 03/17/2026
These construction documents have been examined in accordance with the 2021 Virginia Uniform Statewide Building Code (USBC). Submittals and/or shop drawings have not been provided or reviewed as part of this process.
The Registered Design Professional and/or Building/Tradesman Contractor shall be solely responsible for the correct installation and construction of all required systems in compliance with Federal, State, Local codes and manufacturing installation instructions. Request required special inspections and provide to A&E for review. Request inspections required by OUBO in accordance with OUBO policies and procedures. Any revisions that occur during the course of construction shall not be made to this set without the
Lower Level
421' - 5"
First Floor
435' - 5"
Second Floor
449' - 5"
Third Floor
463' - 5"
G
Pit #3
417' - 4"
D-1
D-2
D-12
D-8
D-11
D-10
D-9
D-8
D-11
D-10
D-9
D-8
D-11
D-10
D-9
REMOVE COP PANEL
D-1
D-3
D-4
D-3
D-6
D-6
D-4
D-3
D-6
D-4
D-3
D-1
D-4
LAE
WN
O M
M O
OF
I
NI
G
RI
H V
E C TCRA
MICHAEL DETOMO
Lic. No. 15799
T
C
A
IH T
Consultants
703.684.5994
333 North Fairfax Street
Alexandria, Virginia 22314
Seal
Key Plan
Drawing
Revisions
Date
Project No.
Sheet No.
OUBO Submission 09/26/2025
Submission Set coleanddenny.com
PC No.: 247-242012
Permit Electronic Approval Stamp
ADDITIVE ITEM #1
02/09/2026
03/11/2026
20011.22
4400 University Drive Fairfax, Virginia 22030
AD4.02
Demo Int Elevations, Sections, and Details - Elevator #3
GMU Enterprise Hall Elevator Modernization
0' 2' 4' 8'
SCALE: 1/4" = 1'-0"
1/4" = 1'-0"AD1.02 AD4.02
1 DEMO SECTION - ELEVATOR SHAFT #3
1/4" = 1'-0"A1.02 AD4.02
2 LOWER LEVEL DEMO ELEVATION
1/4" = 1'-0"AD1.02 AD4.02
3 FIRST FLOOR DEMO ELEVATION
1/4" = 1'-0"AD1.02 AD4.02
4 SECOND FLOOR DEMO ELEVATION
1/4" = 1'-0"AD1.02 AD4.02
5 ELEV CAR DOOR - DEMO ELEVATION
1/4" = 1'-0"AD1.02 AD4.02
6 ELEV CAR - DEMO ELEVATION
1/4" = 1'-0"AD1.02 AD4.02
7 ELEV CAR - DEMO ELEVATION
1/4" = 1'-0"AD4.02
8 ELEV CAR - DEMO FLOOR PLAN
1/4" = 1'-0"AD4.02
9 ELEV CA - DEMO RCP
GENERAL DEMOLITION NOTES
1. ALL EXISTING DIMENSIONS AND CONDITIONS SHALL BE FIELD VERIFIED.
2. REQUIRED DEMOLITION SHALL NOT BE LIMITED TO THAT PORTION ON THE PLANS, BUT SHALL INCLUDE ALL
NECESSARY WORK (OR INCIDENTAL THERE TO) TO COMPLETE THE WORK IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
3. REMOVE FLOOR, AND CEILING FINISHES AND CONSTRUCTION AS INDICATED.
4. REPAIR EXISTING CONSTRUCTION TO REMAIN WHERE MECHANICAL, PLUMBING, FIRE PROTECTION, AND
ELECTRICAL WORK IS REMOVED TO MATCH EXISTING CONSTRUCTION.
D-1 REMOVE EXIST ELEVATOR CAR DOORS
D-2 REMOVE EXIST DOOR OPERATORS
D-3 REMOVE EXIST TILE FLOORING
D-4 REMOVE EXISTING CEILING AND LIGHTS
D-6 REMOVE EXIST HAND RAILS
D-7 REMOVE EXIST PLAM WALL PANELS
D-8 REMOVE EXIST HALL LANTERNS, PATCH AND PAINT EXCESS OPENING TO MATCH EXIST
D-9 REMOVE EXIST EGRESS SIGNAGE AND SAVE FOR REINSTALLATION
D-10 REMOVE EXIST UNUSED JBOX AND COVER PLATE, PATCH AND PAINT TO MATCH EXIST
D-11 REMOVE EXIST ELEVATOR CALL BUTTON, PATCH AND PAINT EXCESS OPENING TO MATCH EXIST
D-12 REMOVE EXIST PITT LADDER
KEYED DEMO NOTES
ELEV CAR DEMOLITION NOTES
1. RETAIN & REFURBISH CAR SLING, SAND AND PAINT
2. RETAIN & REFURBISH CAR SHELL
3. RETAIN & REFURBISH CAR PLATFORM
4. REMOVE AND REPLACE EXISTING ISOLATION PADS
5. REMOVE AND REPLACE EXISTING SUBFLOORING
No. Revision Date 1 Response to Comments 11/20/2025
Revisions
Date
OUBO Submission 09/26/2025
Submission Set
03/11/2026
No. Revision Date 1 Response to Comments 11/20/2025
2 Response to Comments 02/09/2026
3 Response to Comments 03/11/2026
APPROVED FOR
CONSTRUCTION
Date = 03/17/2026
These construction documents have been examined in accordance with the 2021 Virginia Uniform Statewide Building Code (USBC). Submittals and/or shop drawings have not been provided or reviewed as part of this process.
The Registered Design Professional and/or Building/Tradesman Contractor shall be solely responsible for the correct installation and construction of all required systems in compliance with Federal, State, Local codes and manufacturing installation instructions. Request required special inspections and provide to A&E for review. Request inspections required by OUBO in accordance with OUBO policies and procedures. Any revisions that occur during the course of construction shall not be made to this set without the
J K
ELEV MACH
ROOM
TEL/
COMM
KITCHENETTE
MEN'S
TOILET
WOMEN'S
TOILET
#1
ELEVATOR
#2
ELEVATOR
LOBBY
STAIR #2
A4.01A1.01 A4.01
5' -0
6'-2"
A1.01 A1.01
EQ
EQ
A4.01
Sim
S im
Sim
S im A4.01
Sim
S im
Sim
S im
REF REF
A5.01A1.01
R-20
R-21
A1.03A1.01
A1.03A1.01
J K
MEN'S
TOILET
WOMEN'S
TOILET
STAIR #2
VV
TT
SS
RR
LOBBY
A4.01A1.01
A4.01
#1
ELEVATOR
#2
ELEVATOR
A5.01A1.01
HYDRAULIC
PUMP #1
OIL
COOL
#1
OIL
COOL
#2
ELEV
CONTROLLER #1
ELEV
CONTROLLER #2
HYDRAULIC
PUMP #2
STACKED ELEV
DISCONNECTS
- SEE ELEC
STACKED ELEV
CAB LIGHT
DISCONNECTS
- SEE ELEC
DUCTLESS
AC-2 ABOVE
D U C
TL
E
-1
A B O
V E
RATH
#2
RATH
#1
STACKED OIL
MINDER AND SUMP
POWER - SEE ELEC
A1.03A1.01
A1.03A1.01
R-1
R-2
R-4
R-5
R-6
R-7
R-1
R-2
R-3
R-4
R-5
R-6
R-7
A5.01A1.01
R-8R-8R-8 R-8
LAE
WN
O M
M O
OF
I
NI
G
RI
H V
E C TCRA
MICHAEL DETOMO
Lic. No. 15799
T
C
A
IH T
Consultants
703.684.5994
333 North Fairfax Street
Alexandria, Virginia 22314
Seal
Key Plan
Drawing
Revisions
Date
Project No.
Sheet No.
OUBO Submission 09/26/2025
Submission Set coleanddenny.com
PC No.: 247-242012
Permit Electronic Approval Stamp
03/11/2026
03/11/2026
20011.22
4400 University Drive Fairfax, Virginia 22030
A1.01
Partial Floor Plans - Elev #1 & #2
GMU Enterprise Hall Elevator Modernization
GENERAL NEW WORK NOTES
1. DIMENSIONS ARE TO FINISH FACE OF CONSTRUCTION UNLESS OTHERWISE INDICATED.
2. OUTSIDE OF DOOR JAMBS TO BE 4" FROM WALL INTERSECTION UNLESS OTHERWISE INDICATED.
3. PROVIDE NON-COMBUSTIBLE OR FIRE RETARDANT TREATED WOOD BLOCKING IN PARTITIONS WHERE
REQUIRED TO SUPPORT WALL MOUNTED ITEMS.
4. "TOOTH-IN" MASONRY WHERE ALTERING OR REPAIRING EXISTING MASONRY. MORTAR COLOR SHALL MATCH
EXISTING MORTAR.
R-1 RETAIN & REFURBISH EXISTING HYDRAULIC JACK ASSEMBLY, PROVIDE NEW SEALS
R-2 RETAIN & REFURBISH EXISTING HYDRAULIC OIL PIPING, PROVIDE NEW VICTAULIC FITTINGS, PAINT EXIST PIPE
R-3 RETAIN & REFURBISH EXISTING PIT CHANNEL, PAINT CHANNEL
R-4 INSTALL NEW PIT LADDER SUCH THAT EACH SIDE RAIL EXTENSION SHALL BE DESIGNED TO RESIST A SINGLE CONCENTRATED LOAD OF 100 POUNDS IN ACCORDANCE WITH VCC 1607.17 AND SECTION 4.5.4 OF ASCE 7.
R-5 PROVIDE NEW LED PIT LIGHTING WITH MIN OF 10FC - SEE ELEC
R-6 PROVIDE NEW SURFACE MOUNTED SUMP PUMP - SEE PLUMB
R-7 PROVIDE NEW NON-PROPRIETARY HOISTWAY DOOR OPERATING EQUIPMENT
R-8 SAND AND PAINT RETAINED EXIST RAILS
R-9 PROVIDE NEW LED LIGHT, PATCH AND REAPAIR EXIST GWB CEILING - SEE ELEC
R-10 INSTALL FLOOR DESIGNATIONS IN TACTLE CHARACTERS & BRAILLE ON BOTH JAMBS OF THE ELEV HOISTWAY
ENTRANCE PER 2017 ANSI 407.2.3.1
R-11 LOCATE HALL LANTERN W/ DIRECTIONAL SIGNAL CENTERED AT 72" MIN AFF - TYP
R-12 LOCATE FIRE FIGHTERS RECALL SWITCH ABOVE CALL BUTTONS
R-13 LOCATE HALL ELEVATOR CALL BUTTONS RECESSED FLUSH TO THE WALL WITH ENGRAVING AT 48" MAX TO THE
CENTERLINE OF HIGHEST OPERABLE PART - TYP
R-14 INSTALL ELEVATOR EMERGENCY POWER INDICATOR AT 76" MIN AFF
R-15 RETAIN AND PROVIDE NEW PAINT AT ENTRANCE DOORS
R-16 RETAIN AND PROVIDE NEW PAINT AT ENTRANCE FRAMES
R-17 PROVIDE NEW TEXTURED STAINLESS STEEL CAR DOORS
R-18 PROVIDE NEW 2X2 LAY-IN ACP AND GRID. COORDINATE WITH OWNER FOR ATTIC STOCK
R-19 PROVIDE NEW 2X4 FLOURESCENT TROFFER FIXTURE TO MATCH EXISTING CORRIDOR LIGHTS - SEE ELEC
R-20 PATCH AND REPAIR EXIST GWB WALL
R-21 PROVIDE NEW HOLLOW METAL FRAME FOR 3' X 7' CASED OPENING
KEYED REPAIR NOTES
1/4" = 1'-0"A1.01
1 PARTIAL LOWER LEVEL FLOOR PLAN - ELEV #1 & #2
1/4" = 1'-0"A1.01
PARTIAL FLOOR PLAN LEVEL
1 THRU 4 - ELEV #1 & #2
1/2" = 1'-0"A1.01 A1.01
3 ELEVATOR MACHINE ROOM PLAN
0' 2' 4' 8'
SCALE: 1/4" = 1'-0"
N
1/2" = 1'-0"A1.01
4 ELEVATOR #1 & #2 PIT
1. PROVIDE NEW SHUT OFF VALVE
2. PROVIDE NEW SCAVENGER PUMP
3. PROVIDE NEW CAR LANDING SYSTEM
4. PROVIDE NEW LIMIT SWITCHES
5. PROVIDE NEW VICTAULIC FITTINGS
SHAFT AND PIT NEW WORK NOTES
1. REVIEW PHASING PLAN AND NARRATIVE ON PH1.01. NEW WORK RELATED TO ELEVATOR #1 TO BE DONE IN A SEPARATE PHASE FROM NEW WORK RELATED TO ELEVATOR #2 SUCH THAT ONE ELEVATOR REMAINS
FULLY OPERATIONAL AT ALL TIMES. SEE ADDITIONAL NOTES ON MEP SHEETS.
2. SEE A5.01 FOR RATH WIRING DIAGRAM AND SHEETS T-001THRU T-202 FOR PLANS AND ADDITIONAL
INFORMATION ON THE ELEVATOR EMERGENCY TWO-WAY COMMUNICATION SYSTEM (RATH).
ELEVATOR MACHINE ROOM NOTES
No. Revision Date
Revisions
Date
OUBO Submission 09/26/2025
Submission Set
03/11/2026
No. Revision Date 1 Response to Comments 11/20/2025
2 Response to Comments 02/09/2026
3 Response to Comments 03/11/2026
APPROVED FOR
CONSTRUCTION
Date = 03/17/2026
These construction documents have been examined in accordance with the 2021 Virginia Uniform Statewide Building Code (USBC). Submittals and/or shop drawings have not been provided or reviewed as part of this process.
The Registered Design Professional and/or Building/Tradesman Contractor shall be solely responsible for the correct installation and construction of all required systems in compliance with Federal, State, Local codes and manufacturing installation instructions. Request required special inspections and provide to A&E for review. Request inspections required by OUBO in accordance with OUBO policies and procedures. Any revisions that occur during the course of construction shall not be made to this set without the
E F G
STAIR
#3
CLASSROOM
ELEV MACH
ROOM
#3
ELEVATOR
LOBBY
A4.02A1.02
A4.02 2
WOMEN'S
TOILET
A1.02 A1.02
A4.029
E F G
WOMEN'S
TOILET
STAIR
#3
#3
ELEVATOR
LOBBY
COMM /
TELL
A4.02A1.02
A4.02 3
MECH SHAFT
E F G
WOMEN'S
TOILET
#3
ELEVATOR
STIAR #3
COMM /
TEL208
LOBBY
A4.02A1.02
A4.02 4
MECH SHAFT
HYDRAULIC
PUMP #3
OIL COOL
#3
ELEV
CONTROLLER #3
OIL MINDER
CONTROLS
RATH BASE STATION
#3 - SEE TELE
D U C
TL
E
-3
A B O
V E
RELOCATED SHUNT
TRIP BREAKER
AC-3 CONDENSATE
REMOVAL PUMP
ELEVATOR CAB
POWER DISCONNECT
SUMP PUMP POWER
R-1
R-2
R-4
R-5 R-6
R-7
R-8
R-8
LAE
WN
O M
M O
OF
I
NI
G
RI
H V
E C TCRA
MICHAEL DETOMO
Lic. No. 15799
T
C
A
IH T
Consultants
703.684.5994
333 North Fairfax Street
Alexandria, Virginia 22314
Seal
Key Plan
Drawing
Revisions
Date
Project No.
Sheet No.
OUBO Submission 09/26/2025
Submission Set coleanddenny.com
PC No.: 247-242012
Permit Electronic Approval Stamp
ADDITIVE ITEM #1
02/09/2026
03/11/2026
20011.22
4400 University Drive Fairfax, Virginia 22030
A1.02
Partial Floor Plans - Elevator #3
GMU Enterprise Hall Elevator Modernization
GENERAL NEW WORK NOTES
1. DIMENSIONS ARE TO FINISH FACE OF CONSTRUCTION UNLESS OTHERWISE INDICATED.
2. OUTSIDE OF DOOR JAMBS TO BE 4" FROM WALL INTERSECTION UNLESS OTHERWISE
INDICATED.
3. PROVIDE NON-COMBUSTIBLE OR FIRE RETARDANT TREATED WOOD BLOCKING IN
PARTITIONS WHERE REQUIRED TO SUPPORT WALL MOUNTED ITEMS SUCH AS
TELEVISIONS, DIGITAL MEDIA PLAYERS, DRY ERASE BOARDS, SMART BOARDS, ETC. SEE
FLOOR PLAN. GC SHALL COORDINATE WITH OWNER FOR LOCATIONS OF BLOCKING. THE
OWNER SHALL PROVIDE THESE WALL MOUNTED DEVICES.
4. "TOOTH-IN" MASONRY WHERE ALTERING OR REPAIRING EXISTING MASONRY. MORTAR
COLOR SHALL MATCH EXISTING MORTAR.
R-1 RETAIN & REFURBISH EXISTING HYDRAULIC JACK ASSEMBLY, PROVIDE NEW SEALS
R-2 RETAIN & REFURBISH EXISTING HYDRAULIC OIL PIPING, PROVIDE NEW VICTAULIC FITTINGS, PAINT EXIST PIPE
R-3 RETAIN & REFURBISH EXISTING PIT CHANNEL, PAINT CHANNEL
R-4 INSTALL NEW PIT LADDER SUCH THAT EACH SIDE RAIL EXTENSION SHALL BE DESIGNED TO RESIST A SINGLE CONCENTRATED LOAD OF 100 POUNDS IN ACCORDANCE WITH VCC 1607.17 AND SECTION 4.5.4 OF ASCE 7.
R-5 PROVIDE NEW LED PIT LIGHTING WITH MIN OF 10FC - SEE ELEC
R-6 PROVIDE NEW SURFACE MOUNTED SUMP PUMP - SEE PLUMB
R-7 PROVIDE NEW NON-PROPRIETARY HOISTWAY DOOR OPERATING EQUIPMENT
R-8 SAND AND PAINT RETAINED EXIST RAILS
R-9 PROVIDE NEW LED LIGHT, PATCH AND REAPAIR EXIST GWB CEILING - SEE ELEC
R-10 INSTALL FLOOR DESIGNATIONS IN TACTLE CHARACTERS & BRAILLE ON BOTH JAMBS OF THE ELEV HOISTWAY
ENTRANCE PER 2017 ANSI 407.2.3.1
R-11 LOCATE HALL LANTERN W/ DIRECTIONAL SIGNAL CENTERED AT 72" MIN AFF - TYP
R-12 LOCATE FIRE FIGHTERS RECALL SWITCH ABOVE CALL BUTTONS
R-13 LOCATE HALL ELEVATOR CALL BUTTONS RECESSED FLUSH TO THE WALL WITH ENGRAVING AT 48" MAX TO THE
CENTERLINE OF HIGHEST OPERABLE PART - TYP
R-14 INSTALL ELEVATOR EMERGENCY POWER INDICATOR AT 76" MIN AFF
R-15 RETAIN AND PROVIDE NEW PAINT AT ENTRANCE DOORS
R-16 RETAIN AND PROVIDE NEW PAINT AT ENTRANCE FRAMES
R-17 PROVIDE NEW TEXTURED STAINLESS STEEL CAR DOORS
R-18 PROVIDE NEW 2X2 LAY-IN ACP AND GRID. COORDINATE WITH OWNER FOR ATTIC STOCK
R-19 PROVIDE NEW 2X4 FLOURESCENT TROFFER FIXTURE TO MATCH EXISTING CORRIDOR LIGHTS - SEE ELEC
R-20 PATCH AND REPAIR EXIST GWB WALL
R-21 PROVIDE NEW HOLLOW METAL FRAME FOR 3' X 7' CASED OPENING
KEYED REPAIR NOTES
1/4" = 1'-0"A1.02
1 PARTIAL LOWER LEVEL FLOOR PLAN - ELEV #3
1/4" = 1'-0"A1.02
2 PARTIAL FIRST FLOOR PLAN - ELEV #3
1/4" = 1'-0"A1.02
3 PARTIAL SECOND FLOOR PLAN - ELEV #3
1/2" = 1'-0"A1.02 A1.02
4 ELEVATOR MACHINE ROOM PLAN
0' 2' 4' 8'
SCALE: 1/4" = 1'-0"
N
1/2" = 1'-0"A1.02
5 ELEVATOR #3 PIT
1. PROVIDE NEW SHUT OFF VALVE
2. PROVIDE NEW SCAVENGER PUMP
3. PROVIDE NEW CAR LANDING SYSTEM
4. PROVIDE NEW LIMIT SWITCHES
5. PROVIDE NEW VICTAULIC FITTINGS
SHAFT AND PIT NEW WORK NOTES
09/26/2025
1. REVIEW PHASING PLAN AND NARRATIVE ON PH1.01. ALL WORK RELATED TO ELEVATOR #3 TO BE
COMPLETED IN PHASE #3. SEE ADDITIONAL NOTES ON MEP SHEETS.
2. SEE A5.01 FOR RATH WIRING DIAGRAM AND SHEETS T-001THRU T-202 FOR PLANS AND ADDITIONAL
INFORMATION ON THE ELEVATOR EMERGENCY TWO-WAY COMMUNICATION SYSTEM (RATH).
ELEVATOR MACHINE ROOM NOTES
No. Revision Date
Revisions
Date
OUBO Submission 09/26/2025
Submission Set
03/11/2026
No. Revision Date 1 Response to Comments 11/20/2025
2 Response to Comments 02/09/2026
3 Response to Comments 03/11/2026
APPROVED FOR
CONSTRUCTION
Date = 03/17/2026
These construction documents have been examined in accordance with the 2021 Virginia Uniform Statewide Building Code (USBC). Submittals and/or shop drawings have not been provided or reviewed as part of this process.
The Registered Design Professional and/or Building/Tradesman Contractor shall be solely responsible for the correct installation and construction of all required systems in compliance with Federal, State, Local codes and manufacturing installation instructions. Request required special inspections and provide to A&E for review. Request inspections required by OUBO in accordance with OUBO policies and procedures. Any revisions that occur during the course of construction shall not be made to this set without the
ELEV MACH
ROOM
TEL/
COMM
KITCHENETTE
MEN'S
TOILET
WOMEN'S
TOILET
#1
ELEVATOR
#2
ELEVATOR
LOBBY
STAIR #2
A4.01A1.01
R-9
R-9
TYP (11)
R-18
R-19 R-18
A1.03A1.01
A1.03A1.01
MEN'S
TOILET
#1
ELEVATOR
#2
ELEVATOR
STAIR #2
WOMEN'S
TOILET
LOBBY
A4.01A1.01
R-9
TYP (11)
AREAS
OF WORK
Lower Level
421' - 5"
First Floor
435' - 5"
NEW 2HR RATED CEILING
ASSEMBLY PER UL-I506
OR SIMILAR TO EXTEND
THE RATED CEILING TO
THE NEW RATED WALL
EXIST 2HR RATED
CEILING ASSEMBLY
EXIST ACP TO BE REMOVED
AND REPLACED AS
REQUIRED FOR ACCESS TO
PERFORM THE WORK ABOVE
2 HR HORIZ SHAFT
WALL DUCT AND
CEILING ASSEMBLY -
SEE WHI 694-0300
ON A5.02
A1.03A1.01
KITCHENETTE
ELEV MACH
ROOM
EXIST 90MIN RATED
ACCESS PANEL
Lower Level
421' - 5"
A1.03A1.01
ELEV MACH
ROOM031
KITCHENETTE
CORRIDOR
NEW 2HR RATED CEILING
ASSEMBLY PER UL-I506
OR SIMILAR TO EXTEND
THE RATED CEILING TO
THE NEW RATED WALL
PROVIDE NEW FIRE DAMPER
AND ASSOCIATED
ACCESORIES WHERE
EXISTING DUCT PENETRATES
NEW RATED WALL
ENCLOSURE - SEE MECH
EXIST 24X16 DUCT TO
REMAIN - SEE MECH
EXIST 44X16 DUCT TO
REMAIN - SEE MECH
LAE
WN
O M
M O
OF
I
NI
G
RI
H V
E C TCRA
MICHAEL DETOMO
Lic. No. 15799
T
C
A
IH T
Consultants
703.684.5994
333 North Fairfax Street
Alexandria, Virginia 22314
Seal
Key Plan
Drawing
Revisions
Date
Project No.
Sheet No.
OUBO Submission 09/26/2025
Submission Set coleanddenny.com
PC No.: 247-242012
Permit Electronic Approval Stamp
03/11/2026
03/11/2026
20011.22
4400 University Drive Fairfax, Virginia 22030
A1.03
Partial RCP - Elevator #1 & #2
GMU Enterprise Hall Elevator Modernization
1/4" = 1'-0"A1.03
1 PARTIAL LOWER LEVEL RCP - ELEV #1 & #2
1/4" = 1'-0"A1.03
2 PARTIAL RCP LEVEL 1 THRU 4 - ELEV #1 & #2
GENERAL NEW WORK NOTES
1. DIMENSIONS ARE TO FINISH FACE OF CONSTRUCTION UNLESS OTHERWISE INDICATED.
2. OUTSIDE OF DOOR JAMBS TO BE 4" FROM WALL INTERSECTION UNLESS OTHERWISE INDICATED.
3. PROVIDE NON-COMBUSTIBLE OR FIRE RETARDANT TREATED WOOD BLOCKING IN PARTITIONS
WHERE REQUIRED TO SUPPORT WALL MOUNTED ITEMS SUCH AS TELEVISIONS, DIGITAL MEDIA
PLAYERS, DRY ERASE BOARDS, SMART BOARDS, ETC. SEE FLOOR PLAN. GC SHALL COORDINATE
WITH OWNER FOR LOCATIONS OF BLOCKING. THE OWNER SHALL PROVIDE THESE WALL MOUNTED
DEVICES.
4. "TOOTH-IN" MASONRY WHERE ALTERING OR REPAIRING EXISTING MASONRY. MORTAR COLOR
SHALL MATCH EXISTING MORTAR.
R-1 RETAIN & REFURBISH EXISTING HYDRAULIC JACK ASSEMBLY, PROVIDE NEW SEALS
R-2 RETAIN & REFURBISH EXISTING HYDRAULIC OIL PIPING, PROVIDE NEW VICTAULIC FITTINGS, PAINT EXIST PIPE
R-3 RETAIN & REFURBISH EXISTING PIT CHANNEL, PAINT CHANNEL
R-4 INSTALL NEW PIT LADDER SUCH THAT EACH SIDE RAIL EXTENSION SHALL BE DESIGNED TO RESIST A SINGLE CONCENTRATED LOAD OF 100 POUNDS IN ACCORDANCE WITH VCC 1607.17 AND SECTION 4.5.4 OF ASCE 7.
R-5 PROVIDE NEW LED PIT LIGHTING WITH MIN OF 10FC - SEE ELEC
R-6 PROVIDE NEW SURFACE MOUNTED SUMP PUMP - SEE PLUMB
R-7 PROVIDE NEW NON-PROPRIETARY HOISTWAY DOOR OPERATING EQUIPMENT
R-8 SAND AND PAINT RETAINED EXIST RAILS
R-9 PROVIDE NEW LED LIGHT, PATCH AND REAPAIR EXIST GWB CEILING - SEE ELEC
R-10 INSTALL FLOOR DESIGNATIONS IN TACTLE CHARACTERS & BRAILLE ON BOTH JAMBS OF THE ELEV HOISTWAY
ENTRANCE PER 2017 ANSI 407.2.3.1
R-11 LOCATE HALL LANTERN W/ DIRECTIONAL SIGNAL CENTERED AT 72" MIN AFF - TYP
R-12 LOCATE FIRE FIGHTERS RECALL SWITCH ABOVE CALL BUTTONS
R-13 LOCATE HALL ELEVATOR CALL BUTTONS RECESSED FLUSH TO THE WALL WITH ENGRAVING AT 48" MAX TO THE
CENTERLINE OF HIGHEST OPERABLE PART - TYP
R-14 INSTALL ELEVATOR EMERGENCY POWER INDICATOR AT 76" MIN AFF
R-15 RETAIN AND PROVIDE NEW PAINT AT ENTRANCE DOORS
R-16 RETAIN…
This is the start of the file's text. The full file is on GovTribe.