This Addendum No. 2 issued by George Mason University on October 7, 2026, provides clarifications and revisions to the Enterprise Hall Elevator Modernization project for bidders in Fairfax, Virginia. The project involves the modernization of three hydraulic elevators (Elevators #1, #2, and #3 as an additive item) in Enterprise Hall, including renovation of elevator pits, replacement of elevator doors, installation of new interior stainless steel panels, lighting, and call buttons to bring elevators to current code compliance. The revised bidders' questions and responses document addresses 51 inquiries from contractors regarding project specifications, phasing requirements, maintenance responsibilities, and technical requirements. The revised bid submission deadline is October 19, 2026, at 2:00 p.m., with bid opening on October 20, 2026, project award on October 29, 2026, and construction start on November 3, 2026. Substantial completion is required by March 2, 2028, for the base bid work, with a June 1, 2028, completion date for Additive Item #1 (Elevator #3) if awarded. Bidders must acknowledge receipt of Addendum No. 2 with their submission and remain bound by the original Invitation for Bid terms except as amended herein.
Key project specifications and clarifications include that Elevator #1 shall be connected to emergency generator power while Elevators #2 and #3 shall have battery lowering capability; elevators must be modernized sequentially per the phasing plan with no concurrent construction on multiple elevators; existing sprinkler heads require cleaning per NFPA 25 without replacement; shop drawings for sprinkler and fire alarm systems must be NICET Level III or PE-level (not requiring seals); the project is not subject to prevailing wage or Buy American Steel Act requirements; George Mason University shall pay elevator phone monitoring subscription fees after the warranty period expires; and the contractor assumes maintenance responsibilities for remaining elevators during phases once demolition begins, with repairs managed via change orders. The SWaM participation goal is 50% for fiscal year 2026, though no SWaM-certified elevator subcontractors attended the pre-bid site visit. No hazardous materials assessment is required as the building was constructed in 1990. The addendum contains 369 pages including revised drawings, the standard bid form, and responses to all bidder questions.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
10402 Rivanna River Way
Fairfax, VA 22030 Phone: (703) 993-2520
ADDENDUM NO. 2
Project No: 247-242012 Project Name: Enterprise Hall Elevator Modernization
George Mason University Purchasing & Fiscal Services Facilities Administration Building 4400 University Drive – MSN 1E4 Fairfax, Virginia 22030-4444
Date: 07 October 2026
From: Michele Kelly, VCCO Contract Specialist 703.993.4019
To: Potential Bidders
Addendum No. 2 is being issued to provide all bidders with the following project clarif ications and/or revisions:
• Cole & Denny Architects Addendum No. 2 Narrative Page dated 06 October 2026
• Responses to Bidders Questions
• Revised Project Drawing G0.01 – Cover Sheet dated 06 October 2026. Response to Bidder Question No.
• Revised Project Drawing G1.01 – Egress, Occupancy & Fire Resistance Rating Plan dated 11 March
2026. Response to Bidder Question No. 27
• Enterprise Hall Elevator Maintenance Records – Response to Bidder Question No. 31
• Addendum No. 2 - Invitation for Bid - Enterprise Hall Elevator Modernization
• Addendum No. 2 - Standard Bid Form - Enterprise Hall Elevator Modernization
• Revised Bidders Questions w/Responses Due: 07 October 2026
• Revised Bid Submission Date: 19 October 2026
• Revised Bid Opening Date: 20 October 2026
• Revised Project Award Date: 29 October 2026
• Revised Construction Start Date: 03 November 2026
• Revised Substantial Completion Date: 02 March 2028
Bidders must acknowledge receipt of Addendum No. 2 with their Bid Submission. Revised Bid submission due date is 19 October 2026 at 2:00pm.
Except as amended or clarif ied herein, all terms, conditions and provisions of the original Invitation for Bid (IFB) remains unchanged, and all changes and clarif ications stated above and within this Addendum are hereby made part of the IFB Requirements and Contract Documents, and shall be taken into account in the preparation of the bid submission and the execution of all work.
Acknowledgment
(signature) (date)
(company)
Project Information
Owner: George Mason University
Project Title GMU Enterprise Hall Elevator Modernization
Project Location: 4400 University Drive, Fairfax, Virginia 22030
Owners' Project Manager: Christy Hogan 10/6/2026
Owner's Project No: 247-242012
A/E Project Manager: Mike Detomo
A/E Project No: 20011.22
Date: 10/6/2026
Item no.
1.01
1.02
1.03
1.04 Maintenance records per bid question #31 response is attached.
Bid Addendum No. 2
The following constitutes Addendum 2, contains 369 (three hundred sixtey nine) pages, and is a part of the Contract
Documents. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject bidder to disqualification.
Bidder Questions and A/E/Owner Responses dated 10/06/2026 are attached.
Revised Delegated Design Items on G0.01 per bid question #03 / #37 response is attached.
Dumpster location diagram per bid question #27 response is attached.
# Bidder Name Date Asked Subject Question Response Response Date
1 PBS Contracting Inc 9/15/2026 RATH Phone and
Data Connections
The Telecom (T) Drawings show telephone and data outlets being added to the Elevator Machine Rooms. Please confirm that these rough-in's are required. Our understanding is that the RATH systems need to be supported by a Cellular dialer due to GMU's inability to support the IT network via battery/backup generator.
The GC shall provide conduit and rough ins for the RATH system. Refer to 1/A5.01.
10/6/2026
2 PBS Contracting Inc 9/15/2026 Project phasing Please confirm that elevators 1, 2 and if accepted 3 will need to be completed sequentially and that multiple elevators can not be taken out during a single phase.
Confirmed. The elevator construction sequence shall be bid per Phasing PH.101.
10/6/2026
3 PBS Contracting Inc 9/15/2026 Delegated Design
Elements
Please clarify what deliverables and calculations will need to be provided and sealed for the In-Building Emergency
Communications Infrastructure (RATH).
Shop drawings for sprinkler and fire alarm systems are required indicating applicable existing to remain and new work portions of these systems associated with the elevators. Shop drawings are not required to be sealed, but must be NICET Level III or PE.
In-building emergency communications infrastructure
(RATH) shall not be required to have an engineer's seal.
10/6/2026
4 PBS Contracting Inc 9/15/2026 Emergency
Generator supporting
Elevators
Our understanding of the code is that if a building is supported by a generator that all the elevators are required to be supported by the generator. This is typically supported by a selector switch so that the generator does not need to support all the elevator loads, but each individually. Right now the bid documents match the field conditions, where only Elevator 1 is supported by the generator. Please confirm this is the project expectation.
Elevator #1 shall be connected to emergency generator power. Elevator #2 & #3 shall be provided with battery lowering.
10/6/2026
5 PBS Contracting Inc 9/15/2026 Sprinkler head cleaning
Please clarify the condition of the existing sprinkler heads.
Key Note 2 asks for sprinkler heads to be cleaned, the amount of "cleaning" permitted is limited without full head replacement. Please clarify.
Per Key Note 2, existing sprinklers shall be cleaned in accordance with NFPA 25. Replacement not required.
10/6/2026
6 Juniper Construction Company, Inc 9/29/2026 Controls Vendor Please confirm if the controls will be stand-alone and no base building control vendor will be required
Controls are part of the mechanical package. Separately we can have siemens put in a. These units will not be part of the BAS, standalone
10/6/2026
7 NICHOLS CONTRACTING INC 9/30/2026 GMU Quiet Hours Per site visit, there are quiet hours that should be known of.
Please confirm the quiet hours to be demonstrated during construction.
Quiet Hours are to be observed during construction occurring on GMU's 'Reading Days' and 'Examination
Days' in attachment J.
10/6/2026
8 NICHOLS CONTRACTING INC 9/30/2026 Emergency Power Per the site visit, Elevator 1 is the only elevator connected to the emergency power. Please confirm if elevator 2 & 3 should be connected to emergency power as well in this contract.
Elevator #1 shall be connected to emergency generator power. Elevator #2 & #3 shall be provided with battery lowering.
10/6/2026
9 NICHOLS CONTRACTING INC 9/30/2026 Superintendent Please confirm if a full-time dedicated on-site Superintendent must be on-site at all times during construction and shall have no other duties.
GC shall refer to Article 17 of CO-7 for responsibilities of
Superintendents
10/6/2026
10 NICHOLS CONTRACTING INC 9/30/2026 Kitchenette
Materials
Please confirm who will be responsible for relocating or salvaging existing materials in the RM 031 Kitchenette prior to construction or will it be the contractor's responsibility.
GC shall be responsible for relocating or salvaging existing materials in 031 Kitchenette prior to construction.
10/6/2026
11 NICHOLS CONTRACTING INC 9/30/2026 Construction
Sequence
Please confirm if Elevator 1 and 3 can be done at the same time if Elevator 3 is approved as an additive.
No. The elevator construction sequence shall be bid per
Phasing PH.101.
10/6/2026
12 NICHOLS CONTRACTING INC 9/30/2026 Prevailing Wage Please confirm project is not subjected to prevailing wage Per Addendum No. 1 Optional Pre-Bid Meeting Minutes, Item 26.09.14.09 - this project is not subject to prevailing wages
10/6/2026
13 NICHOLS CONTRACTING INC 9/30/2026 SWam
Requirements
The SWam requirement for this contract is 50%. Note that no
SWam elevator subcontractors attended the site visit and this being an elevator modernization project, achieving the 50% goal may not be attainable unless the offeror (GC) is SWam certified. Please clarify if this goal is mandatory, and if so, can the goal be revised to a lower amount?
Per the Invitation for Bid - SWaM Information - It is the policy of George Mason University to contribute to the establishment, preservation, and strengthening of small, women and minority owned businesses (SWaM), as certified by the Commonwealth of Virginia’s Department of Small Business and Supplier Diversity (SBSD), and to encourage their participation in Mason’s procurement activities. To this end, Mason has established an overall
SWaM participation goal of 50% for fiscal Year 2026 and encourages Contractors to provide for the participation of
SWaM businesses.
10/6/2026
14 NICHOLS CONTRACTING INC 9/30/2026 Hazmat
Assessment
Has a hazmat assessment been completed? If so, please provide the reports.
The building was drawn in 1990 which is beyond the year that HazMat surveys are required.
10/6/2026
15 NICHOLS CONTRACTING INC 9/30/2026 Hazardous
Materials
Please confirm that any hazardous materials abatement will not be the responsibility of the contractor if encountered.
The building was drawn in 1990 which is beyond the year that HazMat surveys are required. There should be no hazardous materials encountered.
10/6/2026
16 NICHOLS CONTRACTING INC 9/30/2026 Phone Monitoring
Subscription Fees
Please confirm that the Owner pays the elevator phone monitoring subscription fees after the warranty and guarantee maintenance period expires.
Confirmed, GMU shall pay the elevator phone monitoring subscription fees after the warranty and guarantee maintenance period expires.
10/6/2026
17 NICHOLS CONTRACTING INC 9/30/2026 Buy American Steel
Act
Please confirm that this project is not subject to Buy American
Steel Act.
Confirmed, this project is not subject to Buy American
Steel Act.
10/6/2026
18 NICHOLS CONTRACTING INC 9/30/2026 Bathroom Will the contractor be given access to the bathrooms on-site? GC shall have access to on-site bathrooms provided they are maintained in good condition.
10/6/2026
19 NICHOLS CONTRACTING INC 9/30/2026 BAS Integration Please confirm if BAS integration is required for this project and if yes, please confirm the point of contact information for the incumbent BAS servicer at the facility so we can obtain pricing. If required, please clarify which systems need to be integrated into the BAS (HVAC, Sump Pump, Elevator
Controllers, etc.).
No, there shall be no BAS integration for the elevators. 10/6/2026
20 NICHOLS CONTRACTING INC 9/30/2026 Fire Alarm Servicer
POC
Please provide the point of contact information for the incumbent fire alarm servicer at the facility so we can obtain pricing.
Honeywell Gamewell FCI - see photos in Addendum 1 10/6/2026
21 NICHOLS CONTRACTING INC 9/30/2026 Temporary
Barricades
Will the offeror be required to construct 8' hard plywood temporary barricades at each elevator entrance throughout the modernization period for each elevator or will the elevator contractor's temporary collapsable barricades be acceptable?
Barricades required for the work is a means and methods determination for the GC. Temporary barricades have been sufficient on past projects of a similar scope.
10/6/2026
22 NICHOLS CONTRACTING INC 9/30/2026 Machine Room
Doors and Frames
Please confirm machine room doors and frames are to remain.
Confirm, machine room doors and frames are existing to remain.
10/6/2026
23 NICHOLS CONTRACTING INC 9/30/2026 Damproofing Please confirm that damproofing of the elevator pits is not part of the contract scope of work.
Confirmed, damproofing of the elevator pits is not part of the project scope.
10/6/2026
24 NICHOLS CONTRACTING INC 9/30/2026 Sump Pump Please confirm sump pump is surface mounted and a sump pit/crock is not required.
Confirmed, see Elevator Pump 3/P-001. 10/6/2026
25 NICHOLS CONTRACTING INC 9/30/2026 Ceiling Please confirm whether the new ceiling in Room 031 is gypsum board or lay-in acoustical panel.
New ceiling in Kitchenette 031 shall match existing - see
1/A1.03.
10/6/2026
26 NICHOLS CONTRACTING INC 9/30/2026 Laydown Area Please confirm where the laydown area will be during the construction of the project.
Interior lay down space is unavailable. 10/6/2026
27 NICHOLS CONTRACTING INC 9/30/2026 Dumpster Please confirm where a dumpster can be place for this project.
Allowable dumpster sites are depicted on annotated
G1.01 attached.
10/6/2026
28 NICHOLS CONTRACTING INC 9/30/2026 Schedule Please confirm: (a) whether work is permitted, and building access available, during the Winter Holiday Closing (21 Dec
2026 - 1 Jan 2027) and during other campus closures, and whether escort or special access arrangements apply; (b) whether there are blackout periods during final examinations, commencement or move-in when noisy work or elevator outages will not be permitted; and (c) that the 2027 and 2028
Mason holiday calendars will be issued to the successful
Contractor.
GC can work over winter holiday. See the academic calendar per attachment J. GMU 2027-2027 calendars will be issued once available.
10/6/2026
29 NICHOLS CONTRACTING INC 9/30/2026 Temp Field Offices Please confirm that temporary field offices for the owner and contractor are not required for this project.
Confirmed. No field offices are required. 10/6/2026
30 NICHOLS CONTRACTING INC 9/30/2026 Hydraulic Jack
Assembly
Section 14 24 01, 2.6.B (Hydraulic Jack Assembly), retains the existing borehole jack assemblies for all three elevators and replaces only the packing seals. Please confirm whether pressure or leak testing of the existing in-ground cylinders is required under this Contract, and provide any records the
University has of cylinder testing, oil loss or leak repairs for
Elevators 1, 2 and 3. Please also confirm how replacement of a cylinder that is found to be leaking or fails testing will be handled.
Pressure or leak testing is not required under this
Contract.
10/6/2026
31 NICHOLS CONTRACTING INC 9/30/2026 Maintenance Addendum No. 1, pre-bid minutes item 26.09.14.20, requires the Contractor to take over maintenance and callbacks for the remaining elevator in the Elevator 1 & 2 bank once demolition of the first elevator starts, and for Elevator 3 once Phase 1 demolition starts if Additive Item #1 is awarded. Please identify the current maintenance provider and provide recent maintenance records and known deficiencies for the existing elevators. Please also confirm whether repair or replacement of existing, non-modernized components during this takeover period is part of the Contract or will be handled by change order.
ThyssenKrupp is the current elevator maintenance provider. Maintenance records are available and are included in this addendum. Repair or replacement of existing, non-modernized components during this takeover period shall be managed via change orders.
10/6/2026
32 NICHOLS CONTRACTING INC 9/30/2026 Project Manual
Revision
Addendum No. 1, pre-bid minutes item 26.09.14.20, revises
"142101-1.13 Maintenance Service," but the Project Manual section is 14 24 01, Hydraulic Elevator Modernization. Please confirm that the revision applies to Section 14 24 01, paragraph 1.13. Section 14 24 01, 1.12 starts the warranty at
Substantial Completion of each elevator; please also confirm whether the warranty for the Phase 1 elevator is extended to match the revised maintenance period.
Elevator #1 & #2 shall have a 1 year warranty that begins upon the substantial completion of the latter of both elevators. Elevators in a shared hoistway shall not have separate maintenance service providers.
Additive Item #1 - Elevator #3 shall be under a separate 1 year warranty that begins upon its own substantial completion date.
10/6/2026
33 NICHOLS CONTRACTING INC 9/30/2026 Section 14 24 01, 1.8.B (Source
Limitations)
Section 14 24 01, 1.8.B (Source Limitations) requires the controllers, signal fixtures, door operators, car frames, cabs and entrances to be manufactured by a single manufacturer.
Sections 2.1 and 2.2 require non-proprietary equipment and list separate manufacturers for controllers, door equipment, fixtures and two-way communication. Please confirm that components from the different manufacturers listed in 2.2 may be combined.
Confirmed, components from the different manufacturers listed in 2.2 may be combined.
10/6/2026
34 NICHOLS CONTRACTING INC 9/30/2026 Motion Control Section 14 24 01, 2.4.I (Motion Control) requires variable voltage, variable frequency (VVVF) motion control with closed-loop velocity feedback, while 2.5.B.7 requires an electronic soft starter with closed transition for the hydraulic power units.
Please confirm which motor control is required for the hydraulic power units.
CD: Section 14 24 01, Paragraph 2.5.B.7 shall govern the motor starting requirements for the hydraulic power units. Provide an electronic solid-state soft starter sized for the hydraulic pump motor and coordinated with the elevator controller and hydraulic power unit. The reference to variable voltage, variable frequency (VVVF) motion control in Paragraph 2.4.I is not intended to require a variable-frequency drive for the hydraulic pump motor. A separate VVVF drive and electronic soft starter are not required for the same hydraulic pump motor.
10/6/2026
35 NICHOLS CONTRACTING INC 9/30/2026 Card Readers and
Cameras
Section 14 24 01, 2.6.E.3 and E.4 require traveling cable pairs and junction boxes for access control and security cameras, and the car operating panel service cabinet requires an access control override switch. No card reader, access control or camera equipment is specified. Please confirm whether card readers and cab cameras are to be furnished and installed under this Contract or by the University's access control and security vendors. If by others, please identify those vendors.
These specifications are to provide for the future installation of access control and cameras should GMU choose to do so as a separate project at a later date. The elevators do not have any existing access control or cameras and there is no planned installation of such devices as part of this project.
10/6/2026
36 NICHOLS CONTRACTING INC 9/30/2026 Communication
System
Section 14 24 01 (Communication System) requires a Rath
SmartView system with video capability and a text-based interface, provided with no recurring monitoring costs. Please identify the answering point for the elevator emergency communication system. Please also confirm whether the
University will furnish the telephone, cellular or data connections to the elevator machine rooms, or whether these connections are part of the Contract.
GC shall be responsible for providing the 24/7 answering point during the maintenance period. After the maintenance period, the 24/7 answering point will transfer to GMU's contracted maintenance provider. GMU will provide the FirstNet connectivity. See 1/A5.01.
37 NICHOLS CONTRACTING INC 9/30/2026 Delegated Sprinkler and Fire Alarm
Design
Addendum No. 1, pre-bid minutes item 26.09.14.02, lists Fire
Suppression Systems and Fire Alarm Systems as delegated-design submittals. Sheets FX1.00-FX1.04 note that all sprinkler equipment is existing to remain except where indicated, and Sheets FA1.00-FA1.04 show added heat detectors and reconnection of existing shunt-trip modules.
Please confirm the extent of the delegated sprinkler and fire alarm design required, and whether sealed drawings and calculations by a Virginia-licensed professional engineer are required for these modifications.
Shop drawings for sprinkler and fire alarm systems are required indicating applicable existing to remain and new work portions of these systems associated with the elevators. Shop drawings are not required to be sealed, but must be NICET Level III or PE.
10/6/2026
38 NICHOLS CONTRACTING INC 9/30/2026 Substantial
Completion
IFB Item 12 (Project Dates) and the Standard Bid Form set
Substantial Completion of the entire project at 01 March 2028.
Please confirm whether this date applies whether or not
Additive Item #1 (Elevator No. 3, Phase 3) is awarded, or whether a separate Substantial Completion date applies to the
Base Bid work.
This date does not apply to Additive Item #1. A substantial completion date of June 1 shall be applied should
Elevator No. 3 be added to the project.
10/6/2026
39 NICHOLS CONTRACTING INC 9/30/2026 Bid Form The Standard Bid Form repeats "TOTAL BASE BID AMOUNT
IS" after Bid Alternate No. 1. The base HECO-12 form
(Attachment F - Invitation for Bids - HECO-12) includes a line for Bid Alternate No. 1 - Elevator No. 3, while its total must match the Total Base Bid Amount entered in Trimble. Please confirm what amount the second "Total Base Bid Amount" line on the Bid Form should show, and whether the Bid Alternate
No. 1 line on the base HECO-12 form should be left blank.
Please also confirm the basis of award.
Refer to Addendum No. 2 - Standard Bid Form -
Enterprise Hall Elevator Modernization.
10/6/2026
40 NICHOLS CONTRACTING INC 9/30/2026 Small Business
Procurement Plan
General Conditions CO-7, Section 51 (Small Business
Procurement Plan), p. 56, requires the Contractor to include a
Small Business Procurement Plan in its Bid when the Contract exceeds $100,000. The IFB Bid Submission Document
Requirements (Items 1 through 7) do not list this plan. Please confirm whether a Small Business Procurement Plan must be submitted with the bid through Trimble, and which form is to be used.
A small business plan is not required. 10/6/2026
41 NICHOLS CONTRACTING INC 9/30/2026 Hoistway entrance frames
Confirm frames will be retained and electrostatically painted in owners' selection of color.
Confirmed 10/6/2026
42 NICHOLS CONTRACTING INC 9/30/2026 Hoistway entrance
Doors
Confirm that the hoistway entrance doors shall be retained and electrostatically painted in owners' selection of color.
Confirmed 10/6/2026
43 NICHOLS CONTRACTING INC 9/30/2026 Elevator Car Please confirm that car interior doors and car raised panels shall be stainless steel with a 5WL finish.
Confirmed 10/6/2026
44 NICHOLS CONTRACTING INC 9/30/2026 Load weighing Please confirm each unit shall have load weighing incorporated into it.
GC shall be responsible for load weight testing. 10/6/2026
45 NICHOLS CONTRACTING INC 9/30/2026 Emergency Power Please confirm if the elevator is not connected to emergency power and it shall be provided with battery lowering.
Elevator #1 shall be connected to emergency generator power. Elevator #2 & #3 shall be provided with battery lowering.
10/6/2026
46 NICHOLS CONTRACTING INC 9/30/2026 Oil Coolers Confirm that the elevator power units shall be provided with oil coolers.
Confirmed. See 3/A1.01. 10/6/2026
47 NICHOLS CONTRACTING INC 9/30/2026 Traveling Cable for
Security
Cameras/Intercom
Confirm elevator contractor is to provide wiring in the traveling cable for security cameras / intercom while integration into these systems is by others.
Confirmed. These specifications are to provide for the future installation of access control and cameras should
GMU choose to do so as a separate project at a later date.
The elevators do not have any existing access control or cameras and there is no planned installation of such devices as part of this project.
10/6/2026
48 NICHOLS CONTRACTING INC 9/30/2026 Access Key switch Is it acceptable to have access key switch mounted in call station or as a separate hall fixture at top and bottom landings in lieu of cutting it into the door frame?
Yes, it is acceptable to have the access key mounted in the call station or as a separate hall fixture. Proposed location to be approved by A/E via submittal.
10/6/2026
49 NICHOLS CONTRACTING INC 9/30/2026 Hall Stations and
Position Indicators
Please advise if hall stations and Position Indicators shall be surface mounted or flush mounted.
Flush mount all hall stations 10/6/2026
50 NICHOLS CONTRACTING INC 9/30/2026 Elevator Car Sills Please confirm whether the elevator car sills are to be replaced.
No, the elevator car sills are existing to remain. 10/6/2026
51 NICHOLS CONTRACTING INC 9/30/2026 Fronts and
Transoms
Please confirm if the fronts and transoms of each elevator shall be reclad with #4 stainless steel.
Yes, the transom and front returns shall be clad in #4 stainless.
CONCRETE
BRICK
CMU
GROUT
STEEL
WOOD LUMBER
FINISH LUMBER
PLYWOOD
GYPSUM WALLBOARD
BATT INSULATION
RIGID INSULATION
AREAS
OF WORK
ROOM NAME &
NUMBER
PARTITION TYPEDOOR TYPE
# WINDOW TYPE
LEVEL MARKER
KEYNOTE
SECTION REFERENCE
SECTION NUMBER
SHEET NUMBER WHERE
DETAIL IS LOCATED
SHEET NUMBER WHERE
DETAIL IS REFERENCED
FROM
DETAIL REFERENCE
DETAIL NUMBER
SHEET NUMBER
WHERE SECTION IS
REFERENCED FROM
SHEET NUMBER WHERE
SECTION IS LOCATED
ELEVATION REFERENCE
ELEVATION NUMBER
SHEET NUMBER WHERE
ELEVATION IS REFERENCED
FROM SHEET NUMBER WHERE
ELEVATION IS LOCATED
INTERIOR ELEVATION
ELEVATION NUMBER
SHEET NUMBER WHERE
ELEVATION IS LOCATED
SECTION NUMBER
SHEET NUMBER WHERE
SECTION IS LOCATED
Name
NAME
PROJECT LOCATION
O
X R D
EXISTING TO REMAIN
EXISTING TO BE DEMOLISHED
NEW CONSTRUCTION
I-
236 / MAIN ST
US 50
I-66
O
X R D
PROJECT LOCATION
US 29
BRIDGE RD
CH
AI
N
General
G0.01 Cover Sheet
G1.01 Egress, Occupancy & Fire Resistance Rating Plan
PH1.01 Phasing Plan
Architectural
AD1.01 Partial Demolition Floor Plan - Elev #1 & #2
AD1.02 Partial Demolition Floor Plan - Elevator #3
AD1.03 Partial Demo RCP - Elev #1 & #2
AD1.04 Partial Demo RCP - Elevator #3
AD4.01 Demo Int Elevations, Sections, and Details - Elevator #1 & #2
AD4.02 Demo Int Elevations, Sections, and Details - Elevator #3
A1.01 Partial Floor Plans - Elev #1 & #2
A1.02 Partial Floor Plans - Elevator #3
A1.03 Partial RCP - Elevator #1 & #2
A1.04 Partial RCP - Elevator #3
A4.01 Interior Elevations, Wall Sections, and Details - Elevator #1 & #2
A4.02 Interior Elevations, Wall Sections, and Details - Elevator #3
A5.01 Partition Type and Rath Wiring Diagram
A5.02 UL Details
Mechanical
M-001 Cover Sheet - Mechanical
M-101 Partial Demolition Floor Plans Elevator #1 & #2 - Mechanical
M-102 Partial Demolition Floor Plans Elevator #3 - Mechanical
M-201 Partial New Work Floor Plans Elevator #1 & #2 - Mechanical
M-202 Partial Demolition Floor Plan Elevator #3 - Mechanical
M-203 Site Plan New Work, Mechanical
M-301 Details - Mechanical
M-401 Schedules - Mechanical
Plumbing
P-001 Cover Sheet - Plumbing
P-201 Partial New Work Floor Plans - Elevator #1 & #2
P-202 Partial New Work Floor Plans - Elevator #3
Electrical
E-001 Cover Sheet - Electrical
E-101 Partial Demolition Floor Plans - Elevator #1 & #2
E-102 Partial Demolition Floor Plans - Elevator #3
E-201 Partial Lighiting Floor Plans - Elevator #1 & #2
E-202 Partial Power Floor Plans - Elevator #1 & #2
E-203 Partial Lighiting Floor Plans - Elevator #3
E-204 Partial Power Floor Plans - Elevator #3
E-205 Site Plan - Electrical
E-401 Power Riser Diagram
E-501 Panel Schedules - Electrical
Telecom
T-001 Cover Sheet - Telecom
T-201 Partial New Work Floor Plans - Elevator #1 & #2
T-202 Partial New Work Floor Plans - Elevator #3
Fire Alarm
FA0.01 Reference Sheet - Fire Alarm
FA1.00 Elev #1 & #2 Lower Floor Plans - Fire Alarm
FA1.01 Elev & #2 Level 1-4 Floor Plans - Fire Alarm
FA1.02 Elev #3 Lower Level Floor Plans - Fire Alarm
FA1.03 Elev #3 First Floor Plans - Fire Alarm
FA1.04 Elev #3 Second Floor Plans - Fire Alarm
FA5.01 Detail Sheet - Fire Alarm
Sprinkler
FX0.01 Reference Sheet - Sprinkler
FX1.00 Elev #1 & #2 Lower Floor Plans - Sprinkler
FX1.01 Elev & #2 Level 1-4 Floor Plans - Sprinkler
FX1.02 Elev #3 Lower Level Floor Plans - Sprinkler
FX1.03 Elev #3 First Floor Plans - Sprinkler
FX1.04 Elev #3 Second Floor Plans - Sprinkler
FX5.01 Detail Sheet - Sprinkler
SHEET INDEX
GMU Enterprise Hall
Elevator Modernization Project Code: 247-242012
4400 University Drive Fairfax, Virginia 22030
LAE
WN
O M
M O
OF
I
NI
G
RI
H V
E C TCRA
MICHAEL DETOMO
Lic. No. 15799
T
C
A
IH T
Consultants
703.684.5994
333 North Fairfax Street
Alexandria, Virginia 22314
Seal
Key Plan
Drawing
Revisions
Date
Project No.
Sheet No.
OUBO Submission 09/26/2025
Submission Set coleanddenny.com
PC No.: 247-242012
Permit Electronic Approval Stamp
03/11/2026
03/11/2026
20011.22
4400 University Drive Fairfax, Virginia 22030
G0.01
Cover Sheet
GMU Enterprise Hall Elevator Modernization
APPLICABLE CODES
MATERIALS
DRAWING SYMBOLS
CODE SUMMARY
LOCATION MAP
ABBREVIATIONS
PHASING
# NUMBER
& AND
@ AT
ACP ACOUSTICAL CEILING PANEL
AFF ABOVE FINISH FLOOR
ALT ALTERNATIVE
ALUM ALUMINUM
ASTM AMERICAN SOCIETY OF TESTING &
MATERIALS
BD BUILDING
BOT BOTTOM
CJ CONTROL JOINT
CLG CEILING
CLOS CLOSET
CMU CONCRETE MASONRY UNIT
CONC CONCRETE
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
DEMO DEMOLITION
DF DRINKING FOUNTAIN
DIA DIAMETER
DN DOWN
DS DOWNSPOUT
EF EXHAUST FAN
EIFS EXTERIOR INSULATION FINISHING SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
EQ EQUAL
EQUIP EQUIPMENT
ETR EXISTING TO REMAIN
EXIST EXISTING
EXT EXTERIOR
FE FIRE EXTINGUISHER
FRT FIRE RETARDANT TREATED
FT FEET/FOOT
GA GAUGE
GALV GALVANIZED
GWB GYPSUM WALL BOARD
HDWR HARDWARE
HM HOLLOW METAL
HR HOUR
IN INCH
INSUL INSULATION
INT INTERIOR
JAN JANITOR'S CLOSET
JT JOINT
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MO MASONRY OPENING
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NO NUMBER
OC ON CENTER
PLAM PLASTIC LAMINATE
PLUMB PLUMBING
PLYWD PLYWOOD
PT PRESSURE TREATED
PTD PAINTED
PVC POLYVINYL CHLORIDE
RB RESILIENT BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RM ROOM
SCW SOLID CORE WOOD
SF SQUARE FOOT/FEET
SIM SIMILAR
SST STAINLESS STEEL
STOR STORAGE
STRUCT STRUCTURAL
THRU THROUGH
TOS TOP OF STEEL
TYP TYPICAL
UL UNDERWRITER'S LABORATORIES
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITE TILE
VEST VESTIBULE
VIF VERIFY IN FIELD
VWC VINYL WALL COVERING
W/ WITH
WD WOOD
THE BUILDING CODE AUTHORITY IS THE OFFICE OF THE UNIVERSITY BUILDING OFFICIAL (OUBO) OF
GEORGE MASON UNIVERSITY (GMU).
THE BUILDING CODE FOR THIS PROJECT IS THE VIRGINIA UNIFORM STATEWIDE BUILDING CODE (VUSBC) 2021 EDITION, EFFECTIVE JANUARY 24, 2024. ALL WORK SHALL CONFORM TO THE BUILDING CODE.
THE PROJECT IS CLASSIFIED AS A LEVEL II ALTERATION PER SECTION 601 OF THE VIRGINIA EXISTING
BUILDING CODE, 2021 EDITION.
THE FIRE CODES FOR THIS PROJECT ARE THE VIRGINIA STATE FIRE PREVENTION CODE, 2021 EDITION.
THE HIGHER EDUCATION CAPITAL OUTLAY (HECO) 2023 EDITION APPLIES TO THIS PROJECT.
GEORGE MASON UNIVERSITY DESIGN MANUAL, 2013 EDITION
THE COMPLIANCE PATH FOR ACCESSIBILITY FOR THIS PROJECT IS ADASO-TITLE II. THE ADA STANDARD FOR SCOPE OF WORK IS CHAPTER 2 OF THE DOJ'S 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN (ASAD) DATED SEPTEMBER 16, 2010. THE ADA STANDARDS FOR TECHNICAL DESIGN ARE CHAPTERS | 8 THRU II OF STANDARDS FOR ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES AI 17.1-2017.
APPROVED MARCH 28, 2017.
THE PROJECT CONSISTS OF THE MODERNIZATION OF THREE HYDRAULIC ELEVATORS IN THE ENTERPRISE HALL CLASSROOM AND OFFICE BUILDING OF THE GEORGE MASON UNIVERSITY. ELEVATORS #1 & #2 IS A 5-STOP ELEVATOR BANK, AND ELEVATOR #3 IS A 3-STOP ELEVATOR. MODERNIZATION CONSISTS OF RENOVATIONS OF THE ELEVATOR PIT AND REPLACING ELEVATOR DOORS. THE ELEVATOR WILL ALSO BE UPGRADED WITH NEW INTERIOR STAINLESS STEEL INTERIOR PANELS, LIGHTING, AND CALL BUTTONS. ALL NECESSARY MODIFICATIONS SHALL BE MADE TO BRING THE ELEVATOR UP TO CURRENT CODE. WORK WILL BE CONDUCTED IN 2 PHASES SUCH THAT THE BUILDING WILL REMAIN OCCUPIED DURING CONSTRUCTION AND ELEVATOR ACCESS TO ALL
FLOORS SHALL BE MAINTAINED. SEE PHASING DIAGRAM AND NARRATIVE ON PH1.01
DESCRIPTION OF WORK
IN ACCORDANCE WITH THE HIGH PERFORMANCE BUILDING ACT, THE BUILDING IS EXEMPT FROM BUILDING IS EXEMPT FROM COMPLIANCE BECAUSE THE COST OF THE RENOVATIONS DOES NOT EXCEED 50% OF THE
VALUE OF THE BUILDING.
HIGH PERFORMANCE BUILDING ACT-
COMPLIANCE STATEMENT
IN ACCORDANCE WITH THE VIRGINIA ENERGY CONSERVATION CODE (VECC), THE BUILDING SHALL COMPLY WITH
VECC SECTIONS C402 THROUGH C405 AND C408.
VECC COMPLIANCE STATEMENT
ORIGINAL CODE BUILT UNDER:
ORIGINAL USE GROUP
ORIGINAL CONSTRUCTION TYPE:
VUSBC 2021 USE & OCC CLASSIFICATION
VUSBC 2021 CONSTRUCTION TYPE:
SPRINKLERED:
EXISTING BUILDING AREA:
EXISTING BUILDING HEIGHT:
NON-HIGH-RISE BUILDING PER <75'-0"
HIGHEST OCCUPIED FLOOR HEIGHT:
PROJECT AREA:
VUSBC 1990
A-3, B & E
IIA
A-3 & B
IIA
YES
101,200 GSF
6 STORIES, 86'-4"
70'-4"
3,250 SF
VICINITY MAP
ADDITIVE ITEM #1
PHASING
ALL WORK RELATED TO THE MODERNIZATION OF ELEVATOR #3 SHALL BE BID AS AN ADDITIVE ITEM.
THE PROJECT WORK WILL BE CONDUCTED IN 3 PHASES SUCH THAT THE BUILDING WILL REMAIN OCCUPIED DURING CONSTRUCTION AND ELEVATOR ACCESS TO ALL FLOORS SHALL BE MAINTAINED. EACH PHASE CONSISTS OF ONE ELEVATOR MODERNIZATION. SEE PH1.01 FOR PHASING PLAN AND NARRATIVE.
THE CONTRACTOR SHALL RETAIN THE NECESSARY DESIGN PROFESSIONALS LICENSED IN THE JURISDICTION OF THE PROJECT TO FULLY DESIGN AND DETAIL THE FOLLOWING DELEGATED DESIGN ITEMS. DELEGATED DESIGN SUBMITTALS SHALL INCLUDE SIGNED AND SEALED DRAWINGS AND CALCULATIONS AS NECESSARY:
1. SYSTEMS WITH SHOP DRAWING REVIEW & APPROVAL BY OUBO AFTER A/E REVIEW AND APPROVAL:
A. FIRE SUPPRESSION SYSTEMS (NICET LEVEL III OR PE)
B. FIRE ALARM SYSTEMS (NICET LEVEL III OR PE)
C. IN-BUILDING EMERGENCY COMMUNICATIONS INFRASTRUCTURE, RATH (ENGINEER SEAL NOT REQUIRED
D. ELEVATOR CAB (ENGINEER SEAL NOT REQUIRED)
2. SYSTEMS WITH SHOP DRAWING REVIEW & APPROVAL BY THE A/E:
A. INTERIOR NON-LOAD BEARING METAL STUD WALLS
B. BOLTED AND WELDED STEEL CONNECTIONS
C. DUCTWORK SUPPORT HANGERS
D. PIPING SUPPORT HANGERS
E. ELEVATOR PIT LADDERS
DELEGATED DESIGN ITEMS
No. Revision Date 1 Response to Comments 11/20/2025
2 Response to Comments 02/09/2026
3 Response to Comments 03/11/2026
Revisions
Date
OUBO Submission 09/26/2025
Submission Set
03/11/2026
No. Revision Date 1 Response to Comments 11/20/2025
2 Response to Comments 02/09/2026
3 Response to Comments 03/11/2026 wkidder Cloud wkidder Text Box 10/06/2026 wkidder Text Box Response to Bid Questions wkidder Text Box wkidder Text Box 10/06/2026 wkidder Text Box wkidder Line wkidder Line wkidder Line
2-HR FIRE BARRIER
EGRESS STARTING POINT
POINT AT WHICH A CHOICE OF
TWO EXITS BECOMES AVAILABLE
REMAINING TRAVEL DISTANCE
(REMAINING TRAVEL DISTANCE +
COMMON PATH OF TRAVEL <300')
COMMON PATH OF TRAVEL (<100')
TYPE-B EGRESS LEGEND
AREAS
OF WORK
ELEC ROOM
LOBBY
KITCHENETTE
ELEV MACH
ROOM
LOBBY
47'
58'
113'
20'
TEL/
COMM
#1
ELEVATOR
#2
ELEVATOR
ELEV MACH
ROOM
#3
ELEVATOR
121'
66'
JAN CL
JAN CL
2-HR FIRE BARRIER
EGRESS STARTING POINT
POINT AT WHICH A CHOICE OF
TWO EXITS BECOMES AVAILABLE
REMAINING TRAVEL DISTANCE
(REMAINING TRAVEL DISTANCE +
COMMON PATH OF TRAVEL <250')
COMMON PATH OF TRAVEL (<75')
TYPE-A EGRESS LEGEND
LAE
WN
O M
M O
OF
I
NI
G
RI
H V
E C TCRA
MICHAEL DETOMO
Lic. No. 15799
T
C
A
IH T
Consultants
703.684.5994
333 North Fairfax Street
Alexandria, Virginia 22314
Seal
Key Plan
Drawing
Revisions
Date
Project No.
Sheet No.
OUBO Submission 09/26/2025
Submission Set coleanddenny.com
PC No.: 247-242012
Permit Electronic Approval Stamp
03/11/2026
03/11/2026
20011.22
4400 University Drive Fairfax, Virginia 22030
G1.01
Egress, Occupancy & Fire Resistance Rating Plan
GMU Enterprise Hall Elevator Modernization
1" = 10'-0"A1.03 G1.01
1 LOWER LEVEL EGRESS PLAN
0' 5' 10' 20'
SCALE: 1" = 10'
N
No. Revision Date
Revisions
Date
OUBO Submission 09/26/2025
Submission Set
03/11/2026
No. Revision Date 1 Response to Comments 11/20/2025
2 Response to Comments 02/09/2026
3 Response to Comments 03/11/2026 wkidder Rectangle wkidder Rectangle wkidder Callout DELIVERY VIA MATTAPONI RIVER LANE. MAINTAIN 3'-0" MINIMUM CLEARANCE ON ALL ADJACENT PEDESTRIAN PATHS.
wkidder Callout DELIVERY VIA YORK RIVER RD. MAINTAIN 3'-0" MINIMUM CLEARANCE ON ALL ADJACENT PEDESTRIAN PATHS.
Comments:
Action Taken:
Work requested:
W171521Work Order #: Source Type: Asset
Originator: Enterprise - Elevator/WC Lift (WC)Origin: PM
Priority: Medium Purpose: Preventive Maintenance
Elevator ServicesIssue: ElevatorsCraft:
Fund or Org: M1022673570 - Zone 3 Maintenance
10/01/2026 04:28:00 AMAssigned:
10/31/2026 11:59:00 PMExpected: Completed:
Total Labor Cost: Total Labor Hours:
Total Part Cost: Total Other Hours:
Total Other Cost:
External Labor $:
Non-inv $:
WO Cost: Total Hrs:
0.00
150.42
0.00
0.00
0.00
0.00
0.00
150.42 0.00
Title:
Project:
Est $: Est Hrs:
Enterprise - Elevator/WC Lift (WC)
0.00 0.00
10/01/2026 04:28:00 AMOriginated:
New PMWO Status:
Category: Academic / Admin Buildings
0.00Equipment Usage Cost
8662 Piney Branch Rd Silver Spring, Maryland 20901
Address:
Custom Fields
Contact Name
Contact Email
Contact Phone
Contact Department
Chargeback Date
Shop Zone 6 – M1143875413
Assigned To
Employee # Name Job Title Phone Email Est Hrs Company Name
1 G00124821 Robert E Sheard
Elevator Maintenance Contract Administrator
(703) 993-3621 rsheard2@gmu.edu 0.00
Asset # Name Site Location Make Model Barcode
Source
Enterprise-Chair Lift -4
Fairfax Campus Enterprise Hall - 0069 [N/A] [N/A] [N/A]
Source Custom Fields
No Name Custom Field Value
4626 Enterprise-Chair Lift-4 Classification D10 Conveying Systems
4626 Enterprise-Chair Lift-4 Type D1010 Elevators and Lifts
None
Labor
Part # Name Location Quantity Unit Usage Type Description
Parts
Detail
Date Printed: 10/05/2026
W171521
ELEV-004
Monthly Fee (Wheelchair)
Elevator 1.00 Ea. Dispatched Service item related to elevator repairs. This item is non-inventory.
Equipment Usage
None
Type Name/Description Done Document
Tasks/Steps
1 Instruction Elevator/WC Lift Monthly PM (Contract)
- 01 No
Perform elevator preventive maintenance according to maintenance checklist
None
Documents
None
Safety Programs
Detail
Date Printed: 10/05/2026
W171521
Work requested:
W171522Work Order #: Source Type: Asset
Originator: Enterprise - Elevator/WC Lift (WC)Origin: PM
Priority: Medium Purpose: Preventive Maintenance
Elevator ServicesIssue: ElevatorsCraft:
Fund or Org: M1022673570 - Zone 3 Maintenance
10/01/2026 04:28:00 AMAssigned:
10/31/2026 11:59:00 PMExpected: Completed:
Total Labor Cost: Total Labor Hours:
Total Part Cost: Total Other Hours:
Total Other Cost:
External Labor $:
Non-inv $:
WO Cost: Total Hrs:
0.00
150.42
0.00
0.00
0.00
0.00
0.00
150.42 0.00
Title:
Project:
Est $: Est Hrs:
Enterprise - Elevator/WC Lift (WC)
0.00 0.00
10/01/2026 04:28:00 AMOriginated:
New PMWO Status:
Category: Academic / Admin Buildings
0.00Equipment Usage Cost
8662 Piney Branch Rd Silver Spring, Maryland 20901
Address:
Custom Fields
Contact Name
Contact Email
Contact Phone
Contact Department
Chargeback Date
Shop Zone 6 – M1143875413
Assigned To
Employee # Name Job Title Phone Email Est Hrs Company Name
1 G00124821 Robert E Sheard
Elevator Maintenance Contract Administrator
(703) 993-3621 rsheard2@gmu.edu 0.00
Asset # Name Site Location Make Model Barcode
Source
Enterprise-Chair Lift -5
Fairfax Campus Enterprise Hall - 0069 [N/A] [N/A] [N/A]
Source Custom Fields
No Name Custom Field Value
4627 Enterprise-Chair Lift-5 Classification D10 Conveying Systems
4627 Enterprise-Chair Lift-5 Type D1010 Elevators and Lifts
None
Labor
Part # Name Location Quantity Unit Usage Type Description
Parts
Detail
Date Printed: 10/05/2026
W171522
(Wheelchair)
Elevator 1.00 Ea. Dispatched Service item related to elevator repairs. This item is non-inventory.
Equipment Usage
None
Type Name/Description Done Document
Tasks/Steps
1 Instruction Elevator/WC Lift Monthly PM (Contract)
- 01 No
Perform elevator preventive maintenance according to maintenance checklist
None
Documents
None
Safety Programs
Detail
Date Printed: 10/05/2026
W171522
Work requested:
W171523Work Order #: Source Type: Asset
Originator: Enterprise - Elevator/WC Lift (WC)Origin: PM
Priority: Medium Purpose: Preventive Maintenance
Elevator ServicesIssue: ElevatorsCraft:
Fund or Org: M1022673570 - Zone 3 Maintenance
10/01/2026 04:28:00 AMAssigned:
10/31/2026 11:59:00 PMExpected: Completed:
Total Labor Cost: Total Labor Hours:
Total Part Cost: Total Other Hours:
Total Other Cost:
External Labor $:
Non-inv $:
WO Cost: Total Hrs:
0.00
150.42
0.00
0.00
0.00
0.00
0.00
150.42 0.00
Title:
Project:
Est $: Est Hrs:
Enterprise - Elevator/WC Lift (WC)
0.00 0.00
10/01/2026 04:28:00 AMOriginated:
New PMWO Status:
Category: Academic / Admin Buildings
0.00Equipment Usage Cost
8662 Piney Branch Rd Silver Spring, Maryland 20901
Address:
Custom Fields
Contact Name
Contact Email
Contact Phone
Contact Department
Chargeback Date
Shop Zone 6 – M1143875413
Assigned To
Employee # Name Job Title Phone Email Est Hrs Company Name
1 G00124821 Robert E Sheard
Elevator Maintenance Contract Administrator
(703) 993-3621 rsheard2@gmu.edu 0.00
Asset # Name Site Location Make Model Barcode
Source
Enterprise-Chair Lift -6
Fairfax Campus Enterprise Hall - 0069 [N/A] [N/A] [N/A]
Source Custom Fields
No Name Custom Field Value
4628 Enterprise-Chair Lift-6 Classification D10 Conveying Systems
4628 Enterprise-Chair Lift-6 Type D1010 Elevators and Lifts
None
Labor
Part # Name Location Quantity Unit Usage Type Description
Parts
Detail
Date Printed: 10/05/2026
W171523
(Wheelchair)
Elevator 1.00 Ea. Dispatched Service item related to elevator repairs. This item is non-inventory.
Equipment Usage
None
Type Name/Description Done Document
Tasks/Steps
1 Instruction Elevator/WC Lift Monthly PM (Contract)
- 01 No
Perform elevator preventive maintenance according to maintenance checklist
None
Documents
None
Safety Programs
Detail
Date Printed: 10/05/2026
W171523
Work requested:
W171340Work Order #: Source Type: Asset
Originator: Enterprise - Elevator/WC Lift (Hydro)Origin: PM
Priority: Medium Purpose: Preventive Maintenance
Elevator ServicesIssue: ElevatorsCraft:
Fund or Org: M1022673570 - Zone 3 Maintenance
10/01/2026 04:27:00 AMAssigned:
10/31/2026 11:59:00 PMExpected: Completed:
Total Labor Cost: Total Labor Hours:
Total Part Cost: Total Other Hours:
Total Other Cost:
External Labor $:
Non-inv $:
WO Cost: Total Hrs:
0.00
238.00
0.00
0.00
0.00
0.00
0.00
238.00 0.00
Title:
Project:
Est $: Est Hrs:
Enterprise - Elevator/WC Lift (Hydro)
0.00 0.00
10/01/2026 04:27:00 AMOriginated:
New PMWO Status:
Category: Academic / Admin Buildings
0.00Equipment Usage Cost
8662 Piney Branch Rd Silver Spring, Maryland 20901
Address:
Custom Fields
Contact Name
Contact Email
Contact Phone
Contact Department
Chargeback Date
Shop Zone 6 – M1143875413
Assigned To
Employee # Name Job Title Phone Email Est Hrs Company Name
1 G00124821 Robert E Sheard
Elevator Maintenance Contract Administrator
(703) 993-3621 rsheard2@gmu.edu 0.00
Asset # Name Site Location Make Model Barcode
Source
Enterprise-Elevator-
Fairfax Campus Enterprise Hall - 0069 [N/A] [N/A] [N/A]
Source Custom Fields
No Name Custom Field Value
4641 Enterprise-Elevator-1 Classification D10 Conveying Systems
4641 Enterprise-Elevator-1 Type D1010 Elevators and Lifts
None
Labor
Part # Name Location Quantity Unit Usage Type Description
Parts
Detail
Date Printed: 10/05/2026
W171340
ELEV-002
(Hydraulic)
Elevator 1.00 Ea. Dispatched Service item related to elevator repairs. This item is non-inventory.
Equipment Usage
None
Type Name/Description Done Document
Tasks/Steps
1 Instruction Elevator/WC Lift Monthly PM (Contract)
- 01 No
Perform elevator preventive maintenance according to maintenance checklist
None
Documents
None
Safety Programs
Detail
Date Printed: 10/05/2026
W171340
Work requested:
W171341Work Order #: Source Type: Asset
Originator: Enterprise - Elevator/WC Lift (Hydro)Origin: PM
Priority: Medium Purpose: Preventive Maintenance
Elevator ServicesIssue: ElevatorsCraft:
Fund or Org: M1022673570 - Zone 3 Maintenance
10/01/2026 04:27:00 AMAssigned:
10/31/2026 11:59:00 PMExpected: Completed:
Total Labor Cost: Total Labor Hours:
Total Part Cost: Total Other Hours:
Total Other Cost:
External Labor $:
Non-inv $:
WO Cost: Total Hrs:
0.00
238.00
0.00
0.00
0.00
0.00
0.00
238.00 0.00
Title:
Project:
Est $: Est Hrs:
Enterprise - Elevator/WC Lift (Hydro)
0.00 0.00
10/01/2026 04:27:00 AMOriginated:
New PMWO Status:
Category: Academic / Admin Buildings
0.00Equipment Usage Cost
8662 Piney Branch Rd Silver Spring, Maryland 20901
Address:
Custom Fields
Contact Name
Contact Email
Contact Phone
Contact Department
Chargeback Date
Shop Zone 6 – M1143875413
Assigned To
Employee # Name Job Title Phone Email Est Hrs Company Name
1 G00124821 Robert E Sheard
Elevator Maintenance Contract Administrator
(703) 993-3621 rsheard2@gmu.edu 0.00
Asset # Name Site Location Make Model Barcode
Source
Enterprise-Elevator-
Fairfax Campus Enterprise Hall - 0069 [N/A] [N/A] [N/A]
Source Custom Fields
No Name Custom Field Value
4642 Enterprise-Elevator-2 Classification D10 Conveying Systems
4642 Enterprise-Elevator-2 Type D1010 Elevators and Lifts
None
Labor
Part # Name Location Quantity Unit Usage Type Description
Parts
Detail
Date Printed: 10/05/2026
W171341
(Hydraulic)
Elevator 1.00 Ea. Dispatched Service item related to elevator repairs. This item is non-inventory.
Equipment Usage
None
Type Name/Description Done Document
Tasks/Steps
1 Instruction Elevator/WC Lift Monthly PM (Contract)
- 01 No
Perform elevator preventive maintenance according to maintenance checklist
None
Documents
None
Safety Programs
Detail
Date Printed: 10/05/2026
W171341
Work requested:
W171342Work Order #: Source Type: Asset
Originator: Enterprise - Elevator/WC Lift (Hydro)Origin: PM
Priority: Medium Purpose: Preventive Maintenance
Elevator ServicesIssue: ElevatorsCraft:
Fund or Org: M1022673570 - Zone 3 Maintenance
10/01/2026 04:27:00 AMAssigned:
10/31/2026 11:59:00 PMExpected: Completed:
Total Labor Cost: Total Labor Hours:
Total Part Cost: Total Other Hours:
Total Other Cost:
External Labor $:
Non-inv $:
WO Cost: Total Hrs:
0.00
238.00
0.00
0.00
0.00
0.00
0.00
238.00 0.00
Title:
Project:
Est $: Est Hrs:
Enterprise - Elevator/WC Lift (Hydro)
0.00 0.00
10/01/2026 04:27:00 AMOriginated:
New PMWO Status:
Category: Academic / Admin Buildings
0.00Equipment Usage Cost
8662 Piney Branch Rd Silver Spring, Maryland 20901
Address:
Custom Fields
Contact Name
Contact Email
Contact Phone
Contact Department
Chargeback Date
Shop Zone 6 – M1143875413
Assigned To
Employee # Name Job Title Phone Email Est Hrs Company Name
1 G00124821 Robert E Sheard
Elevator Maintenance Contract Administrator
(703) 993-3621 rsheard2@gmu.edu 0.00
Asset # Name Site Location Make Model Barcode
Source
Enterprise-Elevator-
Fairfax Campus Enterprise Hall - 0069 [N/A] [N/A] [N/A]
Source Custom Fields
No Name Custom Field Value
4643 Enterprise-Elevator-3 Classification D10 Conveying Systems
4643 Enterprise-Elevator-3 Type D1010 Elevators and Lifts
None
Labor
Part # Name Location Quantity Unit Usage Type Description
Parts
Detail
Date Printed: 10/05/2026
W171342
(Hydraulic)
Elevator 1.00 Ea. Dispatched Service item related to elevator repairs. This item is non-inventory.
Equipment Usage
None
Type Name/Description Done Document
Tasks/Steps
1 Instruction Elevator/WC Lift Monthly PM (Contract)
- 01 No
Perform elevator preventive maintenance according to maintenance checklist
None
Documents
None
Safety Programs
Detail
Date Printed: 10/05/2026
W171342
Work requested:
W171363Work Order #: Source Type: Asset
Originator: Enterprise - Elevator Fire Service InspOrigin: PM
Priority: Medium Purpose: Preventive Maintenance
Repair / MaintenanceIssue: ElevatorsCraft:
Fund or Org: M1022673570 - Zone 3 Maintenance
10/01/2026 04:27:00 AMAssigned:
10/31/2026 11:59:00 PMExpected: Completed:
Total Labor Cost: Total Labor Hours:
Total Part Cost: Total Other Hours:
Total Other Cost:
External Labor $:
Non-inv $:
WO Cost: Total Hrs:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00
Title:
Project:
Est $: Est Hrs:
Enterprise - Elevator Fire Service Insp
0.00 0.00
10/01/2026 04:27:00 AMOriginated:
New PMWO Status:
Category: Academic / Admin Buildings
0.00Equipment Usage Cost
8662 Piney Branch Rd Silver Spring, Maryland 20901
Address:
Custom Fields
Contact Name
Contact Email
Contact Phone
Contact Department
Chargeback Date
Shop Zone 3 – E&G – M1022675413
Assigned To
Employee # Name Job Title Phone Email Est Hrs Company Name
1 G00124821 Robert E Sheard
Elevator Maintenance Contract Administrator
(703) 993-3621 rsheard2@gmu.edu 0.00
Asset # Name Site Location Make Model Barcode
Source
Enterprise-Chair Lift -4
Fairfax Campus Enterprise Hall - 0069 [N/A] [N/A] [N/A]
Enterprise-Chair Lift -5
Fairfax Campus Enterprise Hall - 0069 [N/A] [N/A] [N/A]
Enterprise-Chair Lift -6
Fairfax Campus Enterprise Hall - 0069 [N/A] [N/A] [N/A]
Enterprise-Elevator-
Fairfax Campus Enterprise Hall - 0069 [N/A] [N/A] [N/A]
Enterprise-Elevator-
Fairfax Campus Enterprise Hall - 0069 [N/A] [N/A] [N/A]
Enterprise-Elevator-
Fairfax Campus Enterprise Hall - 0069 [N/A] [N/A] [N/A]
Source Custom Fields
Detail
Date Printed: 10/05/2026
W171363
No Name Custom Field Value
4626 Enterprise-Chair Lift-4 Classification D10 Conveying Systems
4626 Enterprise-Chair Lift-4 Type D1010 Elevators and Lifts
4627 Enterprise-Chair Lift-5 Classification D10 Conveying Systems
4627 Enterprise-Chair Lift-5 Type D1010 Elevators and Lifts
4628 Enterprise-Chair Lift-6 Classification D10 Conveying Systems
4628 Enterprise-Chair Lift-6 Type D1010 Elevators and Lifts
4641 Enterprise-Elevator-1 Classification D10 Conveying Systems
4641 Enterprise-Elevator-1 Type D1010 Elevators and Lifts
4642 Enterprise-Elevator-2 Classification D10 Conveying Systems
4642 Enterprise-Elevator-2 Type D1010 Elevators and Lifts
4643 Enterprise-Elevator-3 Classification D10 Conveying Systems
4643 Enterprise-Elevator-3 Type D1010 Elevators and Lifts
None
Labor
None
Parts
Equipment Usage
None
Type Name/Description Done Document
Tasks/Steps
1 Instruction Elevator Fire Service Inspections _01 No
Test Fire Service early in the morning before elevators are likely to be in use. Before starting the test, verify elevators are all in service. Push the hall button to call elevators, and send each elevator to the top floor, and repeat until you determine if all elevators are in service or not. Try to avoid activating Fire Service while there might be passengers currently riding. Listen for the sound of elevators moving, and if there is a position indicator in the lobby watch that to see if elevators are moving.
2 Instruction Elevator Fire Service Inspections _02 No
Locate the Phase 1 Fire Recall key switch in the elevator lobby. It will at the floor designated for Fire Department response, which is usually the bottom floor, but might be at another floor in some buildings. Phase 1 key switch is a three-position switch ON, OFF, and RESET (OR BYPASS).
3 Instruction Elevator Fire Service Inspections _03 No
Test Phase 1 by turning the key switch from OFF to ON. Each elevator should recall to the floor where Phase 1 key switch is located, and the doors should stay open.
4 Instruction Elevator Fire Service Inspections _04 No
Locate the Phase 2 key switch inside each elevator. It will be on the car panel, or behind a cabinet door. Phase 2 key switch is a three-position switch ON, HOLD, and OFF.
5 Instruction Elevator Fire Service Inspections _05 No
Test Phase 2 by turning the key switch from OFF to ON to get control of that elevator. To open and close the doors you must use the DOOR OPEN and DOOR CLOSE buttons. Push a floor button to go up a floor, then push the DOOR CLOSE button until the doors close all the way. The elevator will go to the floor you pushed, and stay with the doors closed. Push the DOOR OPEN button until the doors are open all the way and stay open. Go back to the floor you started from by pushing the floor button, and then DOOR CLOSE button until the doors close all the way.