Attachment E - Schedule B Price Proposal Form.pdf
PDF 129 KB Posted
- Attached to
- P20001 - Deployable Air Base Systems-Facilities, Equipment and Vehicles (DABS-FEV) Storage Facilities
- Solicitation number
- N6247023R0006
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P-20001 EDI: DABS-FEV Storage Facilities
Keflavik, Iceland
DOCUMENT 00 22 13.00 20
SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
02/14
REVISED 11 JAN 2023
PART 1 GENERAL
1.1 CONTRACT LINE ITEMS
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.
Provide the Contract Line Item (CLIN) lump sum price for the following items:
CLIN 0001 - BASE PRICE. Price includes the following:
CLIN 0001AA - WAREHOUSE SUPPLY & EQUIPMENT BASE. Price for the entire work complete to the 1.5 m line outside of the buildings: Rolling Stock
Warehouse (RSW) and Vehicle Storage (VS), in accordance with the drawings and specifications, but excluding work described in Contract
Line Item (CLIN) 0001AB, 0001AC, 0001AD, 0002 and 0003.
CLIN DESCRIPTION TOTAL PRICE FOR CLIN
0001AA
0001AA WAREHOUSE SUPPY AND EQUIPMENT BASE $____________
CLIN 0001AB - CONTROLED HUMIDITY WAREHOUSE B. Price for the entire work complete to the 1.5 m line outside of the building: Container
Warehouse (CW), in accordance with the drawings and specifications, but excluding work described in Contract Line Item (CLIN) 0001AA, 0001AC, 0001AD, 0002 and 0003.
0001AB
0001AB CONTROLLED HUMIDITY WAREHOUSE B $____________
CLIN 0001AC - VEHICLE MAINTENANCE SHOP. Price for the entire work complete to the 1.5 m line outside of the building: Vehicle Maintenance
Shop (VMS), in accordance with the drawings and specifications, but excluding work described in Contract Line Item (CLIN) 0001AA, 0001AB, 0001AD, 0002 and 0003.
CLIN DESCRIPTION TOTAL PRICE FOR
0001AC
0001AC VEHICLE MAINTENANCE SHOP $______________
CLIN 0001AD - Price for the entire project Site Work, outside the facilities' 1.5 m line listed in CLIN 0001AA, CLIN 0001AB, CLIN 0001AC, with site work to include site facilities: Vehicle Fueling Station
(VFS), Force Testing Facility (FTF), Pumphouse (PH) and Hazmat, complete in accordance with the drawings and specifications but excluding work described in Contract Line Item (CLIN) 0001AA, 0001AB, 0001AC, 0002 and 0003.
0001AD
0001AD SITE WORK $____________
TOTAL PRICE CLIN 0001 $______________________________
CLIN 0002 Option Item No. 1 - Guardhouse B - Price includes the following:
Price for providing all work in connection with Guardhouse B, complete in accordance with the drawings and specifications.
0002 Option Item No. 1 - Guardhouse B $____________
CLIN 0003 Option Item No. 2 - Guardhouse A - Price includes the following:
Price for providing all work in connection with Guardhouse A, complete in accordance with the drawings and specifications.
0003 Option Item No. 2 - Guardhouse A $____________
TOTAL PRICE OF ALL CLINS (0001-0003)$____________________________
1.2 GENERAL BID NOTES
a. Award will be made on the total sum of Contract Line Items CLIN 0001 through CLIN 0003.
b. Government intends to award a contract to a single contractor for CLIN
0001, with CLINs 0002 and 0003 as priced options.
The award of one or more options will NOT extend the contract completion date (regardless of the number of options awarded). Offerors not submitting pricing for all CLINs will be considered nonresponsive to the solicitation and will not be evaluated.
c. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206(b) Evaluation not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s) to the total price for CLIN 0001.
In accordance with FAR 52.217-5 Evaluation of Options, evaluation of options will not obligate the Government to exercise the Option(s).
d. If CLIN 0002 and 0003 are exercised, additional bonding and consent of surety is required. Consequently, the Performance Bond must reflect
100 percent of the aggregate amount of all Items.
File details come from the government source that posted it. Updated .