Attachment E - Question and Answer.docx
DOCX document 15 KB Posted
- Solicitation number
- 36C24424Q1010
About this file
This document is a Question and Answer (Q&A) related to a federal contract opportunity for Water System Testing and Maintenance services. The key details are:
The contractor is not required to conduct regular sampling, but will be responsible for overseeing the collection of samples by facility personnel and providing a database for the facility to log and track testing results. Any existing equipment found to be in need of repair or replacement to comply with AAMI ST108 standards will be the responsibility of the facility, not the contractor, to address.
The related federal contract opportunity is for a five-year, firm-fixed-price Indefinite Delivery-Indefinite Quantity (IDIQ) contract for Comprehensive Water Management Program services at the Pittsburgh VA Medical Center. The solicitation is a Small Business set-aside, with a NAICS code of 541380. The anticipated award date is approximately September 23, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24424Q1010 0001.docx | DOCX document | |
| Attachment E - Question and Answer -9-12-24.docx | DOCX document | |
| Combined Synopsis - 36C24424Q1010 - Water Management Prog.docx | DOCX document | |
| Attachment B - Past Performance Questionnaire.docx | DOCX document | |
| Attachment D - Wage Determination.pdf | ||
| 36C24424Q1010.docx | DOCX document | |
| Attachment A - Statement of Work.pdf | ||
| Attachment C - Price Schedule.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question and Answer
1. Are you looking for the contractor to conduct regular (daily, monthly, quarterly, etc.) sampling as part of this solicitation, or to oversee the collection of these samples by facility personnel?
No sampling is required. However observation of collection would be included in survey of of the SPS water system as referenced in 2.1 in the SOW. The contractor will provide a database for the facility to log and track testing results as referenced in 3.19.5
2. Following the initial survey, should existing equipment be found in need of repair or replacement to comply with AAMI ST108 standards, will this work fall under this contract?
No, when issues with equipment or parts of the water system are identified it will be the responsibility of the facility to fix or address these issues.