Attachment E - Pricing Sheet.xlsx
XLSX spreadsheet 226 KB Posted
- Solicitation number
- 47PJ0025R0002
About this file
This document is an Attachment E - Pricing Sheet for a federal contract opportunity for Landscape, Grounds Maintenance and Snow Removal Services in the Denver and Boulder, Colorado area.
The contract is a single-award IDIQ with a base year and four one-year option periods, for a total potential contract period of five years. The services required include grounds maintenance and snow removal for various federal buildings and properties in the region. The pricing sheet provides detailed pricing line items for monthly and annual services at each facility, as well as pricing for additional above-standard services and a time and materials ceiling price for snow removal. The solicitation is being issued by the General Services Administration (GSA), Public Building Service (PBS) Region 8. Pricing should be provided in the specified format, with labor rates based on Collective Bargaining Agreements. The contract will be awarded without any set-asides.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions to Offerors
| Section B | ||
| Supplies or Services and Prices | ||
| Electronic Offer Sheet | ||
| The Contractor shall provide all Management, Supervision, Parts, Material, Labor, Supplies, Tools and Equipment for all of the services described in this solicitation. This contract is being solicited as a: one (1) base year contract (12 months), with four (4) one-year follow on periods (12 months each), for a potential contract period total of five (5) years. This electronic offer sheet shall be used to document the Contractor’s price to the Government for the required services. Prices are required for all line items contained on this electronic offer sheet: | ||
| This offer sheet is in electronic version, a paper copy will not be provided. Ensure you include a price in every yellow shaded area of each worksheet. Do not insert prices of more than two decimal places (i.e. $2.339), as this will result in rounding errors. Ensure that all monthly rates are evenly divisable 12. Ensure you click on each tab and complete all line items that comprise the offer sheet. ** Pricing should be provided in this format or equvalent. This sheet is intended to be a guide for information required by this soliciation. If you feel additional information is necessary please ADD |
NOTE: Contract year totals should equal, for each contract year, in the "Schedule B" tab and "Costs Summary" tab.
| General Services Administration | |
| Region 8 Colorado Service Center Landscape, Grounds Maintenance and Snow Removal Services |
Denver and Boulder, Colorado Properties
| General Services Administration | |
| Contractor Name: |
Contractor Address:
Schedule B
| Schedule B Pricing | Base Period: | Grounds Services and Snow Removal Services Base Year April 1, 2025 - March 31, 2026 | Option YR 1: | Grounds Services and Snow Removal Services | Option Year 1 April 1, 2026 - March 31, 2027 | Option YR 2: | Grounds Services and Snow Removal Services Option Year 2 April 1, 2027 - March 31, 2028 | Option YR 3: | Grounds Services and Snow Removal Services Option Year 3 April 1, 2028 - March 31, 2029 | Option YR 4: | Grounds Services and Snow Removal Services Option Year 4 April 1, 2029 - March 31, 2030 | |||||||||||||
| Services | Building | Bldg Code | Quantity | Unit of Issue | CLINs | Monthly Price | Annual Price | Total Price | CLINs | Monthly Price | Annual Price | Total Price | CLINs | Monthly Price | Annual Price | Total Price | CLINs | Monthly Price | Annual Price | Total Price | CLINs | Monthly Price | Annual Price | Total Price |
| Ground Maintenance | Alfred A. Arraj Courthouse | CO0061ZZ | 12 | MONTHS | 0001 | $0.00 | $0.00 | 1001 | $0.00 | $0.00 | 2001 | $0.00 | $0.00 | 3001 | $0.00 | $0.00 | 4001 | $0.00 | $0.00 | |||||
| Ground Maintenance | Byron G. Rogers Courthouse & FOB | CO0039ZZ | 12 | MONTHS | 0002 | $0.00 | $0.00 | 1002 | $0.00 | $0.00 | 2002 | $0.00 | $0.00 | 3002 | $0.00 | $0.00 | 4002 | $0.00 | $0.00 | |||||
| Ground Maintenance | Byron White Courthouse | CO0009ZZ | 12 | MONTHS | 0003 | $0.00 | $0.00 | 1003 | $0.00 | $0.00 | 2003 | $0.00 | $0.00 | 3003 | $0.00 | $0.00 | 4003 | $0.00 | $0.00 | |||||
| Ground Maintenance | U.S. Custom House | CO0006ZZ | 12 | MONTHS | 0004 | $0.00 | $0.00 | 1004 | $0.00 | $0.00 | 2004 | $0.00 | $0.00 | 3004 | $0.00 | $0.00 | 4004 | $0.00 | $0.00 | |||||
| Ground Maintenance | California Street Garage | CO0050ZZ | 12 | MONTHS | 0005 | $0.00 | $0.00 | 1005 | $0.00 | $0.00 | 2005 | $0.00 | $0.00 | 3005 | $0.00 | $0.00 | 4005 | $0.00 | $0.00 | |||||
| Ground Maintenance | Welton Street Garage | CO0051ZZ | 12 | MONTHS | 0006 | $0.00 | $0.00 | 1006 | $0.00 | $0.00 | 2006 | $0.00 | $0.00 | 3006 | $0.00 | $0.00 | 4006 | $0.00 | $0.00 | |||||
| Ground Maintenance | 22nd & Stout Street Parking Lot | CO0053ZZ | 12 | MONTHS | 0007 | $0.00 | $0.00 | 1007 | $0.00 | $0.00 | 2007 | $0.00 | $0.00 | 3007 | $0.00 | $0.00 | 4007 | $0.00 | $0.00 | |||||
| Ground Maintenance | Cesar E. Chavez Memorial Bldg & Fox St Garage | CO0054ZZ | 12 | MONTHS | 0008 | $0.00 | $0.00 | 1008 | $0.00 | $0.00 | 2008 | $0.00 | $0.00 | 3008 | $0.00 | $0.00 | 4008 | $0.00 | $0.00 | |||||
| Ground Maintenance | David Skaggs Research Center (DSRC) | CO0055ZZ | 12 | MONTHS | 0009 | $0.00 | $0.00 | 1009 | $0.00 | $0.00 | 2009 | $0.00 | $0.00 | 3009 | $0.00 | $0.00 | 4009 | $0.00 | $0.00 | |||||
| Snow Removal Ceiling Price (Time & Materials) | All Buildings | 8PSCC | 1 | Lump Sum | 0010 | $0.00 | $0.00 | 1010 | $0.00 | $0.00 | 2010 | $0.00 | $0.00 | 3010 | $0.00 | $0.00 | 4010 | $0.00 | $0.00 |
Monthly $0.00 Annual $0.00 Annual $0.00 Annual $0.00 Annual $0.00 Annual
| 6 Month: | Grounds Services and Snow Removal Services Six Month Option April 1, 2030 -September 30, 2030 | |||||||
| Building | Bldg Code | Quantity | Unit of Issue | CLINs | Monthly Price | Annual Price | Total Price | |
| Ground Maintenance | Alfred A. Arraj Courthouse | CO0061ZZ | 6 | MONTHS | 5001 | $0.00 | $0.00 | |
| Ground Maintenance | Byron G. Rogers Courthouse & FOB | CO0039ZZ | 6 | MONTHS | 5002 | $0.00 | $0.00 | |
| Ground Maintenance | Byron White Courthouse | CO0009ZZ | 6 | MONTHS | 5003 | $0.00 | $0.00 | |
| Ground Maintenance | U.S. Custom House | CO0006ZZ | 6 | MONTHS | 5004 | $0.00 | $0.00 | |
| Ground Maintenance | California Street Garage | CO0050ZZ | 6 | MONTHS | 5005 | $0.00 | $0.00 | |
| Ground Maintenance | Welton Street Garage | CO0051ZZ | 6 | MONTHS | 5006 | $0.00 | $0.00 | |
| Ground Maintenance | 22nd & Stout Street Parking Lot | CO0053ZZ | 6 | MONTHS | 5007 | $0.00 | $0.00 | |
| Ground Maintenance | Cesar E. Chavez Memorial Bldg & Fox St Garage | CO0054ZZ | 6 | MONTHS | 5008 | $0.00 | $0.00 | |
| Ground Maintenance | David Skaggs Research Center (DSRC) | CO0055ZZ | 6 | MONTHS | 5009 | $0.00 | $0.00 | |
| Snow Removal Ceiling Price (Time & Materials) | All Buildings | 8PSCC | 1 | Lump Sum | 5010 | $0.00 | $0.00 |
Monthly $0.00 Annual
Costs Summary Region 8 Colorado Service Center Landscape, Grounds Maintenance and Snow Removal Services
| IGE for Optional | Total | |||||||
| IGE for Base Services | 6 Months | Evaluated Price | ||||||
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Total | Year 6 | ||
| (Base) | (Opt 1) | (Opt 2) | (Opt 3) | (Opt 4) | ||||
| Grounds Labor | $0.00 | |||||||
| Grounds ODCs | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Snow Removal Labor | ERROR:#REF! | |||||||
| Snow Removal ODCs | ERROR:#REF! | |||||||
| ERROR:#REF! | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| G&A | % | ||||||||
| Profit | % | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
OVERALL CONTRACT TOTAL ERROR:#REF! $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
| -labor rates utilize Collective Bargaining Agreements for all areas |
| -ODC's are calculated as a percentage multiplier applied to the gross square footage of each facility, these multipliers have been calculated using historical contract data |
| -total costs are for recurring standard service and are not enclusive of above standard service line items |
| -labor rates are not escalated year over year as all staff wages/benefits are governed by a CBA |
| -current annual price is |
Grounds Labor
Manpower / Labor Costs Matrix
Labor Costs
| Labor | |||||||||
| Category | FTE | Number of Regular M-hrs | % Increase | 2023 | |||||
| Rate of Pay | 2024 SCA Rate of Pay | Labor Cost | FICA | FUTA | SUI | Health and Welfare * | 401k / Pension | Total of Labor Burdens | Total Burdened labor Cost |
| Primary location |
Sub-Total Labor Expense 0 0.00 $0.00 $0.0000 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
*Assumes mix of family and single for purposes of Health and Welfare Benefits
Grounds Other Direct Cost (ODC)
| Cost Centers | LOCATIONS | |||||||||||
| CO0061ZZ | ||||||||||||
| Alfred A. Arraj Ct | CO0039ZZ | |||||||||||
| CO0009ZZ | ||||||||||||
| Byron White Ct | CO0006ZZ | |||||||||||
| U.S. Custom House | CO0050ZZ | |||||||||||
| California St. Garage | CO0051ZZ | |||||||||||
| Welton St Garage | CO0053ZZ | |||||||||||
| 22nd & Stout Lot | CO0054ZZ | |||||||||||
| Chavez & Fox St. Garage | CO0055ZZ | |||||||||||
| David Skaggs Research Cntr | Formula Totals | |||||||||||
| Byron Rogers Ct House | Byron Rogers FOB | |||||||||||
| Exterior Grounds GSF | 91,939.53 | 48,208.09 | 16,069.36 | 75,892.00 | 63,268.79 | 6,598.17 | 5,553.56 | 37,952.62 | 126,561.09 | 401,871.50 | 873,914.71 | |
| Grounds Equipment and Materials |
Total Grounds Equipment and Materials Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Costs
Total Other Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Other Direct Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Labor w 247 at VA
Manpower / Labor Costs Matrix
Labor Costs
| Labor | ||||||||||||||||
| Category | FTE | Number of Regular M-hrs | Number of Overtime M-hrs | Rate of Pay | Labor Cost | FICA | FUTA | SUI | Workers Comp Insurance | General Liability Insurance | Health and Welfare * | Pension/401k | Other Union Required Benefits: | Total of Labor Burdens | Total Burdened labor Cost | |
| Primary location |
| Project Manager | Camden, NJ | 1 | 2,080.00 | 0.00 | $47.00 | $97,760.00 | $7,478.64 | $420.00 | $256.00 | $211.65 | $3,177.20 | $20,800.00 | $15,000.00 | $0.00 | $47,343.49 | $145,103.49 |
| Assistan Project Manager | Camden, NJ | 1 | 2,080.00 | 0.00 | $42.00 | $87,360.00 | $6,683.04 | $420.00 | $256.00 | $189.13 | $1,092.00 | $19,136.00 | $13,000.00 | $0.00 | $40,776.17 | $128,136.17 |
| Lead Engineer | Camden, NJ | 1 | 2,080.00 | 0.00 | $38.26 | $79,580.80 | $6,087.93 | $420.00 | $256.00 | $172.29 | $2,586.38 | $14,248.00 | $5,512.00 | $500.00 | $29,782.60 | $109,363.40 |
| HVAC Tech | Camden, NJ | 1 | 2,080.00 | 0.00 | $37.26 | $77,500.80 | $5,928.81 | $420.00 | $256.00 | $167.79 | $2,518.78 | $14,248.00 | $5,512.00 | $500.00 | $29,551.38 | $107,052.18 |
| HVAC Tech | Camden, NJ | 1 | 2,080.00 | 0.00 | $37.26 | $77,500.80 | $5,928.81 | $420.00 | $256.00 | $167.79 | $2,518.78 | $14,248.00 | $5,512.00 | $500.00 | $29,551.38 | $107,052.18 |
| CSD | Camden, NJ | 2 | 4,160.00 | 0.00 | $21.84 | $90,854.40 | $6,950.36 | $420.00 | $512.00 | $196.70 | $1,135.68 | $18,220.80 | $0.00 | $0.00 | $27,435.54 | $118,289.94 |
| OSS | Trenton, NJ | 1 | 2,080.00 | 0.00 | $41.10 | $85,488.00 | $6,539.83 | $420.00 | $256.00 | $185.08 | $2,778.36 | $14,248.00 | $5,512.00 | $500.00 | $30,439.27 | $115,927.27 |
| HVAC Tech | Trenton, NJ | 1 | 2,080.00 | 0.00 | $37.26 | $77,500.80 | $5,928.81 | $420.00 | $256.00 | $167.79 | $2,518.78 | $14,248.00 | $5,512.00 | $500.00 | $29,551.38 | $107,052.18 |
| HVAC Tech | Trenton, NJ | 1 | 2,080.00 | 0.00 | $37.26 | $77,500.80 | $5,928.81 | $420.00 | $256.00 | $167.79 | $968.76 | $14,248.00 | $5,512.00 | $500.00 | $28,001.36 | $105,502.16 |
| GMW | Trenton, NJ | 1 | 2,080.00 | 0.00 | $31.47 | $65,457.60 | $5,007.51 | $420.00 | $256.00 | $141.72 | $818.22 | $14,248.00 | $5,512.00 | $500.00 | $26,903.44 | $92,361.04 |
| OSS/Lead Engineer | Wilmington, DE | 1 | 2,080.00 | 0.00 | $42.99 | $89,419.20 | $6,840.57 | $420.00 | $256.00 | $193.59 | $1,117.74 | $17,846.40 | $12,438.40 | $500.00 | $39,612.70 | $129,031.90 |
| HVAC Tech | Wilmington, DE | 1 | 2,080.00 | 0.00 | $39.68 | $82,534.40 | $6,313.88 | $420.00 | $256.00 | $178.69 | $1,031.68 | $17,846.40 | $12,438.40 | $500.00 | $38,985.05 | $121,519.45 |
| OSS | Philadelphia, PA | 1 | 2,080.00 | 0.00 | $41.10 | $85,488.00 | $6,539.83 | $420.00 | $256.00 | $185.08 | $1,068.60 | $14,248.00 | $5,512.00 | $500.00 | $28,729.51 | $114,217.51 |
| HVAC Tech- Lead | Philadelphia, PA | 1 | 2,080.00 | 0.00 | $40.68 | $84,614.40 | $6,473.00 | $420.00 | $256.00 | $183.19 | $1,057.68 | $17,846.40 | $12,438.40 | $500.00 | $39,174.67 | $123,789.07 |
| HVAC Tech | Philadelphia, PA | 1 | 2,080.00 | 0.00 | $39.68 | $82,534.40 | $6,313.88 | $420.00 | $256.00 | $178.69 | $1,031.68 | $17,846.40 | $12,438.40 | $500.00 | $38,985.05 | $121,519.45 |
| HVAC Tech | Philadelphia, PA | 1 | 2,080.00 | 0.00 | $39.68 | $82,534.40 | $6,313.88 | $420.00 | $256.00 | $178.69 | $1,031.68 | $17,846.40 | $12,438.40 | $500.00 | $38,985.05 | $121,519.45 |
| GMW | Philadelphia, PA | 1 | 2,080.00 | 0.00 | $30.00 | $62,400.00 | $4,773.60 | $420.00 | $256.00 | $135.10 | $780.00 | $17,846.40 | $12,438.40 | $500.00 | $37,149.50 | $99,549.50 |
| 24/7 Lead | Philadelphia, PA | 1 | 2,080.00 | 0.00 | $40.68 | $84,614.40 | $6,473.00 | $420.00 | $256.00 | $183.19 | $1,057.68 | $17,846.40 | $12,438.40 | $500.00 | $39,174.67 | $123,789.07 |
| 24/7 HVAC | Philadelphia, PA | 1 | 2,080.00 | 0.00 | $39.68 | $82,534.40 | $6,313.88 | $420.00 | $256.00 | $178.69 | $1,031.68 | $17,846.40 | $12,438.40 | $500.00 | $38,985.05 | $121,519.45 |
| 24/7 HVAC | Philadelphia, PA | 1 | 2,080.00 | 0.00 | $39.68 | $82,534.40 | $6,313.88 | $420.00 | $256.00 | $178.69 | $1,031.68 | $17,846.40 | $12,438.40 | $500.00 | $38,985.05 | $121,519.45 |
| 24/7 GMW | Philadelphia, PA | 1 | 2,080.00 | 0.00 | $30.00 | $62,400.00 | $4,773.60 | $420.00 | $256.00 | $135.10 | $780.00 | $17,846.40 | $12,438.40 | $500.00 | $37,149.50 | $99,549.50 |
| 24/7 GMW | Philadelphia, PA | 1 | 2,080.00 | 0.00 | $30.00 | $62,400.00 | $4,773.60 | $420.00 | $256.00 | $135.10 | $780.00 | $17,846.40 | $12,438.40 | $500.00 | $37,149.50 | $99,549.50 |
| Sub-Total Labor Expense | 23 | 47,840.00 | $1,760,512.00 | $134,679.17 | $9,240.00 | $5,888.00 | $3,811.51 | $31,913.02 | $368,451.20 | $208,918.40 | $9,500.00 | $772,401.30 | $2,532,913.30 |
Labor w 247 at VA and 3rdSpring
Manpower / Labor Costs Matrix
Labor Costs
| Labor | ||||||||||||||||
| Category | FTE | Number of Regular M-hrs | Number of Overtime M-hrs | Rate of Pay | Labor Cost | FICA | FUTA | SUI | Workers Comp Insurance | General Liability Insurance | Health and Welfare * | Pension/401k | Other Union Required Benefits: | Total of Labor Burdens | Total Burdened labor Cost | |
| Primary location |
| Project Manager | Camden, NJ | 1 | 2,080.00 | 0.00 | $47.00 | $97,760.00 | $7,478.64 | $420.00 | $256.00 | $211.65 | $3,177.20 | $15,808.00 | $12,168.00 | $39,519.49 | $137,279.49 | |
| Assistan Project Manager | Camden, NJ | 1 | 2,080.00 | 0.00 | $42.00 | $87,360.00 | $6,683.04 | $420.00 | $256.00 | $189.13 | $1,092.00 | $15,808.00 | $12,168.00 | $36,616.17 | $123,976.17 | |
| Lead Engineer | Camden, NJ | 1 | 2,080.00 | 0.00 | $38.26 | $79,580.80 | $6,087.93 | $420.00 | $256.00 | $172.29 | $2,586.38 | $14,248.00 | $5,512.00 | $29,282.60 | $108,863.40 | |
| HVAC Tech | Camden, NJ | 1 | 2,080.00 | 0.00 | $37.26 | $77,500.80 | $5,928.81 | $420.00 | $256.00 | $167.79 | $2,518.78 | $14,248.00 | $5,512.00 | $29,051.38 | $106,552.18 | |
| HVAC Tech | Camden, NJ | 1 | 2,080.00 | 0.00 | $37.26 | $77,500.80 | $5,928.81 | $420.00 | $256.00 | $167.79 | $2,518.78 | $14,248.00 | $5,512.00 | $29,051.38 | $106,552.18 | |
| CSD | Camden, NJ | 1 | 2,080.00 | 0.00 | $21.84 | $45,427.20 | $3,475.18 | $420.00 | $256.00 | $98.35 | $567.84 | $9,110.40 | $0.00 | $13,927.77 | $59,354.97 | |
| OSS | Trenton, NJ | 1 | 2,080.00 | 0.00 | $41.10 | $85,488.00 | $6,539.83 | $420.00 | $256.00 | $185.08 | $2,778.36 | $14,248.00 | $5,512.00 | $29,939.27 | $115,427.27 | |
| HVAC Tech | Trenton, NJ | 1 | 2,080.00 | 0.00 | $37.26 | $77,500.80 | $5,928.81 | $420.00 | $256.00 | $167.79 | $2,518.78 | $14,248.00 | $5,512.00 | $29,051.38 | $106,552.18 | |
| HVAC Tech | Trenton, NJ | 1 | 2,080.00 | 0.00 | $37.26 | $77,500.80 | $5,928.81 | $420.00 | $256.00 | $167.79 | $968.76 | $14,248.00 | $5,512.00 | $27,501.36 | $105,002.16 | |
| GMW | Trenton, NJ | 1 | 2,080.00 | 0.00 | $31.47 | $65,457.60 | $5,007.51 | $420.00 | $256.00 | $141.72 | $818.22 | $14,248.00 | $5,512.00 | $26,403.44 | $91,861.04 | |
| OSS/Lead Engineer | Wilmington, DE | 1 | 2,080.00 | 0.00 | $42.99 | $89,419.20 | $6,840.57 | $420.00 | $256.00 | $193.59 | $1,117.74 | $17,846.40 | $12,438.40 | $39,112.70 | $128,531.90 | |
| HVAC Tech | Wilmington, DE | 1 | 2,080.00 | 0.00 | $39.68 | $82,534.40 | $6,313.88 | $420.00 | $256.00 | $178.69 | $1,031.68 | $17,846.40 | $12,438.40 | $38,485.05 | $121,019.45 | |
| OSS | Philadelphia, PA | 1 | 2,080.00 | 0.00 | $41.10 | $85,488.00 | $6,539.83 | $420.00 | $256.00 | $185.08 | $1,068.60 | $14,248.00 | $5,512.00 | $28,229.51 | $113,717.51 | |
| HVAC Tech | Philadelphia, PA | 1 | 2,080.00 | 0.00 | $40.68 | $84,614.40 | $6,473.00 | $420.00 | $256.00 | $183.19 | $1,057.68 | $17,846.40 | $12,438.40 | $38,674.67 | $123,289.07 | |
| HVAC Tech | Philadelphia, PA | 1 | 2,080.00 | 0.00 | $39.68 | $82,534.40 | $6,313.88 | $420.00 | $256.00 | $178.69 | $1,031.68 | $17,846.40 | $12,438.40 | $38,485.05 | $121,019.45 | |
| HVAC Tech | Philadelphia, PA | 1 | 2,080.00 | 0.00 | $39.68 | $82,534.40 | $6,313.88 | $420.00 | $256.00 | $178.69 | $1,031.68 | $17,846.40 | $12,438.40 | $38,485.05 | $121,019.45 | |
| GMW | Philadelphia, PA | 1 | 2,080.00 | 0.00 | $30.00 | $62,400.00 | $4,773.60 | $420.00 | $256.00 | $135.10 | $780.00 | $17,846.40 | $12,438.40 | $36,649.50 | $99,049.50 | |
| 24/7 HVAC | Philadelphia, PA | 1 | 2,080.00 | 0.00 | $39.68 | $82,534.40 | $6,313.88 | $420.00 | $256.00 | $178.69 | $1,031.68 | $17,846.40 | $12,438.40 | $38,485.05 | $121,019.45 | |
| 24/7 HVAC | Philadelphia, PA | 1 | 2,080.00 | 0.00 | $39.68 | $82,534.40 | $6,313.88 | $420.00 | $256.00 | $178.69 | $1,031.68 | $17,846.40 | $12,438.40 | $38,485.05 | $121,019.45 | |
| 24/7 HVAC | Philadelphia, PA | 1 | 2,080.00 | 0.00 | $39.68 | $82,534.40 | $6,313.88 | $420.00 | $256.00 | $178.69 | $1,031.68 | $17,846.40 | $12,438.40 | $38,485.05 | $121,019.45 | |
| 24/7 GMW | Philadelphia, PA | 1 | 2,080.00 | 0.00 | $30.00 | $62,400.00 | $4,773.60 | $420.00 | $256.00 | $135.10 | $780.00 | $17,846.40 | $12,438.40 | $36,649.50 | $99,049.50 | |
| 24/7- GMW | Philadelphia, PA | 1 | 2,080.00 | 0.00 | $30.00 | $62,400.00 | $4,773.60 | $420.00 | $256.00 | $135.10 | $780.00 | $17,846.40 | $12,438.40 | $36,649.50 | $99,049.50 | |
| SSA Lead | 3rd and Spring | 1 | 2,080.00 | 0.00 | $40.68 | $84,614.40 | $6,473.00 | $420.00 | $256.00 | $183.19 | $1,057.68 | $17,846.40 | $12,438.40 | $38,674.67 | $123,289.07 | |
| SSA HVAC | 3rd and Spring | 1 | 2,080.00 | 0.00 | $39.68 | $82,534.40 | $6,313.88 | $420.00 | $256.00 | $178.69 | $1,031.68 | $17,846.40 | $12,438.40 | $38,485.05 | $121,019.45 | |
| SSA HVAC | 3rd and Spring | 1 | 2,080.00 | 0.00 | $39.68 | $82,534.40 | $6,313.88 | $420.00 | $256.00 | $178.69 | $1,031.68 | $17,846.40 | $12,438.40 | $38,485.05 | $121,019.45 | |
| SSA HVAC | 3rd and Spring | 1 | 2,080.00 | 0.00 | $39.68 | $82,534.40 | $6,313.88 | $420.00 | $256.00 | $178.69 | $1,031.68 | $17,846.40 | $12,438.40 | $38,485.05 | $121,019.45 | |
| SSA GMW | 3rd and Spring | 1 | 2,080.00 | 0.00 | $30.00 | $62,400.00 | $4,773.60 | $420.00 | $256.00 | $135.10 | $780.00 | $17,846.40 | $12,438.40 | $36,649.50 | $99,049.50 | |
| SSA GMW | 3rd and Spring | 1 | 2,080.00 | 0.00 | $30.00 | $62,400.00 | $4,773.60 | $420.00 | $256.00 | $135.10 | $780.00 | $17,846.40 | $12,438.40 | $36,649.50 | $99,049.50 | |
| Sub-Total Labor Expense | 27 | 56,160.00 | $2,107,622.40 | $161,233.11 | $11,340.00 | $6,912.00 | $4,563.00 | $36,251.90 | $440,252.80 | $267,446.40 | $0.00 | $927,999.22 | $3,035,621.62 |
Above Standard Services
Region 8 Colorado Service Center Landscape, Grounds Maintenance and Snow Removal Services Base Period: 12 Months
| Above Standard Services (Task Order Pricing) | 1 April 2025 - 31 March 2026 | ||
| Materials | Mark Ups | % | |
| Subcontract | Mark Ups | % |
Description Quantity Unit of Issue Unit Price Total Total Price
Hourly Price for Additional Services requested by the Government (Enter Applicable Trades or Blended Rate)
| 1 | Hour | $0.00 |
| 1 | Hour | $0.00 |
| 1 | Hour | $0.00 |
| 1 | Hour | $0.00 |
| 1 | Hour | $0.00 |
| 1 | Hour | $0.00 |
| 1 | Hour | $0.00 |
Hourly Price for Additional Services overtime Rate requested by the Government (Enter Applicable Trades or Blended Rate)
Hours $0.00
Price per occurrence for Planting Government Furnished Trees and Plants, see section C.15.6. 1 Occurrence $0.00
Price per hour for Sub-Contracted Graffiti Removal, see section C.15.8. 10 Hours $0.00
$0.00
Snow Removal (Time and Material
Region 8 Colorado Service Center Landscape, Grounds Maintenance and Snow Removal Services Base Period: 12 Months
Time and Mateirals 1 April 2025 - 31 March 2026
| Proposed Time & Material Ceiling Price | Base Year | Option 1 | Option 2 | Option 3 | Option 4 |
| Provide estimated ceiling price for each year |
Description Quantity Unit of Issue Unit Price Total
Labor Hours (provide fully burdened labor rates)
| 1 | Hour | $0.00 |
| 1 | Hour | $0.00 |
| 1 | Hour | $0.00 |
| 1 | Hour | $0.00 |
| 1 | Hour | $0.00 |
| 1 | Hour | $0.00 |
| 1 | Hour | $0.00 |
Subcontracted Services
| $0.00 |
| $0.00 |
| $0.00 |
| $0.00 |
| $0.00 |
| $0.00 |
| $0.00 |
| $0.00 |
Materials
| $0.00 |
| $0.00 |
Total Extended Price for Evaluation $0.00
Snow Removal Equipment
| $0.00 |
| $0.00 |
Total Extended Price for Evaluation $0.00
Other Direct Costs (ODC)
| $0.00 |
| $0.00 |
| $0.00 |
Total Extended Price for Evaluation $0.00
Indirect Costs (This should be a lump sum costs distrubuted by percentage per event) ** Back up shall be provided with Price proposal.
| $0.00 |
| $0.00 |
| $0.00 |
Inspection and Correction of Defects (Provide a percentage rate to be used in contract reductions for hours rates at the point services are not completed.)
1 $0.00
File details come from the government source that posted it. Updated .