About this file
This document contains information sheets about various properties owned by the General Services Administration (GSA) in Colorado. The properties include courthouses, federal office buildings, parking lots, and a research center. The information sheets provide details on the operating hours, hardscape areas, softscape areas, irrigation systems, and other facility features for each property.
The related federal contract opportunity is a solicitation (47PJ0025R0002) issued by the GSA's Public Buildings Service Region 8 for Grounds Maintenance, Landscape Services, and Snow Removal Services for the Colorado Service Center in Denver, Colorado. GSA intends to award a single award indefinite-delivery, indefinite-quantity (IDIQ) contract for these services.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CSC Properties Information Sheets
Table of Contents
Alfred A. Arraj Courthouse Byron Rogers Courthouse and Federal Office Building Byron White Courthouse Cesar Chavez Memorial Building & Fox Street Garage U.S. Customs House 22nd & Stout Parking Lot California Street Garage Welton Street Garage David Skaggs Research Center
The Contractor is responsible to verify the accuracy of data provided and ensure it is properly updated at the time of any change and for each contract year.
Alfred A. Arraj Courthouse
Building Operating Hours: 6:00 AM to 6:00 PM Mon-Fri
Hardscape Ares:
Sidewalks “LF”: 1500 LF Parking Areas: N/A Underground parking only
Softscape Areas:
Vegetation: Turf and elevated planters Lawn “SF”: 50,000 SF
Irrigation:
Controllers: #1MC36 Plus, #2 MC - 36 Plus - B Control Valves: 36 Backflow Preventers: 1
Planting/Beds:
Trees: 35 Planters: 1 Annual Beds: 3
Trash Receptacles:
How Many: 2 Location: One at the main entrance and one in the back courtyard.
Miscellaneous:
Exterior fountain at the entryway of the building is maintained by current landscaping contract.
Flagstone (snow removal: hand shovel)
Page | 2
Byron Rogers Courthouse and Federal Office Building
Building Operating Hours: 6:00 AM to 6:00 PM Mon-Fri
Hardscape Ares Sidewalks “LF”: 1500 LF Parking Areas: N/A Underground parking only
Softscape Areas Vegetation: 18,000 SF Lawn “SF”: N/A
Irrigation Controllers: 1 Rainbird ESP 36 MC Control Clock Control Valves: 1 Backflow Preventers: 1 Febco 825y backflow device
Planting/Beds Trees: 35 Planters: 32 Annual Beds: 2
Trash Receptacles:
How Many: 2 Location: Main Entry
Miscellaneous Flagstone (snow removal: hand shovel)
Page | 3
Byron White Courthouse
Building Operating Hours: 6:00 am - 6:00 pm
Hardscape Ares Sidewalks “LF”: Total: 2,267 l.f.
1,238 l.f. around the block 730 l.f. around the building 300 l.f. through the plaza area
Parking Areas: Total: 334 l.f.
114 l.f. driveways (2) 220 l.f. parking
Softscape Areas Vegetation: Mulch Areas with trees:
Champa: 1,134 s.f. mulch areas (2) w/trees 19th: 324 s.f. mulch area w/tree 20th: 294 s.f. mulch area w/tree
Lawn “SF”: 19th St side: 813 s.f.
20th St side: 568 s.f.
Irrigation Controllers: 2 - brand Toro and Hunter Node Control Valves: 9 - brand Rainbird Backflow Preventers: 3 - unknown make/model
Planting/Beds Xeriscape: Pea Gravel (both corners have trees and some annuals)
19th/Stout corner: Approximately 2200 sf 20th/Stout corner: Approximately 2200 sf 20th at grass area: 284 s.f.
Trees: Total: 37 Stout Street: 14 Champa Street: 6 19th: 10 20th: 7
Planters: 24 large concrete planters Annual Beds: 5 in plaza, approximate s.f. each 236
Page | 4
Trash Receptacles:
How Many: 2 Location: Plaza
Miscellaneous Pet Relief Area 19th St. - Turf area (approximately 196 s.f.) and poop bag dispenser
Page | 5
Cesar Chavez Memorial Building & Fox Street Garage
Building Operating Hours: 6:00 am - 5:30 pm Mon-Fri
Hardscape Ares Sidewalks “LF”: Approximately 458 lineal feet of concrete (Federal Building)
Approximately 269 lineal feet of concrete (Fox Street Garage)
Plaza / Loading Zone “SF: Approximately 4,900 SF total, 1,640 sq ft. is loading (Federal Building) Parking Areas: Fox Street Parking Garage Structure, approximately 96,614 square feet
Softscape Areas Vegetation: Approximately 286 square feet (Blue Fescue with blue mulch)
Irrigation Controllers: 2ea (Hunter I Core: 1 at the Chavez & 1 at the Fox St. garage) Control Valves: The are 14 Control boxes Backflow Preventers: There are 2 Backflow Preventers
Planting/Beds:
Xeriscape (Pea Gravel) “SF”: Approximately 8,009 square feet Trees: 8 (1 at playground) (Federal Building); 8 (Fox Street Garage) Planters: N/A Annual Beds: N/A
Child Care Center Playground Approximately 2,500 square feet including; rubber surface, turf, and two sand pits Playground Equipment 3 multiplayer apparatus (1 large 2 small) Playground Furniture 9 pieces
Trash Receptacles:
How Many: 4 Location: Main entry/patio/courtyard
Page | 6
Miscellaneous Exterior Art: 3 (Federal Building) Pressure Washing: Cesar E. Chavez Memorial Bldg. and Fox Street Garage Exterior
Fox Street Garage Interior Playground Equipment
Fox Street Garage Interior Pressure Washing: The Fox Street Garage is an open garage with the only smoke detectors located in the enclosed elevator lobbies on each floor. The elevator stairwell lobby located on the southwest side of the parking facility on floors 1-7 does not need to be cleaned, but does need to be included in pressure washing when done inside the garage.
Contractors need to make certain the dust and debris does not blow into any of the enclosed lobby areas on each floor (1-7). Dust and/or debris will activate the fire alarm system by triggering the smoke device(s). The garage does not have an exhaust fan system on floors 2-7.
There's an exhaust fan on the ground level and GSA could have their O&M contractor have it run over the scheduled time of cleaning. The garage does have a full suppression and sprinkler system on the ground level and a water curtain suppression and sprinkler system wall on the upper levels (East side). As long as contractors are not parking their Hotsy or equivalent pressure washing machine directly under the sprinkler heads, the fire system should not be impacted. It is recommended that contractors or subcontractors do not park on the ground level.
Their hose should reach from the level above to pressure wash the ground level. Previous times contractors had the garage pressure washed the system was not taken offline. After hours and the weekend there will be a few tenants accessing the garage; however, the traffic is usually minimal.
In the event, a contractor would like to take the fire alarm system offline, as an added precaution, it could result in a charge to the contractor and could be coordinated directly through GSA’s O&M contractor including the designated GSA Building Manager.
The contractor shall submit a pressure washing plan and schedule to the designated GSA COR and GSA Building Manager for approval and prior to beginning any pressure washing activities.
Typically, pressure washing is needed semiannually or as needed to clean the exterior of both buildings up to the height specified in the performance work statement (eight feet) to get rid of dirt spider etc.
Page | 7
Page | 8
U.S. Customs House
Building Operating Hours: 0630 - 1800
Hardscape Ares Sidewalks “LF”: 1456 Parking Areas: 19,300
Softscape Areas Vegetation: Turf, trees and in-ground plants Lawn “SF”: 19,852
Irrigation Controllers: #1 Orbit #2 Rain Bird Control Valves: 10ea Rainbird and Hunter Backflow Preventers: Back Flow #1 Model # LF825Y S/N J 009195
Back Flow #2 Model # 825Y S/N J 034024 Back Flow #3 Model # 825YS/N J 033340
Planting/Beds Xeriscape: 100sf Trees: 32 Planters: 4 Annual Beds: 2
Child Care Center Playground 3,002sf including two sand pits 160 sf Playground Equipment: Two multiplay apparatus
Playground Furniture
Trash Receptacles:
How Many: 1 Location: Main Entry
Page | 9
Pressure Washing: Courtyard Surface Parking Lot
Playground Equipment
Page | 10
22nd & Stout Parking Lot
Hardscape Ares Sidewalks “LF”: 375 Parking Areas: 31,250sf
Softscape Areas NA
Irrigation NA
Planting/Beds Trees: 6
Trash Receptacles:
How Many: 0 Location:
Page | 11
California Street Garage
Hardscape Ares Sidewalks “LF”: 318 Parking Areas: 0
Softscape Areas NA
Irrigation NA
Planting/Beds NA
Trash Receptacles:
How Many: 1 Location: Lobby
Page | 12
Welton Street Garage
Building Operating Hours:
Hardscape Ares Sidewalks “LF”: 300 Parking Areas: None
Softscape Areas Vegetation: 0 Lawn “SF”: 0
Irrigation Controllers: 0 Control Valves: 0 Backflow Preventers: 0
Planting/Beds Xeriscape: 0 Trees: 0 Planters: 0 Annual Beds: 0
Trash Receptacles:
How Many: 0 Location:
Page | 13
David Skaggs Research Center
Building Operating Hours: 6:00 am - 6:00 PM M-F
Hardscape Ares Sidewalks “LF”: 83,817 SF Concrete Parking Areas: 287,103 SF Asphalt
Softscape Areas Vegetation: 137, 000 SF Lawn “SF”: 14, 408 SF
Irrigation Controllers: 2 Control Valves: 2 Backflow Preventers: 1
Planting/Beds Xeriscape: 57,824 SF Trees: 50 Planters: 25 Annual Beds: 5
Trash Receptacles:
How Many: 2 Location: One at the main entry stairway and
One along the bike path on the East side of the building.
Miscellaneous - Storm water drainage control is very important on this site.
● Water is accessed through a drainage ditch on the east side of the property, flow is controlled by the Anderson Ditch Company.
● An Irrigation pump draws from the ditch and is the primary source for distributing water on the site.
● There are multiple Swales and drainage areas on the perimeter of the property that are important to keep clear of overgrowth of wild trees, and bushes etc.
Page | 14
Page | 15