Attachment E- Price-Cost Schedule.xlsx
XLSX spreadsheet 15 KB Posted
- Solicitation number
- 70FBR626R00000016
- Issued by
-
Federal Emergency Management Agency
About this file
This is a Price-Cost Schedule template for FEMA Region 6's Ground Level HVAC and Roof Replacement project (RFP 70FBR626R00000016). The schedule establishes a firm-fixed-price structure for construction services at the Federal Regional Center (FRC) located at 800 N. Loop 288, Denton, Texas 76209.
The pricing template itemizes seven cost categories: Materials/Parts (covering premium roof membrane in PVC/TPO for 3,000 square feet, insulation, drains, two HVAC units, ductwork, electrical systems, and personal protective equipment); Labor (demolition, installation, cleanup, integration, and inspections); Supervision/Foreman (on-site project management, coordination, and oversight); Safety & Environmental (OSHA/EPA compliance, hazardous materials reporting, PPE, waste disposal, and recycling); Miscellaneous (permits and minor design changes); Market Adjustment (3 percent for inflation, supply chain, and labor cost increases); and Administrative Cost (contingency, bonding, overhead, and profit). All line items are listed as single units with the template showing placeholder values of $0.00, with space provided for contractors to enter estimated unit costs and calculate the total firm-fixed price. Offerors must complete this schedule and submit it as part of their proposal package to Everett Mathis at everett.mathis@fema.dhs.gov.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| RFP- 70FBR626R00000016- | ||||||
| Component: FRC Ground Level Hvac and Roof Replacement | Prepared by: | |||||
| Program/Project Title: FRC Ground Level Hvac and Roof Replacement | Phone Number/Email: | |||||
| Item Description | Part Number/ ID Number | Quantity | Unit of Issue* | Estimated Unit Cost* | Price Per Line Item | |
| Material/Parts - Premium roof membrane (PVC/TPO, 3,000 sq | ||||||
| ft), insulation, drains, 2 HVAC units, ductwork, electrical, PPE, | 1 | each | ||||
| Labor (Demolition, installation, cleanup, integration, | ||||||
| inspections) | 1 | each | ||||
| Supervision/Foreman (On-site project management, | ||||||
| coordination, oversight) | 1 | each | ||||
| Safety & Environmental (OSHA/EPA compliance, hazardous | ||||||
| materials reporting, PPE, waste disposal, recycling) | 1 | each | ||||
| Miscellaneous (Permits, minor design changes) | 1 | each | ||||
| Market Adjustment 3% (Inflation, supply chain, labor cost | ||||||
| increases) | 1 | each | ||||
| Administrative cost (contingency,Bond, Overhead, Profit) | 1 | each |
| $0.00 | |
| $0.00 | |
| Estimated Total Firm Fixed Price | $0.00 |
*BOX, CARTON, CASE, DOZEN, DRUM, EACH, GALLON, ETC,..