Attachment E - Figures.pdf

PDF 692 KB Posted

Attached to
Refrigerant - Virgin (unused) 1, 1, 1, 2 Tetrafluoroethane (R-134a)
Solicitation number
80LARC905745Q
Issued by

About this file

This document is an attachment (Figures) related to a NASA Langley Research Center solicitation for refrigerant procurement. The image depicts NASA Langley's 134a tank with liquid and vapor line hook-up points, which feature spring-loaded check valves to prevent contamination and maintain pressure balance as specified in the Statement of Work (SOW). The figure illustrates the technical configuration of the tank's connection points, showing white piping, valves, and a yellow protective post, which provides context for the technical requirements of the refrigerant procurement solicitation.

View the file

Other files

File Type Posted
Attachment A - SF1449 Amendment 1.pdf PDF
Amendment 00001.pdf PDF
Attachment C - Provisions.pdf PDF
Attachment A - SF1449 Sample.pdf PDF
Attachment B - SOW.pdf PDF
Attachment D - Terms and Conditions.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

80LARC905745Q

FIGURES

F1. NASA Langley’s 134a tank has liquid and vapor line hook up points that are sized the same. Both line connections have spring loaded check valves in them that open when the lines are hooked up so that contamination would be highly unlikely. Utilizing both hook ups is necessary to maintain a pressure balance as per the SOW.

Q2. We are interested in bidding in the above-mentioned solicitation. Please provide the winner of the last solicitation and the award price.

File details come from the government source that posted it. Updated .