Attachment_DRAFT Statement of Requirements (SOR).pdf
PDF 137 KB Posted
- Solicitation number
- F2X3B56188AW01
About this file
This is a Draft Statement of Requirements for a SmartNet Access Control System project at a USAF facility.
The project scope requires the contractor to mobilize to the facility and deliver a fully operational and integrated security solution. Key deliverables include removal and disposal of existing SmartNet access control and video surveillance equipment; upgrade and replacement of access control panels, interface modules, and readers; installation of new IP-based SmartNet surveillance cameras and supporting infrastructure; installation, termination, testing, and labeling of network and low-voltage cabling per TIA/EIA and government standards; configuration and programming of access control and video management software; integration of field devices into enterprise platforms; functional testing and commissioning of all components; delivery of as-built drawings, system documentation, and operations manuals; and end-user training and system turnover. The contractor must provide all tools, consumables, lift rentals, ladder rentals, and miscellaneous installation materials. Services include labor for installation, configuration, testing, and training; travel to and from the USAF facility; and documentation and closeout.
The period of performance is 120 calendar days after award, with normal working hours from 7:00 AM to 5:00 PM, Monday through Friday, excluding government holidays. Technical specifications require FIPS 201 approved, NIST SP 800-116 compliant access control software; compatible readers; and NDAA compliant cameras at 4K resolution. All work must comply with Department of Labor and OSHA requirements, Air Force Occupational Safety and Health (AFOSH) standards including 91-25, and applicable electrical and electronic installation standards. The contractor is responsible for site maintenance, daily cleaning, debris removal, and leaving the work site in clean condition. The government will provide utilities and emergency, fire, and security police response. Final inspection will test all CAC readers and cameras for functionality, integration, and image quality, with all discrepancies corrected prior to final payment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Intent to Sole Source_SMARTNET ACS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
***DRAFT***
Statement of Requirements
SmartNet Access Control System
PROJECT SCOPE: The Contractor shall mobilize to the facility and coordinate all activities with the designated Government representatives, security personnel, and facility management staff. The Contractor shall perform all work required to deliver a fully operational and integrated security solution.
PROJECT DESCRIPTION:
• Removal and disposal of existing SmartNet Access Control System (ACS) and video surveillance equipment as required.
• Upgrade and replacement of SmartNet access control panels, interface modules, readers, and associated field devices
• Installation of new IP-based SmartNet surveillance cameras and supporting infrastructure
• Installation, termination, testing, and labeling of all network and low-voltage cabling in accordance with TIA/EIA and applicable Government standards.
• Configuration and programming of all SmartNet access control and video management software.
• Integration of all SmartNet field devices into the enterprise Access Control and Video Management platforms.
• Functional testing, commissioning, and validation of all SmartNet system components.
• Delivery of as-built drawings, system documentation, and operations manuals.
• Conduct SmartNet end-user training and system turnover.
The contractor will provide and be responsible for all necessary tools and consumables to include lift rentals and ladder rentals for safe working at heights along with incidentals and instrument box for miscellaneous installation materials
Services to include:
• Labor for installation, configuration, testing, and training
• Travel to and from the USAF facility
• Documentation and closeout
PERIOD OF PERFORMANCE: 120 calendar days for Project to be complete after award
HOURS OF WORK: Normal duty hours are from 7:00 Am to 5:00 PM, Monday thru Friday, except on government holidays.
INSPECTION AND ACCEPTANCE: Final inspection will involve testing all CAC readers and cameras for proper functionality, integration into existing systems, and image quality. All discrepancies identified during inspections shall be corrected prior to final payment.
SPECIFICATIONS: The contractor must use FIPS 201 approved, NIST SP 800-116 complaint access control software along with readers and NDAA compliant cameras at a resolution of 4K.
SAFETY: All Contractor operations shall be conducted and performed in accordance with
Department of Labor, OSHA requirements must be met and Air Force Occupational Safety
& Health (AFOSH) AFOSH standards including 91-25. The Contractor shall also ensure that all work is performed in accordance with project identified national standards, military manuals, instructions, pamphlets, standards, and handbooks. The contractor must comply with standards applicable to electrical and electronic installations. All work must meet relevant safety codes and be inspected for compliance.
SITE MAINTENANCE: The Contractor shall protect adjacent property, buildings and their contents from dust, dirt or other materials. Work areas shall be maintained in a neat, clean, and safe condition and shall, at a minimum, be cleaned at the end of each shift. All streets and roadways in/or adjacent to the site shall always remain free of project generated trash and debris.
GOVERNMENT FURNISHED SERVICES: The government will provide utilities (water and electricity) and emergency, fire, and security police response.
TRAFFIC REGULATIONS: Contractor employees shall comply with all base traffic regulations and are subject to random vehicle speed control checks. Contractor's personnel cited for speeding on the installation may suffer loss of base driving privileges, debarment from the base, or other administrative action. The use of cell phones, except hands-free phones, is prohibited while driving on military installations.
DAILY CLEANING: The Contractor shall always keep the site free from debris and shall perform daily cleaning of all areas. The Contractor shall collect all trash, debris, refuse, garbage, etc., that is generated and place it in appropriate containers with lids or approved covers on a periodic basis. The materials shall be hauled from the site by appropriate means daily, unless otherwise approved by the designated Planning Technician. Disposal shall be outside the limits of Government property. Disposal shall be by sanitary landfill or other approved methods and shall conform to all local, state, and federal guidelines, criteria, and regulations. Upon completion of the work, the Contractor shall leave the work site and storage area(s) in a clean, neat, and workmanlike condition satisfactory to the Structural